一种基坑工程混凝土支撑垫层施工装置及绿色施工方法
By using mixing and excavation equipment in foundation pit engineering, the original soil is mixed with solidification materials to form self-compacting materials, which solves the problems of low efficiency, high cost and environmental pollution in the construction of concrete cushion layers in foundation pit engineering, and realizes green construction and resource optimization.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD
- Filing Date
- 2025-04-23
- Publication Date
- 2026-07-17
AI Technical Summary
Existing foundation pit engineering projects suffer from problems such as low pouring efficiency, complex construction process, large carbon emissions, serious material waste, demolition difficulties, and high cost of disposing of original soil.
A construction device for concrete support cushion layer in foundation pit engineering is adopted, including a water storage truck, a mixing device and an excavator. The device mixes the original soil with solidification materials and water to form a fluid self-compacting material, which is then pumped on-site into the concrete structure cushion layer formwork to achieve self-leveling pouring.
It has achieved a complete replacement of concrete foundation layers, reduced construction costs and carbon emissions, improved pouring efficiency and construction safety, optimized the resource utilization of undisturbed soil, and reduced the use of machinery and material waste.
Smart Images

Figure CN120425722B_ABST