Reservoir flood control forecast scheduling risk determination method

CN120471433APending Publication Date: 2025-08-12CHINA YANGTZE POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510532581.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-04-25
Publication Date
2025-08-12

Smart Images

  • Figure CN120471433A_ABST
    Figure CN120471433A_ABST
Patent Text Reader

Abstract

The invention discloses a reservoir flood control forecast scheduling risk determination method. The method comprises the following steps: constructing a factor library, determining weights, and screening risk factors; estimating by using a probability density estimation method; performing scheduling simulation to obtain related data; and constructing a model, and establishing a risk assessment index system. The weight of each risk factor is obtained by adopting an analytic hierarchy process, constructing a judgment matrix, integrating opinions of multiple experts and calculating the maximum characteristic value and the corresponding characteristic vector by utilizing a mathematical method, so that not only are the experience and judgment of the experts considered, but also the objectivity and accuracy of weight determination are ensured through mathematical calculation, and meanwhile, the accuracy of risk factors is improved. In the process of constructing the judgment matrix, the relative importance among the risk factors is fully considered, and the effect of each risk factor in the actual risk can be reflected more comprehensively.
Need to check novelty before this filing date? Find Prior Art