Remote alarm method and system for surge protector

By constructing heating and cooling test curves for surge protectors, obtaining the optimal cooling power, and remotely alarming, the problems of low cooling efficiency and insufficient early warning of surge protectors are solved, achieving efficient cooling and timely early warning to prevent equipment damage.

CN120454004BActive Publication Date: 2026-11-24JIANGSU XINYUN ELECTRONIC TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202510622934.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-05-15
Publication Date
2026-11-24
Estimated Expiration
2045-05-15

AI Technical Summary

Technical Problem

Existing surge protectors have inefficient cooling methods and lack effective early warning of cooling failures, which leads to the risk of accelerated aging or thermal collapse of zinc oxide varistors.

Method used

By conducting heating tests on surge protectors, heating test curves and cooling test curves are constructed to obtain the optimal cooling power. A surge cooling comparison table is constructed based on the surge current to achieve direct or phased cooling, and a remote alarm is triggered when the temperature exceeds the threshold.

Benefits of technology

It improves the cooling efficiency of surge protectors, enhances the early warning timeliness of cooling failure, and prevents overheating damage to zinc oxide varistors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120454004B_ABST
    Figure CN120454004B_ABST
Patent Text Reader

Abstract

This invention discloses a remote alarm method and system for surge protectors, relating to the field of surge protector technology. It solves the technical problems of low cooling efficiency and poor timeliness of early warning for cooling failure in current surge protector cooling methods. The key technical points are: constructing staged cooling polar coordinate points based on staged cooling temperature and staged cooling rate; calculating the vector difference between adjacent cooling vector sets and the target cooling vector to identify the optimal cooling power; constructing a surge cooling reference table based on surge current and optimal cooling power; determining whether the current average surge current is stable; if unstable, performing staged cooling on the current surge protector; if stable, performing direct cooling on the current surge protector; and determining whether the real-time surge adjustment temperature exceeds the temperature alarm threshold; if so, issuing a remote alarm. This invention solves the problems of low cooling efficiency and poor timeliness of early warning for cooling failure in current surge protector cooling methods.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of surge protector technology, and in particular to a remote alarm method and system for surge protectors. Background Technology

[0002] With the widespread use of modern electronic equipment, lightning and other transient overvoltages pose a serious threat to the safe operation of equipment. Surge protection devices (SPDs), as an important lightning protection device, are widely used in residential and industrial fields.

[0003] Transient events such as lightning strikes or instantaneous overvoltages can cause the temperature of the zinc oxide varistor inside a surge protector to rise. If the heat cannot be dissipated in time, it will accelerate the aging of the zinc oxide varistor, and may even cause thermal breakdown when the temperature exceeds the limit. Currently, surge protectors are mainly cooled using semiconductor cooling chips. However, the cooling process does not adapt the cooling power selection to the actual surge current inside the surge protector, and a complete alarm procedure for cooling failure has not been established. Therefore, current cooling methods for surge protectors suffer from low cooling efficiency and poor timeliness in early warning of cooling failure. Summary of the Invention

[0004] This application provides a remote alarm method and system for surge protectors. The technical objective is to improve the cooling efficiency of surge protector cooling methods and enhance the early warning timeliness of cooling failure.

[0005] The above-mentioned technical objective of this application is achieved through the following technical solution:

[0006] A remote alarm method for a surge protector includes:

[0007] Step S1: Perform a heating test on the pre-built surge protector based on the surge current to obtain the heating test curve and the heating surge protector;

[0008] Step S2: Obtain the cooling power of the cooling chip, and perform a cooling test on the surge protector based on the heating test curve and the cooling power of the cooling chip to obtain the cooling test curve;

[0009] Step S3: According to the preset sampling time interval, sequentially obtain the stage cooling temperature and stage cooling rate in the cooling test curve; construct stage cooling polar coordinate points based on the stage cooling temperature and stage cooling rate to obtain the stage cooling polar coordinate point set; construct adjacent cooling vector set and target cooling vector based on the stage cooling polar coordinate point set; calculate the vector difference between the adjacent cooling vector set and the target cooling vector according to the pre-constructed difference formula to obtain the vector difference set; obtain the optimal cooling power corresponding to the minimum vector difference in the vector difference set, and construct a surge cooling reference table based on the surge current and the optimal cooling power.

[0010] Step S4: Obtain the current average surge current of the current surge protector;

[0011] Step S5: Determine whether the current average surge current is stable; if so, directly cool the current surge protector according to the current average surge current and surge cooling comparison table, and monitor the real-time surge regulation temperature; otherwise, cool the current surge protector in stages according to the current average surge current and surge cooling comparison table, and monitor the real-time surge regulation temperature.

[0012] Step S6: Determine whether the real-time surge regulation temperature is greater than the preset temperature alarm threshold; if so, issue a remote alarm; otherwise, return to step S4.

[0013] Further, step S1 includes:

[0014] Step S11: Perform a surge test on the surge protector according to the preset surge frequency and surge current to obtain a real-time test surge protector. Detect the real-time surge test temperature of the real-time test surge protector and fit a temperature change curve based on the real-time surge test temperature to obtain a real-time surge test curve. Wherein, the horizontal axis of the real-time surge test curve represents the surge test time, and the vertical axis represents the real-time surge test temperature.

[0015] Step S12: Determine whether the real-time surge test temperature is greater than the temperature alarm threshold. If yes, proceed to step S13; otherwise, proceed to step S11.

[0016] Step S13: Use the real-time surge test curve as the heating test curve and the real-time test surge protector as the heating surge protector.

[0017] Further, step S2 includes:

[0018] Step S21: Perform a continuous cooling test on the heat surge protector based on the cooling power of the cooling chip, then detect the real-time cooling test temperature based on the heat test curve, and plot the real-time cooling test curve based on the real-time cooling test temperature.

[0019] Step S22: Obtain the current ambient temperature and determine whether the real-time cooling test temperature is lower than the current ambient temperature. If yes, proceed to step S23; otherwise, proceed to step S21.

[0020] Step S23: Use the real-time cooling test curve as the cooling test curve.

[0021] Further, in step S3, constructing the stage cooling polar coordinate points based on the stage cooling temperature and stage cooling rate includes:

[0022] The temperature-radius ratio coefficient is calculated based on the preset radius threshold and the stage cooling threshold, and is expressed as follows:

[0023]

[0024] Where α represents the temperature-diameter ratio coefficient, ΔT represents the stage cooling threshold, and L represents the diameter threshold;

[0025] The stage cooling radius is calculated based on the stage cooling temperature and the temperature radius proportionality coefficient, and is expressed as follows:

[0026] l=α×Δt

[0027] Where l represents the stage cooling radius, and Δt represents the stage cooling temperature;

[0028] The temperature rate polar angle proportionality coefficient is calculated based on the preset polar angle threshold and the stage temperature rate threshold, and is expressed as follows:

[0029]

[0030] Where β represents the temperature-velocity polar angle proportionality coefficient, π represents pi, and Δv represents the temperature-velocity polar angle proportionality coefficient.

[0031] The stage cooling polar angle is calculated based on the stage cooling rate and the temperature rate polar angle proportionality coefficient, and is expressed as:

[0032] θ=β×Δv

[0033] Where θ represents the polar angle of the stage cooling, and Δv represents the stage cooling rate;

[0034] The polar coordinates of the stage cooling are determined based on the stage cooling radius and stage cooling angle.

[0035] Further, step S4 includes:

[0036] Obtain the current surge current set, and calculate the current average surge current based on the current surge current set, expressed as:

[0037]

[0038] in, Indicates the current time as t J The current average surge current at that time, P represents the number of surge currents concentrated in the current surge current, I p This represents the p-th surge current in the current surge current concentration.

[0039] Further, in step S5, determining whether the current average surge current is stable includes:

[0040] The current average surge current at each detection time is acquired to obtain the current average surge current set;

[0041] The fluctuation value of the current average surge current set is calculated using a pre-constructed fluctuation formula;

[0042] The system determines whether the fluctuation value is greater than a preset fluctuation threshold. If it is, the current average surge current is unstable; otherwise, the current average surge current is stable.

[0043] Furthermore, the fluctuation formula is expressed as:

[0044]

[0045] Where δ represents the fluctuation value, Indicates the current time as t J-1 The current average surge current at time J represents the total number of times the average surge current is detected.

[0046] Furthermore, in step S5, the current surge protector is directly cooled according to the current average surge current and surge cooling comparison table, including: querying the direct cooling power corresponding to the current average surge current in the surge cooling comparison table, and then cooling the current surge protector according to the direct cooling power.

[0047] Further, in step S5, the surge protector is subjected to phased cooling based on the current average surge current and surge cooling comparison table, including:

[0048] Step S511: Query the stage cooling power corresponding to the current average surge current in the surge cooling comparison table;

[0049] Step S512: Perform phased cooling on the current surge protector according to the phased cooling power, and obtain the next phase average surge current of the current average surge current.

[0050] Step S513: Determine whether the average surge current of the next stage is less than the preset surge current extreme value. If so, complete the stage cooling. Otherwise, update the current average surge current to the average surge current of the next stage and return to step S511.

[0051] A remote alarm system for a surge protector includes:

[0052] The heat generation test module performs a heat generation test on a pre-built surge protector based on the surge current, and obtains the heat generation test curve and the heat generation surge protector.

[0053] The cooling test module acquires the cooling power of the cooling chip, and performs a cooling test on the surge protector based on the heating test curve and the cooling power of the cooling chip to obtain the cooling test curve.

[0054] The surge cooling reference table construction module sequentially acquires the stage cooling temperature and stage cooling rate from the cooling test curve according to the preset sampling time interval. Based on the stage cooling temperature and stage cooling rate, it constructs stage cooling polar coordinate points to obtain a stage cooling polar coordinate point set. Based on the stage cooling polar coordinate point set, it constructs an adjacent cooling vector set and a target cooling vector. Based on the pre-constructed difference formula, it calculates the vector difference between the adjacent cooling vector set and the target cooling vector to obtain a vector difference set. It then acquires the optimal cooling power corresponding to the minimum vector difference in the vector difference set and constructs a surge cooling reference table based on the surge current and the optimal cooling power.

[0055] The module obtains the current average surge current of the current surge protector;

[0056] The first judgment module determines whether the current average surge current is stable. If it is, it switches to the direct cooling module; otherwise, it switches to the staged cooling module.

[0057] The direct cooling module directly cools the current surge protector based on the current average surge current and surge cooling comparison table, and monitors the real-time surge regulation temperature.

[0058] The phased cooling module performs phased cooling on the current surge protector based on the current average surge current and surge cooling comparison table, and monitors the real-time surge regulation temperature.

[0059] The second judgment module determines whether the real-time surge regulation temperature is greater than the preset temperature alarm threshold. If it is, it switches to the remote alarm module; otherwise, it switches to the acquisition module.

[0060] The remote alarm module enables remote alarm activation.

[0061] The beneficial effects of this application are as follows: The remote alarm method and system for surge protectors described in this application perform a heating test on a pre-constructed surge protector based on the surge current to obtain a heating test curve and a heating surge protector. The cooling power of the cooling chip is obtained, and a cooling test is performed on the heating surge protector based on the heating test curve and the cooling power of the cooling chip to obtain a cooling test curve. The stage cooling temperature and stage cooling rate are sequentially obtained from the cooling test curve according to a preset sampling time interval. Stage cooling polar coordinate points are constructed based on the stage cooling temperature and stage cooling rate to obtain a stage cooling polar coordinate point set. An adjacent cooling vector set and a target cooling vector are constructed based on the stage cooling polar coordinate point set. The vector difference between the adjacent cooling vector set and the target cooling vector is calculated according to a pre-constructed difference formula to obtain a vector difference set. The optimal cooling power corresponding to the minimum vector difference in the vector difference set is obtained, and a surge cooling reference table is constructed based on the surge current and the optimal cooling power. The current average surge current of the current surge protector is obtained. Determine if the current average surge current is stable. If so, directly cool the surge protector according to the current average surge current and surge cooling comparison table, and monitor the real-time surge regulation temperature. If not, perform phased cooling of the surge protector according to the current average surge current and surge cooling comparison table, and monitor the real-time surge regulation temperature. Determine if the real-time surge regulation temperature exceeds the preset temperature alarm threshold. If so, issue a remote alarm; otherwise, continue to acquire the current average surge current of the surge protector.

[0062] In summary, this application improves the cooling efficiency of the surge protector cooling method and enhances the early warning timeliness of cooling failure. Attached Figure Description

[0063] Figure 1 A schematic flowchart illustrating a remote alarm method for a surge protector provided in an embodiment of this application;

[0064] Figure 2 This is a functional block diagram of a remote alarm system for a surge protector provided in an embodiment of the present invention. Detailed Implementation

[0065] The technical solution of this application will be described in detail below with reference to the accompanying drawings.

[0066] This application provides a remote alarm method for a surge protector. The executing entity of the remote alarm method for the surge protector includes, but is not limited to, at least one of the following electronic devices that can be configured to execute the method provided in this application: a server, a terminal, etc. In other words, the remote alarm method for the surge protector can be executed by software or hardware installed on a terminal device or a server device, and the software can be a blockchain platform. The server includes, but is not limited to, a single server, a server cluster, a cloud server, or a cloud server cluster.

[0067] Figure 1 This is a flowchart illustrating a remote alarm method for a surge protector according to an embodiment of the present invention. In this embodiment, the remote alarm method for the surge protector includes:

[0068] Step S1: Perform a heating test on the pre-built surge protector based on the surge current to obtain the heating test curve and the heating surge protector.

[0069] Specifically, surge currents can be extracted sequentially from a preset surge current set.

[0070] The surge current set refers to a pre-set collection of instantaneous currents used to simulate the surge protector under the influence of lightning electromagnetic pulses and various overvoltages. The heating test curve refers to the curve showing the change in the real-time surge test temperature of the surge protector over the surge test time under surge current. The real-time surge test temperature refers to the real-time temperature of the surge protector during the heating test. The heating surge protector refers to the surge protector at the end of the heating test.

[0071] Preferably, step S1 includes:

[0072] Step S11: Perform a surge test on the surge protector according to the preset surge frequency and surge current to obtain a real-time test surge protector. Detect the real-time surge test temperature of the real-time test surge protector and fit a temperature change curve based on the real-time surge test temperature to obtain a real-time surge test curve. Wherein, the horizontal axis of the real-time surge test curve represents the surge test time, and the vertical axis represents the real-time surge test temperature.

[0073] Step S12: Determine whether the real-time surge test temperature is greater than the temperature alarm threshold. If yes, proceed to step S13; otherwise, proceed to step S11.

[0074] Step S13: Use the real-time surge test curve as the heating test curve and the real-time test surge protector as the heating surge protector.

[0075] Understandably, the surge frequency refers to the number of times the surge current passes through the zinc oxide varistor inside the surge protector per unit time during a surge test. The surge frequency can be set by the user according to the actual application scenario of the surge protector. For example, in a real-world application scenario, the surge protector generates surge currents sequentially at the 2nd, 6th, 10th, 12th, and 15th seconds after a lightning strike. Therefore, the frequency at which lightning causes the surge protector to generate surge currents is approximately 5 / 15. Thus, the surge frequency can be set to generate a surge current passing through the surge protector every 3 seconds. Explainably, the temperature alarm threshold refers to the temperature value at which the surge protector needs to trigger a temperature alarm; the temperature alarm threshold can be 65℃.

[0076] Step S2: Obtain the cooling power of the cooling chip, and perform a cooling test on the surge protector based on the heating test curve and the cooling power of the cooling chip to obtain the cooling test curve.

[0077] Specifically, the cooling power of the cooling chip is extracted sequentially from the cooling power concentration of the cooling chip.

[0078] The cooling power set of the cooling chip refers to the set of cooling power used to cool the overheating surge protector, which can be achieved using a semiconductor cooling chip. The cooling test refers to testing the temperature change of the overheating surge protector over time after cooling is completed at a certain cooling power of the cooling chip, and the cooling test curve refers to the temperature-time relationship curve of the overheating surge protector during the cooling test.

[0079] Preferably, step S2 includes:

[0080] Step S21: Perform a continuous cooling test on the heat surge protector based on the cooling power of the cooling chip, then detect the real-time cooling test temperature based on the heat test curve, and plot the real-time cooling test curve based on the real-time cooling test temperature.

[0081] Step S22: Obtain the current ambient temperature and determine whether the real-time cooling test temperature is lower than the current ambient temperature. If yes, proceed to step S23; otherwise, proceed to step S21.

[0082] Step S23: Use the real-time cooling test curve as the cooling test curve.

[0083] Understandably, the current ambient temperature refers to the operating ambient temperature of the surge protector. When the real-time cooling test temperature is lower than the current ambient temperature, it indicates that the cooling test is complete. The step of detecting the real-time cooling test temperature based on the heating test curve refers to identifying the final heating temperature of the heating test curve and then starting the real-time cooling test temperature detection from that final heating temperature, ensuring the continuity between the heating test curve and the real-time cooling test curve.

[0084] Step S3: According to the preset sampling time interval, sequentially obtain the stage cooling temperature and stage cooling rate in the cooling test curve. Construct stage cooling polar coordinate points based on the stage cooling temperature and stage cooling rate to obtain the stage cooling polar coordinate point set. Construct adjacent cooling vector sets and target cooling vectors based on the stage cooling polar coordinate point set. Calculate the vector difference between the adjacent cooling vector set and the target cooling vector according to the pre-constructed difference formula to obtain the vector difference set. Obtain the optimal cooling power corresponding to the minimum vector difference in the vector difference set, and construct a surge cooling reference table based on the surge current and the optimal cooling power.

[0085] Specifically, the sampling time interval can be 1 minute. The staged cooling temperature refers to the cooling temperature of the surge protector within each minute during the cooling test, and the staged cooling rate refers to the cooling speed of the surge protector within each minute during the cooling test. For example, if the real-time cooling test temperature at 0 minutes is 55°C, at 1 minute it is 50°C, at 2 minutes it is 42°C, and at 3 minutes it is 30°C, then the staged cooling temperature within 0-1 minutes is 5°C, and the staged cooling rate is 5°C / min; the staged cooling temperature within 1-2 minutes is 8°C, and the staged cooling rate is 8°C / min; and the staged cooling temperature within 2-3 minutes is 12°C, and the staged cooling rate is 12°C / min.

[0086] The polar coordinate points of the staged cooling process refer to the polar coordinate points representing the stage cooling temperature and the stage cooling rate for each cooling stage. The polar angle of the staged cooling polar coordinate point represents the stage cooling rate, and the polar radius represents the stage cooling temperature.

[0087] Preferably, in step S3, constructing the stage cooling polar coordinate points based on the stage cooling temperature and stage cooling rate includes:

[0088] The temperature-radius ratio coefficient is calculated based on the preset radius threshold and the stage cooling threshold, and is expressed as follows:

[0089]

[0090] Where α represents the temperature-diameter ratio coefficient, ΔT represents the stage cooling threshold, and L represents the diameter threshold;

[0091] The stage cooling radius is calculated based on the stage cooling temperature and the temperature radius proportionality coefficient, and is expressed as follows:

[0092] l=α×Δt

[0093] Where l represents the stage cooling radius, and Δt represents the stage cooling temperature;

[0094] The temperature rate polar angle proportionality coefficient is calculated based on the preset polar angle threshold and the stage temperature rate threshold, and is expressed as follows:

[0095]

[0096] Where β represents the temperature-velocity polar angle proportionality coefficient, π represents pi, and Δv represents the temperature-velocity polar angle proportionality coefficient.

[0097] The stage cooling polar angle is calculated based on the stage cooling rate and the temperature rate polar angle proportionality coefficient, and is expressed as:

[0098] θ=β×Δv

[0099] Where θ represents the polar angle of the stage cooling, and Δv represents the stage cooling rate;

[0100] The polar coordinates of the stage cooling are determined based on the stage cooling radius and stage cooling angle.

[0101] Specifically, the stage cooling radius refers to the radius after the stage cooling temperature is converted to a radius, and the stage cooling angle refers to the angle after the stage cooling rate is converted to an angle.

[0102] Specifically, the adjacent cooling coordinate points refer to two adjacent polar coordinate points in the polar coordinate system, and the adjacent cooling vector refers to the vector constructed from adjacent cooling coordinate points. The direction of the adjacent cooling vector is from the polar coordinate point with higher temperature to the polar coordinate point with lower temperature. The initial cooling polar coordinate point and the final cooling polar coordinate point are identified in the set of cooling polar coordinate points for each stage, and a target cooling vector is constructed based on the initial cooling polar coordinate point and the final cooling polar coordinate point.

[0103] Specifically, the initial cooling polar coordinate point refers to the first polar coordinate point in the set of staged cooling polar coordinate points, and the final cooling polar coordinate point refers to the last polar coordinate point in the set of staged cooling polar coordinate points. The staged cooling polar coordinate points in the set are ordered according to the cooling time. The target cooling vector refers to the directed line segment from the initial cooling polar coordinate point to the final cooling polar coordinate point.

[0104] Specifically, the vector difference refers to the difference in vector magnitude between adjacent cooling vector sets and the target cooling vector. The vector difference set refers to the set of vector differences under the cooling power of each cooling chip.

[0105] In detail, the difference formula is as follows:

[0106]

[0107] Where δ represents the vector difference, I represents the number of vectors in adjacent cooling vector sets, and |*| represents the modulo sign. This represents the magnitude of the i-th adjacent cooling vector. This represents the magnitude of the target cooling vector.

[0108] Specifically, the optimal cooling power refers to the cooling power of the cooling chip corresponding to the minimum vector difference. The surge cooling reference table refers to the table showing the correspondence between surge current and its optimal cooling power.

[0109] Step S4: Obtain the current average surge current of the current surge protector.

[0110] Specifically, the current average surge current refers to the average surge current under the actual operating environment of the surge protector. For example, during a thunderstorm, if there are three surge currents passing through the surge protector at the current moment, with the first surge current being 50kA, the second surge current being 40kA, and the third surge current being 10kA, then the current average surge current is 100kA / 3.

[0111] Preferably, step S4 includes:

[0112] Obtain the current surge current set, and calculate the current average surge current based on the current surge current set, expressed as:

[0113]

[0114] in, Indicates the current time as t J The current average surge current at that time, P represents the number of surge currents concentrated in the current surge current, I p This represents the p-th surge current in the current surge current concentration.

[0115] Step S5: Determine whether the current average surge current is stable; if so, directly cool the current surge protector according to the current average surge current and surge cooling comparison table, and monitor the real-time surge regulation temperature; otherwise, perform phased cooling of the current surge protector according to the current average surge current and surge cooling comparison table, and monitor the real-time surge regulation temperature.

[0116] Preferably, in step S5, determining whether the current average surge current is stable includes:

[0117] The current average surge current at each detection time is acquired to obtain the current average surge current set;

[0118] The fluctuation value of the current average surge current set is calculated using a pre-constructed fluctuation formula;

[0119] The system determines whether the fluctuation value is greater than a preset fluctuation threshold. If it is, the current average surge current is unstable; otherwise, the current average surge current is stable.

[0120] Explained, the detection time refers to the time at which the average surge current is calculated. The interval between each detection time can be 5 minutes. For example, if the detection time is 7:00 (surges occurring before 7:00), the surge currents are 50kA, 40kA, and 10kA; if the detection time is 7:05, the surge currents are 50kA, 40kA, 10kA, 20kA, and 10kA; if the detection time is 7:10, the surge currents are 50kA, 40kA, 10kA, 20kA, 10kA, 20kA, and 30kA. Then, the current average surge current at 7:00 is 100kA / 3, the current average surge current at 7:05 is 30kA / 2, and the current average surge current at 7:10 is 50kA / 2. The fluctuation threshold can be set by the user. The smaller the fluctuation threshold, the higher the requirement for the stability of the current average surge current.

[0121] As a specific embodiment, the fluctuation formula is expressed as:

[0122]

[0123] Where δ represents the fluctuation value, Indicates the current time as t J-1 The current average surge current at time J represents the total number of times the average surge current is detected.

[0124] Preferably, in step S5, directly cooling the current surge protector according to the current average surge current and surge cooling comparison table includes: querying the direct cooling power corresponding to the current average surge current in the surge cooling comparison table, and then cooling the current surge protector according to the direct cooling power.

[0125] Preferably, in step S5, the surge protector is subjected to phased cooling based on the current average surge current and surge cooling comparison table, including:

[0126] Step S511: Query the stage cooling power corresponding to the current average surge current in the surge cooling comparison table;

[0127] Step S512: Perform phased cooling on the current surge protector according to the phased cooling power, and obtain the next phase average surge current of the current average surge current.

[0128] Step S513: Determine whether the average surge current of the next stage is less than the preset surge current extreme value. If so, complete the stage cooling. Otherwise, update the current average surge current to the average surge current of the next stage and return to step S511.

[0129] Understandably, the term "staged cooling" refers to cooling the surge protector in stages according to different cooling power of the cooling chip. The term "real-time surge regulation temperature" refers to the real-time temperature of the surge protector during the staged cooling process.

[0130] Furthermore, the average surge current in the next stage refers to the average surge current from the current time to the next detection time. For example, if the detection time is 7:00 (a surge occurred before 7:00), and the surge currents are 50kA, 40kA, and 10kA respectively; if the detection time is 7:05, and the surge currents are 50kA, 40kA, 10kA, 20kA, and 10kA respectively, then the average surge current in the next stage is 30kA / 2. When the average surge current in the next stage is less than the preset surge current extreme value, it indicates that lightning will not generate any more surge current passing through the surge protector. The surge current extreme value refers to the current value at which the surge is judged to have ended.

[0131] Step S6: Determine whether the real-time surge regulation temperature is greater than the preset temperature alarm threshold; if so, issue a remote alarm; otherwise, return to step S4.

[0132] Understandably, when the real-time surge regulation temperature exceeds the temperature alarm threshold, it indicates that the surge protector has not achieved an effective cooling effect, and therefore, a remote alarm is required.

[0133] Figure 2 This is a functional block diagram of a remote alarm system for a surge protector according to an embodiment of the present invention. The remote alarm system for a surge protector described in this application can be installed in an electronic device. The remote alarm system includes a heat generation testing module, a cooling testing module, a surge cooling comparison table construction module, an acquisition module, a first judgment module, a direct cooling module, a staged cooling module, a second judgment module, and a remote alarm module.

[0134] Specifically, the heat test module is used to perform heat tests on the pre-built surge protector based on the surge current, and obtain the heat test curve and the heat surge protector.

[0135] The cooling test module is used to obtain the cooling power of the cooling chip. Based on the heating test curve and the cooling power of the cooling chip, the cooling surge protector is tested to obtain the cooling test curve.

[0136] The surge cooling reference table construction module is used to sequentially obtain the stage cooling temperature and stage cooling rate in the cooling test curve according to the preset sampling time interval. Based on the stage cooling temperature and stage cooling rate, it constructs stage cooling polar coordinate points to obtain a stage cooling polar coordinate point set. Based on the stage cooling polar coordinate point set, it constructs adjacent cooling vector sets and target cooling vectors. Based on the pre-constructed difference formula, it calculates the vector difference between the adjacent cooling vector sets and the target cooling vector to obtain a vector difference set. It obtains the optimal cooling power corresponding to the minimum vector difference in the vector difference set and constructs a surge cooling reference table based on the surge current and the optimal cooling power.

[0137] The acquisition module is used to obtain the current average surge current of the current surge protector.

[0138] The first judgment module is used to determine whether the current average surge current is stable. If it is, it switches to the direct cooling module; otherwise, it switches to the staged cooling module.

[0139] The direct cooling module is used to directly cool the current surge protector based on the current average surge current and surge cooling comparison table, and monitor the real-time surge regulation temperature.

[0140] The phased cooling module is used to perform phased cooling of the current surge protector based on the current average surge current and surge cooling comparison table, and to monitor the real-time surge regulation temperature.

[0141] The second judgment module is used to determine whether the real-time surge regulation temperature is greater than the preset temperature alarm threshold. If it is, it is transferred to the remote alarm module; otherwise, it is transferred to the acquisition module.

[0142] The remote alarm module is used for remote alarm functions.

[0143] The modules described as separate components may or may not be physically separate. The components shown as modules may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the modules can be selected to achieve the purpose of this embodiment according to actual needs.

[0144] Furthermore, the functional modules in the various embodiments of the present invention can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated unit can be implemented in hardware or in the form of hardware plus software functional modules.

[0145] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention.

[0146] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention.

Claims

1. A remote alarm method for a surge protector, characterized in that, include: Step S1: Perform a heating test on the pre-built surge protector based on the surge current to obtain the heating test curve and the heating surge protector; Step S2: Obtain the cooling power of the cooling chip, and perform a cooling test on the surge protector based on the heating test curve and the cooling power of the cooling chip to obtain the cooling test curve; Step S3: According to the preset sampling time interval, sequentially obtain the stage cooling temperature and stage cooling rate in the cooling test curve; construct stage cooling polar coordinate points based on the stage cooling temperature and stage cooling rate to obtain the stage cooling polar coordinate point set; construct adjacent cooling vector set and target cooling vector based on the stage cooling polar coordinate point set; calculate the vector difference between the adjacent cooling vector set and the target cooling vector according to the pre-constructed difference formula to obtain the vector difference set; obtain the optimal cooling power corresponding to the minimum vector difference in the vector difference set, and construct a surge cooling reference table based on the surge current and the optimal cooling power. Step S4: Obtain the current average surge current of the current surge protector; Step S5: Determine whether the current average surge current is stable; if so, directly cool the current surge protector according to the current average surge current and surge cooling comparison table, and monitor the real-time surge regulation temperature; otherwise, cool the current surge protector in stages according to the current average surge current and surge cooling comparison table, and monitor the real-time surge regulation temperature. Step S6: Determine whether the real-time surge regulation temperature is greater than the preset temperature alarm threshold; if so, issue a remote alarm; otherwise, return to step S4.

2. The remote alarm method as described in claim 1, characterized in that, Step S1 includes: Step S11: Perform a surge test on the surge protector according to the preset surge frequency and surge current to obtain a real-time test surge protector. Detect the real-time surge test temperature of the real-time test surge protector and fit a temperature change curve based on the real-time surge test temperature to obtain a real-time surge test curve. Wherein, the horizontal axis of the real-time surge test curve represents the surge test time, and the vertical axis represents the real-time surge test temperature. Step S12: Determine whether the real-time surge test temperature is greater than the temperature alarm threshold. If yes, proceed to step S13; otherwise, proceed to step S11. Step S13: Use the real-time surge test curve as the heating test curve and the real-time test surge protector as the heating surge protector.

3. The remote alarm method as described in claim 2, characterized in that, Step S2 includes: Step S21: Perform a continuous cooling test on the heat surge protector based on the cooling power of the cooling chip, then detect the real-time cooling test temperature based on the heat test curve, and plot the real-time cooling test curve based on the real-time cooling test temperature. Step S22: Obtain the current ambient temperature and determine whether the real-time cooling test temperature is lower than the current ambient temperature. If yes, proceed to step S23; otherwise, proceed to step S21. Step S23: Use the real-time cooling test curve as the cooling test curve.

4. The remote alarm method as described in claim 3, characterized in that, In step S3, constructing the stage cooling polar coordinate points based on the stage cooling temperature and stage cooling rate includes: The temperature-radius ratio coefficient is calculated based on the preset radius threshold and the stage cooling threshold, and is expressed as follows: ; in, This represents the temperature-radius proportionality coefficient. Indicates the stage cooling threshold. Indicates the polar radius threshold; The stage cooling radius is calculated based on the stage cooling temperature and the temperature radius proportionality coefficient, and is expressed as follows: ; in, Indicates the extreme diameter of the cooling stage. Indicates the temperature at which the temperature drops in stages; The temperature rate polar angle proportionality coefficient is calculated based on the preset polar angle threshold and the stage temperature rate threshold, and is expressed as follows: ; in, This represents the temperature-velocity polar angle proportionality coefficient. Represents pi (π). Indicates the stage temperature rate threshold; The stage cooling polar angle is calculated based on the stage cooling rate and the temperature rate polar angle proportionality coefficient, and is expressed as: ; in, Indicates the polar angle of the cooling phase. Indicates the rate of cooling in stages; The polar coordinates of the stage cooling are determined based on the stage cooling radius and stage cooling angle.

5. The remote alarm method as described in claim 4, characterized in that, Step S4 includes: Obtain the current surge current set, and calculate the current average surge current based on the current surge current set, expressed as: ; in, Indicates the current time is The current average surge current at that time, This indicates the number of current surge currents concentrated in a single surge current. This represents the p-th surge current in the current surge current concentration.

6. The remote alarm method as described in claim 5, characterized in that, In step S5, determining whether the current average surge current is stable includes: The current average surge current at each detection time is acquired to obtain the current average surge current set; The fluctuation value of the current average surge current set is calculated using a pre-constructed fluctuation formula; The system determines whether the fluctuation value is greater than a preset fluctuation threshold. If it is, the current average surge current is unstable; otherwise, the current average surge current is stable.

7. The remote alarm method as described in claim 6, characterized in that, The fluctuation formula is expressed as follows: ; in, Indicates the fluctuation value. Indicates the current time is The current average surge current at that time, This represents the total number of times the average surge current was detected.

8. The remote alarm method as described in claim 7, characterized in that, In step S5, the current surge protector is directly cooled according to the current average surge current and surge cooling comparison table. This includes: querying the direct cooling power corresponding to the current average surge current in the surge cooling comparison table, and then cooling the current surge protector according to the direct cooling power.

9. The remote alarm method as described in claim 8, characterized in that, In step S5, the surge protector is subjected to phased cooling based on the current average surge current and surge cooling comparison table, including: Step S511: Query the stage cooling power corresponding to the current average surge current in the surge cooling comparison table; Step S512: Perform phased cooling on the current surge protector according to the phased cooling power, and obtain the next phase average surge current of the current average surge current. Step S513: Determine whether the average surge current of the next stage is less than the preset surge current extreme value. If so, complete the stage cooling. Otherwise, update the current average surge current to the average surge current of the next stage and return to step S511.

10. A remote alarm system for a surge protector, the remote alarm system being used in the remote alarm method according to any one of claims 1-9, characterized in that, include: The heat generation test module performs a heat generation test on a pre-built surge protector based on the surge current, and obtains the heat generation test curve and the heat generation surge protector. The cooling test module acquires the cooling power of the cooling chip, and performs a cooling test on the surge protector based on the heating test curve and the cooling power of the cooling chip to obtain the cooling test curve. The surge cooling reference table construction module sequentially acquires the stage cooling temperature and stage cooling rate from the cooling test curve according to the preset sampling time interval. Based on the stage cooling temperature and stage cooling rate, it constructs stage cooling polar coordinate points to obtain a stage cooling polar coordinate point set. Based on the stage cooling polar coordinate point set, it constructs an adjacent cooling vector set and a target cooling vector. Based on the pre-constructed difference formula, it calculates the vector difference between the adjacent cooling vector set and the target cooling vector to obtain a vector difference set. It then acquires the optimal cooling power corresponding to the minimum vector difference in the vector difference set and constructs a surge cooling reference table based on the surge current and the optimal cooling power. The module obtains the current average surge current of the current surge protector; The first judgment module determines whether the current average surge current is stable. If it is, it switches to the direct cooling module; otherwise, it switches to the staged cooling module. The direct cooling module directly cools the current surge protector based on the current average surge current and surge cooling comparison table, and monitors the real-time surge regulation temperature. The phased cooling module performs phased cooling on the current surge protector based on the current average surge current and surge cooling comparison table, and monitors the real-time surge regulation temperature. The second judgment module determines whether the real-time surge regulation temperature is greater than the preset temperature alarm threshold. If it is, it switches to the remote alarm module; otherwise, it switches to the acquisition module. The remote alarm module enables remote alarm activation.

Citation Information

Patent Citations

  • Surge protector

    CN101685693A

  • Method for judging fault situation of surge protective device by using temperature difference

    CN105552874A