BIM-based construction project progress management method and system
CN119990721BActive Publication Date: 2026-07-14DALIAN LONGYUANDA COMM ENG CO LTD
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- DALIAN LONGYUANDA COMM ENG CO LTD
- Filing Date
- 2025-04-17
- Publication Date
- 2026-07-14
Smart Images

Figure CN119990721B_ABST
Abstract
The present application relates to the technical field of data processing for management, in particular to a BIM-based construction project progress management method and system, comprising: collecting data in the current construction plan, obtaining a change probability according to the number of pipes pre-buried by the construction party, the caliber and length of the pipes, forming a combination of any one pipe pre-buried by the advanced construction party and the late construction party, denoted as a control combination, obtaining a construction space conflict factor and a construction progress difference factor of each control combination according to the construction material and site data and the data difference in each control combination, and then obtaining a construction conflict probability in combination with the construction start and end time of each construction party, thereby obtaining an optimal construction plan. Therefore, the present application obtains an optimal construction plan by adapting the pipe sequence and the number of people required for pipe construction, greatly improves the collaborative construction efficiency of multiple construction parties, and optimizes the construction progress.
Need to check novelty before this filing date? Find Prior Art