An underwater multi-stage load dedicated jettison device and method of operation thereof
The release of multi-stage ballast blocks is achieved through an incomplete gear and rack mechanism driven by an electric cylinder, which solves the problems of stability and operational complexity of existing underwater load jettisoning devices, and realizes multi-stage buoyancy adjustment and improved space utilization.
Patent Information
- Application Number
- CN202510707223.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-29
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2045-05-29
AI Technical Summary
Existing underwater payload jettisoning devices are not very stable or reliable, are complicated to operate, cannot meet the needs of multi-stage buoyancy adjustment with single-stage jettisoning, and occupy a large space.
A dedicated underwater multi-stage load disposal device was designed, which uses an electric cylinder to drive an incomplete gear and rack mechanism. Through the multi-stage release of multiple ballast blocks, multi-stage buoyancy adjustment is achieved. The device has a compact structure and simplifies the operation process.
It improves the stability and reliability of the device, simplifies the operation process, reduces the complexity of the control system, achieves efficient multi-stage buoyancy adjustment, and has a high space utilization rate.
Smart Images

Figure CN120503947B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of underwater manned / unmanned system jettisoning devices, and in particular to a dedicated underwater multi-stage payload jettisoning device and its operation method. Background Technology
[0002] With the current acceleration of ocean exploration, marine surveying, and marine development, the development of underwater manned / unmanned systems is very rapid, and various types of underwater manned / unmanned systems and equipment are emerging in large numbers. Underwater systems use weights as payloads, which can be jettisoned when necessary to adjust their buoyancy underwater, and this is an important means of achieving diving, hovering, and surfacing.
[0003] Currently, the most commonly used payload jettisoning devices in existing underwater systems are electromagnetic and fusible link types. Electromagnetic jettisoning devices lack a locking function, and may detach without command under large platform tilts or significant swaying, resulting in low stability and reliability. Fusible link jettisoning devices are time-consuming and highly susceptible to factors such as seawater temperature, salinity, water quality, installation location, fuse material, and fuse manufacturing process. Furthermore, the fuse component must be replaced after each release, increasing operational complexity. Additionally, due to space constraints, existing payload jettisoning devices are mostly single-stage jettisoning, unable to meet the requirements of multi-stage, precise buoyancy adjustment missions. Summary of the Invention
[0004] In response to the problems of low stability and reliability, long operation time, and complex operation of existing load shedding devices in the above-mentioned production technologies, as well as the inability of single-stage load shedding to meet mission requirements and the large space occupation of multi-stage load shedding, the applicant provides a dedicated underwater multi-stage load shedding device and its operation method, which is applicable to underwater manned / unmanned systems, meets the usage requirements, and has good operational reliability.
[0005] The technical solution adopted in this invention is as follows: A dedicated underwater multi-stage payload jettisoning device includes a mounting base with a hollow interior. A locking and releasing shaft is fitted inside the mounting base, extending out of the mounting base to the outside. A bearing housing is fitted inside the mounting base, and a bearing body is mounted on the bearing housing, matching the root of the locking and releasing shaft. An electric cylinder is fixed to the inner wall of the mounting base. A rack and pinion guide is provided on the mounting base opposite the electric cylinder. An incomplete rack is mounted on the rack and pinion guide, meshing with a gear. The gear is fitted at the root of the locking and releasing shaft. The output end of the electric cylinder is fixed to the incomplete rack by fasteners. Multiple ballast blocks are installed sequentially from bottom to top on the locking and releasing shaft. Each ballast block has guide holes at its four corners, and guide rods are inserted into each guide hole from top to bottom.
[0006] Its further technical solution lies in: There are three ballast blocks, from bottom to top: the first ballast block, the second ballast block, and the third ballast block.
[0007] The structure of the first ballast block is as follows: it includes a first through hole at the center of the first ballast block, a pair of first annular holes concentrically formed along the axis of the first through hole and the first through hole, a countersunk hole at the center of the lower part of the first ballast block, the diameter of the countersunk hole being equal to the outer diameter of the pair of first annular holes; and second through holes for mounting guide rods are formed at the four corners of the first ballast block.
[0008] The central angle of the first annular hole pair of the first ballast block is 30°. The second annular hole pair is opened at the center of the second ballast block, and the central angle of the second annular hole pair is 60°. The third annular hole pair is opened at the center of the third ballast block, and the central angle of the third annular hole pair is 90°.
[0009] The structure of the locking and releasing shaft is as follows: it includes a large bearing end face installed inside the mounting base, and a large cylindrical section and a small cylindrical section are arranged sequentially at the bottom of the large bearing end face. A first annular flange pair, a second annular flange pair and a third annular flange pair are distributed at intervals on the small cylindrical section.
[0010] The first annular flange pair consists of two flanges arranged diagonally and symmetrical about the center of the locking and releasing shaft axis, with a central angle of 30°.
[0011] The first annular flange pair, the second annular flange pair, and the third annular flange pair are arranged alternately with a misalignment angle of 30°.
[0012] The structure of the incomplete rack is as follows: it includes a first rack segment, a first smooth segment, a second rack segment, a second smooth segment, a third rack segment, and a third smooth segment arranged sequentially from one end to the other. Guide grooves are provided on both sides of the incomplete rack, and the guide grooves are installed in the rack guide rail and slide along the rack guide rail. A small boss is provided at the bottom of the incomplete rack.
[0013] The rack and pinion guide is equipped with three equally spaced proximity switches: a first proximity switch, a second proximity switch, and a third proximity switch. Each proximity switch corresponds to a small protrusion and receives proximity signals from the small protrusion.
[0014] An operation method for a dedicated underwater multi-stage payload jettisoning device includes the following steps: Preparation: After installing all components of the underwater multi-stage load-release device except for the guide rod, the first ballast block, the second ballast block, and the third ballast block, it is necessary to ensure that the starting point of the first rack segment meshes with the gear. Install the third ballast block: Rotate the third ballast block 90° clockwise along the installation target posture, pass it from bottom to top through the locking and releasing shaft, and the third annular hole pair passes through the first annular flange pair, the second annular flange pair, and the third annular flange pair in sequence. Then rotate it 90° counterclockwise so that the upper surface of the third annular flange pair contacts the bottom surface of the countersunk hole of the third ballast block and is locked in the vertical upper limit position. The installation of the third ballast block is completed. Install the second ballast block: Rotate the second ballast block 60° clockwise along the installation target posture, pass it from bottom to top through the locking and releasing shaft, and then pass the second annular hole pair through the first annular flange pair and the second annular flange pair in sequence. Then rotate it 60° counterclockwise to complete the installation of the second ballast block.
[0015] As a further improvement to the above technical solution: Passing through the locking and releasing shaft from bottom to top, the first annular hole pair passes through the first annular flange pair in sequence, and then rotates counterclockwise by 30° to complete the installation of the first ballast block; Install guide rod: Passing through the second through hole of the first ballast block, the through hole of the second ballast block, and the through hole of the third ballast block in sequence from top to bottom; The installation is now complete. When the first ballast block needs to be jettisoned, the electric cylinder retracts, causing the incomplete rack to move along the rack guide. The movement of the incomplete rack will drive the rotation of the gear. The meshing point of the two moves from the beginning to the end of the first rack segment. Since the number of teeth in the first rack segment is 1 / 12 of the number of teeth in the gear, the gear will rotate 30° during this period, and drive the locking release shaft to rotate 30°, so that the first annular flange pair is aligned with the first annular hole pair, the vertical limit is released, and under the action of negative buoyancy in the water, the first ballast block will slide down along the guide rod. At the same time, the electric cylinder continues to retract, and the first smooth segment will contact the gear, but the two will disengage. The locking release shaft no longer rotates until the first proximity switch senses the proximity signal of the small boss and sends it back to the control system, causing the electric cylinder to stop, and the first stage of jettisoning is completed. When the second ballast block needs to be ejected, the electric cylinder retracts, causing the incomplete rack to move along the rack guide. The first smooth section of the incomplete rack contacts the gear, but the two are not engaged. They begin to engage when the starting point of the second rack section contacts the gear, and the gear begins to rotate. Since the number of teeth in the second rack section is also 1 / 12 of the number of teeth in the gear, the gear will rotate 30° during this period, causing the locking and releasing shaft to rotate 30°, so that the second annular flange pair is fully inserted into the projection plane of the second annular hole pair, and the vertical limit is released. At this time, the first annular flange pair is also in the projection plane of the second annular hole pair. Under the action of negative buoyancy in the water, the second ballast block will slide down along the guide rod and can pass smoothly through the first annular flange pair. At the same time, the electric cylinder continues to retract, and the second smooth section will contact the gear, but the two are disengaged. The locking and releasing shaft no longer rotates until the second proximity switch senses the proximity signal of the small boss and sends it back to the control system, causing the electric cylinder to stop. The second stage of ejection is completed. When the third ballast block needs to be discarded, the electric cylinder is activated to retract, causing the incomplete rack to move along the rack guide. The second smooth section of the incomplete rack contacts the gear, but the two do not mesh. They begin to mesh only after the starting point of the third rack section contacts the gear, and the gear begins to rotate. Since the number of teeth in the third rack section is also 1 / 12 of the number of teeth in the gear, the gear will rotate 30° during this period, and drive the locking and releasing shaft to rotate 30°, so that the third annular flange pair is completely inserted into the projection plane of the third annular hole pair, and the vertical limit is released.
[0016] The first and second annular flange pairs are also within the projection plane of the third annular hole pair. Under the action of negative buoyancy in the water, the third ballast block will slide down along the guide rod and can pass smoothly through the second and first annular flange pairs. At the same time, the electric cylinder continues to retract, and the third smooth section will contact the gear, but the two will disengage. The locking release shaft will no longer rotate until the third proximity switch senses the proximity signal of the small boss and sends it back to the control system, causing the electric cylinder to stop, and the third stage of ballast release is completed.
[0017] The beneficial effects of this invention are as follows: This invention has a compact and reasonable structure and is easy to operate. It uses an electric cylinder to drive the actuator, which in turn drives the rotation of the rotating shaft to complete the multi-stage release of multiple ballast blocks. The system is simplified, compact, and has high space utilization.
[0018] The actuator described in this invention is an incomplete gear and rack mechanism, which is simple in structure and has good adaptability to marine environments.
[0019] This invention eliminates the need for closed-loop displacement control of actuators, reducing the complexity of the control system and offering simple operation and high reliability.
[0020] This invention can easily achieve the discarding of ballast blocks of any number of levels through design changes, and has good scalability. Attached Figure Description
[0021] Figure 1 This is an isometric view of the underwater multi-stage load ejection device of the present invention.
[0022] Figure 2 This is a cross-sectional view of the underwater multi-stage load ejection device of the present invention.
[0023] Figure 3 This is a bottom view of the first-stage ballast block of the present invention.
[0024] Figure 4 This is a bottom view of the second-stage ballast block of the present invention.
[0025] Figure 5 This is a bottom view of the third-stage ballast block of the present invention.
[0026] Figure 6 This is an isometric view of the locking and releasing shaft of the present invention.
[0027] Figure 7 This is a bottom view of the locking and releasing shaft of the present invention.
[0028] Figure 8 This is an isometric view of the locking and releasing shaft and its driving mechanism of the present invention.
[0029] Figure 9 This is an isometric view of the incomplete rack of the present invention.
[0030] Figure 10 This is a schematic diagram of the structure of the incomplete rack of the present invention.
[0031] The components include: 1. Mounting base; 2. Guide rod; 3. First ballast block; 4. Second ballast block; 5. Third ballast block; 6. Locking and releasing shaft; 7. Gear; 8. Incomplete rack; 9. Rack guide rail; 10. First proximity switch; 11. Second proximity switch; 12. Third proximity switch; 13. Electric cylinder; 14. Bearing housing; 15. Bearing body; 301. First through hole; 302. First annular hole pair; 303. Countersunk hole; 304. Second through hole; 402. Second annular hole pair; 502, Third annular hole pair; 601. Large end face; 602. Large cylindrical segment; 603. Small cylindrical segment; 604. First annular flange pair; 605. Second annular flange pair; 606. Third annular flange pair; 801. First rack segment; 802. First smooth segment; 803. Second rack segment; 804. Second smooth segment; 805. Third rack segment; 806. Third smooth segment; 807. Guide groove; 808. Small boss. Detailed Implementation
[0032] The specific embodiments of the present invention will now be described with reference to the accompanying drawings.
[0033] like Figures 1-10 As shown, the underwater multi-stage load disposal device of this embodiment includes a mounting base 1, which has a hollow interior. A locking and releasing shaft 6 is installed inside the mounting base 1 and extends out of the mounting base 1 to the outside. A bearing seat 14 is installed inside the mounting base 1, and a bearing body 15 is installed on the bearing seat 14. The bearing body 15 matches the root of the locking and releasing shaft 6. An electric cylinder 13 is fixed on the inner wall of the mounting base 1. A rack guide rail 9 is provided on the mounting base 1 on the opposite side of the electric cylinder 13. An incomplete rack 8 is installed on the rack guide rail 9 and meshes with a gear 7. The gear 7 is sleeved at the root of the locking and releasing shaft 6. The output end of the electric cylinder 13 is fixed to the incomplete rack 8 by fasteners. Multiple ballast blocks are installed sequentially from bottom to top on the locking and releasing shaft 6. Each ballast block has guide holes at its four corners, and guide rods 2 are inserted into each guide hole from top to bottom.
[0034] There are three ballast blocks, from bottom to top: the first ballast block 3, the second ballast block 4, and the third ballast block 5.
[0035] The structure of the first ballast block 3 is as follows: it includes a first through hole 301 opened at the center of the first ballast block 3, a first annular hole pair 302 opened axially and concentrically with the first through hole 301, a countersunk hole 303 opened at the lower center of the first ballast block 3, the diameter of the countersunk hole 303 being equal to the outer diameter of the first annular hole pair 302; and second through holes 304 for installing guide rods 2 are opened at the four corners of the first ballast block 3.
[0036] The central angle of the first annular hole pair 302 of the first ballast block 3 is 30°. The second annular hole pair 402 is opened at the center of the second ballast block 4, and the central angle of the second annular hole pair 402 is 60°. The third annular hole pair 502 is opened at the center of the third ballast block 5, and the central angle of the third annular hole pair 502 is 90°.
[0037] The structure of the locking and releasing shaft 6 is as follows: it includes a large bearing end face 601 installed inside the mounting base 1. The bottom of the large bearing end face 601 is provided with a large cylindrical section 602 and a small cylindrical section 603 in sequence. The small cylindrical section 603 is provided with a first annular flange pair 604, a second annular flange pair 605 and a third annular flange pair 606 at intervals.
[0038] The first annular flange pair 604 consists of two flanges arranged diagonally and symmetrical about the center of the locking and releasing shaft 6, with a central angle of 30°.
[0039] The first annular flange pair 604, the second annular flange pair 605, and the third annular flange pair 606 are arranged alternately with a misalignment angle of 30°.
[0040] The structure of the incomplete rack 8 is as follows: it includes a first rack segment 801, a first smooth segment 802, a second rack segment 803, a second smooth segment 804, a third rack segment 805 and a third smooth segment 806 arranged sequentially from one end to the other. Guide grooves 807 are provided on both sides of the incomplete rack 8. The guide grooves 807 are installed in the rack guide rail 9 and slide along the rack guide rail 9. A small boss 808 is provided at the bottom of the incomplete rack 8.
[0041] The rack and pinion guide 9 is equipped with a first proximity switch 10, a second proximity switch 11 and a third proximity switch 12 at equal intervals. The three proximity switches correspond to the small protrusion 808 and receive the proximity signal from the small protrusion 808.
[0042] The specific structure and function of the underwater multi-stage payload jettisoning device described in this invention are as follows: It mainly includes: mounting base 1, guide rod 2, first ballast block 3, second ballast block 4, third ballast block 5, locking and releasing shaft 6, gear 7, incomplete rack 8, rack guide rail 9, first proximity switch 10, second proximity switch 11, third proximity switch 12, electric cylinder 13, bearing seat 14, bearing body 15, etc.
[0043] The guide rods 2 are installed at the four corners of the mounting base 1 and are inserted into the guide holes in the third ballast block 5, the second ballast block 4, and the first ballast block 3 from top to bottom.
[0044] A first through hole 301 is formed at the center of the first ballast block 3. A first annular hole pair 302 is formed concentrically around the first through hole 301. The first annular hole pair 302 consists of two annular holes arranged diagonally and symmetrical about the axis of the through hole. A countersunk hole 303 is formed at the center of the lower part of the first ballast block 3. The diameter of the countersunk hole 303 is equal to the outer diameter of the first annular hole pair 302.
[0045] The first ballast block 3 has a second through hole 304 at each of its four corners, and a guide rod 2 passes through the second through hole 304 for guiding and limiting.
[0046] The second ballast block 4 and the third ballast block 5 have the same size and composition as the first ballast block 3. The difference is that the central angle of the first annular hole of the first ballast block 3 to 302 is 30°, the central angle of the second annular hole of the second ballast block 4 to 402 is 60°, and the central angle of the third annular hole of the third ballast block 5 to 502 is 90°. The starting generatrices of the three annular holes are the same.
[0047] The locking and releasing shaft 6 is composed of a large bearing end face 601, a large cylindrical section 602, a small cylindrical section 603, a first annular flange pair 604, a second annular flange pair 605, and a third annular flange pair 606.
[0048] The first annular flange pair 604 consists of two flanges arranged diagonally and symmetrically about the axis of the locking and releasing shaft 6, with a central angle of 30°. The second annular flange pair 605 and the third annular flange pair 606 have the same outer diameter and thickness as the first annular flange pair 604, and the same outer diameter and depth as the countersunk hole 303, with a central angle of 30°. The first annular flange pair 604 and the second annular flange pair 605 are arranged at a 30° offset angle along the axis, and the second annular flange pair 605 and the third annular flange pair 606 are also arranged at a 30° offset angle.
[0049] The locking and releasing shaft 6 is mounted on the mounting base 1 via the bearing seat 14 and the bearing body 15. The gear 7 is mounted on the small cylindrical section 603 of the locking and releasing shaft 6 via a key connection. The diameter of the small cylindrical section 603 is equal to the inner diameter of the first through hole 301.
[0050] The incomplete rack 8 is composed of a first rack segment 801, a first smooth segment 802, a second rack segment 803, a second smooth segment 804, a third rack segment 805, a third smooth segment 806, a guide groove 807, and a small boss 808. Its guide groove 807 is installed within the rack guide rail 9, allowing it to slide along the rack guide rail 9 and mesh with the gear 7. One end of the incomplete rack 8 is hinged to the electric cylinder 13.
[0051] The first proximity switch 10, the second proximity switch 11, and the third proximity switch 12 are all mounted on the rack and pinion guide rail 9. The proximity switches are spaced equally apart and are used to receive the proximity signal from the small protrusion 808.
[0052] In actual work process: After installing all components of the underwater multi-stage ballast jettisoning device except for the guide rod 2, the first ballast block 3, the second ballast block 4, and the third ballast block 5, ensure that the starting point of the first rack segment 801 meshes with the gear 7.
[0053] First, install the third ballast block 5. Rotate it 90° clockwise along the target installation position, and pass it from bottom to top through the locking and releasing shaft 6. The third annular hole pair 502 passes sequentially through the first annular flange pair 604, the second annular flange pair 605, and the third annular flange pair 606. Then rotate it 90° counterclockwise so that the upper surface of the third annular flange pair 606 contacts the bottom surface of the countersunk hole of the third ballast block and is locked in the vertical upper limit position. The installation of the third ballast block 5 is now complete.
[0054] Next, install the second ballast block 4. Rotate it 60° clockwise along the target installation position, pass it from bottom to top through the locking and releasing shaft 6, and let the second annular hole pair 402 pass through the first annular flange pair 604 and the second annular flange pair 605 in sequence. Then rotate it 60° counterclockwise. The installation of the second ballast block 4 is now complete.
[0055] Reinstall the first ballast block 3. Rotate it 30° clockwise along the installation target posture, pass it from bottom to top through the locking and releasing shaft 6, and let the first annular hole pair 302 pass through the first annular flange pair 604 in sequence. Then rotate it 30° counterclockwise. The installation of the first ballast block 3 is now complete.
[0056] Finally, install guide rod 2, passing it sequentially from top to bottom through the second through hole 304 of the first ballast block 3, the through hole of the second ballast block 4, and the through hole of the third ballast block 5. The installation is now complete.
[0057] During underwater exploration operations, if the first ballast block 3 needs to be jettisoned, the electric cylinder 13 retracts, causing the incomplete rack 8 to move along the rack guide rail 9. The movement of the incomplete rack 8 drives the rotation of the gear 7, with the meshing point moving from the starting point of the first rack segment 801 to its ending point. Since the number of teeth in the first rack segment 801 is 1 / 12 of the number of teeth in the gear 7, the gear 7 will rotate 30° during this period, causing the locking release shaft 6 to rotate 30°. This aligns the first annular flange pair 604 with the first annular hole pair 302, releasing the vertical limit. Under the negative buoyancy in the water, the first ballast block 3 will slide down along the guide rod 2. Simultaneously, the electric cylinder 13 continues to retract, and the first smooth segment 802 will contact the gear 7, but the two will disengage, and the locking release shaft 6 will no longer rotate. The first proximity switch 10 senses the proximity signal of the small boss 808 and transmits it back to the control system, stopping the electric cylinder 13 and completing the first stage of jettisoning.
[0058] When the second ballast block 4 needs to be ejected, the electric cylinder 13 retracts, causing the incomplete rack 8 to move along the rack guide 9. The first smooth section 802 of the incomplete rack 8 contacts the gear 7, but the two are not meshed until the starting point of the second rack section 803 contacts the gear 7, at which point they begin to mesh, and the gear 7 begins to rotate. Since the number of teeth in the second rack section 803 is also 1 / 12 of the number of teeth in the gear 7, the gear 7 will rotate 30° during this period, causing the locking and releasing shaft 6 to rotate 30°, so that the second annular flange pair 605 is fully inserted into the projection plane of the second annular hole pair 402, and the vertical limit is released. At this time, the first annular flange pair 604 is also within the projection plane of the second annular hole pair 402. Under the action of negative buoyancy in the water, the second ballast block 4 will slide down along the guide rod 2 and can smoothly pass through the first annular flange pair 604. Meanwhile, the electric cylinder 13 continues to retract, and the second smooth section 804 will contact the gear 7, but the two will disengage, and the locking release shaft 6 will no longer rotate. The second proximity switch 11 senses the proximity signal of the small protrusion 808 and transmits it back to the control system, causing the electric cylinder 13 to stop, thus completing the second-stage load shedding.
[0059] When the third-stage ballast block 5 needs to be ejected, the electric cylinder 13 retracts, causing the incomplete rack 8 to move along the rack guide 9. The second smooth section 804 of the incomplete rack 8 contacts the gear 7, but the two are not meshed until the starting point of the third rack section 805 contacts the gear 7, at which point they begin to mesh, and the gear 7 begins to rotate. Since the number of teeth in the third rack section 805 is also 1 / 12 of the number of teeth in the gear 7, the gear 7 will rotate 30° during this period, causing the locking and releasing shaft 6 to rotate 30°, so that the third annular flange pair 606 is completely inserted into the projection plane of the third annular hole pair 502, and the vertical limit is released. At this time, the first annular flange pair 604 and the second annular flange pair 605 are also within the projection plane of the third annular hole pair 502. Under the action of negative buoyancy in the water, the third ballast block 5 will slide down along the guide rod 2 and can smoothly pass through the second annular flange pair 605 and the first annular flange pair 604. Meanwhile, the electric cylinder 13 continues to retract, and the third smooth section 806 will contact the gear 7, but the two disengage, and the locking release shaft 6 no longer rotates. The electric cylinder 13 stops only when the third proximity switch 12 senses the proximity signal of the small protrusion 808 and transmits it back to the control system, completing the third-stage load shedding.
[0060] When the number of payloads to be launched is N (N≥3), the above method can still be used, only with the following changes: 1) Change the central angle of the fan-shaped hole pair: the first level is 90° / N, the second level is 2*90° / N, ... the Nth level is 90°.
[0061] 2) Change the central angle of the annular flange pair to 90° / N.
[0062] 3) Change the misalignment angle of adjacent annular flanges along the axis to 90° / N.
[0063] 4) Change the number of rack segments and smooth segments of the incomplete rack, both to N.
[0064] 5) Change the number of teeth in each rack segment to 1 / (4N) of the number of teeth in the gear.
[0065] 6) Change the number of proximity switches to N.
[0066] The above description is an explanation of the present invention and not a limitation thereof. The scope of the present invention is defined by the claims. Within the scope of protection of the present invention, any form of modification may be made.
Claims
1. A dedicated underwater multi-stage payload disposal device, characterized in that: The system includes a mounting base (1), which has a hollow interior. A locking and releasing shaft (6) is installed inside the mounting base (1) and extends out of the mounting base (1) to the outside. A bearing seat (14) is installed inside the mounting base (1), and a bearing body (15) is installed on the bearing seat (14). The bearing body (15) matches the root of the locking and releasing shaft (6). An electric cylinder (13) is fixed on the inner wall of the mounting base (1). A rack guide (9) is provided on the mounting base (1) opposite to the electric cylinder (13). An incomplete rack (8) is installed on the rack guide (9). The incomplete rack (8) meshes with a gear (7). The gear (7) is fitted at the root of the locking and releasing shaft (6). The output end of the electric cylinder (13) is fixed to the incomplete rack (8) by fasteners. Multiple ballast blocks are installed sequentially from bottom to top on the locking and releasing shaft (6). Each ballast block has a guide hole at each of its four corners. The guide rod (2) is inserted into each guide hole from top to bottom. There are three ballast blocks, namely the first ballast block (3), the second ballast block (4), and the third ballast block (5) from bottom to top. The structure of the first ballast block (3) is as follows: it includes a first through hole (301) at the center of the first ballast block (3), a first annular hole pair (302) is opened axially and concentrically with the first through hole (301), and a countersunk hole (303) is opened at the center of the bottom of the first ballast block (3). The diameter of the countersunk hole (303) is equal to the outer diameter of the first annular hole pair (302). The four corners of the first ballast block (3) have second through holes (304) for installing the guide rod (2). The structure of the locking and releasing shaft (6) is as follows: it includes a large bearing end face (601) installed inside the mounting base (1), and a large cylindrical section (602) and a small cylindrical section (603) are arranged sequentially at the bottom of the large bearing end face (601). A first annular flange pair (604), a second annular flange pair (605) and a third annular flange pair (606) are distributed at intervals on the small cylindrical section (603).
2. The underwater multi-stage payload disposal device as described in claim 1, characterized in that: The central angle of the first annular hole pair (302) of the first ballast block (3) is 30°. The second annular hole pair (402) is opened at the center of the second ballast block (4), and the central angle of the second annular hole pair (402) is 60°. The third annular hole pair (502) is opened at the center of the third ballast block (5), and the central angle of the third annular hole pair (502) is 90°.
3. The underwater multi-stage payload disposal device as described in claim 1, characterized in that: The first annular flange pair (604) consists of two flanges arranged diagonally and symmetrical about the center of the locking and releasing pivot (6) axis, with a central angle of 30°.
4. The underwater multi-stage payload disposal device as described in claim 3, characterized in that: The first annular flange pair (604), the second annular flange pair (605), and the third annular flange pair (606) are arranged alternately with a misalignment angle of 30°.
5. The underwater multi-stage payload disposal device as described in claim 1, characterized in that: The structure of the incomplete rack (8) is as follows: it includes a first rack segment (801), a first smooth segment (802), a second rack segment (803), a second smooth segment (804), a third rack segment (805), and a third smooth segment (806) arranged sequentially from one end to the other. Guide grooves (807) are provided on both sides of the incomplete rack (8). The guide grooves (807) are installed in the rack guide rail (9) and slide along the rack guide rail (9). A small boss (808) is provided at the bottom of the incomplete rack (8).
6. The underwater multi-stage payload disposal device as described in claim 5, characterized in that: The rack and pinion guide (9) is provided with a first proximity switch (10), a second proximity switch (11) and a third proximity switch (12) at equal intervals. The three proximity switches correspond to the small protrusion (808) and receive the proximity signal from the small protrusion (808).
7. An operation method for a dedicated underwater multi-stage payload jettisoning device as described in claim 1, characterized in that: Includes the following steps: Preparation: After the components of the underwater multi-stage load-release device, except for the guide rod (2), the first ballast block (3), the second ballast block (4), and the third ballast block (5), are installed, it is necessary to ensure that the starting point of the first rack segment (801) meshes with the gear (7). Install the third ballast block (5): Rotate the third ballast block (5) clockwise by 90° along the installation target posture, and pass it from bottom to top through the locking and releasing shaft (6). The third annular hole pair (502) passes through the first annular flange pair (604), the second annular flange pair (605), and the third annular flange pair (606) in sequence. Then rotate it counterclockwise by 90° so that the upper surface of the third annular flange pair (606) contacts the bottom surface of the countersunk hole of the third ballast block and is locked in the vertical upper limit position. The installation of the third ballast block (5) is completed. Install the second ballast block (4): Rotate the second ballast block (4) clockwise by 60° along the installation target posture, pass it from bottom to top through the locking and releasing shaft (6), and the second annular hole pair (402) passes through the first annular flange pair (604) and the second annular flange pair (605) in sequence. Then rotate it counterclockwise by 60° to complete the installation of the second ballast block (4). Install the first ballast block (3): Rotate the first ballast block (3) clockwise by 30° along the installation target posture, pass it from bottom to top through the locking and releasing shaft (6), and the first annular hole pair (302) passes through the first annular flange pair (604) in sequence. Then rotate it counterclockwise by 30° to complete the installation of the first ballast block (3). Install guide rod (2): Passing through the second through hole (304) of the first ballast block (3), the through hole of the second ballast block (4), and the through hole of the third ballast block (5) from top to bottom; The installation is now complete. When the first ballast block (3) needs to be discarded, the electric cylinder (13) is activated to retract, causing the incomplete rack (8) to move along the rack guide (9). The movement of the incomplete rack (8) will drive the rotation of the gear (7). The meshing point of the two moves from the starting point of the first rack segment (801) to the ending point. Since the number of teeth of the first rack segment (801) is 1 / 12 of the number of teeth of the gear (7), the gear (7) will rotate 30° during this period, and drive the locking and releasing shaft (6) to rotate 30°, so that the first annular flange pair (6) 04) Align with the first annular hole pair (302), release the vertical limit, and under the action of negative buoyancy in the water, the first ballast block (3) will slide down along the guide rod (2). At the same time, the electric cylinder (13) continues to retract, and the first smooth section (802) will contact the gear (7), but the two will disengage. The locking release shaft (6) will no longer rotate until the first proximity switch (10) senses the proximity signal of the small boss (808) and sends it back to the control system, causing the electric cylinder (13) to stop, and the first stage of ballast release is completed. When the second ballast block (4) needs to be discarded, the electric cylinder (13) is activated to retract, causing the incomplete rack (8) to move along the rack guide (9). The first smooth section (802) of the incomplete rack (8) contacts the gear (7), but the two do not mesh. They begin to mesh only after the starting point of the second rack section (803) contacts the gear (7). The gear (7) begins to rotate. Since the number of teeth of the second rack section (803) is also 1 / 12 of the number of teeth of the gear (7), the gear (7) will rotate 30° during this period, and drive the locking and releasing shaft (6) to rotate 30°, so that the second annular flange pair (605) completely enters the second annular hole pair (4). Within the projection plane of 02), the vertical limit is released. At this time, the first annular flange pair (604) is also within the projection plane of the second annular hole pair (402). Under the action of negative buoyancy in the water, the second ballast block (4) will slide down along the guide rod (2) and can pass smoothly through the first annular flange pair (604). At the same time, the electric cylinder (13) continues to retract, and the second smooth section (804) will contact the gear (7), but the two disengage. The locking release shaft (6) no longer rotates until the second proximity switch (11) senses the proximity signal of the small boss (808) and transmits it back to the control system, causing the electric cylinder (13) to stop, and the second stage of ballast release is completed. When the third ballast block (5) needs to be discarded, the electric cylinder (13) is activated to retract, causing the incomplete rack (8) to move along the rack guide (9). The second smooth section (804) of the incomplete rack (8) contacts the gear (7), but the two do not mesh until the starting point of the third rack section (805) contacts the gear (7) and begins to mesh. The gear (7) begins to rotate. Since the number of teeth of the third rack section (805) is also 1 / 12 of the number of teeth of the gear (7), the gear (7) will rotate 30° during this period, and drive the locking and releasing shaft (6) to rotate 30°, so that the third annular flange pair (606) completely enters the projection plane of the third annular hole pair (502) and is vertically limited. Release; at this time, the first annular flange pair (604) and the second annular flange pair (605) are also in the projection plane of the third annular hole pair (502). Under the action of negative buoyancy in the water, the third ballast block (5) will slide down along the guide rod (2) and can pass smoothly through the second annular flange pair (605) and the first annular flange pair (604). At the same time, the electric cylinder (13) continues to retract, and the third smooth section (806) will contact the gear (7), but the two disengage. The locking release shaft (6) no longer rotates until the third proximity switch (12) senses the proximity signal of the small boss (808) and transmits it back to the control system, causing the electric cylinder (13) to stop, and the third stage of ballast release is completed.
Citation Information
Patent Citations
An underwater continuous ballast disposal device
CN114933000A
Underwater multistage load rejection device
CN119329726A