Method for the construction of a continuous flow short-cut denitrification biofilm module with short hydraulic retention time and construction treatment device based thereon
By combining anoxic starvation treatment with a continuous flow reactor, the short-cut denitrification biofilm module can be quickly started and stabilized, solving the problems of nitrite concentration fluctuations and complex operation in traditional wastewater treatment, and achieving efficient and economical wastewater denitrification.
Patent Information
- Application Number
- CN202510278101.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-10
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2045-03-10
AI Technical Summary
Existing wastewater treatment plants face nitrogen pollution problems when using traditional biological denitrification processes, especially in short-cut denitrification systems where nitrite concentrations fluctuate greatly in SBR reactors, operation is complex and difficult to control, and start-up time is long.
A short-cut denitrification process is rapidly initiated using anoxic starvation treatment. A continuous flow reactor is used to construct a short-hydraulic retention time continuous flow short-cut denitrification biofilm module. By inoculating sludge in the SBR reactor and controlling dissolved oxygen, biofilm is gradually attached to the continuous flow reactor, achieving rapid accumulation and stable supply of nitrite.
It significantly shortens the construction and reaction time of short-cut denitrification biofilm modules, increases the nitrite accumulation rate, simplifies the operation process, reduces energy consumption and operating costs, and has a highly efficient wastewater treatment capacity.
Smart Images

Figure CN120208416B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of wastewater biological treatment technology, and in particular to a method for constructing a continuous flow short-path denitrification biofilm module with a short hydraulic retention time and a treatment device based thereon. Background Technology
[0002] Currently, most wastewater treatment plants still use traditional biological denitrification processes. However, as the composition of influent water becomes increasingly complex and the requirements for effluent water quality continue to rise, traditional denitrification processes can no longer meet current discharge requirements. There is an urgent need to develop more economical and efficient wastewater denitrification technologies to solve the environmental pollution problems caused by nitrogen.
[0003] Anaerobic ammonium oxidation (AMO) is a novel wastewater treatment technology that directly converts ammonia nitrogen and nitrite into nitrogen gas under the action of anaerobic ammonium-oxidizing bacteria, significantly improving nitrogen removal efficiency. However, obtaining stable nitrite nitrogen remains a major challenge. In practical operation, short-cut nitrification processes are significantly affected by fluctuations in domestic sewage quality. Artificially controlling water temperature increases treatment costs considerably, and the instability of dissolved oxygen (DO) and pH levels restricts the practical application of short-cut nitrification / anaerobic ammonium oxidation systems.
[0004] In recent years, there have been many reports on the combined use of short-cut denitrification and Anammox (biofilm nitrogen removal process). However, the current methods for starting up short-cut denitrification systems using only methods such as reducing the carbon-to-nitrogen ratio and increasing the pH value require a long time, generally nearly a month or even longer.
[0005] Furthermore, recent studies have found that when starting up short-cut denitrification in an SBR reactor, nitrite concentration peaks when nitrate is depleted, but decreases further with increasing reaction time. While this can be avoided by stopping the reaction promptly or shortening the reaction time, the reaction process accelerates accordingly with shorter reaction times. Moreover, when using an SBR, pumps must be frequently started and stopped, and valves must be frequently opened and closed, increasing operational complexity.
[0006] Therefore, it is both necessary and urgent to study and construct a continuous flow short-cut denitrification biofilm module with a short hydraulic retention time to shorten the construction and reaction time of the short-cut denitrification biofilm module and alleviate the problems of low nitrite accumulation rate, complex operation and difficult control caused by the gradual advancement of the peak time of nitrite in the existing short-cut denitrification SBR reactor cycle operation.
[0007] In view of this, the present invention is hereby proposed. Summary of the Invention
[0008] The purpose of this invention is to provide a method for constructing a continuous flow short-cut denitrification biofilm module with a short hydraulic retention time. This method significantly shortens the construction and reaction time of the short-cut denitrification biofilm module and solves the problems of low nitrite accumulation rate, complex operation, and difficult control caused by the nitrite concentration gradually decreasing after reaching its peak within one cycle in the cyclic operation of the SBR reactor during short-cut denitrification, and the time of nitrite peak appearance gradually advancing as the reaction cycle shortens.
[0009] In order to achieve the above-mentioned objectives of the present invention, the following technical solution is adopted:
[0010] This invention provides a method for constructing a continuous flow short-path denitrification biofilm module with a short hydraulic retention time, the method comprising:
[0011] (A) Start-up of SBR short-cut denitrification:
[0012] The wastewater treatment plant's secondary sedimentation tank sludge or activated sludge from the biological treatment tank is inoculated into the anoxic SBR reactor to achieve a sludge concentration of 2000–3000 mg / L. Subsequently, 30–35 mg / L of NO3 is added to the reactor. - -N, and control the dissolved oxygen in the reactor to ≤0.5mg / L, and subject the sludge in the reactor to anoxic starvation treatment for 2 to 5 days;
[0013] Add 10–15 mg / L of NH4 to the reactor after anaerobic starvation treatment. + -N, NO3 at 40-45 mg / L - -N and COD of 180-220 mg / L, with an influent ratio of 35-40%; proceed with anoxic stirring, sedimentation, and drainage in sequence. When the nitrite accumulation rate in the SBR reactor is ≥70%, the nitrite accumulation rate in the effluent is ≥60%, and the nitrate concentration is ≤1 mg / L, the SBR short-cut denitrification is successfully started.
[0014] (B) Initiation of short-range denitrification biofilm formation:
[0015] The blank polyurethane filler was added to the SBR reactor after the successful start-up of short-cut denitrification in step (A), and then 10-15 mg / L of NH4 was added to the reactor. + -N, NO3 at 40-45 mg / L - -N, COD of 180-220 mg / L, and influent ratio of 35-40%; the process involves anoxic stirring, sedimentation, and drainage. When the sludge concentration on the polyurethane packing is ≥3000 mg / L and the nitrite accumulation rate in the SBR reactor is ≥70%, the short-cut denitrification biofilm formation is successfully initiated, and a polyurethane sponge biofilm is obtained.
[0016] (C) Start-up of the continuous flow short-path denitrification biofilm module:
[0017] The polyurethane sponge biofilm from step (B) is introduced into a continuous flow reactor, the dissolved oxygen in the reactor is controlled to be ≤0.5 mg / L, and 10-15 mg / L of NH4 is added to the reactor. + -N, NO3 at 40-45 mg / L - -N, COD of 160-200 mg / L, hydraulic retention time of 45-50 min;
[0018] When the effluent NO3 from the continuous flow reactor - When the nitrite concentration is <10 mg / L, the effluent COD concentration is <60 mg / L, and the nitrite accumulation rate in the continuous flow reactor is ≥70%, the continuous flow short-cut denitrification biofilm module is constructed.
[0019] It should be noted that the influent ratio in this application refers to the ratio of the amount of wastewater entering the reactor to the effective volume of the reactor. For example, if the influent volume is 3L and the effective reactor volume is 10L, then the influent ratio is 30%.
[0020] Furthermore, during the SBR short-cut denitrification start-up process in step (A), the dissolved oxygen in the SBR reactor is ≤0.5 mg / L;
[0021] Furthermore, during the short-cut denitrification biofilm formation start-up process in step (B), the dissolved oxygen in the SBR reactor is ≤0.5 mg / L.
[0022] Furthermore, during the start-up of the continuous flow short-cut denitrification biofilm module in step (C), the dissolved oxygen in the continuous flow reactor is ≤0.5 mg / L.
[0023] Furthermore, in step (A) of the SBR short-cut denitrification start-up treatment, the anoxic stirring time is 80-100 min, the sedimentation time is 20-30 min, and the drainage time is 3-5 min;
[0024] Furthermore, in step (B) of the biofilm formation start-up treatment, the anoxic stirring time is 80-100 min, the sedimentation time is 20-30 min, and the drainage time is 3-5 min.
[0025] Furthermore, in step (B), the filling ratio of the blank polyurethane filler is 25-30%.
[0026] Furthermore, the filling ratio of polyurethane filler after successful membrane formation in step (C) is 80-85%.
[0027] Furthermore, the construction method also includes the step of running the continuous flow short-range denitrification biofilm module obtained in step (C) to a steady state, the step including:
[0028] Control Step (C): After the continuous flow short-cut denitrification biofilm module is started, the dissolved oxygen in the continuous flow reactor should be ≤0.5 mg / L. Adjust the hydraulic retention time to 25–30 min and add 10–15 mg / L of NH4+ to the reactor. + -N, NO3 at 40-45 mg / L - -N, COD of 140-160 mg / L;
[0029] When NO3 is released - After the N concentration is <10 mg / L, the effluent COD concentration is <50 mg / L, and the NTR is ≥90%, and this condition is maintained for 15–20 days, the continuous flow short-path denitrification biofilm module with short hydraulic retention time is considered to have reached a stable state.
[0030] The above-described construction method provided by this invention yields a continuous flow short-path denitrification biofilm module with a short hydraulic retention time.
[0031] The treatment device for the above-mentioned short hydraulic retention time continuous flow short-path denitrification biofilm module provided by the present invention includes: an SBR reaction system and a continuous flow biofilm reaction system;
[0032] The SBR reaction system includes: a first nitrate inlet tank, a first organic matter inlet tank, and an SBR reactor, wherein the first nitrate inlet tank and the first organic matter inlet tank are respectively connected to the SBR reactor via pipelines;
[0033] The continuous flow biofilm reaction system includes: a second nitrate inlet tank, a second organic matter inlet tank, and a continuous flow reactor, wherein the second nitrate inlet tank and the second organic matter inlet tank are respectively connected to the continuous flow reactor via pipelines;
[0034] The continuous flow reactor contains a polyurethane sponge biofilm.
[0035] Furthermore, the SBR reactor includes a first online pH measuring device, a first electric stirring device, and a first electric drain valve;
[0036] Furthermore, the continuous flow reactor includes a second online pH measurement device.
[0037] Furthermore, a first nitrate inlet pump is installed on the connecting pipe between the first nitrate inlet tank and the SBR reactor.
[0038] And / or, a first organic matter inlet pump is installed on the connecting pipe between the first organic matter inlet tank and the SBR reactor;
[0039] And / or, a second nitrate inlet pump is installed on the connecting pipe between the second nitrate inlet tank and the continuous flow reactor;
[0040] And / or, a second organic matter inlet pump is installed on the connecting pipe between the second organic matter inlet tank and the continuous flow reactor.
[0041] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0042] (1) The construction method of this invention utilizes anoxic starvation treatment to quickly start short-range denitrification, which greatly shortens the start-up time and reduces resource consumption; anoxic starvation treatment can effectively promote the reproduction of specific DNB bacteria, maintain stable operation of the system after startup, and has a certain resistance to shock loads.
[0043] (2) The present invention adopts a continuous flow short-path denitrification module, which is simple and easy to operate and can quickly achieve the accumulation of nitrite. It solves the problems of low nitrite accumulation rate, complicated operation and difficult control caused by the nitrite concentration gradually decreasing after reaching the peak in one cycle during the cycle operation of the SBR reactor, and the nitrite peak time gradually advancing as the reaction cycle shortens. It is an efficient, economical process with practical application value for providing nitrite for anaerobic ammonia oxidation.
[0044] (3) The short-range denitrification biofilm module of the present invention has significant advantages such as short hydraulic retention time, large sewage treatment capacity, strong resistance to shock load, and strong adaptability. Moreover, the biofilm method itself has high microbial diversity and regional metabolism of functional microbial communities, which can improve the removal efficiency of organic matter and recalcitrant pollutants, thereby improving the treatment efficiency. Attached Figure Description
[0045] To more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0046] Figure 1 This is a schematic diagram of the SBR reaction system provided in Embodiment 1 of the present invention;
[0047] Figure 2 This is a schematic diagram of the continuous flow biofilm reaction system provided in Embodiment 1 of the present invention.
[0048] Icons: 1-First nitrate inlet tank; 2-First organic matter inlet tank; 3-SBR reactor; 31-First nitrate inlet pump; 32-First organic matter inlet pump; 33-First online pH measuring device; 34-First electric stirring device; 35-First electric drain valve; 4-Second nitrate inlet tank; 5-Second organic matter inlet tank; 6-Continuous flow reactor; 61-Second nitrate inlet pump; 62-Second organic matter inlet pump; 63-Polyurethane sponge biofilm; 64-Second online pH measuring device. Detailed Implementation
[0049] The technical solution of the present invention will be clearly and completely described below with reference to the embodiments. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0050] According to one aspect of the present invention, a method for constructing a continuous flow short-path denitrification biofilm module with a short hydraulic retention time is provided, the method comprising:
[0051] (A) Start-up of SBR short-cut denitrification:
[0052] Wastewater treatment plant sludge was inoculated into the anoxic SBR reactor 3 to achieve a sludge concentration of 2000–3000 mg / L. Subsequently, 30–35 mg / L of NO3 was added to the reactor. - -N, and control the dissolved oxygen in the reactor to ≤0.5mg / L, and subject the sludge in the reactor to anoxic starvation treatment for 2 to 5 days;
[0053] Add 10–15 mg / L of NH4 to the reactor after anaerobic starvation treatment. + -N, NO3 at 40-45 mg / L - -N and COD of 180-220 mg / L, with an influent ratio of 35-40%; the process involves sequential anoxic stirring, sedimentation, and effluent drainage. When the nitrite accumulation rate in SBR reactor 3 is ≥70%, the nitrite accumulation rate in the effluent is ≥60%, and the nitrate concentration is ≤1 mg / L, the SBR short-cut denitrification is successfully started.
[0054] (B) Initiation of short-range denitrification biofilm formation:
[0055] The blank polyurethane filler was added to the SBR reactor 3 after the successful start-up of short-cut denitrification in step (A), and then 10-15 mg / L of NH4 was added to the reactor. + -N, NO3 at 40-45 mg / L --N, COD of 180-220 mg / L, and influent ratio of 35-40%; the process involves anoxic stirring, sedimentation, and drainage. When the sludge concentration on the polyurethane packing is ≥3000 mg / L and the nitrite accumulation rate in SBR reactor 3 is ≥70%, the short-cut denitrification biofilm formation is successfully started, and polyurethane sponge biofilm 63 is obtained.
[0056] (C) Start-up of the continuous flow short-path denitrification biofilm module:
[0057] The polyurethane sponge biofilm 63 from step (B) is introduced into the continuous flow reactor 6, the dissolved oxygen in the reactor is controlled to be ≤0.5 mg / L, and 10-15 mg / L of NH4 is added to the reactor. + -N, NO3 at 40-45 mg / L - -N, COD of 160-200 mg / L, hydraulic retention time of 45-50 min;
[0058] When the effluent NO3 from continuous flow reactor 6 - When the nitrite concentration is <10 mg / L, the effluent COD concentration is <60 mg / L, and the nitrite accumulation rate in the continuous flow reactor 6 is ≥70%, the continuous flow short-cut denitrification biofilm module is started and constructed.
[0059] The present invention provides an innovative construction strategy for a continuous-flow short-cut denitrification biofilm module with a short hydraulic retention time. This application first rapidly starts up the short-cut denitrification flocculent sludge in anoxic starvation treatment in SBR reactor 3, followed by biofilm formation treatment, and finally places the short-cut denitrification biofilm into a continuous-flow reactor 6. This significantly shortens the construction and reaction time of the short-cut denitrification biofilm module, solving problems such as low nitrite accumulation rate, complex operation, and difficult control caused by the gradual decrease in nitrite concentration after reaching its peak within one cycle in SBR reactor 3 during short-cut denitrification cycle operation, and the earlier occurrence of the nitrite peak as the reaction cycle shortens. Furthermore, the continuous-flow short-cut denitrification biofilm module constructed in this application has high treatment efficiency, low energy consumption, and low operating costs, providing a new approach for anaerobic ammonia oxidation processes to supply nitrite.
[0060] In a preferred embodiment of the present invention, during the SBR short-cut denitrification start-up process in step (A), the dissolved oxygen in the SBR reactor 3 is ≤0.5 mg / L;
[0061] During the short-cut denitrification biofilm formation start-up process in step (B), the dissolved oxygen in the SBR reactor 3 is ≤0.5mg / L.
[0062] As a preferred implementation, the SBR short-cut denitrification start-up and biofilm formation start-up processes require controlling the dissolved oxygen in SBR reactor 3 to ≤0.5 mg / L. Since denitrifying bacteria perform denitrification under anaerobic conditions, controlling the dissolved oxygen concentration is crucial to ensure normal anaerobic metabolism. If the dissolved oxygen level exceeds 0.5 mg / L, denitrifying bacteria will be inhibited, preferentially utilizing oxygen as an electron acceptor for aerobic respiration, which is detrimental to the formation of short-cut denitrification.
[0063] In a preferred embodiment of the present invention, during the start-up of the continuous flow short-path denitrification biofilm module in step (C), the dissolved oxygen in the continuous flow reactor 6 is ≤0.5 mg / L.
[0064] In a preferred embodiment, the dissolved oxygen in the continuous flow reactor 6 during the start-up of the aforementioned continuous flow short-cut denitrification biofilm module is ≤0.5 mg / L, which follows the same principle as the SBR short-cut denitrification start-up and biofilm attachment start-up processes. If the dissolved oxygen is greater than 0.5 mg / L, denitrifying bacteria will be inhibited, and they will preferentially utilize oxygen as an electron acceptor for aerobic respiration, which is not conducive to the formation of short-cut denitrification.
[0065] In a preferred embodiment of the present invention, in step (A) SBR short-cut denitrification start-up treatment, the anoxic stirring time is 80-100 min, the sedimentation time is 20-30 min, and the drainage time is 3-5 min; in step (B) biofilm attachment start-up treatment, the anoxic stirring time is 80-100 min, the sedimentation time is 20-30 min, and the drainage time is 3-5 min.
[0066] In a preferred embodiment of the present invention, the filling ratio of the blank polyurethane filler in step (B) is 25-30%.
[0067] In a preferred embodiment, the filling ratio of the blank polyurethane packing material described above (25%–30%) provides sufficient attachment surface for microorganisms, promotes biofilm formation and stabilization, maintains a high biomass, and thus improves wastewater treatment efficiency. Excessive polyurethane packing material (greater than 30%) increases the internal resistance of the SBR reactor 3, affecting the effluent quality. Too much polyurethane packing material may also prevent activated sludge from adhering sufficiently and evenly to the packing material, thus affecting biofilm formation. Insufficient biofilm leads to insufficient subsequent biomass, making it difficult to cope with high concentrations or large fluctuations in pollutant concentrations in the water.
[0068] In a preferred embodiment of the present invention, the filling ratio of polyurethane filler after successful membrane initiation in step (C) is 80-85%.
[0069] As a preferred embodiment, the filling ratio of the polyurethane packing material after successful biofilm formation is 80-85%. This filling ratio maintains a high biomass within the reactor while ensuring normal reactor operation. A ratio higher than this may increase internal resistance, causing reactor blockage and affecting the microbial community structure within the continuous flow reactor 6. Conversely, a ratio lower than this may result in insufficient biomass within the continuous flow reactor 6, making it difficult to cope with water containing high concentrations or fluctuating pollutant concentrations.
[0070] In a preferred embodiment of the present invention, the construction method further includes the step of running the continuous flow short-range denitrification biofilm module obtained in step (C) to a stable state, the step including:
[0071] Control Step (C): After the continuous flow short-cut denitrification biofilm module is started, the dissolved oxygen in the continuous flow reactor 6 should be ≤0.5 mg / L. Adjust the hydraulic retention time to 25–30 min and add 10–15 mg / L of NH4+ to the reactor. + -N, NO3 at 40-45 mg / L - -N, COD of 140-160 mg / L;
[0072] When NO3 is released - After the N concentration is <10 mg / L, the effluent COD concentration is <50 mg / L, and the NTR is ≥90%, and this condition is maintained for 15–20 days, the continuous flow short-path denitrification biofilm module with short hydraulic retention time is considered to have reached a stable state.
[0073] According to one aspect of the present invention, the above-described construction method yields a continuous flow short-path denitrification biofilm module with a short hydraulic retention time.
[0074] The continuous flow short-cut denitrification biofilm module provided by the present invention is constructed by the above-described method. This continuous flow short-cut denitrification biofilm module not only has the advantage of high treatment efficiency, but also has low energy consumption and operating costs.
[0075] According to one aspect of the present invention, the treatment apparatus for the above-mentioned short hydraulic retention time continuous flow short-path denitrification biofilm module includes: an SBR reaction system and a continuous flow biofilm reaction system;
[0076] The SBR reaction system includes: a first nitrate inlet tank 1, a first organic matter inlet tank 2, and an SBR reactor 3. The first nitrate inlet tank 1 and the first organic matter inlet tank 2 are respectively connected to the SBR reactor 3 by pipelines.
[0077] The continuous flow biofilm reaction system includes: a second nitrate inlet tank 4, a second organic matter inlet tank 5, and a continuous flow reactor 6. The second nitrate inlet tank 4 and the second organic matter inlet tank 5 are respectively connected to the continuous flow reactor 6 via pipelines.
[0078] The continuous flow reactor 6 contains a polyurethane sponge biofilm 63.
[0079] In a preferred embodiment of the present invention, the SBR reactor 3 includes a first online pH measuring device 33, a first electric stirring device 34, and a first electric drain valve 35;
[0080] In a preferred embodiment of the present invention, the continuous flow reactor 6 includes a second online pH measuring device 64.
[0081] In the preferred embodiment described above, a first nitrate inlet pump 31 is installed on the connecting pipe between the first nitrate inlet tank 1 and the SBR reactor 3.
[0082] A first organic matter inlet pump 32 is installed on the connecting pipe between the first organic matter inlet tank 2 and the SBR reactor 3;
[0083] A second nitrate inlet pump 61 is installed on the connecting pipe between the second nitrate inlet tank 4 and the continuous flow reactor 6;
[0084] A second organic matter inlet pump 62 is installed on the connecting pipe between the second organic matter inlet tank 5 and the continuous flow reactor 6.
[0085] The technical solution of the present invention will be further described below with reference to the embodiments.
[0086] Example 1
[0087] A wastewater treatment device for constructing a continuous flow short-path denitrification biofilm module with a short hydraulic retention time, the device comprising: an SBR reaction system and a continuous flow biofilm reaction system;
[0088] Figure 1 This is a schematic diagram of the SBR reaction system provided in this embodiment.
[0089] See Figure 1 The SBR reaction system includes: a first nitrate inlet tank 1, a first organic matter inlet tank 2, and an SBR reactor 3. The first nitrate inlet tank 1 and the first organic matter inlet tank 2 are respectively connected to the SBR reactor 3 by pipelines.
[0090] In a preferred embodiment of this example, the SBR reactor 3 includes a first online pH measuring device 33 for monitoring the pH value in the SBR reactor 3.
[0091] In a preferred embodiment of this example, the SBR reactor 3 includes a first electric stirring device 34 for stirring materials in the SBR reactor 3.
[0092] In a preferred embodiment of this example, the SBR reactor 3 includes a first electrically operated drain valve 35 for draining water.
[0093] See also Figure 1 A first nitrate inlet pump 31 is installed on the connecting pipe between the first nitrate inlet tank 1 and the SBR reactor 3; a first organic matter inlet pump 32 is installed on the connecting pipe between the first organic matter inlet tank 2 and the SBR reactor 3.
[0094] In a preferred embodiment, the first nitrate inlet pump 31 and the first organic matter inlet pump 32 are used to control the C / N ratio in the SBR reactor 3 during the SBR short-cut denitrification start-up and biofilm formation start-up processes.
[0095] Figure 2 This is a schematic diagram of the continuous flow biofilm reaction system provided in this embodiment.
[0096] See Figure 2 The continuous flow biofilm reaction system includes: a second nitrate inlet tank 4, a second organic matter inlet tank 5, and a continuous flow reactor 6. The second nitrate inlet tank 4 and the second organic matter inlet tank 5 are respectively connected to the continuous flow reactor 6 via pipelines.
[0097] The continuous flow reactor 6 contains a polyurethane sponge biofilm 63.
[0098] Example 2
[0099] A method for constructing a continuous flow short-path denitrification biofilm module with a short hydraulic retention time, the method comprising:
[0100] (1) Start-up stage of SBR system short-cut denitrification activated sludge:
[0101] Wastewater treatment plant sludge with a concentration of 2566 mg / L was inoculated into SBR reactor 3, which has an effective volume of 5 L. 30 mg / L of NO3 was then added to the reactor. - -N, except NO3 - No other nutrients were added to the reactor except for N2, and the dissolved oxygen in the reactor was controlled below 0.5 mg / L. The inoculum sludge was subjected to anaerobic starvation treatment for 2 days. On the third day, 10 mg / L of NH4+ was added to the reactor. + -N, NO3 at 40 mg / L --N, COD 200mg / L, influent ratio 40%, and anoxic stirring for 90min, sedimentation for 30min, followed by drainage for 3min via electric drain valve;
[0102] When the maximum nitrite accumulation rate in the SBR reactor reaches 76.5%, the nitrite accumulation rate in the effluent reaches 72.4%, and the nitrate concentration is almost 0, the short-cut denitrification of the SBR system is considered to have been successfully started.
[0103] (2) Start-up phase of short-range denitrification biofilm formation in SBR system:
[0104] Blank polyurethane filler was added to SBR reactor 3 at a filling ratio of 25%, and 10 mg / L of NH4 was added to the reactor. + -N, NO3 at 40 mg / L - -N, COD 200mg / L, influent ratio 40%, and anoxic stirring for 80-100min, followed by sedimentation for 30min, and then drainage for 3min via electric drain valve;
[0105] When the concentration of flocculent sludge in SBR reactor 3 decreases significantly, the surface of the packing changes from light yellow to dark yellow, the sludge concentration on the packing increases significantly to over 4100 mg / L, and the NTR of the short-cut denitrification reaction of the biofilm reaches over 75.9%, it is considered that the biofilm formation of the short-cut denitrification biofilm in the SBR system has been successfully started.
[0106] (3) Start-up phase of continuous flow short-path denitrification biofilm module with short hydraulic retention time:
[0107] The short-cut denitrification biofilm from SBR reactor 3 was fed into continuous flow reactor 6, with a biofilm filling ratio of 82%. The dissolved oxygen in the reactor was controlled below 0.5 mg / L, and the hydraulic retention time was 50 min. 10 mg / L of NH4+ was added to the reactor. + -N, NO3 at 40 mg / L - -N, COD 200 mg / L;
[0108] When NO3 is released - When the -N concentration is stable below 10 mg / L, the effluent COD concentration is less than 60 mg / L, and the NTR reaches 80%, the continuous flow short-path denitrification biofilm module with short hydraulic retention time is considered to have been successfully constructed.
[0109] (4) Stable operation phase of continuous flow short-path denitrification biofilm module with short hydraulic retention time:
[0110] To control dissolved oxygen levels in the reactor below 0.5 mg / L, adjust the hydraulic retention time to 30 min, and add 10 mg / L of NH4+ to the reactor. +-N, NO3 at 40 mg / L - -N, COD 150 mg / L;
[0111] When NO3 is released - When the N-N concentration is less than 10 mg / L, the effluent COD concentration is less than 50 mg / L, and the NTR reaches 92%, and is maintained for 15–20 days, the continuous flow short-path denitrification biofilm module with short hydraulic retention time is considered to have reached a stable state.
[0112] Furthermore, the wastewater treatment is carried out using the steady-state short hydraulic retention time continuous flow short-path denitrification biofilm module constructed in this embodiment, as follows:
[0113] Maintain a hydraulic retention time of 30 min in the reactor, and add 10 mg / L of NH4 to the reactor. + -N, NO3 at 40 mg / L - -N, COD at 150 mg / L is operating normally; effluent NH4 + -N removal efficiency reaches 80%, effluent NO2 - When the accumulated concentration of -N reaches 30 mg / L or more, NO3 - The removal efficiency of -N was further improved, exceeding 80%, while NTR remained stable at a high level of over 90%, demonstrating the efficient operation of the PD process.
[0114] Comparative Example 1
[0115] A method for constructing a continuous flow short-path denitrification biofilm module with a short hydraulic retention time, the method comprising:
[0116] (1) Inoculate wastewater treatment plant wastewater sludge with a concentration of 2566 mg / L into SBR reactor 3 with an effective volume of 5 L, and add 10 mg / L of NH4 to the reactor. + -N, NO3 at 40 mg / L - -N, COD 200mg / L, influent ratio 40%, and anoxic stirring for 90min, sedimentation for 30min, followed by drainage for 3min via electric drain valve;
[0117] (2) Add blank polyurethane filler to SBR reactor 3 at a filling ratio of 25%, and add 10 mg / L of NH4 to the reactor. + -N, NO3 at 40 mg / L - -N, COD 200mg / L, influent ratio 40%, and anoxic stirring for 80-100min, followed by sedimentation for 30min, and then drainage for 3min via electric drain valve;
[0118] (3) The short-cut denitrification biofilm from SBR reactor 3 is introduced into continuous flow reactor 6, with a biofilm filling ratio of 82%. The dissolved oxygen in the reactor is controlled to be below 0.5 mg / L, the hydraulic retention time is 50 min, and 10 mg / L of NH4+ is added to the reactor. + -N, NO3 at 40 mg / L - -N, COD 200 mg / L;
[0119] (4) Control the dissolved oxygen in the reactor to be below 0.5 mg / L, adjust the hydraulic retention time to 30 min, and add 10 mg / L of NH4+ to the reactor. + -N, NO3 at 40 mg / L - -N, COD 150 mg / L.
[0120] The technical solution in this embodiment is the same as that in embodiment 2, except that the starvation treatment in step (1) is not performed.
[0121] Without starvation treatment, the activity of short-cut denitrifying bacteria in the continuous flow short-cut denitrification module is insufficient, preventing rapid initiation of short-cut denitrification and resulting in low NO3 levels in the effluent. - High N-N concentration results in low NTR (less than 40%).
[0122] Comparative Example 2
[0123] A method for constructing a continuous flow short-path denitrification biofilm module with a short hydraulic retention time, the method comprising:
[0124] (1) Start-up stage of SBR system short-range denitrification activated sludge: same as in Example 2.
[0125] (2) Start-up stage of short-range denitrification biofilm formation in SBR system: Same as in Example 2.
[0126] (3) Start-up phase of continuous flow short-range denitrification biofilm module with short hydraulic retention time: Same as Example 2.
[0127] (4) Stable operation phase of continuous flow short-path denitrification biofilm module with short hydraulic retention time:
[0128] To control dissolved oxygen levels in the reactor below 0.5 mg / L, adjust the hydraulic retention time to 50 min, and add 10 mg / L of NH4+ to the reactor. + -N, NO3 at 40 mg / L - -N, COD 200 mg / L;
[0129] The difference between this comparative example and Example 2 is that in step (4), the hydraulic retention time is 50 min and the amount of COD added is 200 mg / L.
[0130] Under these conditions, the effluent COD concentration of this comparative system was high, the removal rate was low, and NO2... - -N accumulation concentration showed a decreasing trend, with NTR stabilizing at only 60%. Therefore, it can be concluded that during the stable operation of the continuous flow short-cut denitrification biofilm module in this application, hydraulic retention time and COD concentration have a significant impact on the module's stable operation.
[0131] In summary, compared with existing methods for starting short-cut denitrification in SBR reactor 3 by reducing the carbon-nitrogen ratio and increasing the pH, the existing methods require a longer time cycle to start short-cut denitrification, at least one month, and the adjustment process of carbon-nitrogen ratio and pH is relatively complex and requires precise control. In contrast, the starvation treatment method adopted in this invention can be successfully started in a very short time (2-3 days), with a short start-up cycle and simple operation.
[0132] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for constructing a continuous flow short-path denitrification biofilm module with a short hydraulic retention time, characterized in that, The construction method includes: (A) Start-up of SBR short-cut denitrification: Inoculate the anoxic SBR reactor with residual sludge from the secondary sedimentation tank or activated sludge from the biological treatment tank of a wastewater treatment plant to achieve a sludge concentration of 2000-3000 mg / L. Then, add 30-35 mg / L of NO3 to the reactor. - -N, and control the dissolved oxygen in the reactor to ≤0.5 mg / L, and subject the sludge in the reactor to anoxic starvation treatment for 2-5 days; Add 10-15 mg / L of NH4 to the reactor after anaerobic starvation treatment. + -N, NO3 at 40~45 mg / L - -N and COD of 180~220mg / L, with an influent ratio of 35~40%; the process involves anoxic stirring, sedimentation, and drainage in sequence. When the nitrite accumulation rate in the SBR reactor is ≥70%, the nitrite accumulation rate in the effluent is ≥60%, and the nitrate concentration is ≤1mg / L, the SBR short-cut denitrification is successfully started. (B) Initiation of short-range denitrification biofilm formation: The blank polyurethane filler was added to the SBR reactor after the successful start-up of short-cut denitrification in step (A), and then 10-15 mg / L of NH4 was added to the reactor. + -N, NO3 at 40~45 mg / L - -N, COD of 180~220mg / L, and influent ratio of 35~40%; the process involves anoxic stirring, sedimentation, and drainage. When the sludge concentration on the polyurethane packing is ≥3000mg / L and the nitrite accumulation rate in the SBR reactor is ≥70%, the short-cut denitrification biofilm formation is successfully initiated, and a polyurethane sponge biofilm is obtained. (C) Start-up of the continuous flow short-cut denitrification biofilm module: The polyurethane sponge biofilm from step (B) is introduced into a continuous flow reactor, the dissolved oxygen in the reactor is controlled to be ≤0.5 mg / L, and 10~15 mg / L of NH4 is added to the reactor. + -N, NO3 at 40~45 mg / L - -N, COD of 160~200mg / L, hydraulic retention time of 45~50min; When the effluent NO3 from the continuous flow reactor - When the nitrite concentration is <10mg / L, the effluent COD concentration is <60mg / L, and the nitrite accumulation rate in the continuous flow reactor is ≥70%, the continuous flow short-cut denitrification biofilm module is started to be constructed. (D) Stable operation: Control Step (C): After the continuous flow short-cut denitrification biofilm module is started, the dissolved oxygen in the continuous flow reactor should be ≤0.5 mg / L. Adjust the hydraulic retention time to 25-30 min and add 10-15 mg / L of NH4+ to the reactor. + -N, NO3 at 40~45 mg / L - -N, COD of 140~160 mg / L; When NO3 is released - After the N concentration is <10 mg / L, the effluent COD concentration is <50 mg / L, and the NTR is ≥90%, and this condition is maintained for 15-20 days, the continuous flow short-path denitrification biofilm module with short hydraulic retention time is considered to have reached a stable state.
2. The construction method according to claim 1, characterized in that, During the SBR short-cut denitrification start-up process in step (A), the dissolved oxygen in the SBR reactor is ≤0.5 mg / L; And / or, during the short-cut denitrification biofilm formation start-up process in step (B), the dissolved oxygen in the SBR reactor is ≤0.5 mg / L; And / or, during the start-up of the continuous flow short-cut denitrification biofilm module in step (C), the dissolved oxygen in the continuous flow reactor is ≤0.5 mg / L.
3. The construction method according to claim 1, characterized in that, In step (A) of the SBR short-cut denitrification start-up treatment, the anoxic stirring time is 80-100 min, the sedimentation time is 20-30 min, and the drainage time is 3-5 min. And / or, in step (B) of the biofilm attachment start-up treatment, the anoxic stirring time is 80-100 min, the sedimentation time is 20-30 min, and the drainage time is 3-5 min.
4. The construction method according to claim 1, characterized in that, In step (B), the blank polyurethane filler filling ratio is 25-30%.
5. The construction method according to claim 1, characterized in that, After the successful initiation of biofilm formation in step (C), the filling ratio of polyurethane filler is 80-85%.
6. The continuous flow short-path denitrification biofilm module with short hydraulic retention time obtained by the construction method according to any one of claims 1 to 5.
7. A treatment apparatus for constructing a continuous flow short-range denitrification biofilm module with a short hydraulic retention time as described in claim 6, characterized in that, The apparatus includes: an SBR reaction system and a continuous flow biofilm reaction system; The SBR reaction system includes: a first nitrate inlet tank, a first organic matter inlet tank, and an SBR reactor, wherein the first nitrate inlet tank and the first organic matter inlet tank are respectively connected to the SBR reactor via pipelines; The continuous flow biofilm reaction system includes: a second nitrate inlet tank, a second organic matter inlet tank, and a continuous flow reactor, wherein the second nitrate inlet tank and the second organic matter inlet tank are respectively connected to the continuous flow reactor via pipelines; The continuous flow reactor contains a polyurethane sponge biofilm.
8. The construction processing apparatus according to claim 7, characterized in that, The SBR reactor includes a first online pH measuring device, a first electric stirring device, and a first electric drain valve; And / or, the continuous flow reactor includes a second online pH measurement device.
9. The construction processing apparatus according to claim 7, characterized in that, A first nitrate inlet pump is installed on the connecting pipe between the first nitrate inlet tank and the SBR reactor; And / or, a first organic matter inlet pump is installed on the connecting pipe between the first organic matter inlet tank and the SBR reactor; And / or, a second nitrate inlet pump is installed on the connecting pipe between the second nitrate inlet tank and the continuous flow reactor; And / or, a second organic matter inlet pump is installed on the connecting pipe between the second organic matter inlet tank and the continuous flow reactor.