Technical Problem

In existing energy storage systems, incorrect CT (current transformer) connection in the electricity meter leads to data acquisition errors. Existing detection methods require manual adjustment or additional equipment, making it difficult to achieve fast and accurate CT wiring correction.

Method used

By controlling the output power of each phase of the inverter, the ratio coefficient of inverter power to grid power is calculated, the CT connection status is identified and the grid power is corrected. Formulas (1) to (7) are used for calculation, and the CT is identified as incorrectly connected or reversed and automatically corrected.

Benefits of technology

It can identify and correct CT wiring errors without additional equipment or manual adjustments, enabling accurate calculation of grid power and simplifying the CT wiring correction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120064741B_ABST
    Figure CN120064741B_ABST
Patent Text Reader

Abstract

本发明公开了一种储能系统及其CT校正计算方法,该CT校正计算方法包括:控制逆变器第j相依次输出两种功率,获取各相电网电压以及对应的各相CT电流采样值,并根据各相电网电压以及对应的各相CT电流采样值,计算各相电网功率;根据两种功率及对应计算得到的各相电网功率,计算逆变器第j相功率分别与各相电网功率之间的比例系数;根据储能系统的相位数,直接或重复控制逆变器其他相输出两种功率,以得到逆变器的每一相功率分别与各相电网功率之间的比例系数;根据逆变器的每一相功率分别与各相电网功率之间的比例系数,来识别CT接入情况和校正各相电网功率。本发明不需要额外的辅助设备和电路,就能够识别CT接入情况并直接计算得到正确的电网功率。