Project production management method and system based on BIM technology, electronic equipment and storage medium

By introducing component production platforms and visual scanning units in BIM technology project production management, the problem of rapid comparison of construction components and BIM models is solved, and efficient production parameter control and construction efficiency improvement is achieved.

CN120146774AInactive Publication Date: 2025-06-13HUBEI UNITED INVESTMENT GROUP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411702817.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-26
Publication Date
2025-06-13
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure CN120146774A_ABST
    Figure CN120146774A_ABST
Patent Text Reader

Abstract

The invention provides a project production management method and system based on a BIM technology, electronic equipment and a storage medium, and relates to the technical field of BIM, the electronic equipment comprises a component production platform and a visual scanning unit, and the component production platform comprises a scanning box, a component conveying table, a pushing mechanism and a front blocking mechanism. A lifting channel is integrally formed in the top of the front end of the scanning box, a front blocking mechanism is inserted into the lifting channel in a penetrating mode, side baffles are integrally formed on the two sides of the bottom of the front blocking mechanism, and the surface of a first lead screw is sleeved with a correcting assembly. The production parameters of the components required in the construction process can be efficiently managed and controlled based on the BIM technology, the digital models of the important components are directly obtained, and the digital models and the BIM model are quickly combined for inspection, so that the probability of later reworking is reduced, the building construction efficiency is improved, the operation process is simple and convenient, the automation degree is high, and the construction efficiency is improved. And the digital model of the component is more accurate and reliable.
Need to check novelty before this filing date? Find Prior Art