Scheduling method for uwb and related products

By generating time unit bitmaps and bitmap offsets in the scheduling information, the problem of high signaling overhead in UWB applications is solved, and signaling overhead is reduced in ranging, sensing, and positioning scenarios.

CN119907113BActive Publication Date: 2026-11-24HUAWEI TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411984740.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-18
Publication Date
2026-11-24
Estimated Expiration
2042-10-18

AI Technical Summary

Technical Problem

Existing scheduling cells for UWB applications suffer from high signaling overhead, necessitating an enhanced scheduling IE design to reduce this overhead.

Method used

By generating scheduling information, including time unit bitmaps and bitmap offsets, to indicate whether a time unit is used for UWB device transmission of UWB signals and to determine the start time unit, the number of bits occupied by the time unit bitmap is reduced, thereby reducing signaling overhead.

Benefits of technology

By combining the time unit bitmap and bitmap offset, the time unit for UWB device to transmit UWB signals is accurately indicated, reducing signaling overhead. This is suitable for ranging, sensing, and positioning scenarios, and reduces signaling overhead.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119907113B_ABST
    Figure CN119907113B_ABST
Patent Text Reader

Abstract

This application discloses a scheduling method and related products for UWB. This application can be applied to UWB-based wireless personal area network (WLAN) systems, sensing systems, positioning systems, ranging systems, or communication systems. It can also be applied to next-generation Wi-Fi protocols supporting IEEE 802.11ax, such as Wi-Fi 7, 802.11be, and Wi-Fi 8, as well as other WLAN systems supporting the 802.11 series protocols. The method includes: generating scheduling information, which includes a time unit bitmap and a bitmap offset. The time unit bitmap indicates whether a time unit is used for UWB device transmission of UWB signals, and the bitmap offset determines the starting time unit for UWB device transmission of UWB signals. The time unit corresponding to the first bit of the time unit bitmap is the starting time unit; sending the scheduling information; and reducing the signaling overhead by shortening the bitmap length.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] This application is a divisional application. The original application has the application number 202211275258.3 and the original application date is October 18, 2022. The entire contents of the original application are incorporated herein by reference. Technical Field

[0002] This application relates to the field of communications, and in particular to scheduling methods and related products for UWB. Background Technology

[0003] Ultra-wideband (UWB) technology is a wireless communication and sensing ranging technology that uses nanosecond-level non-sinusoidal narrow pulses to transmit signals, thus occupying a very wide frequency spectrum. Due to its narrow pulses and extremely low radiation spectral density, UWB systems have advantages such as strong multipath resolution, low power consumption, and strong security, attracting widespread attention from the industry.

[0004] Since the U.S. Federal Communications Commission approved UWB technology for civilian use in 2002, many world-renowned companies, research institutions, and standardization organizations have actively engaged in the research, development, and standardization of ultra-wideband wireless communication technology. Among them, the Institute of Electrical and Electronics Engineers (IEEE) has incorporated UWB technology into its IEEE 802 series of wireless standards, releasing the UWB-based wireless personal area network (WPAN) standard IEEE 802.15.4a, and its evolved version IEEE 802.15.4z. Currently, the development of the next-generation UWB WPAN standard, IEEE 802.15.4ab, is also on the agenda. The IEEE 802.15.4ab standard plans to comprehensively upgrade UWB.

[0005] Scheduling information elements (IEs) for UWB applications (such as ranging, sensing, positioning, and communication) are used to schedule one or more UWB devices to implement UWB applications. Currently, existing scheduling information elements for UWB applications typically suffer from high signaling overhead. Therefore, there is a need to provide an enhanced scheduling IE design for UWB applications to reduce the signaling overhead of scheduling information elements for UWB applications. Summary of the Invention

[0006] This application discloses a scheduling method for UWB that can reduce signaling overhead.

[0007] In a first aspect, embodiments of this application provide a scheduling method for UWB, the method comprising: generating scheduling information, the scheduling information including a time unit bitmap and a bitmap offset, the time unit bitmap being used to indicate whether a time unit is used for UWB device to transmit UWB signals, the bitmap offset being used to determine the starting time unit for the UWB device to transmit UWB signals, the time unit corresponding to the first bit of the time unit bitmap being the starting time unit; and sending the scheduling information.

[0008] In this embodiment, the bitmap offset and the time unit bitmap can be used to determine whether each time unit is used for UWB device to transmit UWB signals. The bitmap offset is used to determine the starting time unit for UWB device to transmit UWB signals, which can reduce the number of bits occupied by the time unit bitmap, thereby reducing signaling overhead.

[0009] In one possible implementation, the bitmap bias is set to the number of time units preceding the starting time unit within a measurement cycle. A measurement cycle refers to the time period during which one or more UWB devices complete one or more measurement tasks. For example, the measurement can be one or more tasks such as ranging, sensing, positioning, or communication. The starting time unit is one time unit within the measurement cycle. The measurement cycle may include a control phase, a measurement phase, and a reporting phase.

[0010] In this implementation, the bitmap offset is set to the number of time units before the start time unit within a measurement cycle, so as to determine the start time unit for the UWB device to transmit UWB signals based on the value of the bitmap offset.

[0011] In one possible implementation, the bitmap bias is the number of time units preceding the starting time unit within a communication cycle. A communication cycle is the entire period for completing one or more communication tasks. The starting time unit is one time unit within the communication cycle.

[0012] In this implementation, the bitmap offset is set to the number of time units before the start time unit within a communication cycle, so as to determine the start time unit for the UWB device to transmit UWB signals based on the value of the bitmap offset.

[0013] In one possible implementation, the time unit bitmap includes K bits, where K is an integer greater than 0. When one of the K bits takes a set value, the set value indicates that the time unit corresponding to that bit is used for the UWB device to transmit the UWB signal. The set value is 0 or 1.

[0014] In this implementation, it is possible to accurately indicate whether each time unit is used for the UWB device to transmit the UWB signal.

[0015] In one possible implementation, the measurement period is a ranging period, i.e., a ranging wheel. The measurement period can also be a positioning wheel or a sensing wheel.

[0016] In one possible implementation, the time unit bitmap is a time unit bitmap corresponding to a portion of the time units within a measurement period, and the scheduling information further includes a field for indicating the scheduling period for the UWB device to transmit the UWB signal.

[0017] By combining the time unit bitmap and bitmap offset, the time units used for transmitting the UWB signal within the first scheduling period of the UWB device's transmission of the UWB signal can be determined. The scheduling information also includes a field indicating the scheduling period for the UWB device's transmission of the UWB signal. By combining the time unit bitmap, bitmap offset, and scheduling period, the time units used for transmitting the UWB signal within each scheduling period of the UWB device's transmission of the UWB signal can be determined. Since the number of time units corresponding to the time unit bitmap is equal to or less than the number of time units within a scheduling period, determining the time units used for transmitting the UWB signal within each scheduling period of the UWB device's transmission of the UWB signal by combining the time unit bitmap, bitmap offset, and scheduling period can reduce signaling overhead.

[0018] In one possible implementation, the scheduling information further includes a field for indicating the number of repetitions of the UWB signal transmitted by the UWB device.

[0019] In this implementation, the scheduling information also includes a field for indicating the number of times the UWB device transmits the UWB signal, which can flexibly indicate the number of times the UWB device transmits the UWB signal.

[0020] In one possible implementation, the scheduling information implicitly indicates (or non-explicitly) the number of times the UWB device will transmit the UWB signal. For example, any scheduling information implicitly assumes that the UWB device will transmit the UWB signal 16 times; the scheduling information does not need to indicate the number of repetitions by carrying specific information. In other words, the UWB device does not need the scheduling information to know the number of repetitions of the UWB signal transmission. For example, the UWB device may be pre-configured with the number of repetitions for transmitting the UWB signal.

[0021] In this implementation, the scheduling information implicitly indicates (or non-explicitly) the number of times the UWB device transmits the UWB signal, which can reduce the number of bits used.

[0022] In one possible implementation, the scheduling information also includes a field for instructing the UWB device to periodically transmit the UWB signal.

[0023] In this implementation, the scheduling information also includes a field for instructing the UWB device to periodically transmit UWB signals, which enables the UWB device to periodically transmit UWB signals, thereby saving signaling overhead.

[0024] In one possible implementation, the scheduling information also includes a field for indicating the length of the time unit bitmap.

[0025] In this implementation, the scheduling information also includes a field indicating the length of the time unit bitmap, which can accurately determine the length of the time unit bitmap and thus determine the time unit corresponding to each bit in the time unit bitmap.

[0026] In one possible implementation, the scheduling information also includes the address of the UWB device, the address of which is 2 bytes or 8 bytes in length.

[0027] In this implementation, the scheduling information also includes the address of the UWB device, so that the UWB device knows the time unit to be occupied for transmitting UWB.

[0028] In one possible implementation, the scheduling information also includes a field for indicating the address type of the UWB device, which includes short addresses and extended addresses.

[0029] In this implementation, the scheduling information also includes a field indicating the address type of the UWB device, so as to be applicable to UWB devices with different address types.

[0030] In one possible implementation, the scheduling information further includes a scheduling list and a field indicating the number of list elements in the scheduling list, wherein one list element in the scheduling list is used to schedule a UWB device, and the time unit bitmap and the bitmap offset correspond to the same list element in the scheduling list.

[0031] In this implementation, the number of list elements in the scheduling list can be accurately indicated.

[0032] In one possible implementation, the scheduling information includes a control field and a scheduling list field. The control field includes: a field indicating the address type of the UWB device, a field indicating the number of list elements in the scheduling list field, and a field indicating that the UWB device periodically transmits the UWB signal. Each list element in the scheduling list field includes: the time unit bitmap, the bitmap offset, a field indicating the scheduling period for the UWB device to transmit the UWB signal, a field indicating the number of repetitions of the UWB signal transmission by the UWB device, the address of the UWB device, and a field indicating the length of the time unit bitmap.

[0033] In this implementation, the bitmap offset is used to determine the starting time unit for UWB signal transmission by the UWB device, which reduces the number of bits occupied by the time unit bitmap and thus reduces signaling overhead. Furthermore, since the number of time units corresponding to the time unit bitmap is equal to or less than the number of time units within a scheduling cycle, combining the time unit bitmap, bitmap offset, and scheduling cycle to determine the time units used for UWB signal transmission within each scheduling cycle can further reduce signaling overhead.

[0034] In one possible implementation, the time unit is any of the following: a time slot (e.g., a ranging time slot), a ranging schedule time unit (RSTU), or a sensing schedule time unit (SSTU). The sensing schedule time unit is a time unit used to determine the duration of a sensing block, a sensing wheel, or a sensing time slot. The time unit can also be other time lengths.

[0035] In this implementation, the time unit can be flexibly configured according to the actual application scenario.

[0036] In one possible implementation, the method is applied to ranging, sensing, or positioning scenarios.

[0037] In this implementation, signaling overhead can be reduced by executing the scheduling method of the first aspect in the application of UWB ranging, sensing or localization scenarios.

[0038] In one possible implementation, the method is applied to application scenarios with repetitive periodic transmission structures, such as ranging based on narrow-band assisted multi-millisecond (NBA-MMS), positioning based on uplink-time difference of arrival (UL-TDOA), positioning based on downlink-time difference of arrival (DL-TDOA), and sensing scenarios.

[0039] In this implementation, the method is applied to application scenarios with repetitive periodic transmission structures, which can effectively reduce signaling overhead.

[0040] Secondly, embodiments of this application provide another scheduling method for UWB, the method comprising: receiving first scheduling information, the first scheduling information including a time unit bitmap and a bitmap offset, the time unit bitmap being used to indicate whether a time unit is used for UWB device to transmit UWB signals, the bitmap offset being used to determine the starting time unit for the UWB device to transmit UWB signals, the time unit corresponding to the first bit of the time unit bitmap being the starting time unit; and transmitting UWB signals according to the first scheduling information.

[0041] In this embodiment, a combination of a time unit bitmap and a bitmap offset can indicate multiple time units allocated to a UWB device for transmitting UWB signals. Since the bitmap offset is used to determine the starting time unit for UWB signal transmission by the UWB device, the number of bits occupied by the time unit bitmap is reduced, thereby reducing signaling overhead.

[0042] In one possible implementation, the bitmap bias is the number of time units preceding the starting time unit within a measurement period. The measurement period is a complete cycle for completing ranging, sensing, positioning, or communication tasks. The starting time unit is one time unit within the measurement period.

[0043] In this implementation, the bitmap offset is set to the number of time units before the start time unit within a measurement cycle. The start time unit for UWB signal transmission by the UWB device is determined based on the bitmap offset value, which can reduce the number of bits occupied by the time unit bitmap.

[0044] In one possible implementation, the bitmap bias is the number of time units preceding the starting time unit within a communication cycle. A communication cycle is the entire period for completing one or more communication tasks. The starting time unit is one time unit within the communication cycle.

[0045] In this implementation, the bitmap offset is set to the number of time units before the start time unit within a communication cycle. The start time unit for UWB signal transmission by the UWB device is determined based on the bitmap offset value, which can reduce the number of bits occupied by the time unit bitmap.

[0046] In one possible implementation, the time unit bitmap includes K bits, where K is an integer greater than 0. When one of the K bits takes a set value, the set value indicates that the time unit corresponding to that bit is used for the UWB device to transmit the UWB signal. The set value is 0 or 1.

[0047] In this implementation, it is possible to accurately indicate whether each time unit is used for the UWB device to transmit the UWB signal.

[0048] In one possible implementation, the measurement period is a ranging period, i.e., a ranging wheel. The measurement period can also be a positioning wheel or a sensing wheel.

[0049] In one possible implementation, the time unit bitmap is a time unit bitmap corresponding to a portion of time units within a measurement period, and the first scheduling information further includes a field for indicating the scheduling period for the UWB device to transmit the UWB signal.

[0050] By combining the time unit bitmap and bitmap offset, the time units used for transmitting the UWB signal within the first scheduling period of the UWB device's UWB signal transmission can be determined. The first scheduling information also includes a field indicating the scheduling period for the UWB device's UWB signal transmission. By combining the time unit bitmap, bitmap offset, and scheduling period, the time units used for transmitting the UWB signal within each scheduling period of the UWB device's UWB signal transmission can be determined. Since the number of time units corresponding to the time unit bitmap is equal to or less than the number of time units within a scheduling period, determining the time units used for transmitting the UWB signal within each scheduling period of the UWB device's UWB signal transmission by combining the time unit bitmap, bitmap offset, and scheduling period can reduce signaling overhead.

[0051] In one possible implementation, the first scheduling information further includes a field for indicating the number of repetitions of the UWB signal transmitted by the UWB device.

[0052] In this implementation, the first scheduling information also includes a field for indicating the number of times the UWB device transmits the UWB signal, which can flexibly indicate the number of times the UWB device transmits the UWB signal.

[0053] In one possible implementation, the first scheduling information implicitly indicates (or non-explicitly) the number of times the UWB device will transmit the UWB signal. For example, any first scheduling information implicitly assumes that the UWB device will transmit the UWB signal 16 times, and the first scheduling information does not need to indicate the number of times the UWB signal will be transmitted through the information it carries. That is, the UWB device does not need to see the first scheduling information to know the number of times the UWB signal will be transmitted. For example, the UWB device may be pre-configured with the number of times the UWB signal will be transmitted.

[0054] In this implementation, the first scheduling information implicitly (or non-explicitly) indicates the number of times the UWB device transmits the UWB signal, which can reduce the number of bits used.

[0055] In one possible implementation, the first scheduling information further includes a field for instructing the UWB device to periodically transmit the UWB signal.

[0056] In this implementation, the first scheduling information also includes a field for instructing the UWB device to periodically transmit UWB signals, which enables the UWB device to periodically transmit UWB signals, thereby saving signaling overhead.

[0057] In one possible implementation, the first scheduling information further includes a field for indicating the length of the time unit bitmap.

[0058] In this implementation, the first scheduling information also includes a field for indicating the length of the time unit bitmap, which can accurately determine the length of the time unit bitmap and thus determine the time unit corresponding to each bit in the time unit bitmap.

[0059] In one possible implementation, the first scheduling information also includes the address of the UWB device, wherein the address of the UWB device is 2 bytes or 8 bytes in length.

[0060] In this implementation, the first scheduling information also includes the address of the UWB device, so that the UWB device knows the time unit to be occupied for transmitting UWB.

[0061] In one possible implementation, the first scheduling information further includes a field for indicating the address type of the UWB device, where the address type of the UWB device includes short address and extended address.

[0062] In this implementation, the first scheduling information also includes a field indicating the address type of the UWB device, so as to be applicable to UWB devices with different address types.

[0063] In one possible implementation, the first scheduling information further includes a scheduling list and a field indicating the number of list elements in the scheduling list, wherein one list element in the scheduling list is used to schedule a UWB device, and the time unit bitmap and the bitmap offset correspond to the same list element in the scheduling list.

[0064] In this implementation, the number of list elements in the scheduling list can be accurately indicated.

[0065] In one possible implementation, the first scheduling information includes a control field and a scheduling list field. The control field includes: a field indicating the address type of the UWB device, a field indicating the number of list elements in the scheduling list field, and a field indicating that the UWB device periodically transmits the UWB signal. Each list element in the scheduling list field includes: the time unit bitmap, the bitmap offset, a field indicating the scheduling period for the UWB device to transmit the UWB signal, a field indicating the number of repetitions of the UWB signal transmission by the UWB device, the address of the UWB device, and a field indicating the length of the time unit bitmap.

[0066] In this implementation, the bitmap offset is used to determine the starting time unit for UWB signal transmission by the UWB device, which reduces the number of bits occupied by the time unit bitmap and thus reduces signaling overhead. Furthermore, since the number of time units corresponding to the time unit bitmap is equal to or less than the number of time units within a scheduling cycle, combining the time unit bitmap, bitmap offset, and scheduling cycle to determine the time units used for UWB signal transmission within each scheduling cycle can further reduce signaling overhead.

[0067] In one possible implementation, the time unit is any of the following: a time slot (e.g., a ranging time slot), an RSTU, or an SSTU. The time unit can also be other time lengths.

[0068] In this implementation, the time unit can be flexibly configured according to the actual application scenario.

[0069] In one possible implementation, the method is applied to ranging, sensing, or positioning scenarios.

[0070] In this implementation, signaling overhead can be reduced by executing the scheduling method of the first aspect in the application of UWB ranging, sensing or localization scenarios.

[0071] In one possible implementation, the method is applied to application scenarios with repetitive periodic transmission structures, such as ranging based on NBA-MMS, positioning based on UL-TDOA, positioning based on DL-TDOA, and sensing scenarios.

[0072] In this implementation, the method is applied to application scenarios with repetitive periodic transmission structures, which can effectively reduce signaling overhead.

[0073] In one possible implementation, the method further includes: receiving second scheduling information, the format of which is different from that of the first scheduling information; and transmitting a UWB signal according to the first scheduling information includes: transmitting a UWB signal according to the first scheduling information based on the order in which the first scheduling information and the second scheduling information are received.

[0074] In this implementation, UWB signals are transmitted based on one of the scheduling messages received in different formats, which can save power consumption.

[0075] For the technical effects of the various possible implementations of the first aspect, please refer to the introduction of the technical effects of the first aspect or the various possible implementations of the first aspect.

[0076] Thirdly, embodiments of this application provide a communication device that has the function of implementing the behavior described in the first aspect of the method embodiments. The communication device can be a communication equipment, a component of a communication equipment (e.g., a processor, chip, or chip system), or a logic module or software capable of implementing all or part of the functions of the communication equipment. The functions of the communication device can be implemented by hardware or by hardware executing corresponding software, the hardware or software including one or more modules or units corresponding to the above functions. In one possible implementation, the communication device includes a transceiver module and a processing module, wherein: the processing module is used to generate scheduling information, the scheduling information including a time unit bitmap and a bitmap bias, the time unit bitmap indicating whether a time unit is used for UWB device to transmit UWB signals, the bitmap bias determining the starting time unit for the UWB device to transmit UWB signals, and the time unit corresponding to the first bit of the time unit bitmap being the starting time unit; the transceiver module is used to transmit the scheduling information.

[0077] For possible implementations of the communication device in the third aspect, please refer to the various possible implementations in the first aspect.

[0078] For the technical effects of the various possible implementations of the third aspect, please refer to the introduction of the technical effects of the first aspect or the various possible implementations of the first aspect.

[0079] Fourthly, embodiments of this application provide a communication device that has the function of implementing the behavior described in the second aspect of the method embodiments. The communication device can be a communication equipment, a component of a communication equipment (e.g., a processor, chip, or chip system), or a logic module or software capable of implementing all or part of the functions of the communication equipment. The function of the communication device can be implemented by hardware or by hardware executing corresponding software, the hardware or software including one or more modules or units corresponding to the above functions. In one possible implementation, the communication device includes a transceiver module and a processing module, wherein: the transceiver module is used to receive first scheduling information, the first scheduling information including a time unit bitmap and a bitmap bias, the time unit bitmap indicating whether a time unit is used for UWB device to transmit UWB signals, the bitmap bias determining the starting time unit for the UWB device to transmit UWB signals, and the time unit corresponding to the first bit of the time unit bitmap being the starting time unit; the processing module is used to transmit the UWB signal according to the first scheduling information.

[0080] In one possible implementation, the transceiver module is further configured to receive second scheduling information, the format of which is different from that of the first scheduling information; the processing module is specifically configured to transmit a UWB signal according to the first scheduling information, based on the order in which the first scheduling information and the second scheduling information are received.

[0081] For possible implementations of the communication device in the fourth aspect, please refer to the various possible implementations in the second aspect.

[0082] For the technical effects of the various possible implementations of the fourth aspect, please refer to the introduction of the technical effects of the second aspect or the various possible implementations of the second aspect.

[0083] Fifthly, embodiments of this application provide another communication device, which includes a processor coupled to a memory for storing programs or instructions. When the program or instructions are executed by the processor, the communication device performs the methods described in the first or second aspect above.

[0084] In this embodiment of the application, during the execution of the above method, the process of sending information (or signals) can be understood as a process of outputting information based on processor instructions. When outputting information, the processor sends the information to the transceiver for transmission. After being output by the processor, the information may require further processing before reaching the transceiver. Similarly, when the processor receives input information, the transceiver receives the information and inputs it into the processor. Furthermore, after the transceiver receives the information, it may require further processing before being input into the processor.

[0085] Unless otherwise specified, or unless their actual function or internal logic in the relevant description is contradicted, the sending and / or receiving operations involved by the processor can generally be understood as processor instruction output.

[0086] In implementation, the processor described above can be a processor specifically designed to execute these methods, or it can be a processor that executes computer instructions stored in memory to execute these methods, such as a general-purpose processor. For example, the processor can also be used to execute a program stored in memory, which, when executed, causes the communication device to perform the methods as shown in the first aspect or any possible implementation thereof.

[0087] In one possible implementation, the memory is located outside the aforementioned communication device. In another possible implementation, the memory is located inside the aforementioned communication device.

[0088] In one possible implementation, the processor and memory may be integrated into a single device; that is, the processor and memory may be integrated together.

[0089] In one possible implementation, the communication device further includes a transceiver for receiving or transmitting signals, etc.

[0090] In a sixth aspect, this application provides another communication device, which includes a processing circuit and an interface circuit, the interface circuit being used to acquire or output data; the processing circuit being used to perform the methods shown in the first or second aspect above.

[0091] In a seventh aspect, this application provides a computer-readable storage medium storing a computer program, the computer program including program instructions that, when executed, cause a computer to perform the methods described in the first or second aspect above.

[0092] Eighthly, this application provides a computer program product comprising a computer program, the computer program including program instructions that, when executed, cause a computer to perform the methods described in the first or second aspect above.

[0093] Ninthly, this application provides a communication system including the communication device described in the third aspect or any possible implementation thereof, and the communication device described in the fourth aspect or any possible implementation thereof.

[0094] In a tenth aspect, this application provides a chip including a processor and a communication interface, wherein the processor reads instructions stored in a memory through the communication interface and executes the method as described in the first aspect or the fourth aspect above. Attached Figure Description

[0095] To more clearly illustrate the technical solutions in the embodiments of this application or the background art, the accompanying drawings used in the embodiments of this application or the background art will be described below.

[0096] Figure 1 This is a schematic diagram of the various stages of a distance measuring wheel in the prior art;

[0097] Figure 2 This is a schematic diagram of DL-TDOA positioning based on UWB signals;

[0098] Figure 3 A schematic diagram illustrating an example of a star topology;

[0099] Figure 4 A schematic diagram illustrating an example of a point-to-point topology or a mesh topology;

[0100] Figure 5 An example of a UWB system to which the technical solution provided in this application is applicable;

[0101] Figure 6 A flowchart illustrating a scheduling method for UWB provided in an embodiment of this application;

[0102] Figure 7 A flowchart illustrating another scheduling method for UWB provided in this application embodiment;

[0103] Figure 8 This application provides a schematic diagram of a scheduling instruction in a ranging scenario.

[0104] Figure 9 An example of a list element in the scheduling information provided in an embodiment of this application;

[0105] Figure 10This is an example of a bitmap indicator in the prior art to show whether a time unit is used for UWB device to transmit UWB signals;

[0106] Figure 11 An example of a time unit bitmap indicating whether a time unit is used for UWB device 1 to transmit UWB signals, provided in an embodiment of this application;

[0107] Figure 12 Another example of a list element in the scheduling information provided in the embodiments of this application;

[0108] Figure 13 A timing diagram of a non-interlacing MMS ranging process provided for an embodiment of this application;

[0109] Figure 14 A timing diagram of another non-interleaved MMS ranging process provided for an embodiment of this application;

[0110] Figure 15 This is a typical set of scheduling modes that can complete the DL-TDOA positioning process;

[0111] Figure 16 A scheduling diagram of 8 repeated DL-TDOA positioning provided for an embodiment of this application;

[0112] Figure 17 This is a schematic diagram of the structure of a communication device 1700 provided in an embodiment of this application;

[0113] Figure 18 A schematic diagram of another communication device 180 provided in an embodiment of this application;

[0114] Figure 19 A schematic diagram of another communication device 190 provided in an embodiment of this application. Detailed Implementation

[0115] The terms "first" and "second," etc., used in the specification, claims, and drawings of this application are only used to distinguish different objects and not to describe a specific order. It is understood that the various numerical designations used in the embodiments of this application are merely for descriptive convenience and are not intended to limit the scope of the embodiments of this application. The order of the process numbers does not imply the order of execution; the execution order of each process should be determined by its function and inherent logic. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion. For example, a process, method, system, product, or device that includes a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units not listed, or may optionally include other steps or units inherent to these processes, methods, products, or devices.

[0116] The term "embodiment" as used herein means that a particular feature, structure, or characteristic described in connection with an embodiment may be included in at least one embodiment of this application. The appearance of this phrase in various places throughout the specification does not necessarily refer to the same embodiment, nor is it a separate or alternative embodiment mutually exclusive with other embodiments. It will be explicitly and implicitly understood by those skilled in the art that the embodiments described herein can be combined with other embodiments.

[0117] The terminology used in the following embodiments of this application is for the purpose of describing particular embodiments only and is not intended to be limiting of this application. As used in the specification and appended claims of this application, the singular expressions “a,” “an,” “the,” “the,” “the,” and “this” are intended to include the plural expressions as well, unless the context clearly indicates otherwise. It should also be understood that the term “and / or” as used in this application refers to and includes any or all possible combinations of one or more of the listed items. For example, “A and / or B” can mean: the presence of only A, the presence of only B, and the presence of both A and B, where A and B can be singular or plural. The term “multiple” as used in this application refers to two or more. In the textual description of this application, the character “ / ” generally indicates that the preceding and following objects are in an “or” relationship.

[0118] It is understood that in the various embodiments of this application, "B corresponding to A" means that there is a correspondence between A and B, and B can be determined based on A. However, it should also be understood that determining (or generating) B based on (or on) A does not mean that B is determined (or generated) solely based on (or on) A; B can also be determined (or generated) based on (or on) A and / or other information.

[0119] To facilitate understanding of the solutions in this application, the terminology and technical solutions involved in the embodiments of this application will be introduced first below.

[0120] Ranging round, positioning round, sensing round, measurement cycle, communication cycle.

[0121] In the IEEE 802.15.4z standard, a single ranging process is defined as a ranging round. A ranging round is defined as a period of sufficient duration to complete one entire range-measurement cycle involving the set of ERDEVs participating in the ranging exchange. The smallest processing unit for each ranging round is a ranging slot. A ranging round consists of three phases: the ranging control phase, the ranging phase, and the measurement report phase. Figure 1 This is a schematic diagram of the various stages of a distance measuring wheel in the prior art. For example... Figure 1 As shown. In the IEEE 802.15.4z standard, the ranging control phase includes one ranging time slot, while in the currently discussed IEEE 802.15.4ab standard, the ranging control phase can include more than one ranging time slot.

[0122] In this embodiment, a single positioning process, i.e., the process of completing a positioning task, is defined as a positioning wheel. The positioning wheel can have other names, and this application does not limit its usage. A positioning wheel can be a time period (or time cycle) sufficient to complete a full positioning task. The meaning of a positioning wheel is similar to that of a ranging wheel, the difference being that one corresponds to a time cycle for ranging, and the other to a time cycle for positioning. The minimum processing time unit for each positioning wheel is a positioning slot. A positioning wheel can be divided into three phases: a positioning control phase, a positioning phase, and a positioning report phase.

[0123] In this embodiment, a single sensing process, i.e., the process of completing a sensing task, is defined as a sensing wheel. The sensing wheel can have other names, and this application does not limit its usage. A sensing wheel can be a time period (or time cycle) sufficient to complete a full sensing task. The meaning of a sensing wheel is similar to that of a ranging wheel, the difference being that one corresponds to a time cycle for ranging, and the other to a time cycle for sensing. The minimum processing time unit for each sensing wheel is a sensing slot. A sensing wheel can be divided into three phases: a sensing control phase, a sensing phase, and a sensing report phase.

[0124] The measurement cycle refers to the time period during which one or more UWB devices complete one or more measurement tasks. These tasks can be ranging, positioning, sensing, etc. The measurement cycle can be a ranging wheel, a positioning wheel, or a sensing wheel. The communication cycle refers to the time period during which one or more UWB devices complete one or more communication tasks.

[0125] Furthermore, it should be noted that the names of different stages within a single measuring wheel (e.g., ranging wheel, sensing wheel, positioning wheel, etc.) are merely examples and do not constitute any limitation on the scope of protection of this application. For example, the aforementioned measurement control stage can be understood as the stage used to configure the required parameters in the measuring wheel. As another example, the aforementioned measurement stage can be understood as the stage used to perform the measurement. Yet another example, the aforementioned measurement result reporting stage can be understood as the stage used to report the measurement results, and can also be referred to as the end of the measurement stage. Additionally, it should be noted that in the various embodiments of this application, the size of each field represents the number of bits occupied by each field.

[0126] UWB positioning

[0127] UWB can be used for indoor positioning. The principles and methods of UWB positioning include, but are not limited to: UL-TDOA, DL-TDOA. Figure 2 This is a schematic diagram of DL-TDOA positioning based on UWB signals. DL-TDOA positioning based on UWB signals can be called UWB DL-TDOA positioning. Figure 2 In the diagram, A, B, and C represent the plotting devices, and the arrows indicate the direction of the UWB positioning / ranging signal. Figure 2 As can be seen, taking UWBDL-TDOA positioning as an example, this method involves deploying three or more anchor devices in an indoor space. The anchor devices interact with each other via bidirectional UWB signals to provide positioning signals for the tag devices. The tag devices calculate their own position by listening to the UWB positioning / ranging interaction signals between the anchor devices and calculating the time difference between each signal, thereby achieving the positioning function.

[0128] The prior art 1 and prior art 2 are described below in relation to the scheduling scheme provided in the embodiments of this application.

[0129] Prior Art 1:

[0130] Prior art 1 provides a scheduling information element for UWB ranging applications, namely the ranging device management information element (RDMIE). Table 1 shows the format of the RDMIE in the prior art.

[0131] Table 1

[0132] Bits:0 1 2-7 Octets:variable SIU Address Size RDM List Length RDM List

[0133] Specifically, the meanings of some fields in Table 1 are as follows:

[0134] The SIU field (slot index used) indicates the access mode adopted in the current ranging procedure. If SIU = 0, the current RDM IE manages ranging procedures based on contention-based access. If SIU = 1, the current RDM IE manages ranging procedures based on scheduled access.

[0135] The Address Size field indicates the address type of the devices participating in the ranging process. If Address Size = 0, it means that the addresses of all devices involved in the current RDM List are short addresses, i.e., the address length is 2 bytes. If Address Size = 1, it means that the addresses of all devices involved in the current RDM List are extended addresses (long addresses), i.e., the address length is 8 bytes.

[0136] The RDM List Length field indicates the number of elements in the RDM List, that is, the number of list elements in the format shown in Table 2. Table 2 shows the format of list elements in the RDM List in prior art 1. In the embodiments of this application, the list element can be referred to as a scheduling list element.

[0137] The RDM List field is a list, where the format of each element in the list is shown in Table 2.

[0138] Table 2

[0139] Bits:0 1-7 Octets: 2 / 8 Ranging Role Ranging Slot Index Address

[0140] Specifically, the meanings of some fields in Table 2 are as follows:

[0141] The Ranging Role field indicates the ranging role of the device corresponding to the Address field of the current list element. If Ranging Role = 0, it means that the device is a ranging responder. If Ranging Role = 1, it means that the device is a ranging initiator.

[0142] The Ranging Slot Index field indicates the index of the time slot assigned to the device participating in ranging corresponding to the current list element. The address of this device is determined by the Address field in Table 2.

[0143] The Address field is used to indicate the address of the device participating in the ranging that corresponds to the current list element.

[0144] Assuming that the ranging system using existing technology 1 has N (integers greater than 0) devices, and each device needs to call up to S (integers greater than 0) time slots, then the message length M required for scheduling IE proposed in existing technology 1 can be expressed as:

[0145] Assuming that all N devices are short-address devices, then the message length of IE is (M = 1 + 3 * N * S) bytes.

[0146] Assuming that all N devices are long address devices, then the message length of IE is (M = 1 + 9 * N * S) bytes.

[0147] The foregoing analysis reveals the following drawbacks of the existing technology 1's scheduling of IE:

[0148] Significant signaling overhead: When the number of devices N is fixed, the length of the scheduled IE increases with the increase of S. For example, taking short addresses as an example, when S=32, the length of the scheduled IE is (M=1+96*N) bytes; when S=64, the length of the scheduled IE is (M=1+192*N) bytes. Therefore, when the number of devices N is fixed, if the number of time slots S that the system currently needs to schedule is large (e.g., S≥64), it will lead to significant signaling overhead.

[0149] Limited flexibility: Each list element (Table 2) of the existing RDM IE in Technology 1 only allows one device to indicate one time slot, and cannot indicate multiple time slots, which limits the flexibility of RDM IE indication scheduling. Specifically, if a device needs to indicate multiple time slots, multiple list elements as shown in Table 2 are required, which will lead to signaling indication redundancy, that is, the aforementioned signaling overhead problem.

[0150] Prior art 2:

[0151] Prior art 2 provides a bitmap-based scheduling information element (IE) format for UWB applications. Table 3 shows the bitmap-based scheduling IE format provided by prior art 2.

[0152] Table 3

[0153] Octets:1 Variable value (one or more bytes) Control (Control Field) Scheduling List (Schedule List Field)

[0154] The Control field occupies one byte, while the Scheduled List field occupies one or more bytes. Table 4 shows the format of the Control field in the bitmap-based scheduling IE provided by prior art 2.

[0155] Table 4

[0156] Bits:0 1-7 Address Type Scheduling List Length

[0157] When Address Type is 0, it indicates that the device address is a short address, that is, the address length is 2 bytes (16 bits); when Address Type is 1, it indicates that the device address is a long address (or extended address), that is, the address length is 8 bytes (64 bits). The device address here refers to the address of the device scheduled by the bitmap-based scheduling IE, that is, the address of the device involved in the scheduling list.

[0158] The Scheduling List Length indicates the number of list elements in the Scheduling List field. List elements are carried within the Scheduling List field. Table 5 shows the format of a list element in the scheduling list of Prior Art 2.

[0159] Table 5

[0160]

[0161] In Table 5, the bitmap represents a one-dimensional bit string, such as 0000100100100000. Bitmap Size indicates the length of the bitmap, and the relationship between the Bitmap Size value and the bitmap length is shown in Table 6. Table 6 illustrates the relationship between the Bitmap Size value and the bitmap length.

[0162] Table 6

[0163] Bitmap Size value meaning 0 A 1-byte bitmap (or an 8-bit bitmap) 1 A 2-byte bitmap (or a 16-bit bitmap) 2 A 4-byte bitmap (or a 32-bit bitmap) 3 An 8-byte bitmap (or a 64-bit bitmap)

[0164] For example, the bitmap shown in Table 7 represents a bit string of length 8, which means it represents 8 time slots (each bit corresponds to one time slot), and the corresponding Bitmap Size value is 0. If a bit is 1, it means that the device participating in ranging corresponding to the list element of that bitmap will transmit a UWB signal in the time slot corresponding to that bit. Conversely, if a bit is 0, it means that the device will not transmit a UWB signal in the time slot corresponding to the bit being 0.

[0165] Table 7

[0166] 0 1 0 1 1 0 1 1

[0167] The bitmap shown in Table 7 represents time slots 1 to 8 (or 0 to 7) from left to right. The bits corresponding to time slots 2, 4, 5, 7, and 8 are all 1, indicating that the device transmits UWB signals in these time slots. The bits corresponding to time slots 1, 3, and 6 are all 0, indicating that the device does not transmit UWB signals in these time slots.

[0168] It should be noted that the description of bitmaps such as those in Table 7 in this document is by default a left-to-right representation. That is, the bitmap represents the time slots from left to right in the order of proximity to distance. For example, for a bitmap of length 1 byte, the bitmap represents time slots 1 to 8 (or time slots 0 to 7) from left to right. On the other hand, the description of the bitmap in this application embodiment can also be from right to left, that is, representing the time slots from proximity to distance. This application embodiment does not impose any limitation on the order of bitmap description. The entire text uses a left-to-right representation as an example.

[0169] Assuming that the system currently employing prior art 2 has N (integers greater than 0) devices, and each device needs to call at most S (integers greater than 0) time slots, then the message length M required for the scheduling IE proposed in prior art 2 can be expressed as:

[0170] Assuming all N devices are short-address devices, then the message length of IE is... byte;

[0171] Assuming all N devices are long-address devices, then the message length in Internet Explorer is... byte.

[0172] Among them, symbols This indicates rounding up to the nearest integer.

[0173] The foregoing analysis reveals the following drawbacks in the scheduling of IE in existing technology 2:

[0174] Significant signaling overhead: When the number of devices N is fixed, the message length for scheduling Internet Explorers (IEs) increases with the increase of S. Taking short addresses as an example, when S = 32, the length of the scheduled IE is (M = 1 + N * 7) bytes; when S = 64, the length of the scheduled IE is (M = 1 + 11 * N) bytes. Therefore, when the number of devices N is fixed, if the number of time slots S that the system currently needs to schedule is large (e.g., S ≥ 64), it will lead to significant signaling overhead.

[0175] Redundancy in message representation: Existing technology 2 uses a bitmap to indicate whether a time slot is used to transmit UWB signals. For time slots that are not involved in transmission, the bit still needs to be set to 0, which makes the message representation inflexible and leads to unnecessary message representation redundancy.

[0176] For UWB applications with repetitive periodic transmission structures, such as narrow-band assisted multi-millisecond (NBA-MMS), DL-TDOA / UL-TDOA positioning, sensing, etc., using only bitmaps to indicate whether time slots are used to transmit UWB signals will lead to unnecessary repetition and redundancy. Furthermore, when the number of repetitions is large, it will result in significant representational redundancy.

[0177] As described above, both prior art 1 and prior art 2 have the drawback of high signaling overhead. To avoid the problem of high signaling overhead caused by using prior art 1 or prior art 2, this application provides a scheduling scheme for UWB with lower signaling overhead. The following describes the applicable topology and system for the scheduling scheme for UWB provided in this application.

[0178] The scheduling scheme for UWB provided in this application can operate in star topology, point-to-point topology, or mesh topology. The scheduling scheme for UWB provided in this application can also operate in other topologies, and this application does not impose any limitations on it. Figure 3 This is a schematic diagram illustrating an example of a star topology. Figure 3 As shown, a star topology involves a central control node, for example... Figure 3 The personal area network (PAN) or coordinator shown refers to data communication between it and one or more other devices. The scheduling scheme for UWB provided in this application embodiment is applicable to data communication / sensing / ranging / positioning between a central control node and one or more other devices in a star topology. Figure 4This is a schematic diagram illustrating an example of a point-to-point topology or a mesh topology. The scheduling scheme for UWB provided in this application embodiment is also applicable to point-to-point or mesh topologies. Figure 4 ( ), communication / sensing / ranging / positioning between different devices. Figure 3 and Figure 4 In the diagram, black nodes represent full-function devices (FFDs), and white nodes represent reduced-function devices (RFDs). FFDs can act as PAN coordinators or coordinators, while RFDs cannot. FFDs can communicate with each other, and with each other. RFDs cannot communicate directly with each other; they can only communicate with FFDs or forward data through an FFD. In a UWB system, an FFD can be an anchor device or a tag device with strong computing capabilities (e.g., a UWB tag mounted on a smartphone); while an RFD is a tag device with only partial computing capabilities.

[0179] The technical solutions of this application are primarily applicable to UWB systems, such as UWB systems supporting IEEE 802.15.4a, IEEE 802.15.4z, IEEE 802.15.4ab, or next-generation standards of IEEE 802.15.4ab. Those skilled in the art will readily understand that the various aspects of this application can be extended to other networks employing various standards or protocols, such as BLUETOOTH, high-performance radio LAN (HIPERLAN) (a wireless standard similar to IEEE 802.11, primarily used in Europe), and wide area networks (WANs), personal area networks (PANs), or other networks now known or to be developed in the future. Therefore, regardless of the coverage area and wireless access protocol used, the various aspects provided in the embodiments of this application can be applied to any suitable wireless network.

[0180] See Figure 5 , Figure 5This application provides an example of a UWB system to which the technical solution provided in the embodiments of this application applies. The UWB system includes an anchor (only one anchor is shown) and one or more tags (only tag 1 and tag 2 are shown). The anchor and tags support protocols such as IEEE 802.15.4a, IEEE 802.15.4z, and IEEE 802.15.4ab. Of course, with the continuous evolution and development of communication technologies, the WLAN protocol can also include next-generation protocols such as IEEE 802.15.4ab. The anchor can be an access point, and the tag can be a station (STA). Both the access point and the STA support WLAN protocols, which may include IEEE 802.11be (or Wi-Fi 7, EHT protocol).

[0181] An access point is a device with wireless communication capabilities, supporting communication using the WLAN protocol and enabling communication with other devices (such as stations or other access points) within a WLAN network. It can also communicate with other devices. In a UWB system, there are one or more access point (AP) type stations and one or more non-access point stations (non-AP STAs). For ease of description, this paper refers to access point type stations as access points (APs) and non-access point type stations as stations (STAs).

[0182] An access point can be a complete device, or it can be a chip or processing system installed within a complete device. Devices with these chips or processing systems installed can implement the methods and functions of the embodiments of this application under the control of the chip or processing system (i.e., the AP). The AP in the embodiments of this application is a device that provides services to a station (STA), and can support, for example, IEEE 802.15.4a, IEEE 802.15.4z, IEEE 802.15.4ab, or their next generation. For example, an AP can be a communication server, router, switch, bridge, computer, mobile phone, or other communication entity. An access point (AP) can include anchors, macro base stations, micro base stations (also known as small stations), pico base stations, femtocells, relay stations, access points, gNBs, transmission reception points (TRPs), evolved Node Bs (eNBs), radio network controllers (RNCs), home base stations (e.g., home evolved Node Bs, or home Node Bs, HNBs), base band units (BBUs), WiFi access points (APs), integrated access and backhaul (IABs), etc. Of course, the AP can also be the chip and processing system within these various types of devices to implement the methods and functions of the embodiments of this application.

[0183] A station is a device with wireless communication capabilities, supporting communication using the WLAN protocol and having the ability to communicate with other stations or access points in a WLAN network. For example, a STA is any communication device that allows a user to communicate with an AP and thus with the WLAN. This communication device can be a complete device or a chip or processing system installed in a complete device. Devices with these chips or processing systems installed can implement the methods and functions of the embodiments of this application under the control of the chip or processing system (i.e., the station). STAs can include tag devices / smart tag devices, mobile phones, mobile stations (MS), tablets, computers with wireless transceiver capabilities (e.g., laptops), virtual reality (VR) devices, augmented reality (AR) devices, wireless terminals in industrial control, self-driving, remote medical, smart grid, transportation safety, smart city, and smart home applications, subscriber units, cellular phones, wireless data cards, personal digital assistant (PDA) computers, tablets, laptop computers, and machine-type communication (MTC) terminals. Stations can include various handheld devices, vehicle-mounted devices, wearable devices, computing devices, or other processing devices connected to a wireless modem with wireless communication capabilities. For example, the station can be a handset with wireless communication capabilities, an in-vehicle device, a wearable device, or a terminal in the Internet of Things or the Internet of Vehicles, or any form of terminal in 5G and subsequent communication systems; this application is not limited to this. The station can support the IEEE 802.15 series protocols, such as IEEE 802.15.4a, IEEE 802.15.4z, and IEEE 802.15.4ab.

[0184] The scheduling scheme for UWB provided in the embodiments of this application is described below with reference to the accompanying drawings.

[0185] Figure 6A flowchart of a scheduling method for UWB provided in an embodiment of this application. Figure 6 The method shown can be applied to scenarios such as ranging, sensing, positioning, and communication, for example: ranging based on NBA-MMS, positioning based on DL-TDOA, positioning based on UL-TDOA, and sensing scenarios. Figure 6 As shown, the method includes:

[0186] 601. The sending end generates scheduling information.

[0187] The transmitter can be a UWB device supporting the UWB standard. The transmitter can be an access point (AP) or a site. The transmitter can be an FFD or an RFD. The transmitter can be an initiator of ranging, sensing, positioning, or communication (i.e., a ranging initiator, sensing initiator, positioning initiator, or communication initiator); it can also be a responder of ranging, sensing, positioning, or communication (i.e., a ranging responder, sensing responder, positioning responder, or communication responder); or it can be a third-party device (which can be called a controller device), i.e., not an initiator or responder of ranging, sensing, positioning, or communication. For example, if the transmitter is a third-party device and the scheduling information is a ranging control message (RCM), all initiators / rangers participating in the ranging process, upon receiving the scheduling information, interpret the information relevant to themselves in the scheduling information (e.g., the corresponding time slot index for transmission) and execute the corresponding ranging procedure during the measurement phase.

[0188] The scheduling information includes a time unit bitmap and a bitmap offset. The bitmap offset can also be called the bitmap offset field or bitmap offset field. The aforementioned time unit bitmap is used to indicate whether a time unit is used for UWB device transmission of UWB signals. For example, the time unit bitmap includes K bits, each bit corresponding to a time unit, where K is an integer greater than 0. When one of the K bits takes a set value, that set value indicates that the time unit corresponding to that bit is used for the aforementioned UWB device to transmit the aforementioned UWB signal. The set value is 0 or 1. The K time units corresponding to the K bits in the time unit bitmap are K time units within a measurement cycle or positioning cycle, i.e., a portion of the time units within the measurement cycle or positioning cycle. The measurement cycle can be a ranging cycle (i.e., a ranging wheel), a sensing wheel, or a positioning wheel. The bitmap offset is used to determine the starting time unit for the aforementioned UWB device to transmit UWB signals. The time unit corresponding to the first bit of the aforementioned time unit bitmap is the aforementioned starting time unit. It can be understood that the bitmap offset is used to determine the time unit corresponding to the first bit of the time unit bitmap. For example: the bitmap offset value mentioned above is the number of time units before the aforementioned starting time unit within a measurement period, and the multiple time units corresponding to the time unit bitmap are multiple time units within that measurement period. For example: the bitmap offset value mentioned above is the number of time units before the aforementioned starting time unit within a positioning period, and the multiple time units corresponding to the time unit bitmap are multiple time units within that positioning period. The following section will further describe the implementation of the time unit bitmap and bitmap offset using examples of scheduling information.

[0189] In one possible implementation, the scheduling information also includes a field (hereinafter referred to as the period index field) indicating the scheduling period for the UWB device to transmit the UWB signal. The scheduling period refers to the period during which the UWB device transmits the UWB signal within a measurement cycle or communication cycle. For example, a measurement cycle or communication cycle may include 8 scheduling cycles for the UWB device. The UWB device transmits the UWB signal in the third and fifth time units of each scheduling cycle, and does not transmit the UWB signal in other time units. For example, the period index field can represent a continuous value, such as 1 to 32 or 1 to 64. The P bits in the period index field represent a value used to indicate the scheduling period for the UWB device to transmit the UWB signal, where P is an integer greater than 0, such as P being any one of 4, 5, 6, 7, 8, etc. For example, the value represented by the period index field is the number of time units corresponding to the scheduling period, such as 1 to 32 time units. For example, the period index field can represent a non-continuous natural number. The `periodindex` field, consisting of H bits representing a natural number, indicates the scheduling period for UWB signal transmission by the UWB device. H is a positive integer, such as 1, 2, or 3. For example, the `periodindex` field can represent any number of time units (including multiple time units), such as 8, 16, 32, 64, or 128 time units. For instance, when the `periodindex` field is 0 (i.e., `periodindex = 0`), the scheduling period for UWB signal transmission is 8 time units. Similarly, when the `periodindex` field is 1 (i.e., `periodindex = 1`), the scheduling period for UWB signal transmission is 16 time units. This application does not limit the number of time units that the `periodindex` field can represent. The period index field can represent a value in units of a single time unit or multiple time units. A time unit can be a time slot, such as a ranging time slot, an RSTU, or a sensing scheduling time unit (a time unit used to determine the duration of a sensing block, sensing wheel, or sensing time slot); it can also be other time lengths, which are not limited in this application. Since the number of time units corresponding to the time unit bitmap is equal to or less than the number of time units within a scheduling cycle, combining the time unit bitmap, bitmap offset, and scheduling cycle to determine the time units used for transmitting UWB signals within each scheduling cycle of the UWB device can reduce signaling overhead.

[0190] In one possible implementation, the scheduling information further includes a field (hereinafter referred to as the repetition index field) indicating the number of times the UWB device transmits the UWB signal. The repetition index field may be called a repetition index field or other fields. The R bits in the repetition index field represent a value used to indicate the number of times the UWB device transmits the UWB signal, where R is an integer greater than 0, such as any one of 2, 3, 4, 5, 6, etc. For example, the repetition index field can represent consecutive values, such as 1 to 32 times. This application does not limit the number of values ​​that the repetition index field can represent. For example, the repetition index field can represent non-consecutive natural numbers. For example, the repetition index field can represent any number of values ​​in a combination of values ​​(including multiple non-consecutive natural numbers), such as 8, 16, 32, 64, 128, etc. For example, when the repetition index field is set to 1 (i.e., repetition index = 1), the number of periodic UWB signal transmissions (or periodic UWB transmissions) is 16. As another example, when the repetition index field is set to 2 (i.e., repetition index = 2), the number of periodic UWB transmissions is 32. This application does not limit the non-continuous values ​​that the repetition index field can represent. In this implementation, the repetition index field is used to indicate the number of times the UWB device transmits the UWB signal. By combining the time unit bitmap and the bitmap offset, it can indicate the time unit in each scheduling cycle of the UWB device's UWB signal transmission, occupying fewer bits and reducing signaling overhead.

[0191] In one possible implementation, the scheduling information implicitly indicates (or non-explicitly) the number of times the UWB device will transmit the UWB signal. For example, any scheduling information implicitly assumes that the UWB device will transmit the UWB signal 16 times, and the scheduling information does not need to indicate the number of repetitions through the information it carries. That is, the UWB device does not need to rely on the scheduling information to know the number of repetitions of the UWB signal transmission. For example, the UWB device may be pre-configured with the number of repetitions of the UWB signal transmission. In this implementation, the scheduling information implicitly indicates (or non-explicitly) the number of repetitions of the UWB signal transmission, which reduces the number of bits used.

[0192] In one possible implementation, the scheduling information further includes a field (hereinafter referred to as the Period Mode field) for instructing the UWB device to periodically transmit the UWB signal. In this implementation, the scheduling information also includes a field for instructing the UWB device to periodically transmit the UWB signal, which enables the UWB device to periodically transmit the UWB signal, thereby saving signaling overhead.

[0193] In one possible implementation, the scheduling information further includes a field indicating the length of the time unit bitmap (hereinafter referred to as the bitmap size field). In this implementation, the scheduling information also includes a field indicating the length of the time unit bitmap, enabling accurate determination of the length of the time unit bitmap, and thus determining the time unit corresponding to each bit in the time unit bitmap.

[0194] In one possible implementation, the scheduling information also includes the address of the UWB device, which is 2 bytes or 8 bytes long. In this implementation, the scheduling information also includes the address of the UWB device so that the UWB device knows the time unit it needs to occupy for transmitting UWB data.

[0195] In one possible implementation, the scheduling information includes a control field and a scheduling list field. The scheduling list field contains one or more list elements. For example, the aforementioned time unit bitmap, bitmap offset, UWB device address, and bitmap size fields are contained within the same list element. Another example is that the aforementioned time unit bitmap, bitmap offset, UWB device address, bitmap size, period index, and repetition index fields are contained within the same list element.

[0196] 602. The sending end sends scheduling information.

[0197] One possible implementation of step 602 is as follows: the sending end sends the scheduling information via broadcast or multicast. Another possible implementation of step 602 is as follows: the sending end sends the scheduling information to one or more UWB devices (i.e., receivers) to be scheduled via unicast. Correspondingly, the receivers receive the scheduling information from the sending end.

[0198] 603. The receiving end transmits UWB signals according to the scheduling information.

[0199] The receiver can be an anchor point or a tag. The receiver can be an FFD or an RFD. The receiver is a UWB device scheduled by the aforementioned scheduling information, and it receives the scheduling information from the sender. The receiver can be an initiator of ranging, sensing, positioning, or communication, or a responder of ranging, sensing, positioning, or communication. For example, a list element in the scheduling information includes a time unit bitmap, a bitmap offset, and address 1; the bitmap offset is used to determine the starting time unit for UWB device 1 (i.e., the receiver) to transmit UWB signals, the time unit bitmap is used to indicate whether the time unit is used for UWB device 1 to transmit UWB signals, and address 1 is the address of UWB device 1; this list element is used to schedule UWB device 1. Step 603 is optional. In practical applications, multiple receivers can receive the scheduling information and transmit UWB signals according to the scheduling information, thereby completing ranging, sensing, positioning, or communication.

[0200] According to the scheduling information, the receiving end can transmit UWB signals for sensing, ranging, positioning, or communication. It should be understood that the scheduling information indicates the time units for UWB device 1 to transmit UWB signals, and UWB device 1 can transmit UWB signals for sensing, ranging, positioning, or communication within these time units. In some embodiments, the scheduling information indicates the time units for multiple UWB devices to transmit UWB signals; that is, the scheduling information schedules multiple receiving ends to perform sensing, ranging, positioning, or communication by transmitting UWB signals; the multiple UWB devices perform sensing, ranging, positioning, or communication by transmitting UWB signals according to the scheduling information.

[0201] In this embodiment, the bitmap offset and the time unit bitmap can be used to determine whether each time unit is used for UWB device to transmit UWB signals. The bitmap offset is used to determine the starting time unit for UWB device to transmit UWB signals, which can reduce the number of bits occupied by the time unit bitmap, thereby reducing signaling overhead.

[0202] Figure 7 A flowchart of another scheduling method for UWB provided in an embodiment of this application. Figure 7 The method flow is Figure 6 One possible implementation of the described method is described. In this implementation, the UWB signal is transmitted according to one of the scheduling messages received in different formats, which can save power consumption. Figure 7 As shown, the method includes:

[0203] 701. The first sending end sends the first scheduling information.

[0204] The first sending end can be Figure 6In the sending end, the first scheduling information can be Figure 6 The scheduling signal in the middle. Correspondingly, the receiving end receives the first scheduling information from the first transmitting end. Here, the receiving end can be... Figure 6 The receiving end in the middle.

[0205] 702. The second sending end sends the second scheduling information.

[0206] The second sending end can be Figure 6 The sender in the middle can also be not Figure 6 The sending end is the first end in the middle. Correspondingly, the receiving end receives the second scheduling information from the second sending end. The format of the second scheduling information differs from the format of the first scheduling information. This difference can occur if one or more fields in the second scheduling information are not included in the first scheduling information, or if one or more fields in the first scheduling information are not included in the second scheduling information. For example, the second scheduling information includes a second field, but the first scheduling information does not. It is understood that as long as the fields in the first scheduling information and the fields in the second scheduling information are not completely identical, the format of the second scheduling information differs from that of the first scheduling information. The second sending end can be the initiator of ranging, sensing, positioning, or communication; it can also be a responder of ranging, sensing, positioning, or communication; or it can be a third-party device, i.e., not an initiator or responder of ranging, sensing, positioning, or communication.

[0207] 703. The receiving end transmits UWB signals according to the order in which it receives the first scheduling information and the second scheduling information, based on the first scheduling information.

[0208] One possible implementation of step 703 is as follows: the first scheduling information and the second scheduling information are received sequentially by the receiving end during the control phase of the same working period (e.g., the ranging control phase of the same ranging wheel); the receiving end transmits the UWB signal based on the first received scheduling information. The receiving end can transmit the UWB signal only based on the first received scheduling information, and does not need to decode the second received scheduling information, thus saving energy.

[0209] Another possible implementation of step 703 is as follows: the first scheduling information and the second scheduling information are received sequentially by the receiving end during the control phase of the same working period (e.g., the ranging control phase of the same ranging wheel); the receiving end transmits the UWB signal based on the later received first scheduling information. The receiving end can transmit the UWB signal only based on the later received first scheduling information, without decoding the earlier received second scheduling information, thus saving energy.

[0210] In this embodiment, the receiving end transmits a UWB signal according to one of the scheduling information in the order of the received scheduling information of different formats; this can save power consumption.

[0211] The following description, in conjunction with the accompanying drawings, describes the application of the scheduling scheme for UWB provided in this application in a ranging scenario. Figure 8 This is a schematic diagram of a scheduling instruction in a ranging scenario provided in an embodiment of this application. Figure 8 In the ranging control phase, the controller device sends the scheduling information provided in this application embodiment to the initiator, responder 1, and responder 2, wherein the controller device can be the aforementioned sending end, and responder 1 or responder 2 is the aforementioned receiving end. For example... Figure 8 As shown, during the ranging control phase, the controller device sends the scheduling information provided in this embodiment to all initiators and / or responders participating in the ranging. This scheduling information can be an RCM or other messages. After receiving the scheduling information, all initiators and / or responders interpret the information related to themselves in the scheduling information and execute the corresponding ranging process during the ranging phase. During the measurement reporting phase, the initiators and / or responders can report the measurement results obtained during the ranging phase. Figure 8 This paper illustrates the application of the scheduling scheme for UWB provided in this application embodiment in a ranging scenario. It is understood that the scheduling scheme for UWB provided in this application embodiment can also be used for sensing, DL-TDOA positioning, UL-TDOA positioning, communication, etc., which will not be elaborated here. This paper specifically describes the case where the controller device is a third-party device. The scheme described herein is equally applicable when the controller device is the initiator or responder, and will not be elaborated further.

[0212] Figure 8 The use of scheduling information provided in embodiments of this application during the ranging control phase is described. Figure 8 This is merely an example of the use of scheduling information provided in this application's embodiments during the control phase of the measurement cycle. The scheduling information provided in this application's embodiments can also be used in the measurement phase and the measurement reporting phase. Generally, when the scheduling information provided in this application's embodiments is used during the measurement phase and the measurement reporting phase, the corresponding scheduling instruction will be used in the next round. The next round can be an adjacent round to the current round, or it can be a round separated from the current round by at least one round. For example, if the current measurement application is distance measurement, when the scheduling information provided in this application's embodiments is used during the distance measurement phase and the measurement reporting phase, the corresponding scheduling instruction will be used in the next distance measurement round. The next distance measurement round can be a distance measurement round adjacent to the current distance measurement round, or it can be a distance measurement round separated from the current distance measurement round by at least one distance measurement round.

[0213] The scheduling information provided in this application embodiment may include a control field and a scheduling list field. Examples of list elements in the scheduling list field and examples of the control field are described below.

[0214] Example 1: An example of a list element in the schedule list field of the scheduling information.

[0215] The list elements include the bitmap offset, the time unit bitmap, and address 1. See [link / reference] Figure 9 . Figure 9 This is an example of a list element in the scheduling information provided in an embodiment of this application. For example... Figure 9 As shown, a list element in the scheduling information includes: bitmap offset, time unit bitmap, and address 1. Figure 9 The list element shown indicates the time unit to be occupied for UWB device 1 to transmit UWB signals, i.e., it is used to schedule UWB device 1. UWB device 1 can be considered as the UWB device scheduled by this list element. The bitmap offset is used to determine the starting time unit for UWB device 1 to transmit UWB signals. The time unit bitmap is used to indicate whether the time unit is used for UWB device 1 to transmit UWB signals. The time unit corresponding to the first bit of the time unit bitmap is the aforementioned starting time unit. It can be understood that the bitmap offset is used to determine the time unit corresponding to the first bit of the time unit bitmap, and the time unit bitmap can be combined with the bitmap offset to determine the time unit corresponding to each bit in the time unit bitmap. Address 1 is the address of UWB device 1, and the length of address 1 is 2 bytes or 8 bytes. For example: the list element also includes a bitmap size field, which is a field used to indicate the length of the time unit bitmap. For example: the list element also includes a reserved field, which includes one or more reserved bits.

[0216] Bitmap offset is used to determine the starting time unit of UWB signal transmission by UWB device 1 within a measurement cycle (which can be replaced by a communication cycle). For example, bitmap offset indicates the number of time units preceding the starting time unit in the measurement cycle containing the starting time unit of UWB signal transmission by UWB device 1. Alternatively, bitmap offset indicates the number of time units preceding the starting time unit in the measurement cycle, including the starting time unit. For example, the bitmap offset value is the number of time units preceding the starting time unit within a measurement cycle. For example, bitmap offset indicates the number of unused time units preceding the starting time unit in the measurement cycle containing the starting time unit of UWB signal transmission by UWB device 1. For example, the bitmap offset value is the number of unused time units preceding the starting time unit within a measurement cycle. For example, the bitmap offset value is equal to the number of time units between the first time unit of the measurement cycle and the starting time unit plus 1. The offset of the sham positioning map is set to T. The time units within the measurement period are sequentially named Time Unit 0 (the first time unit), Time Unit 1, Time Unit 2, ..., with the starting time unit being Time Unit T, where T is an integer greater than 1. For any UWB device, the first time unit of the measurement period is known. Therefore, any UWB device can determine its starting time unit for transmitting UWB signals based on the bitmap offset, which corresponds to the time unit corresponding to the first bit of the time unit bitmap. The time unit corresponding to the first bit of the time unit bitmap is the starting time unit for UWB device 1 to transmit UWB signals.

[0217] Bitmap offsets can represent continuous numerical values. For example, a bitmap offset can represent the number of time units, such as 0 to 15 time units. This application does not impose any limitation on the number of time units that a bitmap offset can represent. Bitmap offsets can also represent non-contiguous natural numbers. For example, a bitmap offset can represent any one of a set of time unit numbers, such as 0, 1, 4, 8, 16, 32, etc. For instance, if the bitmap offset value is 3, it indicates that the number of time units before the starting time unit within the measurement period is 8; if the bitmap offset value is 4, it indicates that the number of time units before the starting time unit within the measurement period is 16. This application does not impose any limitation on the non-contiguous numerical values ​​that a bitmap offset can represent. This application does not impose any limitation on the unit of the bitmap offset value; it can be one time unit, multiple time units, or RSTU.

[0218] The time unit bitmap corresponds to multiple time units and is used to indicate whether a time unit is used for UWB device 1 to transmit UWB signals. The time unit corresponding to the first bit of the time unit bitmap is the starting time unit for UWB device 1 to transmit UWB signals. The multiple time units corresponding to the time unit bitmap are contained within the same measurement cycle or communication cycle. Since the bitmap offset is used to determine the starting time unit for UWB device 1 to transmit UWB signals within a measurement cycle (which can be replaced by a communication cycle), and the time unit corresponding to the first bit of the time unit bitmap is this starting time unit, the time unit corresponding to each bit of the time unit bitmap can be determined according to the bitmap offset. Assuming the time unit bitmap comprises K bits, each bit corresponding to a time unit, and the time units within a measurement cycle are sequentially named time unit 0, time unit 1, time unit 2, ..., time unit L (an integer greater than 1), and the bitmap bias is used to determine that the starting time unit for UWB device 1 to transmit UWB signals is time unit 4, then the K bits in the time unit bitmap sequentially correspond to time units 4, 5, ..., and (3+K). For example, if the time unit bitmap comprises K bits, where K is an integer greater than 0, when one of these K bits takes a set value, that set value indicates that the time unit corresponding to that bit is used for UWB device 1 to transmit UWB signals. This set value is either 0 or 1. For example, if the time unit bitmap comprises K bits, a bit with a value of 1 corresponds to a time unit used for UWB device 1 to transmit UWB signals, and a bit with a value of 0 corresponds to a time unit not used for UWB device 1 to transmit UWB signals.

[0219] By combining the bitmap offset and the time unit bitmap, each time unit used by UWB device 1 to transmit UWB signals can be determined, and unnecessary representation overhead in the bitmap can be reduced, thereby reducing the representation overhead of scheduling information. Figure 10 This is an example of a bitmap indicator in the prior art to show whether a time unit is used for transmitting UWB signals in a UWB device. For example... Figure 10 As shown, each rectangle represents whether a time unit is used for UWB device transmission of UWB signals. The number above each rectangle indicates the timing of the time unit it represents. Black rectangles represent time units used for UWB device transmission of UWB signals, and white rectangles represent time units not used for UWB device transmission of UWB signals. Time units 0 to 15 are 16 time units corresponding to a 16-bit bitmap. The time unit corresponding to the first bit of this bitmap (i.e., Figure 13 The time unit 0 in the bitmap is the first time unit of the measurement cycle. This bitmap is used to indicate whether each time unit from time unit 0 to time unit 15 is used for UWB device to transmit UWB signals. For example, if a bit in the bitmap is 1, it means that the time unit corresponding to that bit is used for UWB device to transmit UWB signals. Figure 10The bitmap in the measurement cycle indicates that time units 4, 7, and 10 are used for UWB devices to transmit UWB signals. Other time units in the measurement cycle are not used for UWB devices to transmit UWB signals. This bitmap occupies 2 bytes, or 16 bits.

[0220] Bitmap biasing can reduce unnecessary representation overhead in the bitmap, thereby reducing the overhead of scheduling message representation. Figure 10 Observation reveals that the first four time units in the measurement cycle are not used for UWB signal transmission by the UWB device, resulting in wasted bitmap representation. Therefore, a bitmap offset can be used to represent the number of time units before the start of UWB signal transmission, thus reducing the bitmap's representation length. Specifically, the bitmap offset indicates the number of time units before the start of UWB signal transmission; for example, Bitmap Offset = 3 indicates that time units 0-3 are unused. Accordingly, Figure 10 The time unit for transmitting UWB signals in the UWB device shown can be further modified by... Figure 11 express. Figure 11 This application provides an example of a time unit bitmap indicating whether a time unit is used for UWB device 1 to transmit UWB signals. For example... Figure 11 As shown, each rectangle represents whether a time unit is used for UWB device 1 to transmit UWB signals. The number above each rectangle indicates the timing of the time unit represented by that rectangle. Black rectangles represent time units used for UWB device 1 to transmit UWB signals, and white rectangles represent time units not used for UWB device 1 to transmit UWB signals. Time units 0 to 7 are 8 time units corresponding to an 8-bit time unit bitmap. The first bit of this time unit bitmap corresponds to the time unit (i.e., Figure 11 Time unit 0 in the measurement cycle is determined based on the bitmap offset. This bitmap indicates whether each time unit from time unit 0 to time unit 7 is used for UWB device 1 to transmit UWB signals. For example, if a bit in the bitmap is 1, it means that the time unit corresponding to that bit is used for UWB device 1 to transmit UWB signals. The bitmap offset indicates that the number of time units before the starting time unit for UWB device 1 to transmit UWB signals is 4, meaning that time units 0 to 3 in the measurement cycle are not used for UWB device 1 to transmit UWB signals. Therefore, the first bit of this bitmap corresponds to time unit 4 in the measurement cycle. The time units corresponding to this bitmap, in chronological order, are time unit 4, time unit 5, ..., time unit 11. The time units in the measurement cycle, in chronological order, are time unit 0, time unit 1, time unit 2, ... Figure 11As can be seen, by moving the unnecessary representation of the first four time units to the bitmap offset field in the schedule list field, the time unit bitmap can be completed using only 8 bits. In other words, the time unit bitmap now only requires 1 byte, and does not require... Figure 11 The two bytes in the time unit bitmap are used to save message overhead. In other words, the time unit bitmap and bitmap offset together determine the transmission order of UWB signals transmitted by UWB device 1.

[0221] Tables 8 and 9 show two examples of list elements in the scheduling information provided in the embodiments of this application.

[0222] Table 8

[0223]

[0224] Referring to Table 8, the bitmap size field occupies 2 bits, i.e., bits 0 to 1; the bitmap offset occupies 4 bits, i.e., bits 2 to 5; the reserved field occupies 2 bits, i.e., bits 6 to 7; the time unit bitmap occupies one or more bytes, i.e., the length of the time unit bitmap is a variable value; address 1 occupies 2 or 8 bytes. It should be understood that Table 8 is merely an example of one list element in the scheduling list fields of the scheduling information, and the number of bits occupied by each field in this list element and the position of each field are not limited.

[0225] Table 9

[0226]

[0227] Referring to Table 9, the bitmap size field occupies 2 bits (bits 0-1); the Bitmap Offset Presence field occupies 1 bit (bit 2); the reserved field occupies 5 bits (bits 3-7); the time unit bitmap occupies one or more bytes, meaning the length of the time unit bitmap is a variable value; address 1 occupies 2 or 8 bytes; the bitmap offset occupies 4 bits (bits 0-3); and the reserved field occupies 4 bits (bits 4-7). The Bitmap OffsetPresence field indicates whether the list element contains the Bitmap Offset field. For example, the Bitmap Offset field only appears when Bitmap OffsetPresence = 1, meaning the list element contains the Bitmap Offset field; when Bitmap Offset Presence = 0, the Bitmap Offset field does not appear, meaning the list element does not contain the Bitmap Offset field. It is understood that Table 9 is only an example of one list element in the scheduling list field of the scheduling information, and the number of bits occupied by each field in the list element and the position of each field are not limited.

[0228] Referring to Table 8, the list elements in Example 1 can occupy 4 bytes (corresponding to the short address) or 10 bytes (corresponding to the extended address). Referring to Table 9, the list elements in Example 1 can occupy 5 bytes (corresponding to the short address) or 11 bytes (corresponding to the extended address).

[0229] Example 2: An example of a list element in the scheduling list field of the scheduling information. The list element in Example 2 can be obtained by further combining the bitmap offset field with fields that have periodic transmission characteristics. For example, adding a period index field and a repetition index field to the list element in Example 1.

[0230] The list elements include a bitmap offset, a time unit bitmap, address 1, a period index field, and a repetition index field. The bitmap offset in Example 2 can be the same as the bitmap offset in Example 1, and address 1 in Example 2 can be the same as address 1 in Example 1. The time unit bitmap indicates the time unit used for UWB device 1 to transmit UWB signals within each scheduling period. Alternatively, the time unit bitmap indicates whether a time unit within each scheduling period is used for UWB device 1 to transmit UWB signals. The period index field indicates the scheduling period for UWB device 1 to transmit UWB signals, and the repetition index field indicates the number of repetitions of UWB signal transmission by UWB device 1. The repetition index field is optional. Figure 12 Another example of a list element in the scheduling information provided in this application embodiment. For example... Figure 12 As shown, a list element in the scheduling information includes a bitmap offset, a time unit bitmap, address 1, a period index field, and a repetition index field. For example, the list element also includes a bitmap size field, which indicates the length of the time unit bitmap. This embodiment does not limit the size or position of the bitmap size field. For example, the list element also includes a reserved field, which includes one or more reserved bits. This embodiment does not limit the size or position of the reserved field.

[0231] In one possible implementation, the time unit bitmap is used to indicate the time units allocated for UWB device 1 to transmit UWB signals in each scheduling cycle of UWB signal transmission, i.e., the time units to be occupied by UWB device 1 for UWB signal transmission. For example, K bits in the time unit bitmap correspond one-to-one with K time units in each scheduling cycle of UWB signal transmission by UWB device 1, where each scheduling cycle consists of K time units and K is an integer greater than 1. For example, the time unit bitmap includes 8 bits, and each scheduling cycle of UWB signal transmission by UWB device 1 includes 8 time units. The time unit bitmap is used to indicate that the third and fifth time units in each scheduling cycle of UWB signal transmission by UWB device 1 are used for UWB signal transmission by UWB device 1, and the other time units are not used for UWB signal transmission by UWB device 1. For example, the K bits in the time unit bitmap correspond one-to-one with the K consecutive time units (e.g., the first K time units or the last K time units) in each scheduling cycle of UWB device 1 transmitting UWB signals. Each scheduling cycle consists of Q time units, where Q is an integer greater than K. For example, the time unit bitmap includes 8 bits. Each scheduling cycle of UWB device 1 transmitting UWB signals includes 16 time units. The 8 bits in the time unit bitmap correspond one-to-one with the earliest eight time units within the scheduling cycle. The time unit bitmap is used to indicate that the third and fifth time units in each scheduling cycle of UWB device 1 transmitting UWB signals are used for UWB device 1 to transmit UWB signals, and other time units are not used for UWB device 1 to transmit UWB signals.

[0232] By combining the bitmap offset, time unit, and period index field, the time unit used for transmitting UWB signals in each scheduling cycle of UWB device 1 can be determined, further reducing unnecessary representation overhead in the bitmap and thus lowering the representation overhead of scheduling information. The difference between the time unit bitmap in Example 2 and the time unit bitmap in Example 1 is that the time unit bitmap in Example 1 does not indicate whether the time unit is used for UWB device 1 to transmit UWB signals through a periodic pattern, while the time unit bitmap in Example 2, combined with the period index field, indicates whether the time unit is used for UWB device 1 to transmit UWB signals through a periodic pattern. For example, the time unit bitmap in Example 1 includes 64 bits, with each bit corresponding to one time unit. This bitmap indicates whether the 64 time units corresponding to these 64 bits are used for UWB device 1 to transmit UWB signals. The time unit bitmap in Example 2 includes 8 bits, with each bit corresponding to one time unit. The period index field indicates a scheduling period of 8 time units. The time unit bitmap in Example 2 indicates whether the 8 time units within the 8 scheduling periods (a total of 64 time units) are used for UWB device 1 to transmit UWB signals. As can be seen from this example, the number of bits in the time unit bitmap in Example 2 is less than that in Example 1. Therefore, by combining the time unit bitmap in Example 2 with the period index field to indicate whether time units are used for UWB device 1 to transmit UWB signals in a periodic pattern, the length of the time unit bitmap can be reduced, thereby reducing signaling overhead.

[0233] The time unit bitmap indicates the time unit used for UWB signal transmission by UWB device 1 within the first scheduling period of UWB signal transmission. The bitmap offset determines the starting time unit for UWB signal transmission by UWB device 1 within a measurement period. It can be understood that the time unit bitmap and bitmap offset together determine the UWB transmission within the first scheduling period, while the Period index and Repetition Index fields further determine the periodicity and repetition of the periodic UWB transmission. For the second, third, ..., Xth scheduling period of UWB device 1, the UWB signal transmission order within each scheduling period is the same as the transmission order within the first period. X is the number of repetitions indicated by the Repetition Index field, where X is an integer greater than 1. For example, the scheduling cycles of UWB device 1 are sequentially named the first scheduling cycle, the second scheduling cycle, the third scheduling cycle, ..., the Xth scheduling cycle. The time unit bitmap and bitmap offset jointly determine the first and third time units within the first scheduling cycle for UWB device 1 to transmit UWB signals. The Period index field and Repetition Index field further determine the first and third time units within the second, third, ..., Xth scheduling cycles for UWB device 1 to transmit UWB signals. The time units within each scheduling cycle are sequentially named the first time unit, the second time unit, the third time unit, ..., the Cth time unit, where C is the number of time units included in the scheduling cycle, and C is an integer greater than 1. In other words, for any UWB device's periodic UWB transmission process, by determining the time unit used for transmitting UWB signals within its first scheduling period (represented by the time unit bitmap and bitmap offset), the scheduling period (represented by the Period index field), and the number of repeated transmissions (represented by the Repetition Index field), the periodic UWB transmission process can be completely determined, that is, the specific time unit allocated to any UWB device for periodic UWB transmission can be completely determined.

[0234] Tables 10, 11, 12, and 13 are four examples of list elements in the scheduling information provided in the embodiments of this application.

[0235] Table 10

[0236]

[0237] Referring to Table 10, the bitmap size field occupies 2 bits (bits 0-1); the bitmap offset occupies 4 bits (bits 2-5); the reservation field occupies 2 bits (bits 6-7); the time unit bitmap occupies one or more bytes, meaning the length of the time unit bitmap is a variable value; address 1 occupies 2 or 8 bytes; the Period Index field occupies 4 bits, and the Repetition Index field occupies 4 bits. It should be understood that Table 10 is merely an example of a list element in the scheduling information, and the number of bits occupied by each field and the position of each field in this list element are not limited.

[0238] Table 11

[0239]

[0240] Referring to Table 11, the prior art's Range Role field and Receiver Address Presence field appear in the list element format provided in this application embodiment. That is, the scheduling information provided in this application embodiment may allow the appearance of the Range Role field and the Receiver Address Presence field, or may allow only one of the Range Role field and the Receiver Address Presence field to appear, such as in Tables 12 and 13 below; this application embodiment does not impose any limitations.

[0241] Table 12

[0242]

[0243] Table 13

[0244]

[0245]

[0246] Tables 11, 12, and 13 are examples of placing fields from the prior art (such as the Ranger Role field and the Receiver Address Presence field) in the scheduling information provided in the embodiments of this application. It should be understood that other fields from the prior art can also be placed in the scheduling information provided in the embodiments of this application. This application does not impose any limitations on the order or size of the Bitmap Offset field, Ranger Role field, Receiver Address Presence field, etc.; Tables 11, 12, and 13 are merely examples.

[0247] Referring to Tables 10 to 13, the list elements in Example 2 can occupy 5 bytes (corresponding to short address) or 11 bytes (corresponding to extended address).

[0248] Example 3: An example of a list element in the schedule list field of the scheduling information.

[0249] The list elements include a bitmap offset, a time unit bitmap, address 1, a period index field, a repetition index field, and a Period Mode field. For example, the Period Mode field can be called a periodic mode field or other fields. The meaning of each field in Example 3 can be found in the meaning of each field in Example 2. The Period Mode field is used to indicate that the UWB device periodically transmits UWB signals. Alternatively, the Period Mode field is used to trigger the periodic transmission of UWB signals by each UWB device scheduled by the scheduling information. Or, the Period Mode field is used to indicate the trigger for periodic transmission mode. The Period Mode field can be considered a periodic transmission mode trigger field. The Period Mode field can occupy one or more bits. For example, the Period Mode field includes one bit. If the value of this bit is 1, the Period Mode field is used to indicate that the UWB device periodically transmits UWB signals, and the scheduling information includes fields related to the transmission period, such as the second field and the third field. If the value of this bit is 0, the Period Mode field is used to indicate that the UWB device transmits UWB signals through other transmission modes, and the scheduling information does not include fields related to the transmission period. For example, the scheduling list field in the scheduling information is the same as the scheduling list field in Table 3. Alternatively, if the Period Mode field indicates that the UWB device periodically transmits UWB signals, the scheduling information includes the first field and the second field; if the Period Mode field indicates that the UWB device transmits UWB signals according to other modes, the scheduling information does not include the first field and the second field, and the scheduling list in the scheduling information can be the same as the scheduling list in the scheduling information element in prior art 1 (or prior art 2). It should be understood that the list elements in Examples 1 to 4 above can all indicate that UWB device 1 periodically transmits UWB signals. In this embodiment of the application, the periodic transmission mode refers to the mode in which the UWB device periodically transmits UWB signals as implemented by the scheduling information provided in this embodiment of the application, and other transmission modes refer to any mode other than the periodic transmission mode.

[0250] Table 14 shows an example of a list element in the scheduling information provided in the embodiments of this application.

[0251] Table 14

[0252]

[0253] The meanings of each sub-segment in Table 14 are the same as those of each field in Table 10. The difference between Table 14 and Table 10 is that bit 6 is the Period Mode field. For example, when Period Mode = 1, fields related to the transmission periodicity, such as the Period Index field and the Repetition Index field, appear and take effect; when Period Mode = 0, these fields do not appear. It is understood that Table 14 is merely an example of a list element in the scheduling list fields of the scheduling information, and the number of bits occupied by each field in this list element and the position of each field are not limited.

[0254] Referring to Table 14, the list elements in Example 3 can occupy 5 bytes (corresponding to short address) or 11 bytes (corresponding to extended address).

[0255] In Examples 1, 2, and 3 above, the bitmap offset and time unit bitmap can be used to determine whether each time unit is used for UWB device transmission of UWB signals. The bitmap offset is used to determine the starting time unit for UWB device transmission of UWB signals, which can reduce the number of bits occupied by the time unit bitmap, thereby reducing signaling overhead.

[0256] Example 4: An example of a control field in a scheduling message.

[0257] The control fields in the scheduling information include a Period Mode field, an Address Type field, and a Scheduling List Length field. The Period Mode field indicates that the UWB device periodically transmits UWB signals. Alternatively, the Period Mode field triggers each UWB device scheduled by the scheduling information to periodically transmit UWB signals. Or, the Period Mode field indicates the trigger for a periodic transmission mode. The Period Mode field can be considered a periodic transmission mode trigger field. In this embodiment, the periodic transmission mode refers to the mode in which the UWB device periodically transmits UWB signals as implemented by the scheduling information provided in this embodiment. The Period Mode field may occupy one or more bits. For example, the Period Mode field includes one bit. If the value of this bit is 1, the Period Mode field is used to indicate that the UWB device periodically transmits UWB signals, and the scheduling information includes fields related to the transmission periodicity, such as the Period index field and the Repetition Index field. If the value of this bit is 0, the Period Mode field is used to indicate that the UWB device transmits UWB signals through other transmission modes, and the scheduling information does not include fields related to the transmission periodicity. For example, the scheduling list field in the scheduling information is the same as the scheduling list field in Table 8. For instance, when Period Mode = 0, the format of each list element in the scheduling list field in the scheduling information is as shown in Table 8 or Table 9; when Period Mode = 1, the format of each list element in the scheduling list field in the scheduling information is as shown in Table 10 / Table 11 / Table 12 / Table 13. The Address Type field is used to indicate the address type of the UWB device. The address types of the UWB device include short address (length is 2 bytes) and extended address (length is 8 bytes). For example, the Address Type field includes 1 bit. If the bit is 0 (i.e., Address Type is 0), the Address Type field indicates that the UWB device address is a short address, meaning the address length is 2 bytes (16 bits). If the bit is 1 (i.e., Address Type is 1), the Address Type field indicates that the UWB device address is a long address (or extended address), meaning the address length is 8 bytes (64 bits). The Scheduling ListLength field is used to indicate the number of list elements in the scheduling list.

[0258] Table 15 shows examples of control fields in the scheduling information provided in the embodiments of this application.

[0259] Table 15

[0260]

[0261] Referring to Table 15, the Address Type field occupies 1 bit, i.e., bit 0; the Scheduling List Length field occupies 6 bits, i.e., bits 1 to 6; and the Period Mode field occupies 1 bit, i.e., bit 7. Table 15 is merely an example of control fields in the scheduling information provided in this application embodiment. It is understood that Table 15 is only an example of control fields in scheduling information, and the number of bits occupied by each field and the position of each field in this control field are not limited. Referring to Table 10, the control field in the scheduling information provided in this application embodiment occupies one byte.

[0262] In Example 4, the control fields in the scheduling information include the Period Mode field, Address Type field, and Scheduled List Length field. The Period Mode field is used to instruct the UWB device to periodically transmit UWB signals. The control fields in the scheduling information can instruct the UWB device to periodically transmit UWB signals, thereby reducing signaling overhead.

[0263] Examples of scheduling list fields and control fields in scheduling information have been provided above. It should be understood that one example of scheduling information includes the scheduling list field in Example 1 and the control field in Example 4. Another example of scheduling information includes the scheduling list field in Example 2 and the control field in Example 4. Yet another example of scheduling information includes the scheduling list field in Example 3 and the control field shown in Table 2 or Table 4. The signaling overhead of the scheduling information provided in the embodiments of this application, the signaling overhead of the scheduling information element in prior art 1, and the signaling overhead of the scheduling information element in prior art 2 are compared below. Table 16 shows the signaling overhead of the scheduling information element in prior art 1, the signaling overhead of the scheduling information element in prior art 2, the signaling overhead of scheduling information 1, and the signaling overhead of scheduling information 2. The signaling overhead of scheduling information 1 is equal to the signaling overhead of the scheduling information including the scheduling list field in Example 1 and the control field in Example 4 (see Table 8); it is also equal to the signaling overhead of the scheduling information including the scheduling list field in Example 2 and the control field in Example 4. The overhead of scheduling information 2 is equal to the signaling overhead of scheduling information including the scheduling list field in Example 1 and the control field in Example 4, see Table 9; it is also equal to the signaling overhead of scheduling information including the scheduling list field in Example 3 and the control field shown in Table 2 or Table 4.

[0264] Table 16

[0265]

[0266] In Table 16, S represents the number of time units that the UWB device needs to call, and N represents the number of UWB devices participating in the current UWB application in the system. S is a positive integer, and N is a positive integer. As can be seen from Table 16, the scheduling information provided in this application embodiment does not depend on the number of time units S, that is, the size of the scheduling information provided in this application embodiment will not increase with the increase of the number of time units S. That is, when the same number of time units S need to be scheduled, when the number of S is large, the message size of the scheduling information provided in this application embodiment is smaller than the message size of the scheduling IE of prior art 1 and prior art 2, thereby effectively saving the air interface resource overhead required to transmit scheduling information and reducing the air interface time required to transmit scheduling information.

[0267] The following examples further compare the signaling overhead of the scheduling information provided in the embodiments of this application, the signaling overhead of the scheduling IE in prior art 1, and the signaling overhead of the scheduling IE in prior art 2.

[0268] Figure 13 This is a timing diagram of a non-interlacing MMS ranging process provided in an embodiment of this application. Figure 13 In the diagram, each rectangle represents whether a time unit is used for UWB device transmission of UWB signals. The number above each rectangle indicates the timing of the time unit represented by that rectangle. Black rectangles represent time units used for UWB device transmission of UWB signals, while white rectangles represent time units not used for UWB device transmission of UWB signals. Figure 13 This illustrates that the initiator needs to send UWB signals in time units 0, 2, 4, and 8, and the responder needs to send UWB signals in time units 8, 10, 12, and 14. To achieve this... Figure 13 The scheduling shown for the responder, specifically scheduling the responder to send UWB signals in time units 8, 10, 12, and 14, requires a 2-byte (16-bit) Bitmap to complete the scheduling instruction for the response frame. However, on the other hand, due to... Figure 13Observation shows that time unit 8 is the starting time unit for the responder's UWB signal transmission, meaning the first 8 time units of the responder's transmission (time units 0-7) are unused, resulting in wasted Bitmap representation. Therefore, we can consider using the Bitmap Offset field to represent the starting time unit for the responder's UWB signal transmission, thereby reducing the Bitmap representation length. For example, the value of the Bitmap Offset field represents the number of time units before the starting time unit for the responder's UWB signal transmission. For example, Bitmap Offset = 7 indicates that the starting time unit for the responder's UWB signal transmission is time unit 8. Alternatively, the value of the Bitmap Offset field can represent the number of unused time units before the starting time unit for the responder's UWB signal transmission. For example, using the Bitmap Offset field to represent the number of unused time units, i.e., Bitmap Offset = 7, indicates that time units 0-7 are all unused. Accordingly, Figure 13 The time unit shown is used for transmitting UWB signals, which can be... Figure 14 express. Figure 14 A timing diagram of another non-interleaved MMS ranging process provided in an embodiment of this application. Figure 14 In the diagram, each rectangle represents whether a time unit is used for UWB device transmission of UWB signals. The number above each rectangle indicates the timing of the time unit represented by that rectangle. Black rectangles represent time units used for UWB device transmission of UWB signals, while white rectangles represent time units not used for UWB device transmission of UWB signals. Figure 14 This illustrates that the responder needs to send UWB signals in time units 0, 2, 4, and 8. Figure 14 As can be seen, by moving the unnecessary representation of the first four time units to the Bitmap Offset field of the list element in the scheduling list field, the actual scheduling instruction can be completed with only 8 bits. That is, the scheduling Bitmap only needs 1 byte at this time, and no additional bytes are required. Figure 13 This reduces message overhead by using 2 bytes.

[0269] Figure 15 This is a typical scheduling pattern for completing the DL-TDOA positioning process. In this scheduling pattern, there are three anchor devices, namely... Figure 15 Anchor points 1, 2, and 3 in the image are obtained through methods such as... Figure 15 The scheduling method shown transmits UWB signals to perform DL-TDOA positioning. Assume... Figure 15The DL-TDOA scheduling mode shown requires 8 repetitions, with no interval between two consecutive DL-TDOA positioning processes. The scheduling situation in this case is as follows: Figure 16 As shown. Figure 16 This is a schematic diagram illustrating the scheduling of an 8-repetition DL-TDOA positioning method, as provided in an embodiment of this application. Figure 15 and Figure 16 In the diagram, each rectangle represents a time unit. Gray rectangles represent time units that are scheduled and allocated for transmitting UWB signals, while white rectangles represent time units that are not scheduled and allocated for transmitting UWB signals. Since a complete DL-TDOA process is completed within 8 time units, therefore... Figure 16 The two adjacent DL-TDOA processes shown have no interval in between.

[0270] against Figure 16 In the scheduling scenario shown, Period Mode=1 should be enabled. This allows for effective compression by utilizing the Period Index and Repetition Index fields. Figure 16 The signaling overhead for scheduling information in the illustrated scenario. Assuming the Period index field can represent periodic values ​​such as 0, 1, 4, 8, 16, and 32 time units, and the Repetition Index field can represent 1 to 16 repetitions, then setting the Period index field to 0 (indicating no interval between two adjacent DL-TDOA measurements, with the next measurement starting immediately after the previous one completes) and setting the Repetition Index field to 7 (with indices starting from 0, thus representing 8 repetitions) allows for... Figure 16 The scheduling instructions for the situation. Assuming the Period index field can represent period values ​​such as 0, 1, 4, 8, 16, 32 time units, and the Repetition Index field can represent 1 to 16 repetitions, then setting the Period index field to 8 (indicating a scheduling period of 8 time units) and the Repetition Index field to 7 (indicating 8 repetitions, with indices starting from 0) will enable the scheduling of... Figure 16 Dispatch instructions for the situation.

[0271] Accordingly, by Figure 16 We know that S = 64 and N = 3. Therefore, Figure 16 The signaling consumption of each scheduling information under the given conditions is compared in Table 17 below.

[0272] Table 17

[0273]

[0274] The scheduling information in Table 17 of this application may include the scheduling list field in Example 2 and the control field in Example 4. As can be seen from Table 17, the scheduling information proposed in this application can significantly reduce message size overhead compared with prior art 1 and prior art 2.

[0275] It should be noted that the scheduling information provided in this application embodiment (hereinafter referred to as the newly designed scheduling IE) can be identified and processed by devices (anchors or tags) that need to perform ranging or sensing functions. As one possible implementation, the corresponding identification and processing method of the newly designed scheduling IE is similar to the identification and processing method of nested IEs (e.g., RDM IEs) specified in the existing protocol 802.15.4z, and can be referred to the identification and processing method of nested IEs in the existing protocol 802.15.4z. For example, the upper layer of the transmitting device's protocol configures the scheduling IE and passes it to the medium access control (MAC) layer of the transmitting device. Another example is that the MAC layer of the receiving device passes the received scheduling IE to the upper layer protocol of the receiving device, and the upper layer of the protocol performs identification and processing on the scheduling IE, etc.

[0276] As one possible implementation, the newly designed scheduling IE can be transmitted via narrowband frequency bands.

[0277] As another possible implementation, the newly designed scheduling IE can also be transmitted via the UWB band.

[0278] To facilitate understanding, the newly designed scheduling IE will be described in detail below with reference to Table 18.

[0279] Table 18 below is an extension and continuation of Table 7-18 of the existing 802.15.4z protocol. For simplicity, definitions already present in Table 7-18 are not reflected in Table 18. Specifically, as can be seen from Table 18, newly designed scheduling IEs can be added to the nested IE list defined in Table 7-18 of the existing 802.15.4z protocol, as new IEs in the 802.15.4ab protocol or subsequent versions. Specifically, a reserved sub-ID value from the nested IE list defined in Table 7-18 of the existing 802.15.4z protocol can be used to indicate the newly designed scheduling IE.

[0280] Table 18

[0281] Sub-ID value IE Name Data Used by Created by T (Newly added scheduling IE) X Upper Layer Upper Layer

[0282] In Table 18, T can be any one or more values ​​from 0x5d to 0x7f. Table 18 can be an extension and continuation of the nested IE list defined in the existing 802.15.4z protocol table-7-18. X in Table 18 indicates that the newly designed scheduling IE belongs to the Data type.

[0283] The structure of a communication device that can implement the scheduling method provided in the embodiments of this application is described below with reference to the accompanying drawings.

[0284] Figure 17 This is a schematic diagram of a communication device 1700 provided in an embodiment of this application. The communication device 1700 can correspondingly implement the functions or steps implemented by the transmitting end in the above-described method embodiments, and can also correspondingly implement the functions or steps implemented by the receiving end in the above-described method embodiments. The communication device may include a processing module 1710 and a transceiver module 1720. In one possible implementation, a storage unit may also be included, which can be used to store instructions (code or program) and / or data. The processing module 1710 and the transceiver module 1720 can be coupled to the storage unit. For example, the processing module 1710 can read the instructions (code or program) and / or data in the storage unit to implement the corresponding method. The above-described units can be set independently, or partially or completely integrated. For example, the transceiver module 1720 may include a transmitting module and a receiving module. The transmitting module can be a transmitter, and the receiving module can be a receiver. The entity corresponding to the transceiver module 1720 can be a transceiver or a communication interface.

[0285] In some possible implementations, the communication device 1700 can correspondingly implement the behavior and functions of the transmitting end in the above method embodiments. For example, the communication device 1700 can be a transmitting end, or a component (e.g., a chip or circuit) applied in the transmitting end. The transceiver module 1720 can, for example, be used to perform... Figure 6 , Figure 7 In the embodiments, all receiving or sending operations performed by the sending end, for example Figure 6 Step 602 in the illustrated embodiment, Figure 7 Steps 701 and 702 in the illustrated embodiments, and / or other processes used to support the techniques described herein. Processing module 1710 is used to execute... Figure 6 , Figure 7 In the embodiments, all operations performed by the sending end other than the sending and receiving operations are included, for example... Figure 6 Step 601 in the illustrated embodiment.

[0286] In some possible implementations, the communication device 1700 can correspondingly implement the behavior and functions of the receiving end in the above method embodiments. For example, the communication device 1700 can be a receiving end, or it can be a component (e.g., a chip or circuit) applied in the receiving end. The transceiver module 1720 can, for example, be used to perform... Figure 6 , Figure 7 In the embodiments, all receiving or sending operations performed by the receiving end, for example Figure 6 Step 602 in the illustrated embodiment, Figure 7 Steps 701 and 702 in the illustrated embodiments, and / or other processes used to support the technology described herein. Processing module 1710 is used to perform all operations performed by the receiving end other than the transmit / receive operations, such as... Figure 6 Step 603 in the illustrated embodiment, Figure 7 Step 703 in the illustrated embodiment.

[0287] Figure 18 This is a schematic diagram of another communication device 180 provided in an embodiment of this application. Figure 18 The communication device mentioned above can be either the sending end or the receiving end.

[0288] like Figure 18 As shown, the communication device 180 includes at least one processor 1810 and a transceiver 1820.

[0289] In some embodiments of this application, the processor 1810 and transceiver 1820 can be used to perform functions or operations performed by the transmitting end. For example, the transceiver 1820 performs... Figure 6 , Figure 7 In this embodiment, all receive or transmit operations are performed by the transmitting end. The processor 1810 is used, for example, to perform... Figure 6 , Figure 7 In the embodiments, all operations performed by the sending end other than the sending and receiving operations are included.

[0290] In some embodiments of this application, the processor 1810 and transceiver 1820 can be used to perform functions or operations performed by the receiving end. For example, the transceiver 1820 performs... Figure 6 , Figure 7 In this embodiment, all receive or transmit operations are performed by the receiving end. The processor 1810 is used to perform all operations performed by the receiving end other than the receive and transmit operations.

[0291] Transceiver 1820 is used to communicate with other devices / appliances via a transmission medium. Processor 1810 uses transceiver 1820 to send and receive data and / or signaling, and to implement the methods in the above method embodiments. Processor 1810 can implement the functions of processing module 1710, and transceiver 1820 can implement the functions of transceiver module 1720.

[0292] For example, transceiver 1820 may include radio frequency (RF) circuitry and an antenna. The RF circuitry is mainly used for converting baseband signals to RF signals and processing RF signals. The antenna is mainly used for transmitting and receiving RF signals in the form of electromagnetic waves. Input / output devices, such as touchscreens, displays, and keyboards, are mainly used for receiving user input data and outputting data to the user.

[0293] For example, the communication device 180 may further include at least one memory 1830 for storing program instructions and / or data. The memory 1830 is coupled to the processor 1810. The coupling in this embodiment is an indirect coupling or communication connection between devices, units, or modules, and can be electrical, mechanical, or other forms, used for information exchange between devices, units, or modules. The processor 1810 may operate in conjunction with the memory 1830. The processor 1810 may execute program instructions stored in the memory 1830. At least one of the at least one memory may be included in the processor.

[0294] The processor 1810 can read the software program in the memory 1830, interpret and execute the instructions of the software program, and process the data of the software program. When data needs to be transmitted wirelessly, the processor 1810 performs baseband processing on the data to be transmitted and outputs the baseband signal to the radio frequency (RF) circuit. The RF circuit processes the baseband signal and transmits the RF signal outward in the form of electromagnetic waves through the antenna. When data is sent to the communication device, the RF circuit receives the RF signal through the antenna, converts the RF signal into a baseband signal, and outputs the baseband signal to the processor 1810. The processor 1810 converts the baseband signal into data and processes the data.

[0295] In another implementation, the aforementioned radio frequency circuits and antennas can be set up independently of the processor that performs baseband processing. For example, in a distributed scenario, the radio frequency circuits and antennas can be arranged in a remote manner, independent of the communication device.

[0296] This application embodiment does not limit the specific connection medium between the transceiver 1820, processor 1810, and memory 1830. This application embodiment... Figure 18 The memory 1830, processor 1810, and transceiver 1820 are connected via a bus 1840, and the bus is in... Figure 18The connections between other components are shown in thick lines only and are not intended to be limiting. This bus can be divided into address bus, data bus, control bus, etc. For ease of illustration, Figure 18 The bus is represented by a single thick line, but this does not mean that there is only one bus or one type of bus.

[0297] In the embodiments of this application, the processor may be a general-purpose processor, a digital signal processor, an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, or discrete hardware components, capable of implementing or executing the methods, steps, and logic block diagrams disclosed in the embodiments of this application. The general-purpose processor may be a microprocessor or any conventional processor. The steps of the methods disclosed in the embodiments of this application can be directly manifested as being executed by a hardware processor, or executed by a combination of hardware and software modules within the processor.

[0298] Figure 19 A schematic diagram of another communication device 190 provided in an embodiment of this application. (See attached diagram.) Figure 19 As shown, Figure 19 The communication device shown includes logic circuit 1901 and interface 1902. Figure 17 The processing module 1710 can be implemented using logic circuit 1901. Figure 17 The transceiver module 1720 can be implemented using interface 1902. The logic circuit 1901 can be a chip, processing circuit, integrated circuit, or system-on-chip (SoC) chip, etc., and the interface 1902 can be a communication interface, input / output interface, etc. In this embodiment, the logic circuit and the interface can also be coupled to each other. The specific connection method between the logic circuit and the interface is not limited in this embodiment.

[0299] In some embodiments of this application, the logic circuit and interface can be used to perform the functions or operations performed by the sending end as described above.

[0300] In some embodiments of this application, the logic circuit and interface can be used to perform the functions or operations performed by the receiving end described above.

[0301] This application also provides a computer-readable storage medium storing a computer program or instructions that, when run on a computer, cause the computer to perform the methods of the above embodiments.

[0302] This application also provides a computer program product, which includes instructions or a computer program that, when run on a computer, causes the methods in the above embodiments to be executed.

[0303] This application also provides a communication system, including the aforementioned transmitting end and the aforementioned receiving end.

[0304] This application also provides a chip, which includes: a communication receiver and processor; a communication interface for transmitting and receiving signals from the chip; and a processor for executing computer program instructions to cause a communication device including the chip to perform the methods described in the above embodiments.

[0305] In the above embodiments, implementation can be achieved, in whole or in part, through software, hardware, firmware, or any combination thereof. When implemented using software, it can be implemented, in whole or in part, as a computer program product. The aforementioned computer program product includes one or more computer programs or instructions. When the aforementioned computer program or instructions are loaded and executed on a computer, the processes or functions described in the embodiments of this application are performed, in whole or in part. The aforementioned computer can be a general-purpose computer, a special-purpose computer, a computer network, a network device, a user equipment, or other programmable device. The aforementioned computer program or instructions can be stored in a computer-readable storage medium or transferred from one computer-readable storage medium to another. For example, the aforementioned computer program or instructions can be transferred from one website, computer, server, or data center to another website, computer, server, or data center via wired or wireless means. The aforementioned computer-readable storage medium can be any available medium accessible to a computer or a data storage device such as a server or data center integrating one or more available media. The aforementioned available medium can be a magnetic medium, such as a floppy disk, hard disk, or magnetic tape; it can also be an optical medium, such as a digital video optical disc; or it can be a semiconductor medium, such as a solid-state drive. The computer-readable storage medium may be a volatile or non-volatile storage medium, or may include both types of storage media.

[0306] In the various embodiments of this application, unless otherwise specified or in case of logical conflict, the terminology and / or descriptions of different embodiments are consistent and can be referenced by each other. The technical features of different embodiments can be combined to form new embodiments according to their inherent logical relationship.

Claims

1. A scheduling method for Ultra-Wideband (UWB), characterized in that, include: The scheduling information includes a time unit bitmap and a bitmap offset. The time unit bitmap is used to indicate whether a time unit is used for UWB device to transmit UWB signals. The bitmap offset is used to determine the start time unit for the UWB device to transmit UWB signals. The time unit corresponding to the first bit of the time unit bitmap is the start time unit. The scheduling information also includes a scheduling list and a field for indicating the number of list elements in the scheduling list. One list element in the scheduling list is used to schedule one UWB device. The time unit bitmap and the bitmap offset correspond to the same list element in the scheduling list. Send the scheduling information.

2. The method according to claim 1, characterized in that, The bitmap bias is set to the number of time units preceding the starting time unit within a measurement period.

3. The method according to claim 2, characterized in that, The time unit bitmap includes K bits, where K is an integer greater than 0. When one of the K bits takes a set value, the set value indicates that the time unit corresponding to that bit is used for the UWB device to transmit the UWB signal.

4. The method according to claim 2 or 3, characterized in that, The measurement period is the ranging period.

5. The method according to any one of claims 1 to 4, characterized in that, The time unit bitmap is a time unit bitmap corresponding to a portion of the time units within a measurement cycle, and the scheduling information also includes a field for indicating the scheduling cycle for the UWB device to transmit the UWB signal.

6. The method according to claim 5, characterized in that, The scheduling information also includes a field indicating the number of times the UWB device transmits the UWB signal.

7. The method according to claim 5 or 6, characterized in that, The scheduling information also includes a field for instructing the UWB device to periodically transmit the UWB signal.

8. The method according to any one of claims 1 to 7, characterized in that, The scheduling information also includes a field indicating the length of the time unit bitmap.

9. The method according to any one of claims 1 to 8, characterized in that, The scheduling information also includes the address of the UWB device, which has a length of 2 bytes or 8 bytes.

10. The method according to any one of claims 1 to 9, characterized in that, The time unit is any one of the following: time slot, ranging scheduling time unit (RSTU).

11. The method according to any one of claims 1 to 10, characterized in that, The method is applied to ranging, sensing, or positioning scenarios.

12. A communication device, characterized in that, Includes modules or units for implementing the method of any one of claims 1 to 11.

13. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores a computer program, the computer program including program instructions that, when executed, cause the computer to perform the method as described in any one of claims 1 to 11.

14. A communication device, characterized in that, The device includes a processor coupled to a memory storing computer program instructions, the processor executing the computer program instructions to cause the communication device to perform the method as described in any one of claims 1 to 11.

15. A chip, characterized in that, include: A communication interface is used for signal transmission and reception of the chip. as well as A processor for executing computer program instructions, causing a communication device including the chip to perform the method as described in any one of claims 1 to 11.

16. A computer program product, characterized in that, When the computer program product is run on a computer, it causes the computer to perform the method as described in any one of claims 1 to 11.