Industrial production line simulation optimization method and system based on digital twinning
By building a high-precision digital twin model and combining with particle swarm optimization algorithm, the problems of insufficient real-time data acquisition and difficult to implement optimization results in the industrial production line optimization method are solved, and the precise optimization of production line layout and the improvement of operating efficiency are achieved.
Patent Information
- Application Number
- CN202510297026.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-13
- Publication Date
- 2025-06-17
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing industrial production line optimization methods lack real-time data acquisition, the virtual model is disconnected from actual production, the optimization algorithm is poor adaptability, and the optimization results are difficult to implement, making it difficult to adapt to the complex and changeable production environment.
By collecting and integrating real-time operating parameters of industrial production lines, a high-precision digital twin model is built, and dynamically adjusting it with particle swarm optimization algorithm, the precise transformation of optimized parameters into the actual production environment is achieved.
It realizes accurate optimization of production line layout, improves the operating efficiency and equipment utilization of production line, simplifies the implementation process of optimization results, and improves the adaptability and implementability of optimization.
Smart Images

Figure CN120161738A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of industrial automation and intelligent manufacturing, and particularly to an industrial production line simulation optimization method and system based on digital twin. Background Art
[0002] As one of the core enabling technologies of Industry 4.0, digital twin technology realizes the virtual-real integration of production systems by constructing a digital mapping of the physical world. In recent years, the application of digital twin technology in the field of industrial production has been continuously deepened, evolving from initial equipment monitoring to current full-process simulation and optimization. However, most traditional industrial production line optimization methods rely on static modeling and offline simulation, which are often disconnected from the actual production environment and difficult to capture dynamic changes and random factors in the production process. In addition, existing production line optimization technologies mostly adopt experience-oriented decision-making methods, lacking effective utilization of massive real-time data, resulting in optimization results that are difficult to adapt to complex and changing production environments. With the development of Internet of Things and artificial intelligence technologies, intelligent optimization methods based on real-time data have gradually become a research hotspot. However, effectively combining digital twin with intelligent optimization algorithms to construct a dynamic and accurate industrial production line optimization method still faces many challenges.
[0003] The current industrial production line optimization technologies have the following deficiencies: First, existing optimization methods lack accurate modeling of the real-time operating state of the production line, making it difficult to achieve precise optimization of the production line layout; Second, most optimization systems fail to fully integrate equipment operating state data and production process data, resulting in optimization results lacking global coordination; Third, traditional optimization algorithms are inefficient in dealing with complex production environments with high-dimensional and non-linear constraints and difficult to obtain an ideal solution within an acceptable time; Finally, the implementation process of the optimization results lacks a standardized execution plan, increasing the difficulty of transforming from virtual optimization to practical application. These problems seriously restrict the further improvement of industrial production line efficiency, and there is an urgent need to develop optimization methods with real-time, accuracy, and implementability.
[0004] To address the above problems, the present invention proposes an industrial production line simulation optimization method and system based on digital twin. By collecting and integrating real-time operating parameters of the industrial production line, constructing a high-precision digital twin model, and dynamically adjusting it in combination with the particle swarm optimization algorithm, the optimization parameters are finally accurately transformed into the actual production environment. Summary of the Invention
[0005] In view of the problems existing in the existing industrial production line optimization methods, such as insufficient real-time data collection, disconnection between virtual models and actual production, poor adaptability of optimization algorithms, and difficulty in implementing optimization results, the present invention is proposed.
[0006] Therefore, the problem to be solved by the present invention is how to collect production data in real time, accurately model the production environment, intelligently optimize the production layout, and effectively guide the actual implementation of the industrial production line optimization method.
[0007] To solve the above technical problems, the present invention provides the following technical solutions:
[0008] In a first aspect, an embodiment of the present invention provides a digital-twin-based industrial production line simulation optimization method, which includes:
[0009] Collect the first operating parameters of the industrial production line and import the first operating parameters into the digital-twin model through a data interface, where the first operating parameters include equipment operating status data and production process data;
[0010] Establish a three-dimensional geometric model and map the production process data to the corresponding equipment nodes of the three-dimensional geometric model;
[0011] Based on the equipment node data of the three-dimensional geometric model, use the particle swarm optimization algorithm to dynamically adjust the production line layout to obtain layout optimization parameters;
[0012] Apply the layout optimization parameters to the actual industrial production line and complete the production line layout optimization by moving the equipment position and adjusting the process connection.
[0013] As a preferred solution of the digital-twin-based industrial production line simulation optimization method of the present invention, where: applying the layout optimization parameters to the actual industrial production line and completing the production line layout optimization by moving the equipment position and adjusting the process connection includes:
[0014] Prepare an equipment shift plan according to the layout optimization parameters and formulate an implementation plan for layout adjustment;
[0015] At the same time, reconstruct the production rhythm according to the layout optimization parameters, adjust the process connection relationship of the equipment, and modify the process parameters and timing logic of the production control system to complete the production line layout optimization;
[0016] Collect the operation data of the optimized production line for production line trial operation verification, verify the optimization effect through data analysis, and judge whether the production line layout adjustment reaches the expected optimization goal.
[0017] As a preferred solution of the digital-twin-based industrial production line simulation optimization method of the present invention, where: the method for formulating the implementation plan for layout adjustment is:
[0018] Use a laser locator to calibrate the equipment installation position and perform equipment shift operations according to the preset adjustment steps;
[0019] Use industrial forklifts and lifting equipment to move the production equipment to the designated location, and use a spirit level and a theodolite to level and align the equipment;
[0020] Re-lay the material transfer device between equipment rooms, and adjust the speed parameters and connection spacing of the material transfer device to optimize the transfer efficiency of materials between equipment.
[0021] As a preferred solution of the digital twin-based industrial production line simulation optimization method described in the present invention, wherein: the method for judging whether the production line layout adjustment reaches the expected optimization goal includes:
[0022] When the improvement rate of the material transfer efficiency is greater than the preset threshold, the expected optimization goal of logistics is achieved, and a logistics optimization report is automatically generated and pushed to the production management department;
[0023] When the improvement rate of the space utilization rate of the equipment reaches the expected goal, the expected optimization goal of the space layout is achieved, and the optimal layout plan is recorded and stored in the plan library for reference;
[0024] When the improvement of the production beat does not reach the predetermined goal, the beat optimization subsystem is triggered to automatically adjust the equipment working parameters and re-evaluate the optimization effect;
[0025] When the overall operating efficiency of the production line reaches the expected operating efficiency, lock the current layout optimization parameters, mark the optimization plan as the verified status, and push the optimization result report to the management;
[0026] When the operating data of the optimized production line remains stable for multiple consecutive days, confirm that the expected optimization of the layout is met, and set this layout mode as the standard layout configuration for this type of product.
[0027] As a preferred solution of the digital twin-based industrial production line simulation optimization method described in the present invention, wherein: the method for obtaining the layout optimization parameters is as follows:
[0028] Construct an evaluation index system for the production line layout optimization, where the evaluation index system includes equipment spacing index, material transportation distance index, equipment utilization rate index, and space occupancy index;
[0029] Establish an objective function for layout optimization according to the evaluation index system, and set constraint conditions, where the objective function uses the weighted summation form to comprehensively process each evaluation index after normalization;
[0030] Configure the second operating parameters of the particle swarm optimization algorithm, and use the configured particle swarm optimization algorithm to perform iterative search in the solution space, and guide the movement direction of the particles through the individual optimal position and the global optimal position;
[0031] Based on the layout optimization scheme, layout optimization parameters are extracted, where the layout optimization parameters include the optimized spatial coordinates of each device, the device orientation angle, the material transfer path, and the process connection timing sequence.
[0032] As a preferred scheme of the digital twin-based industrial production line simulation optimization method of the present invention, wherein: the method of iterative search is as follows.
[0033] Input the device node data into the particle swarm optimization algorithm, calculate the objective function values of the corresponding layout schemes of each particle, and update the individual optimal position and the global optimal position.
[0034] Adjust the motion state of the particles according to the velocity update formula and the position update formula, and gradually converge to the optimal solution.
[0035] When the termination condition is met, the global optimal position is output as the layout optimization scheme.
[0036] As a preferred scheme of the digital twin-based industrial production line simulation optimization method of the present invention, wherein: a three-dimensional geometric model is established, and the production process data is mapped to the corresponding device nodes of the three-dimensional geometric model, including:
[0037] Based on the three-dimensional modeling engine of the digital twin model, a parametric modeling method is used to construct the three-dimensional geometric model of the production line, where the three-dimensional geometric model is modeled according to the actual size data of the industrial production line.
[0038] Based on the three-dimensional geometric model, a physical property model is constructed, and physical parameters are added to each device node, where the physical property model is operated by a rigid body dynamics engine.
[0039] A data node network is established according to the three-dimensional geometric model, and the production process data is transmitted to the corresponding device nodes through a data distribution mechanism, where the data node network includes a main control node and several device nodes.
[0040] A data visualization layer is established, and the production process data mapped to the device nodes is converted into a visual effect, and the operating status and performance parameters of the device nodes are displayed by means of color coding.
[0041] In a second aspect, an embodiment of the present invention provides a digital twin-based industrial production line simulation optimization system, which includes:
[0042] An acquisition module, configured to acquire the operation parameters of the industrial production line and import the operation parameters into the digital twin model through a data interface, where the operation parameters include device operation status data and production process data.
[0043] A mapping module, configured to establish a three-dimensional geometric model and map the production process data to corresponding device nodes of the three-dimensional geometric model;
[0044] An adjustment module, based on the device node data of the three-dimensional geometric model, dynamically adjusts the production line layout by using a particle swarm optimization algorithm to obtain layout optimization parameters;
[0045] An optimization module, configured to apply the layout optimization parameters to an actual industrial production line, and complete the production line layout optimization by moving device positions and adjusting process connections.
[0046] In a third aspect, an embodiment of the present invention provides a computer device, including a memory and a processor, where the memory stores a computer program, and: when the computer program instructions are executed by the processor, the steps of the digital twin-based industrial production line simulation optimization method as described in the first aspect of the present invention are implemented.
[0047] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium, on which a computer program is stored, and: when the computer program instructions are executed by the processor, the steps of the digital twin-based industrial production line simulation optimization method as described in the first aspect of the present invention are implemented.
[0048] The beneficial effects of the present invention are as follows: By collecting the operation parameters of the actual production line and importing them into the digital twin model, the real-time data synchronization between the physical entity and the digital model is realized, providing an objective basis for optimization decisions; at the same time, a parametric modeling method is used to construct a three-dimensional geometric model and map the production process data, making complex data more intuitive and understandable, and facilitating engineers to discover potential problems; the particle swarm optimization algorithm is used to dynamically adjust the production line layout, establishing a multi-dimensional evaluation index system, and efficiently solving the high-dimensional non-linear complex layout optimization problem that is difficult to handle by traditional methods; applying the optimization parameters to the actual production line, by accurately calibrating the device positions, reconstructing the production rhythm and process connection relationships, the accurate conversion from the virtual optimization scheme to the actual production line transformation is realized, and a multi-level optimization effect evaluation mechanism is established, improving the production line performance. Description of the Drawings
[0049] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for description in the embodiments will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present invention, and those of ordinary skill in the art can obtain other drawings according to these drawings without creative efforts. Among them:
[0050] Figure 1 It is the overall flowchart of the digital twin-based industrial production line simulation optimization method for Embodiment 1. Detailed Embodiments
[0051] In order to make the above objects, features and advantages of the present invention more obvious and understandable, the following detailed description of the specific embodiments of the present invention will be given in conjunction with the accompanying drawings of the specification.
[0052] In the following description, many specific details are set forth in order to fully understand the present invention. However, the present invention may also be implemented in other ways different from those described herein. Those skilled in the art can make similar generalizations without departing from the connotation of the present invention. Therefore, the present invention is not limited by the specific embodiments disclosed below.
[0053] Secondly, the so-called "one embodiment" or "embodiment" herein refers to a specific feature, structure or characteristic that may be included in at least one implementation manner of the present invention. The "in one embodiment" appearing in different places in this specification does not all refer to the same embodiment, nor is it a separate or selectively mutually exclusive embodiment with other embodiments.
[0054] Embodiment 1
[0055] Referring to Figure 1 , which is the first embodiment of the present invention. This embodiment provides a digital twin-based industrial production line simulation and optimization method, including:
[0056] S1: Collect the first operating parameters of the industrial production line and import the first operating parameters into the digital twin model through a data interface, where the operating parameters include equipment operating status data and production process data.
[0057] Specifically, a multi-modal sensor array is arranged on the key equipment of the industrial production line to collect operating parameters.
[0058] It should be noted that the multi-modal sensor array includes a strain sensor, a vibration sensor, a temperature sensor, a displacement sensor, and a photoelectric sensor; the strain sensor is installed on the equipment load-bearing structure to collect equipment stress state data; the vibration sensor is installed on the equipment moving parts to collect equipment vibration frequency data; the temperature sensor is installed on the equipment heating part to collect equipment temperature distribution data; the displacement sensor is installed on the equipment movement mechanism to collect equipment position coordinate data; the photoelectric sensor is installed on the material transmission path to collect material flow speed data.
[0059] Furthermore, the first operating parameters are aggregated to a field data collector for preprocessing to form standardized first operating parameters, where the data collector is built with an edge computing module.
[0060] It should be noted that the first operating parameter includes equipment operating status data and production process data. The equipment operating status data includes equipment vibration frequency data, equipment temperature distribution data, and equipment stress status data. The production process data includes equipment position coordinate data and material flow rate data.
[0061] Furthermore, the standardized first operating parameter is transmitted to the data interface of the digital twin platform through the industrial Ethernet and imported into the digital twin model to establish real-time data mapping of the virtual production line.
[0062] It should be noted that the data interface uses the OPC UA communication protocol.
[0063] S2: Establish a three-dimensional geometric model and map the production process data to the corresponding equipment nodes of the three-dimensional geometric model.
[0064] Specifically, based on the three-dimensional modeling engine of the digital twin model, a parametric modeling method is used to construct the three-dimensional geometric model of the production line, and the three-dimensional geometric model is modeled according to the actual size data of the industrial production line.
[0065] Preferably, the specific formula of the three-dimensional geometric model is as follows:
[0066]
[0067] Among them, G(x, y, z) is the space mapping function of the three-dimensional geometric model; x is the space x coordinate; y is the space y coordinate; z is the space z coordinate; n is the total number of equipment nodes; ω i is the shape parameter of the i-th equipment; k is the space attenuation constant; d i (x, y, z) is the distance from the space point to the surface of the i-th equipment; h i is the contour function of the i-th equipment.
[0068] It should be noted that when G(x, y, z) = 1, it means that the space point (x, y, z) is inside the equipment entity; when G(x, y, z) = 0, it means that the space point (x, y, z) is in the free space outside the equipment; when 0 < G(x, y, z) < 1, it means that the space point (x, y, z) is in the equipment boundary influence area. The actual size data of the industrial production line includes equipment outer contour, connection structure, and transmission device; the digital twin model is constructed based on the three-dimensional modeling engine and the rigid body dynamics engine.
[0069] Further, based on the three-dimensional geometric model, a physical property model is constructed, and physical parameters are added to each equipment node, and the physical property model is calculated through the rigid body dynamics engine.
[0070] It should be noted that the physical parameters include mass attributes, material attributes, and motion constraints.
[0071] Furthermore, a data node network is established based on the three-dimensional geometric model, and the production process data is transmitted to the corresponding device nodes through a data distribution mechanism, where the data node network includes a master node and several device nodes.
[0072] It should be noted that each device node corresponds to a device in the actual production line, and a data reception port and a data processing unit are configured.
[0073] Specifically, a data visualization layer is established to convert the production process data mapped to the device nodes into visual effects, and the operating status and performance parameters of the device nodes are presented through color coding.
[0074] S3: Based on the device node data of the three-dimensional geometric model, the particle swarm optimization algorithm is used to dynamically adjust the production line layout to obtain layout optimization parameters;
[0075] Specifically, an evaluation index system for production line layout optimization is constructed, where the evaluation index system includes device spacing index, material transportation distance index, device utilization rate index, and space occupancy index.
[0076] It should be noted that the device spacing index represents the minimum safety distance between adjacent devices; the material transportation distance index represents the transmission path length of materials between devices; the device utilization rate index represents the working efficiency of the device; and the space occupancy index represents the overall layout compactness of the production line.
[0077] Further, an objective function for layout optimization is established according to the evaluation index system, and constraint conditions are set, where the objective function uses a weighted summation form to comprehensively process each evaluation index after normalization.
[0078] Preferably, the specific formula of the objective function is as follows:
[0079]
[0080] Among them, λ1 is the device spacing weight coefficient; λ2 is the material transportation weight coefficient; D i is the distance from device i to the adjacent device; G i (x,y,z) is the spatial mapping function of the three-dimensional geometric model of the i-th device; D max is the maximum allowable spacing; T i is the material turnover time of device i; T max is the maximum turnover time.
[0081] It should be noted that the constraint conditions include equipment safety distance constraints, workshop boundary constraints, equipment process sequence constraints, and equipment orientation constraints; the constraint conditions ensure that the optimization results meet the actual production requirements.
[0082] Furthermore, configure the second operating parameters of the particle swarm optimization algorithm, and use the configured particle swarm optimization algorithm to perform iterative search in the solution space, guiding the movement direction of the particles through the individual optimal position and the global optimal position.
[0083] It should be noted that the second operating parameters include population size, number of iterations, inertia weight, and learning factor; each particle corresponds to a set of feasible production line layout plans, and the position vector of the particle represents the spatial coordinates and orientation angles of each equipment.
[0084] Specifically, the method of iterative search is as follows: input the equipment node data into the particle swarm optimization algorithm, calculate the objective function values of the layout plans corresponding to each particle, and update the individual optimal position and the global optimal position; adjust the movement state of the particles according to the velocity update formula and the position update formula, and gradually converge to the optimal solution; when the termination conditions are met, output the global optimal position as the layout optimization plan.
[0085] Preferably, the specific formula for updating the particle position is as follows:
[0086] X t+1 =X t +V t +α·G(x,y,z);
[0087] Among them, X t is the particle position at time t; V t is the particle velocity at time t; α is the adjustment coefficient.
[0088] It should be noted that the termination conditions include: the number of iterative calculations reaches the set maximum number of iteration limits; the change range of the objective function values in several consecutive iterations is less than the preset convergence determination threshold; the global optimal particle position remains unchanged in several consecutive iterations; the position change amounts of all particles in the particle swarm are less than the minimum displacement determination threshold; the calculation result of the objective function reaches the expected optimization index requirements; when the running time of the algorithm exceeds the preset maximum calculation time limit; getting stuck in a local optimum and still unable to jump out after multiple attempts.
[0089] Furthermore, based on the layout optimization plan, extract the layout optimization parameters, where the layout optimization parameters include the optimized spatial coordinates of each equipment, the equipment orientation angle, the material transfer path, and the process connection timing sequence.
[0090] S4: Apply the layout optimization parameters to the actual industrial production line, and complete the production line layout optimization by moving the equipment position and adjusting the process connection.
[0091] Specifically, prepare an equipment relocation plan based on layout optimization parameters and formulate a layout adjustment implementation plan.
[0092] It should be noted that the equipment shift plan table records in detail the target position coordinates, moving path and adjustment steps of each equipment.
[0093] Furthermore, the method for formulating the layout adjustment implementation plan is to use a laser locator to calibrate the equipment installation position, and perform equipment shifting operations according to the preset adjustment steps; move the production equipment to the designated location by industrial forklifts and lifting equipment, and use a spirit level and theodolite to level and align the equipment; re-lay the material transmission device between the equipment, and adjust the speed parameters and connection spacing of the material transmission device to optimize the material flow efficiency between the equipment.
[0094] It should be noted that the laser locator projects positioning lines on the ground to indicate the target position and direction of the equipment; the material transmission device includes a conveyor belt, a transmission pipeline and a material bucket; the installation position and direction of the transmission device strictly follow the optimized layout plan to ensure that the material transmission path is shortened.
[0095] Furthermore, the production rhythm is reconstructed according to the layout optimization parameters, the process connection relationship of the equipment is adjusted, and the process parameters and timing logic of the production control system are modified to complete the production line layout optimization; the optimized production line operation data is collected to conduct production line trial operation verification, and the optimization effect is verified through data analysis to determine whether the production line layout adjustment has achieved the expected optimization goal.
[0096] Specifically, when the material circulation efficiency is improved by more than the preset threshold, the logistics optimization goal is achieved, and a logistics optimization report is automatically generated and pushed to the production management department; when the space utilization rate of the equipment is improved to the expected goal, the space layout optimization goal is achieved, and the optimal layout plan is recorded and stored in the plan library for reference. When the production rhythm improvement does not reach the predetermined goal, the rhythm optimization subsystem is triggered to automatically adjust the equipment working parameters and re-evaluate the optimization effect; when the overall operating efficiency of the production line is improved to the expected operating efficiency, the current layout optimization parameters are locked, and the optimization plan is marked as verified, and the optimization results report is pushed to the management; when the optimized production line operation data remains stable for many consecutive days, it is confirmed that the layout optimization meets the standards, and this layout mode is set as the standard layout configuration for such products.
[0097] Furthermore, if the operating status of the material transmission device between equipment is abnormal, the production line operation will be suspended immediately, triggering the logistics path replanning module, and re-verifying the layout effect after adjustment.
[0098] It should be noted that the production line operation data includes equipment operation status data, material turnover time, and product processing rhythm.
[0099] Furthermore, this embodiment also provides an industrial production line simulation optimization system based on digital twin, including: a collection module, configured to collect the operation parameters of the industrial production line and import the operation parameters into the digital twin model through a data interface, where the operation parameters include equipment operation status data and production process data; a mapping module, configured to establish a three-dimensional geometric model and map the production process data to the corresponding equipment nodes of the three-dimensional geometric model; an adjustment module, based on the equipment node data of the three-dimensional geometric model, dynamically adjusts the production line layout by using a particle swarm optimization algorithm to obtain layout optimization parameters; an optimization module, configured to apply the layout optimization parameters to the actual industrial production line and complete the production line layout optimization by moving the equipment positions and adjusting the process connection.
[0100] This embodiment also provides a computer device applicable to the situation of the industrial production line simulation optimization method based on digital twin, including a memory and a processor; the memory is used to store computer-executable instructions, and the processor is used to execute the computer-executable instructions to implement the industrial production line simulation optimization method based on digital twin as proposed in the above embodiment.
[0101] The computer device may be a terminal, and the computer device includes a processor, a memory, a communication interface, a display screen, and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be implemented through WIFI, a carrier network, NFC (Near Field Communication), or other technologies. The display screen of the computer device may be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device may be a touch layer covered on the display screen, or a button, a trackball, or a touchpad provided on the computer device housing, or an external keyboard, a touchpad, or a mouse, etc.
[0102] In summary, by collecting the operation parameters of the actual production line and importing them into the digital twin model, real-time data synchronization between the physical entity and the digital model is achieved, providing an objective basis for optimization decisions. At the same time, a parametric modeling method is used to construct a three-dimensional geometric model and map the production process data, making complex data more intuitive and understandable, and facilitating engineers to discover potential problems. The particle swarm optimization algorithm is used to dynamically adjust the production line layout, and a multi-dimensional evaluation index system is established, effectively solving the high-dimensional non-linear complex layout optimization problem that is difficult to handle by traditional methods. The optimized parameters are applied to the actual production line, and by accurately calibrating the equipment position, reconstructing the production rhythm and the connection relationship of processes, the precise transformation from the virtual optimization scheme to the actual production line transformation is realized, and a multi-level optimization effect evaluation mechanism is established to improve the production line performance.
[0103] Embodiment 2
[0104] Referring to Table 1, this is the second embodiment of the present invention. This embodiment provides a digital twin-based industrial production line simulation and optimization method. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through economic benefit calculation and simulation experiments.
[0105] Specifically, a certain automobile chassis parts production line is selected as the experimental object. This production line includes 12 workstations such as stamping, welding, grinding, spraying, and assembly. The operation parameters of each workstation are collected, including equipment operation status, production rhythm time, material turnover time, and energy consumption data. The collected data is transmitted to the digital twin platform in real time through the industrial Ethernet. A three-dimensional geometric model of the production line is established based on the AutoCAD Plant 3D software, and the model accuracy reaches the millimeter level. On the digital twin platform, the collected real-time data is mapped to the corresponding equipment nodes to realize the synchronous operation of the physical equipment and the digital model.
[0106] Furthermore, an improved particle swarm algorithm is used to optimize the production line layout. The population size is set to 50, the maximum number of iterations is 200, the learning factors c1 = c2 = 2.0, and the inertia weight w linearly decreases from 0.9 to 0.4. During the optimization process, the equipment spacing, material transportation distance, equipment utilization rate, and space occupancy rate are used as evaluation indicators, and an objective function is constructed by weighted summation. The constraint conditions include: the minimum safety distance between equipment is not less than 1.5 meters, the equipment process sequence must meet the process requirements, and the equipment orientation angle meets the operation and maintenance requirements.
[0107] Furthermore, after the optimization is completed, prepare a detailed equipment relocation plan according to the output layout plan; use a Leica TS16 total station for equipment positioning and lofting, and use a 5-ton forklift and a 10-ton bridge crane for equipment relocation; after the equipment is in place, use a theodolite for leveling and alignment to ensure the installation accuracy of the equipment. Re-lay the conveyor belt and the material turnover rack, and adjust the transmission speed and the connection spacing. The production line undergoes a 72-hour trial operation, and the operation data is collected and compared with that before optimization for analysis.
[0108] Specifically, as shown in Table 1, it can be seen from the comparison of experimental data that the method of the present invention has significant advantages compared with the traditional manual optimization method; in terms of the average material transportation distance, the method of the present invention has achieved a 30.8% reduction, from 156.8 meters in the original layout to 108.5 meters, greatly shortening the transmission path of materials between workstations; the production cycle time has been optimized from 45.6 seconds to 35.8 seconds, with a 21.5% increase, significantly improving the production efficiency; the equipment utilization rate has been increased from 76.2% to 88.7%, with an increase of 16.4%, indicating that the optimized layout is more conducive to the performance of equipment.
[0109] Table 1. Comparison table of layout optimization effects
[0110] Evaluation index Original layout plan Traditional manual optimization method Optimization method of the present invention Improvement rate Average material transportation distance 156.8m 142.3m 108.5m 30.8m% Production tact time 45.6s 42.1s 35.8s 21.5s% Equipment utilization rate 76.2% 79.5% 88.7% 16.4% Space occupied area <![CDATA[485.5m 2 > <![CDATA[462.8m 2 > <![CDATA[398.4m 2 > 17.9% Material turnover time 892.4s 815.6s 685.3s 23.2% Energy consumption 145.6 kWh / h 138.2 kWh / h 116.4 kWh / h 20.1% Equipment changeover time 25.8 min 23.4 min 18.6 min 27.9%
[0111] Furthermore, in terms of space utilization, the optimized layout plan reduces the total floor area from 485.5 square meters to 398.4 square meters, saving 17.9% of the workshop space; the material turnover time is shortened by 23.2%, from 892.4 seconds to 685.3 seconds, greatly improving the logistics efficiency. The energy consumption is reduced by 20.1%, from 145.6 kWh per hour to 116.4 kWh, reflecting the positive effect of the optimized layout on energy conservation and emission reduction. The equipment changeover time is shortened by 27.9%, from 25.8 minutes to 18.6 minutes, improving the production flexibility. The method of the present invention realizes the precise modeling and real-time optimization of the production line layout through digital twin technology, overcoming the deficiencies of the traditional manual optimization method that relies on experience and has limited optimization degree.
[0112] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that the technical solutions of the present invention can be modified or equivalently replaced without departing from the spirit and scope of the technical solutions of the present invention, and they should all be covered within the scope of the claims of the present invention.
Claims
1. A digital twin-based industrial production line simulation optimization method, characterized in that: include, Collecting first operating parameters of the industrial production line, and importing the first operating parameters into the digital twin model through a data interface, wherein the first operating parameters include equipment operating status data and production process data; Establishing a three-dimensional geometric model, and mapping the production process data to corresponding device nodes of the three-dimensional geometric model; Based on the equipment node data of the three-dimensional geometric model, a particle swarm optimization algorithm is used to dynamically adjust the production line layout to obtain layout optimization parameters; The layout optimization parameters are applied to actual industrial production lines, and the production line layout optimization is completed by moving equipment positions and adjusting process connections.
2. The industrial production line simulation optimization method based on digital twin according to claim 1, characterized in that: Apply the layout optimization parameters to the actual industrial production line, and optimize the production line layout by moving equipment positions and adjusting process connections, including: Prepare equipment relocation schedule based on layout optimization parameters and formulate layout adjustment implementation plan; At the same time, the production rhythm is reconstructed according to the layout optimization parameters, the process connection relationship of the equipment is adjusted, and the process parameters and timing logic of the production control system are modified to complete the production line layout optimization; Collect the optimized production line operation data to conduct production line trial operation verification, verify the optimization effect through data analysis, and determine whether the production line layout adjustment has achieved the expected optimization goal.
3. The industrial production line simulation optimization method based on digital twin according to claim 2, characterized in that: The method for formulating the layout adjustment implementation plan is: Use a laser locator to calibrate the equipment installation position, and perform equipment shifting operations according to the preset adjustment sequence; Use industrial forklifts and lifting equipment to move production equipment to designated locations, and use spirit levels and theodolites to level and align the equipment; Re-lay the material transmission devices between equipment, and adjust the speed parameters and connection spacing of the material transmission devices to optimize the flow efficiency of materials between equipment.
4. The industrial production line simulation optimization method based on digital twins according to claim 2, characterized in that: The method for determining whether the production line layout adjustment has achieved the expected optimization goal includes: When the material circulation efficiency is improved by more than the preset threshold, the expected logistics optimization goal is achieved, and a logistics optimization report is automatically generated and pushed to the production management department; When the space utilization rate of the equipment reaches the expected target, the expected optimization target of the space layout is achieved, and the optimal layout plan is recorded and stored in the plan library for reference; When the production rhythm improvement fails to reach the predetermined target, the rhythm optimization subsystem is triggered to automatically adjust the equipment working parameters and re-evaluate the optimization effect; When the overall operating efficiency of the production line reaches the expected operating efficiency, the current layout optimization parameters are locked, the optimization plan is marked as verified, and the optimization results report is pushed to the management; When the optimized production line operation data remains stable for several consecutive days, it is confirmed that the expected layout optimization has been met, and this layout mode is set as the standard layout configuration for such products.
5. The industrial production line simulation optimization method based on digital twin according to claim 4, characterized in that: The method for obtaining the layout optimization parameters is: Constructing an evaluation index system for production line layout optimization, wherein the evaluation index system includes equipment spacing index, material transportation distance index, equipment utilization index and space occupancy index; Establishing an objective function for layout optimization according to the evaluation index system and setting constraints, wherein the objective function integrates various evaluation indicators after normalization in the form of weighted summation; Configure the second operating parameter of the particle swarm optimization algorithm, and use the configured particle swarm optimization algorithm to perform iterative search in the solution space, and guide the movement direction of the particles through the individual optimal position and the global optimal position; Based on the layout optimization plan, layout optimization parameters are extracted, wherein the layout optimization parameters include the optimized spatial coordinates of each device, the device orientation angle, the material transmission path, and the process connection timing.
6. The industrial production line simulation optimization method based on digital twin according to claim 5, characterized in that: The iterative search method is: Input the device node data into a particle swarm optimization algorithm, calculate the objective function value of each particle's corresponding layout scheme, and update the individual optimal position and the global optimal position; Adjust the motion state of the particle according to the velocity update formula and position update formula, and gradually converge to the optimal solution; When the termination condition is met, the global optimal position is output as the layout optimization solution.
7. The industrial production line simulation optimization method based on digital twin according to claim 6, characterized in that: Establishing a three-dimensional geometric model and mapping the production process data to corresponding device nodes of the three-dimensional geometric model, including: A 3D modeling engine based on a digital twin model uses a parametric modeling method to construct a 3D geometric model of the production line, wherein the 3D geometric model is modeled based on the actual size data of the industrial production line; Based on the three-dimensional geometric model, a physical property model is constructed to add physical parameters to each device node, wherein the physical property model is calculated by a rigid body dynamics engine; Establishing a data node network according to the three-dimensional geometric model, and transmitting the production process data to the corresponding device nodes through a data distribution mechanism, wherein the data node network includes a master control node and a plurality of device nodes; A data visualization layer is established to convert the production process data mapped to the equipment nodes into visual effects, and the operating status and performance parameters of the equipment nodes are displayed through color coding.
8. An industrial production line simulation optimization system based on digital twins, based on the industrial production line simulation optimization method based on digital twins according to any one of claims 1 to 7, characterized in that: include, A collection module, used to collect operating parameters of the industrial production line and import the operating parameters into the digital twin model through a data interface, wherein the operating parameters include equipment operating status data and production process data; A mapping module, used to establish a three-dimensional geometric model and map the production process data to corresponding device nodes of the three-dimensional geometric model; An adjustment module dynamically adjusts the layout of the production line based on the equipment node data of the three-dimensional geometric model using a particle swarm optimization algorithm to obtain layout optimization parameters; The optimization module is used to apply the layout optimization parameters to the actual industrial production line, and complete the production line layout optimization by moving the equipment position and adjusting the process connection.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the industrial production line simulation optimization method based on digital twins according to any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the industrial production line simulation optimization method based on digital twins according to any one of claims 1 to 7 are implemented.
Citation Information
Cited By
Axial plunger pump batch production process optimization system based on digital twinning
CN120611536A
Batch production process optimization system for axial plunger pump based on digital twinning
CN120611536B
Digital twin-driven production line simulation and general control decision-making method, device and equipment and storage medium
CN121386690A