BIM-based construction project progress management method and system

CN119990721BActive Publication Date: 2026-07-14DALIAN LONGYUANDA COMM ENG CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
DALIAN LONGYUANDA COMM ENG CO LTD
Filing Date
2025-04-17
Publication Date
2026-07-14

Smart Images

  • Figure CN119990721B_ABST
    Figure CN119990721B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of data processing for management, in particular to a BIM-based construction project progress management method and system, comprising: collecting data in the current construction plan, obtaining a change probability according to the number of pipes pre-buried by the construction party, the caliber and length of the pipes, forming a combination of any one pipe pre-buried by the advanced construction party and the late construction party, denoted as a control combination, obtaining a construction space conflict factor and a construction progress difference factor of each control combination according to the construction material and site data and the data difference in each control combination, and then obtaining a construction conflict probability in combination with the construction start and end time of each construction party, thereby obtaining an optimal construction plan. Therefore, the present application obtains an optimal construction plan by adapting the pipe sequence and the number of people required for pipe construction, greatly improves the collaborative construction efficiency of multiple construction parties, and optimizes the construction progress.
Need to check novelty before this filing date? Find Prior Art