An automatic bobbin changing control system and method based on artificial intelligence

By using an AI-based automatic yarn changing control system, production equipment data is collected and analyzed in real time. The reversing speed is adjusted using a neural network model, which solves the problem of unstable yarn tension, achieves stability and accuracy in the yarn reversing process, and improves production efficiency and product quality.

CN119774373BActive Publication Date: 2026-11-20YANCHENG RONGYILAI TEXTILE MASCH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202510020050.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-01-07
Publication Date
2026-11-20
Estimated Expiration
2045-01-07

AI Technical Summary

Technical Problem

Existing automatic yarn changing control systems lack precise control over the turning speed during yarn turning, resulting in unstable yarn tension. This can easily lead to problems such as yarn breakage, loosening, and equipment jamming, affecting production efficiency and product quality.

Method used

An AI-based automatic bobbin changing control system is adopted. The system collects the operation records of the production equipment in real time through sensing devices, establishes a neural network model, calculates the bobbin changing preparation time, and adjusts the turning speed in real time to keep the yarn tension within the target range. The turning speed is dynamically adjusted using the tension error value.

Benefits of technology

It achieves stability and precision in the yarn flipping process, avoids yarn breakage and equipment jamming, improves production efficiency and product quality, reduces manual intervention, and enhances the automation and precision of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119774373B_ABST
    Figure CN119774373B_ABST
Patent Text Reader

Abstract

The application discloses an automatic bobbin changing control system and method based on artificial intelligence, and belongs to the technical field of artificial intelligence. The application comprises the following steps: collecting and storing the operation records of production equipment; obtaining a first record set and a second record set; calculating the average time interval of bobbin changing at different production rotating speeds and the target tension during bobbin changing; establishing a neural network model and training, calculating the bobbin changing timing value, and starting bobbin changing; obtaining the real-time yarn tension and real-time reversing rotating speed during bobbin changing, calculating the tension error value during bobbin changing, and adjusting the real-time reversing rotating speed during bobbin changing. The application not only effectively avoids problems such as yarn breakage, loosening and equipment jamming caused by excessive or insufficient tension, thereby improving production efficiency and product quality, but also ensures the stability and safety of the bobbin changing process, further improves the continuous operation capacity of the production line and the service life of the equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of artificial intelligence technology, specifically an automatic drum changing control system and method based on artificial intelligence. Background Technology

[0002] With the development of mechatronics technology, the automation level of textile production has also been improved. Modern warping machines process more yarn heads and produce at a faster speed, resulting in more frequent yarn bobbin changes. Shortening the downtime for bobbin changes is of great significance for improving production efficiency.

[0003] While existing automatic bobbin changing control systems can automate the bobbin changing process from manual to automated, reducing labor intensity and shortening changing time, they lack control over the tumbling speed during the process. If the tumbling device controls the bobbin to tumble too quickly, it can lead to excessive tension, or if the tumbling speed is too slow, it can lead to insufficient tension, resulting in problems such as yarn breakage, yarn loosening, and equipment jamming. This not only affects product quality but also causes production line downtime, reduces production efficiency, and shortens the service life of the equipment.

[0004] Therefore, there is an urgent need for an automatic drum-changing control system based on artificial intelligence to solve the above problems. Summary of the Invention

[0005] The purpose of this invention is to provide an automatic drum changing control system based on artificial intelligence to solve the problems mentioned in the background art.

[0006] To solve the above-mentioned technical problems, the present invention provides the following technical solution:

[0007] An automatic drum-changing control method based on artificial intelligence, the method comprising the following steps:

[0008] S1. Set up sensing devices to collect and store the operation records of the production equipment; filter the operation records to obtain a first set of records and a second set of records;

[0009] S2. Using the first set of records, calculate the average time interval between drum changes at different production speeds; using the second set of records, calculate the target tension during the drum change process.

[0010] S3. Establish a neural network model, train the neural network model by combining the average time interval of drum changing at different production speeds, calculate the drum changing preparation time; extract the operation records after the drum changing preparation time, calculate the drum changing timing value, and start drum changing.

[0011] S4. Obtain the real-time yarn tension and real-time tumbling speed during the bobbin changing process. Combined with the target tension during the bobbin changing process, calculate the tension error value during the bobbin changing process and adjust the real-time tumbling speed during the bobbin changing process.

[0012] According to the above technical solution, step S1 includes the following:

[0013] S1-1. Install a sensor on the production equipment. Each time the sensor collects data, it generates an operation record of the production equipment and stores it in the database. The operation record includes yarn tension, production speed, bobbin changing time and tumbling speed.

[0014] Tension sensors installed in the yarn channel, typically based on strain gauges, fiber optic sensing technology, or electromagnetic force principles, measure yarn tension in real time. Production speed refers to the rotational speed of the spool in the warping machine, which winds the yarn evenly onto the spool. The spool speed is usually related to the production speed (length wound per minute). The bobbin change time refers to the activation time of the corresponding tumbling device during the bobbin change process. Tumbling speed refers to the rotational speed at which the tumbling device performs the tumbling operation during the bobbin change. If the operation record is during a bobbin change, the bobbin change time corresponding to the operation record is the activation time of the most recent tumbling device, and the tumbling speed corresponding to the operation record is the real-time tumbling speed. If the operation record is not during a bobbin change, the bobbin change time corresponding to the operation record is the activation time of the most recent tumbling device, and the tumbling speed corresponding to the operation record is the tumbling speed at the activation time of the most recent tumbling device.

[0015] S1-2. Based on the production speed, extract all operation records with the same production speed, mark the extracted operation records with the same production speed, associate each operation record with the corresponding production speed, count all marked operation records, and form the first record set;

[0016] S1-3. Based on the yarn tension, calculate the average yarn tension corresponding to all running records, denoted as A. If the yarn tension corresponding to a certain running record is less than or equal to (1+α)×A and the yarn tension corresponding to that running record is greater than or equal to (1-α)×A, then select that running record as a running record in the second record set, where α represents the tension screening parameter. Screen all running records to form the second record set.

[0017] According to the above technical solution, step S2 includes the following:

[0018] S2-1. Select the running records with the same production speed from the first record set to form a filtered record set; sort each running record in the filtered record set from front to back according to the drum change time, calculate the time interval between the drum change times of adjacent running records after sorting, and calculate the average and standard deviation of all time intervals.

[0019] Let B1 be the time interval between the drum change times corresponding to a set of adjacent operation records; let B2 be the average of all time intervals; let B3 be the standard deviation of all time intervals; if B1 satisfies B2-β×B3≤B1≤B2-β×B3, then the time interval between the drum change times corresponding to the set of adjacent operation records is retained; if B1 does not satisfy B2-β×B3≤B1≤B2-β×B3, then the time interval between the drum change times corresponding to the set of adjacent operation records is removed; where β represents the time filtering parameter.

[0020] Used to remove abnormal time intervals and improve accuracy, such as the time interval between the drum change times corresponding to adjacent operation records being zero between adjacent operation records, or the time interval between the drum change times corresponding to adjacent operation records being very large, etc.

[0021] Calculate the average time interval retained in the filtered record set, and use it as the average time interval for changing drums at the corresponding production speed;

[0022] S2-2. Calculate the average yarn tension corresponding to each running record in the second record set, and use it as the target tension during the bobbin changing process.

[0023] According to the above technical solution, step S3 includes the following:

[0024] S3-1. Establish a neural network model, take different production speeds as inputs, and take the average time interval between drum changes at different production speeds as outputs, and train the neural network model.

[0025] The current time is used to filter the operation records to select real-time operation records; the production speed corresponding to the real-time operation record is input into the trained neural network model; the average time interval of the drum change corresponding to the production speed output by the trained neural network model is added to the drum change time corresponding to the real-time operation record to obtain the current drum change preparation time.

[0026] S3-2. Extract the operation records after the bobbin changing preparation time. Use the formula: C=γ1×C1+γ2×C2 to calculate the bobbin changing timing value corresponding to a certain operation record after the bobbin changing preparation time. Where C represents the bobbin changing timing value corresponding to a certain operation record after the bobbin changing preparation time, C1 represents the yarn tension corresponding to a certain operation record after the bobbin changing preparation time, C2 represents the production speed corresponding to a certain operation record after the bobbin changing preparation time, γ1 represents the weighting parameter of yarn tension, and γ2 represents the weighting parameter of production speed.

[0027] When the timing value of a certain operation record after the preparation time for changing the drum is greater than or equal to the first threshold, the drum changing begins and the drum changing time is recorded.

[0028] "Starting to change the drum" means that the corresponding flipping device starts to flip when changing the drum.

[0029] According to the above technical solution, step S4 includes the following:

[0030] S4-1. Using sensing devices, acquire the real-time yarn tension and real-time rotation speed during the bobbin changing process; denot the real-time yarn tension during the bobbin changing process as D; denot the target tension during the bobbin changing process as D0. target ;Use the formula; ΔD=DD target Calculate the tension error value during the sleeve changing process, where ΔD represents the tension error value during the sleeve changing process;

[0031] S4-1. The absolute value of the tension error during the cylinder changing process is denoted as |ΔD|.

[0032] When |ΔD| is less than or equal to the second threshold, maintain the real-time reversing speed during the drum changing process;

[0033] When |ΔD| is greater than the second threshold, the real-time rotation speed during the drum changing process is adjusted. The specific adjustment process is as follows:

[0034] Adjust the real-time rotation speed during the drum changing process to E. after =E before ×(1-δ×ΔD), where E after E represents the adjusted real-time reversing speed. before The value indicates the real-time rotation speed before adjustment, and δ represents the adjustment parameter. This ensures that the tension during the bobbin changing process remains within a reasonable range, thereby improving the stability and accuracy of bobbin changing and effectively avoiding problems such as yarn breakage, loosening, and equipment jamming caused by excessive or insufficient tension, thus improving production efficiency and product quality.

[0035] An automatic drum changing control system based on artificial intelligence, the system includes a data acquisition and screening module, a calculation module, a drum changing judgment module and a drum changing control module;

[0036] The data acquisition and filtering module is used to collect real-time operating records of the production equipment through sensing devices, including yarn tension, production speed, bobbin changing time, and tumbling speed, and store them in a database. The data is then filtered to form a first record set and a second record set. The calculation module is used to calculate the average bobbin changing time interval under different production speeds using the first record set, and to calculate the target tension during the bobbin changing process using the second record set. The bobbin changing judgment module is used to obtain the relationship between production speed and the bobbin changing time interval through a neural network model, and to calculate the bobbin changing timing value from the operating records to determine the start of the bobbin changing process. The bobbin changing control module is used to monitor the real-time yarn tension and real-time tumbling speed during the bobbin changing process, and to adjust the tumbling speed in real-time by calculating the tension error value to achieve bobbin changing control.

[0037] According to the above technical solution, the data acquisition and filtering module includes a data acquisition unit and a data filtering unit;

[0038] The data acquisition unit is used to continuously monitor the production equipment through sensing devices, collect the operating data of the production equipment in real time, and record and store the operating data in the database; the data filtering unit is used to filter and classify the collected operating records, and filter out the data that meets the requirements through production speed and yarn tension to form a first record set and a second record set.

[0039] According to the above technical solution, the calculation module includes a time calculation unit and a tension calculation unit;

[0040] The time calculation unit is used to calculate the time interval between the bobbin changing times by analyzing the first set of records after screening, and to statistically generate the average value and standard deviation, and retain the time interval data that meets the conditions; the tension calculation unit is used to perform statistical analysis on the yarn tension in the second set of records after screening, and to calculate the target tension during the bobbin changing process.

[0041] According to the above technical solution, the cylinder replacement judgment module includes a training unit and a timing judgment unit;

[0042] The training unit is used to train the neural network model to learn the time interval relationship of drum changing under different production speeds. After training, it outputs the corresponding drum changing preparation time according to the real-time production speed. The timing judgment unit is used to calculate the drum changing timing value through real-time data, judge the drum changing start timing and record the drum changing time.

[0043] According to the above technical solution, the drum changing control module includes an error calculation unit and a speed adjustment unit;

[0044] The error calculation unit is used to calculate the real-time tension error during the drum changing process. By comparing the difference between the real-time tension and the target tension, a tension error value is generated. The speed adjustment unit is used to adjust the tumbling speed during the drum changing process according to the calculated tension error value.

[0045] Compared with the prior art, the beneficial effects achieved by the present invention are:

[0046] This invention utilizes artificial intelligence technology to achieve intelligent control in the automatic bobbin changing process, solving the problem of insufficient control over yarn tension and tumbling speed in traditional bobbin changing systems. By collecting and analyzing real-time operating data from production equipment, the timing of bobbin changing and the tumbling speed are dynamically adjusted according to different production speeds. This effectively avoids problems such as yarn breakage, loosening, and equipment jamming caused by excessive or insufficient tension, thereby improving production efficiency and product quality. Furthermore, compared to traditional automatic bobbin changing control systems, this invention optimizes the timing judgment of the bobbin changing process through a neural network model and ensures that the tension remains within the target range during the bobbin changing process by real-time monitoring and adjustment of the tumbling speed. This reduces manual intervention and improves the automation and accuracy of the system. In addition, by precisely controlling the adjustment of the tumbling speed, this invention ensures the stability and safety of the bobbin changing process, further enhancing the continuous operation capability of the production line and the service life of the equipment. Attached Figure Description

[0047] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used in conjunction with embodiments of the invention to explain the invention and do not constitute a limitation thereof. In the drawings:

[0048] Figure 1 This is a flowchart illustrating an automatic drum-changing control method based on artificial intelligence according to the present invention.

[0049] Figure 2 This is a schematic diagram of the structure of an automatic drum changing control system based on artificial intelligence according to the present invention. Detailed Implementation

[0050] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by visitors of ordinary skill in the art without creative effort are within the scope of protection of the present invention.

[0051] Please see Figure 1 The present invention provides the following technical solution:

[0052] An automatic drum-changing control method based on artificial intelligence, the method includes the following steps:

[0053] S1. Set up sensing devices to collect and store the operation records of the production equipment; filter the operation records to obtain a first set of records and a second set of records;

[0054] According to the above technical solution, step S1 includes the following:

[0055] S1-1. Install a sensor on the production equipment. Each time the sensor collects data, it generates an operation record of the production equipment and stores it in the database. The operation record includes yarn tension, production speed, bobbin changing time and tumbling speed.

[0056] Tension sensors installed in the yarn channel, typically based on strain gauges, fiber optic sensing technology, or electromagnetic force principles, measure yarn tension in real time. Production speed refers to the rotational speed of the spool in the warping machine, which winds the yarn evenly onto the spool. The spool speed is usually related to the production speed (length wound per minute). The bobbin change time refers to the activation time of the corresponding tumbling device during the bobbin change process. Tumbling speed refers to the rotational speed at which the tumbling device performs the tumbling operation during the bobbin change. If the operation record is during a bobbin change, the bobbin change time corresponding to the operation record is the activation time of the most recent tumbling device, and the tumbling speed corresponding to the operation record is the real-time tumbling speed. If the operation record is not during a bobbin change, the bobbin change time corresponding to the operation record is the activation time of the most recent tumbling device, and the tumbling speed corresponding to the operation record is the tumbling speed at the activation time of the most recent tumbling device.

[0057] S1-2. Based on the production speed, extract all operation records with the same production speed, mark the extracted operation records with the same production speed, associate each operation record with the corresponding production speed, count all marked operation records, and form the first record set;

[0058] S1-3. Based on the yarn tension, calculate the average yarn tension corresponding to all running records, denoted as A. If the yarn tension corresponding to a certain running record is less than or equal to (1+α)×A and the yarn tension corresponding to that running record is greater than or equal to (1-α)×A, then select that running record as a running record in the second record set, where α represents the tension screening parameter. Screen all running records to form the second record set.

[0059] S2. Using the first set of records, calculate the average time interval between drum changes at different production speeds; using the second set of records, calculate the target tension during the drum change process.

[0060] According to the above technical solution, step S2 includes the following:

[0061] S2-1. Select the running records with the same production speed from the first record set to form a filtered record set; sort each running record in the filtered record set from front to back according to the drum change time, calculate the time interval between the drum change times of adjacent running records after sorting, and calculate the average and standard deviation of all time intervals.

[0062] Let B1 be the time interval between the drum change times corresponding to a group of adjacent operation records; let B2 be the average of all time intervals; let B3 be the standard deviation of all time intervals; if B1 satisfies B2-β×B3≤B1≤B2-β×B3, then the time interval between the drum change times corresponding to the group of adjacent operation records is retained; if B1 does not satisfy B2-β×B3≤B1≤B2-β×B3, then the time interval between the drum change times corresponding to the group of adjacent operation records is removed; where β represents the time filtering parameter.

[0063] Used to remove abnormal time intervals and improve accuracy, such as the time interval between the drum change times corresponding to adjacent operation records being zero between adjacent operation records, or the time interval between the drum change times corresponding to adjacent operation records being very large, etc.

[0064] Calculate the average time interval retained in the filtered record set, and use it as the average time interval for changing drums at the corresponding production speed;

[0065] S2-2. Calculate the average yarn tension corresponding to each running record in the second record set, and use it as the target tension during the bobbin changing process.

[0066] S3. Establish a neural network model, train the neural network model by combining the average time interval of drum changing at different production speeds, calculate the drum changing preparation time; extract the operation records after the drum changing preparation time, calculate the drum changing timing value, and start drum changing.

[0067] According to the above technical solution, step S3 includes the following:

[0068] S3-1. Establish a neural network model, take different production speeds as inputs, and take the average time interval of drum changing at different production speeds as outputs, and train the neural network model.

[0069] The current time is used to filter the operation records to select real-time operation records; the production speed corresponding to the real-time operation record is input into the trained neural network model; the average time interval of the drum change corresponding to the production speed output by the trained neural network model is added to the drum change time corresponding to the real-time operation record to obtain the current drum change preparation time.

[0070] S3-2. Extract the operation records after the bobbin changing preparation time. Use the formula: C=γ1×C1+γ2×C2 to calculate the bobbin changing timing value corresponding to a certain operation record after the bobbin changing preparation time. Where C represents the bobbin changing timing value corresponding to a certain operation record after the bobbin changing preparation time, C1 represents the yarn tension corresponding to a certain operation record after the bobbin changing preparation time, C2 represents the production speed corresponding to a certain operation record after the bobbin changing preparation time, γ1 represents the weighting parameter of yarn tension, and γ2 represents the weighting parameter of production speed.

[0071] When the timing value of a certain operation record after the preparation time for changing the drum is greater than or equal to the first threshold, the drum changing begins and the drum changing time is recorded.

[0072] "Starting to change the drum" means that the corresponding flipping device starts to flip when changing the drum.

[0073] S4. Obtain the real-time yarn tension and real-time tumbling speed during the bobbin changing process. Combined with the target tension during the bobbin changing process, calculate the tension error value during the bobbin changing process and adjust the real-time tumbling speed during the bobbin changing process.

[0074] According to the above technical solution, step S4 includes the following:

[0075] S4-1. Using sensing devices, acquire the real-time yarn tension and real-time rotation speed during the bobbin changing process; denot the real-time yarn tension during the bobbin changing process as D; denot the target tension during the bobbin changing process as D0. target ;Use the formula; ΔD=DD target Calculate the tension error value during the sleeve changing process, where ΔD represents the tension error value during the sleeve changing process;

[0076] S4-1. The absolute value of the tension error during the cylinder changing process is denoted as |ΔD|.

[0077] When |ΔD| is less than or equal to the second threshold, maintain the real-time reversing speed during the drum changing process;

[0078] When |ΔD| is greater than the second threshold, the real-time rotation speed during the drum changing process is adjusted. The specific adjustment process is as follows:

[0079] Adjust the real-time rotation speed during the drum changing process to E. after =E before ×(1-δ×ΔD), where E after E represents the adjusted real-time reversing speed. before This indicates the real-time rotational speed before adjustment, and δ represents the adjustment parameter.

[0080] For example:

[0081] During a certain production run, the real-time yarn tension D = 55 during the bobbin changing process; the target tension D during the bobbin changing process... target =50; second threshold is 3; adjust parameter δ = 0.02; real-time flip speed is 200;

[0082] Use the formula; ΔD=DD target =5, calculate the tension error value during the drum changing process; the absolute value of the tension error value during the drum changing process |ΔD| = 5;

[0083] If |ΔD| = 5, which is greater than the second threshold of 3, the real-time rotation speed during the drum changing process is adjusted. The specific adjustment process is as follows:

[0084] Adjust the real-time rotation speed during the drum changing process to E. after =E before ×(1-δ×ΔD)=200×

[0085] (1-0.02×5)=180, where E before The real-time rotation speed, i.e., E before =200;

[0086] Ensuring that the tension is kept within a reasonable range during the bobbin changing process improves the stability and accuracy of bobbin changing, effectively avoiding problems such as yarn breakage, loosening, and equipment jamming caused by excessive or insufficient tension, thereby improving production efficiency and product quality.

[0087] Please see Figure 2 An automatic drum changing control system based on artificial intelligence, the system includes a data acquisition and screening module, a calculation module, a drum changing judgment module and a drum changing control module;

[0088] The data acquisition and filtering module is used to collect real-time operating records of the production equipment through sensing devices, including yarn tension, production speed, bobbin changing time, and tumbling speed, and store them in a database. The data is then filtered to form a first record set and a second record set. The calculation module is used to calculate the average bobbin changing time interval under different production speeds using the first record set, and to calculate the target tension during the bobbin changing process using the second record set. The bobbin changing judgment module is used to obtain the relationship between production speed and the bobbin changing time interval through a neural network model, and to calculate the bobbin changing timing value from the operating records to determine the start of the bobbin changing process. The bobbin changing control module is used to monitor the real-time yarn tension and real-time tumbling speed during the bobbin changing process, and to adjust the tumbling speed in real-time by calculating the tension error value to achieve bobbin changing control.

[0089] According to the above technical solution, the data acquisition and filtering module includes a data acquisition unit and a data filtering unit;

[0090] The data acquisition unit is used to continuously monitor the production equipment through sensing devices, collect the operating data of the production equipment in real time, and record and store the operating data in the database; the data filtering unit is used to filter and classify the collected operating records, and filter out the data that meets the requirements through production speed and yarn tension to form a first record set and a second record set.

[0091] According to the above technical solution, the calculation module includes a time calculation unit and a tension calculation unit;

[0092] The time calculation unit is used to calculate the time interval between the bobbin changing times by analyzing the first set of records after screening, and to statistically generate the average value and standard deviation, and retain the time interval data that meets the conditions; the tension calculation unit is used to perform statistical analysis on the yarn tension in the second set of records after screening, and to calculate the target tension during the bobbin changing process.

[0093] According to the above technical solution, the cylinder replacement judgment module includes a training unit and a timing judgment unit;

[0094] The training unit is used to train the neural network model to learn the time interval relationship of drum changing under different production speeds. After training, it outputs the corresponding drum changing preparation time according to the real-time production speed. The timing judgment unit is used to calculate the drum changing timing value through real-time data, judge the drum changing start timing and record the drum changing time.

[0095] According to the above technical solution, the drum changing control module includes an error calculation unit and a speed adjustment unit;

[0096] The error calculation unit is used to calculate the real-time tension error during the drum changing process. By comparing the difference between the real-time tension and the target tension, a tension error value is generated. The speed adjustment unit is used to adjust the tumbling speed during the drum changing process according to the calculated tension error value.

[0097] It should be noted that, in this document, relational terms such as "first" and "second" are used merely to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention and are not intended to limit the invention. Although the invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. An automatic drum-changing control method based on artificial intelligence, characterized in that: The method includes the following steps: S1. Set up sensing devices to collect and store the operation records of the production equipment; filter the operation records to obtain a first set of records and a second set of records; Step S1 includes the following: S1-1. Install a sensor on the production equipment. Each time the sensor collects data, it generates an operation record of the production equipment and stores it in the database. The operation record includes yarn tension, production speed, bobbin changing time and tumbling speed. S1-2. Based on the production speed, extract all operation records with the same production speed, mark the extracted operation records with the same production speed, associate each operation record with the corresponding production speed, count all marked operation records, and form the first record set; S1-3. Based on the yarn tension, calculate the average yarn tension corresponding to all running records, denoted as A; if the yarn tension corresponding to a certain running record is less than or equal to (1+α)×A and greater than or equal to (1-α)×A, then select that running record as a running record in the second record set, where α represents the tension selection parameter; filter all running records to form the second record set; S2. Using the first set of records, calculate the average time interval between drum changes at different production speeds; using the second set of records, calculate the target tension during the drum change process. S3. Establish a neural network model, train the neural network model by combining the average time interval of drum changing at different production speeds, calculate the drum changing preparation time; extract the operation records after the drum changing preparation time, calculate the drum changing timing value, and start drum changing. Step S3 includes the following: S3-1. Establish a neural network model, take different production speeds as inputs, and take the average time interval between drum changes at different production speeds as outputs, and train the neural network model. The current time is used to filter the operation records to select real-time operation records; the production speed corresponding to the real-time operation record is input into the trained neural network model; the average time interval of the drum change corresponding to the production speed output by the trained neural network model is added to the drum change time corresponding to the real-time operation record to obtain the current drum change preparation time. S3-2. Extract the operation records after the bobbin changing preparation time. Use the formula: C=γ1×C1+γ2×C2 to calculate the bobbin changing timing value corresponding to a certain operation record after the bobbin changing preparation time. Where C represents the bobbin changing timing value corresponding to a certain operation record after the bobbin changing preparation time, C1 represents the yarn tension corresponding to a certain operation record after the bobbin changing preparation time, C2 represents the production speed corresponding to a certain operation record after the bobbin changing preparation time, γ1 represents the weighting parameter of yarn tension, and γ2 represents the weighting parameter of production speed. When the timing value of a certain operation record after the preparation time for changing the drum is greater than or equal to the first threshold, the drum changing begins and the drum changing time is recorded. S4. Obtain the real-time yarn tension and real-time tumbling speed during the bobbin changing process. Combined with the target tension during the bobbin changing process, calculate the tension error value during the bobbin changing process and adjust the real-time tumbling speed during the bobbin changing process.

2. The automatic drum changing control method based on artificial intelligence according to claim 1, characterized in that: Step S2 includes the following: S2-1. Select the running records with the same production speed from the first record set to form a filtered record set; sort each running record in the filtered record set from front to back according to the drum change time, calculate the time interval between the drum change times of adjacent running records after sorting, and calculate the average and standard deviation of all time intervals. The time interval between the drum switching times corresponding to a set of adjacent operation records is denoted as B1; the average of all time intervals is denoted as B2; and the standard deviation of all time intervals is denoted as B3. If B1 satisfies B2-β×B3≤B1≤B2-β×B3, then the time interval between the corresponding drum switching times of adjacent operation records in this group is retained; If B1 does not satisfy B2-β×B3≤B1≤B2-β×B3, then the time interval between the corresponding drum changing times of adjacent operation records in this group is removed; where β represents the time filtering parameter. Calculate the average time interval retained in the filtered record set, and use it as the average time interval for changing drums at the corresponding production speed; S2-2. Calculate the average value of the yarn tension corresponding to each running record in the second record set, and use it as the target tension during the bobbin changing process.

3. The automatic drum changing control method based on artificial intelligence according to claim 1, characterized in that: Step S4 includes the following: S4-1. Use sensing devices to obtain the real-time yarn tension and real-time rotation speed during the bobbin changing process; denot the real-time yarn tension during the bobbin changing process as D. The target tension during the cylinder changing process is denoted as D. target ; Using formulas; ΔD=DD target Calculate the tension error value during the sleeve changing process, where ΔD represents the tension error value during the sleeve changing process; S4-1. The absolute value of the tension error during the cylinder changing process is denoted as |ΔD|. When |ΔD| is less than or equal to the second threshold, maintain the real-time reversing speed during the drum changing process; When |ΔD| is greater than the second threshold, the real-time rotation speed during the drum changing process is adjusted. The specific adjustment process is as follows: Adjust the real-time rotation speed during the drum changing process to E. after =E before ×(1-δ×ΔD), where E after E represents the adjusted real-time reversing speed. before This indicates the real-time rotation speed before adjustment, and δ represents the adjustment parameter.

4. An artificial intelligence-based automatic drum changing control system, used to implement the artificial intelligence-based automatic drum changing control method according to any one of claims 1-3, characterized in that: The system includes a data acquisition and filtering module, a calculation module, a drum change judgment module, and a drum change control module; The data acquisition and filtering module is used to acquire real-time operating records of the production equipment through sensing devices, including yarn tension, production speed, bobbin changing time and tumbling speed, and store them in a database. The data is then filtered to form a first record set and a second record set. The calculation module is used to calculate the average time interval between bobbin changing at different production speeds using the first record set, and to calculate the target tension during the bobbin changing process using the second record set. The drum changing judgment module is used to obtain the relationship between the production speed and the drum changing time interval through a neural network model, and to calculate the drum changing timing value through the operation record to determine the start of drum changing; The yarn changing control module is used to monitor the real-time yarn tension and real-time rotation speed during the yarn changing process. By calculating the tension error value, the rotation speed is adjusted in real time to achieve yarn changing control.

5. The automatic drum changing control system based on artificial intelligence according to claim 4, characterized in that: The data acquisition and filtering module includes a data acquisition unit and a data filtering unit; The data acquisition unit is used to continuously monitor the production equipment through sensing devices, collect the operating data of the production equipment in real time, and record and store the operating data in the database. The data filtering unit is used to filter and classify the collected operation records. By filtering out the data that meets the requirements based on the production speed and yarn tension, a first record set and a second record set are formed.

6. The automatic drum changing control system based on artificial intelligence according to claim 4, characterized in that: The calculation module includes a time calculation unit and a tension calculation unit; The time calculation unit is used to calculate the time interval between the drum switching times by analyzing the first set of records after filtering, and to statistically generate the average value and standard deviation, and retain the time interval data that meet the conditions. The tension calculation unit is used to perform statistical analysis on the yarn tension in the second set of records after analysis and screening, and to calculate the target tension during the bobbin changing process.

7. The automatic drum changing control system based on artificial intelligence according to claim 4, characterized in that: The cylinder switching judgment module includes a training unit and a timing judgment unit; The training unit is used to train the neural network model to learn the time interval relationship of drum changing under different production speeds. After training, it outputs the corresponding drum changing preparation time according to the real-time production speed. The timing judgment unit is used to calculate the drum changing timing value through real-time data, judge the drum changing start timing and record the drum changing time.

8. The automatic drum changing control system based on artificial intelligence according to claim 4, characterized in that: The drum-changing control module includes an error calculation unit and a speed adjustment unit; The error calculation unit is used to calculate the real-time tension error during the cylinder changing process, and generates a tension error value by comparing the difference between the real-time tension and the target tension. The speed adjustment unit is used to adjust the tumbling speed during the drum changing process based on the calculated tension error value.

Citation Information

Patent Citations

  • Filament constant-tension control method based on optimized BP neural network

    CN112698568A

  • Cone yarn winding closed-loop control method based on package diameter prediction

    CN116692596A