Real-time power outage impact assessment and response plan generation method, device and storage medium

CN120235479BActive Publication Date: 2026-03-03GUANGDONG POWER GRID CO LTD INFORMATION CENT
2 Cites 0 Cited by

Patent Information

Application Number
CN202510385086.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-03-28
Publication Date
2026-03-03
Estimated Expiration
2045-03-28

Smart Images

  • Figure CN120235479B_ABST
    Figure CN120235479B_ABST
Patent Text Reader

Abstract

The application provides a real-time power failure influence evaluation and coping scheme generation method, equipment and storage medium, comprising: obtaining real-time power failure data from a transformer substation, a power distribution line and a transformer area, uploading the data to a central processing system through a preset data acquisition protocol, obtaining power failure data after removing abnormal data; according to a power grid topology structure, establishing a device association model based on physical connection and logical relationship, dynamically matching power failure events and device state changes, and updating device state information in real time; when the device state changes, triggering a power failure range analysis module, combining load distribution data and user type information, calculating the regional range and user quantity of power failure influence; using real-time data processing technology, parallel processing power failure data and power failure influence evaluation report data, extracting key power failure event characteristics, and generating power failure event trend analysis results.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Power distribution network power cutting method

    CN103150688A

  • Event influence assessment regulation and control method and system based on power failure situation analysis

    CN116187799A