资源配置和调度方法、装置、处理设备、程序产品及介质

By configuring the PSFCH period and resource pool time domain length according to preset rules in the New Radio (NR) – Vehicle to Everything (V2X) standard, the resource conflict problem caused by the incoordination of resource pool configuration is solved, and communication efficiency and reliability are improved.

CN120200719BActive Publication Date: 2026-07-17HONGXING ZHIXIN TECHNOLOGY (NANJING) CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
HONGXING ZHIXIN TECHNOLOGY (NANJING) CO LTD
Filing Date
2025-03-18
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In the New Radio (NR) – Vehicle to Everything (V2X) standard, the mismatch between the PSFCH cycle and resource pool configuration parameters leads to resource conflicts and degraded communication performance.

Method used

By configuring the time domain period and time domain length according to preset rules, the time domain length is an integer multiple or non-integer multiple of the time domain period, but the total number of logical subframes within the superframe is a common multiple, thereby optimizing resource scheduling and feedback decisions and avoiding resource conflicts.

Benefits of technology

This effectively avoids resource conflicts caused by the logical subframe interval between PSSCH and PSFCH exceeding the maximum RTT configuration, thus improving the efficiency and reliability of V2X communication.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120200719B_ABST
    Figure CN120200719B_ABST
Patent Text Reader

Abstract

本发明提供了一种资源配置和调度方法、装置、处理设备、程序产品及介质,涉及通信技术领域,其中,该方法包括:根据预设规则,进行时域周期和时域长度的资源配置,所述时域周期为物理侧行链路反馈信道PSFCH的时域周期,所述时域长度为资源池对应的位图的时域长度;根据所述资源配置,进行资源调度和反馈决策;其中,所述预设规则包括以下其中一项:所述时域长度为所述时域周期的整数倍;所述时域周期与所述时域长度之间非整数倍关系,且超帧内的逻辑子帧总数为所述时域周期与所述时域长度的公倍数。本发明的方案解决了现有技术中存在因PSFCH周期和资源池配置不协调导致的资源冲突问题。
Need to check novelty before this filing date? Find Prior Art