Filling mining method and system for steeply-inclined nearly-upright extra-thick coal seam

By combining the sectional mining of acute inclined extra-thick coal seams with low-level mining system and high-level tunnel filling system, safe and efficient mining of acute inclined extra-thick coal seams is achieved, the problems of stress concentration and energy accumulation are solved, and the stability of surrounding rocks and resource recovery rate are improved.

CN120520578AActive Publication Date: 2025-08-22CHINA UNIV OF MINING & TECH

Patent Information

Application Number
CN202510755736.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-06-07
Publication Date
2025-08-22
Estimated Expiration
2045-06-07

AI Technical Summary

Technical Problem

The mining of acutely tilted extra-thick coal seams has problems of stress concentration and energy accumulation. The existing methods are difficult to effectively reduce stress concentration and reduce energy accumulation, resulting in instability of surrounding rocks and causing major hidden dangers.

Method used

The nearly upright extra-thick coal seam is divided into multiple horizontal sections, and the low-level mining system and the high-level tunnel filling system work together. The goaf is isolated through the grid slurry bracket, and the filling detection holes are used for space detection and grouting filling, forming a stable filling interface and dynamically adjusting the filling parameters.

Benefits of technology

It realizes stable filling of goaf, weakens stress concentration and energy accumulation, improves surrounding rock stability and resource recovery, and ensures the integrity and long-term safety of the filling body.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120520578A_ABST
    Figure CN120520578A_ABST
Patent Text Reader

Abstract

The invention discloses a steeply-inclined nearly-upright extra-thick coal seam horizontal section fully-mechanized caving filling mining method, and relates to the technical field of coal mining. The method includes the following steps that the nearly-vertical super-thick coal seam is divided into different mining levels of 20-40 m, a low-position mining and releasing system is arranged at the horizontal position of the junction of a current section and a lower section, a high-position filling system is arranged in a top plate or bottom plate rock pillar at the horizontal position of the junction of the current section and an upper section, and the coal seam of the current section is mined through a fully-mechanized caving mining method; along with advancing of the coal face, a separation net and slurry blocking cloth are laid on the goaf through a net laying and slurry blocking support; a suspended cavity space detection characterization robot arranged in the high-position filling system is used for carrying out goaf space detection; the method comprises the following steps: dividing a nearly upright extra-thick coal seam into different sections for section mining, performing in-situ grouting filling on a subsequent mining space in the mining process, forming a stable filling interface in a goaf, fundamentally weakening stress concentration and reducing energy accumulation, and realizing collaborative proceeding of filling and coal mining.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of coal mining, in particular to a filling mining method and system for a steeply inclined, nearly vertical and extra-thick coal seam. Background Art

[0002] Safely and efficiently mining steeply inclined, thick, complex, and difficult-to-mine coal seams has long been a global challenge. Foreign fully mechanized top-coal caving mining methods have not yet reached seam inclinations exceeding 45°. In China, steeply inclined, thick coal seams in Xinjiang, Gansu, and Guizhou account for over 30% of the world's reserves of such seams. The Urumqi mining district in Xinjiang alone holds 3.6 billion tons of such coal reserves. This type of coal seam currently mainly adopts the horizontal segmented comprehensive mining method with large section height and large mining ratio. This mining method is prone to form asymmetric surrounding rock, super-large subsequent space and significant "compression warping effect" stress distribution state, and potential sudden instability of surrounding rock causing major hidden dangers of disasters. In view of the mining conditions of steeply inclined and extra-thick coal seams, the high stress of nearly vertical roof and floor rock pillars, and the continuous expansion of goaf areas, water injection modification and drilling and blasting pressure relief are currently mainly used to prevent and control dynamic disasters. These methods only change the local stress state and cannot fundamentally weaken stress concentration and reduce energy accumulation, which seriously restricts the mining of steeply inclined and nearly vertical extra-thick coal seams. Therefore, there is an urgent need to develop a coordinated technology for filling mining of steeply inclined and extra-thick coal seams. Summary of the Invention

[0003] The purpose of the present invention is to overcome the shortcomings of the existing technology and provide a method for filling and mining steeply inclined, nearly vertical and extra-thick coal seams. The method divides the nearly vertical and extra-thick coal seams into different sections for segmented mining, fills the subsequent mining space during the mining process, and forms a stable filling interface in the goaf, fundamentally reducing stress concentration and energy accumulation.

[0004] To achieve the above objectives, in a first aspect, the present invention provides a method for backfill mining of a steeply inclined, nearly vertical, and extra-thick coal seam, comprising the following steps:

[0005] Dividing the steeply inclined, nearly vertical, and extra-thick coal seam into a plurality of horizontal segments;

[0006] A low-level mining and placing system is established at the bottom of each horizontal segment, and a high-level roadway filling system is established at the intersection of each horizontal segment and the previous horizontal segment;

[0007] The low-level mining and caving system is used to perform fully mechanized caving mining to carry out coal mining and caving operations on the horizontal segmented coal seam to form a goaf;

[0008] During the advancement of the fully mechanized caving mining working face, an isolation net is laid on the floor of the goaf by using a mesh-laying slurry blocking support as the support moves forward, and when the width of the goaf reaches a preset value, a slurry blocking mechanism is activated to lay the slurry blocking isolation cloth;

[0009] The detection device is sent into the goaf through the filling detection hole of the high-level roadway filling system to perform spatial detection, and the detection information of the goaf is obtained, including the spatial contour, volume and amount of coal residue;

[0010] Adjusting filling parameters based on the detection information, and grouting the goaf through the filling detection hole by a filling device to form a filling body;

[0011] After filling is completed, the filling detection hole is sealed and the filling body stability control is implemented through displacement monitoring optical fiber.

[0012] Beneficial effects: Through the coordination of segmented mining and high-level filling, a stable filling interface is formed in situ in the goaf, fundamentally reducing stress concentration and energy accumulation, and solving the problem of instability of the surrounding rock of steeply inclined coal seams causing disasters; the mesh-laying slurry retaining support is used to isolate and retain the goaf, ensuring the integrity of the filling body; the filling parameters are dynamically adjusted based on spatial detection information to improve filling accuracy and efficiency; the borehole is sealed after filling and the stability is monitored to ensure long-term safety.

[0013] Furthermore, the steps of establishing a low-level mining and discharge system include excavating cutting eyes, transport tunnels, return air tunnels, connecting tunnels, auxiliary transport tunnels, transport chute and return air chute in sequence at the bottom of the current horizontal segment; wherein the transport chute connects the transport tunnel with the current horizontal segment, the return air chute connects the auxiliary transport tunnel and the return air tunnel with the current horizontal segment, the transport chute and the return air chute are connected through a connecting tunnel and a protective coal pillar is reserved, and the cutting eyes are located at the boundary of the protective coal pillar.

[0014] Furthermore, the step of establishing the high-level tunnel filling system includes excavating a high-level filling process tunnel within the roof or floor rock pillar at the horizontal position where the current horizontal segment intersects with the previous horizontal segment, then arranging filling chambers at intervals of 10 to 20 meters within the high-level filling process tunnel, filling the chambers and filling detection holes, and then drilling filling detection holes from the filling chambers toward the goaf. Filling chambers are arranged at intervals within the high-level filling process tunnel and connected to the goaf through drilled holes, forming an integrated "detection-grouting-sealing" channel, shortening the filling path and improving efficiency. The chambers centrally control the slurry ratio to ensure the strength and density of the filling body.

[0015] Furthermore, each goaf corresponds to at least one filling detection hole to avoid local cavities, ensure that the filling body evenly supports the roof, and reduce the risk of surrounding rock deformation.

[0016] Furthermore, adjacent horizontal segments adopt a staggered filling process, so that the filling bodies between segments form a staggered block structure, which resists the sliding force of the nearly vertical coal seam filling body, enhances the overall stability, and prevents stress transfer from causing chain disasters.

[0017] Furthermore, based on the geological conditions of steeply inclined and extra-thick coal seams, an integrated time-space mining process of mining, caving, exploration, filling and control is designed. Specifically, after the implementation of the low-level fully-mechanized caving mining (mining and caving) process, the spatial detection and hole-by-hole filling (exploration and filling) process is carried out in the filling chamber with a certain step distance, and the slurry blocking process is carried out by laying a mesh slurry blocking support in the low-level caving and filling mining. Combined with the dislocation filling process (control refers to the filling body stability control process, which is achieved by the coordination of the slurry blocking process and the dislocation filling process), a nearly vertical extra-thick coal seam mining and filling process including the "mining, caving, exploration, filling and control" process is formed as a whole.

[0018] Furthermore, the preset value of the goaf width is 10 to 20 m.

[0019] Furthermore, the height of each horizontal segment is 20 to 40 m, balancing mining efficiency and surrounding rock control, avoiding the "compression warping effect" caused by large segment heights, and reducing asymmetric stress accumulation.

[0020] In a second aspect, the present invention further provides a steeply inclined, nearly vertical, and extra-thick coal seam backfill mining system for implementing any of the above methods, comprising:

[0021] The low-level mining and placing system is arranged at the bottom of the horizontal segment, and specifically includes the connected opening eye, transport lane, return air lane, connecting lane, auxiliary transport lane, transport chute and return air chute;

[0022] A mesh-laying slurry-blocking support is located in the working surface when the low-level mining and caving system performs fully mechanized caving mining. The mesh-laying slurry-blocking support lays an isolation mesh on the floor of the goaf during the forward movement of the support.

[0023] The high-level tunnel filling system is specifically arranged in the roof or floor rock pillar at the horizontal position where the horizontal segment and the previous horizontal segment intersect, including the high-level filling process tunnel, the filling chambers and the filling detection holes arranged at intervals. The filling detection holes connect the goaf and the filling chambers;

[0024] The filling device is fixed in the filling chamber and includes a retractable pipe for conveying filling slurry to the goaf; the filling pipe is provided with a flow sensor, a high-definition camera, a pressure sensor and an explosion-proof monitor, the flow sensor is used to monitor the slurry flow in real time to regulate the slurry concentration and diffusion, the high-definition camera monitors the grouting status in real time and collects images of the filling status; the pressure sensor is used to monitor the pressure of the retractable pipe, and the explosion-proof monitor is used to integrate the control of flow and pressure parameters; and,

[0025] The detection device passes through the filling detection hole and is arranged in the filling chamber of the high-level tunnel filling system to perform three-dimensional detection of the goaf and communicate with the filling device. It includes a three-dimensional scanning module and a coal residue detection module, which are used to obtain spatial contour shape, volume and coal residue data and feed them back to the filling device to adjust the explosion-proof grouting flowmeter sensor and pressure sensor.

[0026] Beneficial effect: The whole process of "mining-exploitation-exploration-filling-control" is integrated: the low-level system performs efficient mining, and the high-level system realizes precise filling; the detection device dynamically feedbacks spatial parameters, and the filling device adjusts the concentration and diffusion of the slurry in real time to form a closed-loop intelligent control, solving the problem of filling high-hanging voids in the future.

[0027] Furthermore, the mesh laying slurry blocking bracket includes:

[0028] A top coal caving hydraulic support, comprising a hydraulic support base, an inverted four-link support body, a split shield beam mechanism and a coal caving mechanism; wherein the coal caving mechanism comprises a coal shearer and a conveyor;

[0029] A net laying mechanism is arranged at the bottom of the top coal caving hydraulic support, and is used to lay an isolation net on the floor of the goaf during the forward movement of the support;

[0030] The slurry blocking mechanism is arranged on the side of the top coal caving hydraulic support and is used to deploy the slurry blocking isolation cloth at the boundary of the goaf.

[0031] Beneficial effect: The top coal caving hydraulic support, the mesh laying mechanism and the slurry blocking mechanism work together. The frame is moved and the mesh is laid synchronously to isolate the floor of the goaf. The slurry blocking mechanism unfolds the isolation cloth to seal the filling boundary, ensuring the safety of parallel coal mining and filling and reducing process interference.

[0032] Furthermore, the inverted four-bar linkage support structure comprises a load-bearing beam, an inverted four-bar linkage mechanism, and two sets of hydraulic columns. The inverted four-bar linkage mechanism is hinged to the load-bearing beam at an angle of 15° to 45°. The two sets of hydraulic columns, including two front columns and two rear columns, are hinged between the load-bearing beam and the hydraulic support base. The 15° to 45° hinge angle of the inverted four-bar linkage is suitable for supporting steeply inclined working faces and improving roof stability. The split shield beam cylinders are flexible in control, resisting lateral pressure caused by the coal seam's inclination and preventing the support from toppling.

[0033] Furthermore, the split shielding beam mechanism includes a shielding beam, a shielding beam lifting column, a shielding beam lifting cylinder and a shielding beam swing cylinder; the shielding beam lifting column is hinged to the shielding beam, the shielding beam lifting cylinder is hinged to the shielding beam, and the shielding beam swing cylinder is hinged to the hydraulic support base.

[0034] In summary, compared with the existing technology, the present invention divides the steeply inclined, nearly vertical, and extra-thick coal seam into horizontal segments for mining, arranges a low-level mining and caving system at the bottom of the segment to perform coal mining and caving operations, and simultaneously arranges a high-level tunnel filling system in the segment roof rock layer; lays an isolation net in the goaf by laying a mesh slurry retaining bracket and arranges a slurry retaining isolation cloth; uses a filling detection hole to send a detection device into the goaf to obtain spatial morphology and coal residue data; adjusts the filling parameters based on the detection results, and implements grouting filling through a filling device; finally, forms a filling body and implements stability control. This method realizes the coordinated operation of coal mining and filling, effectively reduces stress concentration and energy accumulation in the goaf, and improves surrounding rock stability and resource recovery rate. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 Schematic diagram of the layout of the high-level roadway filling system for horizontal sub-level fully-mechanized caving mining according to an embodiment of the present invention;

[0036] Figure 2 A schematic diagram of the layout of a high-level lane filling system according to an embodiment of the present invention;

[0037] Figure 3 Schematic diagram of the filling process according to an embodiment of the present invention;

[0038] Figure 4 Schematic diagram of a slurry-filling hydraulic support according to an embodiment of the present invention;

[0039] Figure 5 A schematic diagram of the process connection process of an embodiment of the present invention;

[0040] Description of the drawings: 1-high-level tunnel filling system, 2-low-level mining and caving system, 3-filling body, 4-coal seam, 5-goaf, 6-high-level tunnel, 7-filling chamber, 8-filling detection hole, 9-return air tunnel, 10-grid laying and slurry blocking support, 11-hole sealing, 12-filling, 13-detection, 14-slurry blocking mechanism, 15-grid laying mechanism, 16-coal mining, 17-coal caving, 18-detection, 19-filling, 20-filling body stability control, 21-filling device, 22-detection device. DETAILED DESCRIPTION

[0041] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solutions of the present invention and are not intended to limit the scope of protection of the present invention.

[0042] In the description of the present invention, it should be understood that the terms "center", "axial", "lateral", "upper", "lower", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0043] In the description of the invention, it should be noted that, unless otherwise expressly specified or limited, the terms "mounted," "connected," and "connected" should be understood broadly. For example, they may refer to fixed, detachable, or integral connections; mechanical or electrical connections; direct or indirect connections through an intermediary; and internal communication between two components. Those skilled in the art will understand the specific meanings of the above terms in the present invention based on specific circumstances.

[0044] An embodiment of the present invention provides a backfill mining method for a steeply inclined, nearly vertical, and extra-thick coal seam, comprising the following steps:

[0045] Divide the steeply inclined, nearly vertical and extra-thick coal seams into multiple horizontal segments;

[0046] A low-level mining and placing system 2 is established at the bottom of each horizontal segment, and a high-level roadway filling system 1 is established at the horizontal position where each horizontal segment intersects with the previous horizontal segment;

[0047] The fully mechanized caving mining is performed by the low-level mining and caving system 2, and coal mining 16 and coal caving 17 are performed on the horizontal segmented coal seam to form a goaf 5;

[0048] During the advancement of the fully mechanized caving mining working face, the isolation net is laid on the bottom plate of the goaf 5 by the mesh-laying slurry blocking support 10 during the forward movement of the support. When the width of the goaf 5 reaches a preset value, the slurry blocking mechanism 14 is activated to lay the slurry blocking isolation cloth.

[0049] The detection device 22 is sent into the goaf 5 through the filling detection hole 8 of the high-level roadway filling system 1 to perform spatial detection to obtain detection information of the goaf, including spatial contour, volume and amount of coal residue;

[0050] Based on the detection information, the filling parameters are adjusted, and the goaf 5 is grout-filled through the filling detection hole 8 by the filling device 21 to form a filling body 3;

[0051] After the filling is completed, the filling detection hole 8 is sealed and the stability of the filling body is controlled by the displacement monitoring optical fiber.

[0052] Specifically, the steps of establishing the low-level mining and discharge system 2 include excavating a cutting eye, a transport tunnel, a return air tunnel 9, a connecting tunnel, an auxiliary transport tunnel, a transport chute and a return air chute at the bottom of the current horizontal segment; wherein the transport chute connects the transport tunnel with the current horizontal segment, the return air chute connects the auxiliary transport tunnel and the return air tunnel 9 with the current horizontal segment, the transport chute and the return air chute are connected through a connecting tunnel and a protective coal pillar is reserved, and the cutting eye is located at the boundary of the protective coal pillar.

[0053] Specifically, the steps of establishing the high-level tunnel filling system 1 include excavating a high-level filling process tunnel 6 in the top or bottom rock pillar at the horizontal position where the current horizontal segment and the previous horizontal segment intersect, and then arranging the filling chamber 7 in the high-level filling process tunnel 6 at intervals of 10 to 20 meters, filling the chamber 7 and the filling detection hole 8, and then drilling the filling detection hole 8 from the filling chamber 7 toward the goaf 5.

[0054] Specifically, each goaf 5 corresponds to at least one filling detection hole 8 .

[0055] Furthermore, adjacent horizontal segments adopt a staggered filling process so that the filling bodies 3 between the segments form a staggered block structure.

[0056] Preferably, the preset value of the width of the goaf 5 is 10 to 20 m.

[0057] Preferably, the height of each horizontal segment is 20 to 40 meters.

[0058] As an embodiment, the present invention further provides a steeply inclined, nearly vertical, and extra-thick coal seam backfill mining system for implementing any of the above methods, comprising:

[0059] The low-level mining and placing system 2 is arranged at the bottom of the horizontal segment and specifically includes the connected cutting eye, transport lane, return air lane 9, connecting lane, auxiliary transport lane, transport chute and return air chute;

[0060] The mesh-laying slurry-blocking support 10 is located in the working surface when the low-level mining and caving system 2 performs fully mechanized caving mining. The mesh-laying slurry-blocking support 10 lays an isolation mesh on the floor of the goaf 5 during the process of moving the support forward.

[0061] The high-level tunnel filling system 1 is arranged in the roof or floor rock pillar at the horizontal position where the horizontal segment and the previous horizontal segment intersect, and includes a high-level filling process tunnel 6, spaced filling chambers 7 and filling detection holes 8. The filling detection holes 8 connect the goaf 5 with the filling chamber 7;

[0062] The filling device 21 is fixed in the filling chamber 7 and includes a retractable pipe for conveying the filling slurry to the goaf 5. The filling pipe is provided with a flow sensor, a high-definition camera, a pressure sensor and an explosion-proof monitor. The flow sensor is used to monitor the slurry flow in real time to regulate the slurry concentration and diffusion. The high-definition camera monitors the grouting status in real time and collects images of the filling status. The pressure sensor is used to monitor the pressure of the retractable pipe. The explosion-proof monitor is used to integrate and control the flow and pressure parameters.

[0063] The detection device 22 passes through the filling detection hole 8 and is arranged in the filling chamber 7 of the high-level tunnel filling system 1 to perform three-dimensional detection of the goaf and communicate with the filling device 21. It includes a three-dimensional scanning module and a coal residue detection module, which are used to obtain spatial contour shape, volume and coal residue data and feed them back to the filling device 21 to adjust the explosion-proof grouting flowmeter sensor and pressure sensor.

[0064] Furthermore, the paving slurry blocking support 10 includes:

[0065] The top coal caving hydraulic support includes a hydraulic support base, an inverted four-link support body, a split shield beam mechanism and a coal caving mechanism; wherein the coal caving mechanism includes a coal shearer and a conveyor;

[0066] The net laying mechanism 15 is arranged at the bottom of the top coal caving hydraulic support and lays the isolation net on the goaf floor during the forward movement of the support;

[0067] The slurry blocking mechanism 14 is arranged on the side of the top coal hydraulic support and is used to deploy the slurry blocking isolation cloth at the boundary of the goaf 5;

[0068] Furthermore, the inverted four-bar support body includes a load-bearing beam, an inverted four-bar linkage and two groups of hydraulic columns. The inverted four-bar linkage is hinged to the load-bearing beam, and the hinge angle is 15° to 45°. The two groups of hydraulic columns include two front columns and two rear columns. The two groups of hydraulic columns are hinged between the load-bearing beam and the hydraulic support base.

[0069] Furthermore, the split shielding beam mechanism includes a shielding beam, a shielding beam lifting column, a shielding beam lifting cylinder and a shielding beam swing cylinder; the shielding beam lifting column is hinged to the shielding beam, the shielding beam lifting cylinder is hinged to the shielding beam, and the shielding beam swing cylinder is hinged to the hydraulic support base.

[0070] The present invention divides a nearly vertical extra-thick coal seam into different mining horizontal segments. Based on a low-level mining and caving system 2, a high-level roadway filling system 1 is arranged at the roof position of the mining horizontal segment. The high-level roadway filling system 1 includes a high-level roadway 6, a filling chamber 7, and a filling detection hole 8. The filling chamber 7 is arranged in the high-level roadway 6, and the filling detection hole 8 connects the filling chamber 7 with the horizontal mining segment.

[0071] After the low-level mining and discharge system 2 is implemented, the goaf 5 is detected by a detection device, and then the goaf 5 is filled with filling materials through the filling detection hole 8 based on the detection result.

[0072] It can realize the safe and efficient mining of steeply inclined and extra-thick coal seams and the long-term stability of the filling body in the goaf area 5. It includes two major systems: the high-level tunnel filling system 1 and the low-level mining and caving system 2. The two major systems implement coal mining 16, coal caving 17, mesh laying, detection 18, slurry blocking, filling 19, and filling body stability control 20 functions one by one or in groups to complete the "mining-caving-exploration-filling-control" integrated time-sharing and zoned digital intelligent driven connection process.

[0073] In a further implementation of this embodiment, the low-level mining and caving system includes a transport lane, a filling detection hole 8, an inclined lane, an auxiliary transport lane, a transport chute, a return air chute, a coal mining machine, a conveyor and a paving slurry retaining support 10;

[0074] The transport chute connects the transport tunnel with the corresponding mining horizontal section, and the return air chute connects the auxiliary transport tunnel, the return air tunnel 9 and the corresponding mining horizontal section respectively. The transport chute and the return air chute are connected through a connecting tunnel and a protective coal pillar is reserved. An incision is opened at the boundary of the protective coal pillar, and the coal mining machine, conveyor and mesh slurry blocking support 10 are arranged in the incision.

[0075] An incision is made from the transport tunnel, and excavation is carried out from the inclined tunnel to the section boundary in the coal body to form a pre-excavated transport chute. An incision is made from the auxiliary transport tunnel, and excavation is carried out from the inclined tunnel to the section boundary in the coal body and connected to the return air tunnel 9 to form a return air chute. An incision is made from the transport chute or the return air chute to form a connecting tunnel, which passes through the transport chute and the return air chute, reserves a protective coal pillar, and cuts are made at the boundary of the protective coal pillar.

[0076] In a further implementation of this embodiment, during the process of coal mining 16 on the coal mining face, the coal mining machine moves forward after the top coal is caving is completed, and the mesh-laying slurry-blocking hydraulic support 10 lays an isolation net on the bottom plate of the goaf through the mesh-laying mechanism 15 during the process of moving the frame forward. After the width of the goaf reaches 3-8m, the mesh-laying slurry-blocking support arranges the slurry-blocking isolation cloth at the boundary of the goaf through the slurry-blocking mechanism 14.

[0077] The ground pulping device is connected to the filling chamber 7 through a filling material transport pipeline, and the filling chamber 7 is connected to the goaf 5 through a filling detection hole 8. The detection robot 22 can perform goaf space detection and characterization on the goaf 5 through the filling detection hole 8.

[0078] A high-level filling tunnel, namely the high-level tunnel 6, is arranged horizontally at the intersection of the horizontal segments, a material transportation pipeline is arranged to the high-level filling process tunnel, connecting the ground slurrying device and the high-level filling process tunnel, and a filling chamber 7 is arranged at a certain step distance inside the high-level filling process tunnel. At the same time, a filling detection hole 8 is arranged in the filling chamber 7 towards the working face, forming a "tunnel-chamber-hole" combined filling system layout method based on the high-level filling process tunnel with filling chambers and detection filling drill holes arranged at intervals.

[0079] In a further implementation of this embodiment, the goaf 5 after each implementation of the low-level mining and discharge system corresponds to at least one connected filling detection hole 8. Each goaf 5 corresponds to at least one filling detection hole 8 during the filling process so as to facilitate hole-by-hole filling 19 during the filling process. By performing hole-by-hole filling 19 in the above-mentioned "lane-chamber-hole" combination method, it is possible to ensure that the filling body 3 is evenly distributed and densely fills the pores to form a continuous support structure. The crushing, mixing and slurry preparation of the filling material are completed in the chamber and directly transported to the target area through the pipeline system, shortening the transportation path and improving the filling efficiency. The filling body 3 is layered and solidified in the goaf 5, gradually forming a high-strength bearing body, effectively sharing the pressure of the overburden strata, and suppressing the deformation and damage of the surrounding rock.

[0080] The filling chamber 7 centrally controls the filling process, realizes the precise adjustment of material ratio and grouting parameters, ensures the strength and density of the filling body 3, fills hole by hole to reduce slurry loss and overflow, avoids local cavities in the goaf 5, and improves filling uniformity. The continuous support of the filling body 3 to the goaf 5 can significantly reduce the surface settlement rate, protect surface buildings and the ecological environment, inhibit the collapse of the surrounding rock in the goaf, reduce the risk of secondary disasters such as water seepage and gas accumulation, and use coal gangue, tailings and other waste as filling materials to realize on-site backfilling of underground waste, reduce ground pollution and stacking costs, reduce ore depletion rate, and improve resource recovery rate.

[0081] It can also adapt to complex geological conditions and dynamically adjust the grouting volume and pressure according to the shape of the goaf 5, making it suitable for mining irregular or deep ore bodies.

[0082] In a further implementation of this embodiment, the detection robot 22 passes through the filling detection hole 8 to perform high-altitude scanning and spatial characterization of the goaf 5 to obtain accurate spatial information of the goaf, and based on the detected information, the goaf 5 is filled through the filling detection hole 8. After the filling is completed, the filling detection hole 8 is sealed to form a filling body in the goaf 5.

[0083] The overall process for filling the goaf 5 is: first, the steeply inclined, nearly vertical, and extra-thick coal seam is mined and emptied through the low-level mining and caving system 2. The goaf 5 formed after the mining and caving is the subsequent filling space. The detection device is passed through the filling detection hole 8 into the subsequent filling space to perform high-altitude scanning and spatial characterization to obtain accurate goaf space information. Based on the detected information, the ground slurrying device in the high-level lane filling system is used to make slurry and control the total amount of slurry. Then, the subsequent filling space is filled with high-level lane grouting through the above-mentioned "lane-chamber-hole" combined filling system layout. After the filling is completed, the grouting device is withdrawn and the filling detection hole 8 is sealed to form a "detection-injection-sealing" hole-by-hole filling process.

[0084] By setting up displacement monitoring optical fibers, the stability of the filling body 3 can be monitored in real time. The stress, strain and deformation of the filling body 3 can be sensed in real time through the optical fiber sensing network, and the signals generated by small displacements or cracks can be captured to provide data support for judging the integrity of the filling body 3. The interaction between the filling body 3 and the surrounding rock can be monitored, and its supporting effect on the overlying rock strata can be evaluated to prevent surface subsidence or collapse of the goaf caused by failure of the filling body 3.

[0085] In a further implementation of this embodiment, when dividing the mining level into separate sections, the coal mining face is used to mine coal on the roof of the next section, and a high-level filling tunnel is excavated on the roof of the mining level section for high-level tunnel grouting filling. Adjacent mining level sections are filled using a staggered filling process.

[0086] The filling body 3 formed by grouting and solidifying in different time periods of the previous mining horizontal segment and the filling body 3 formed by grouting and solidifying in different time periods of the next mining horizontal segment are arranged in the form of staggered blocks to prevent the filling body 3 from slipping.

[0087] In a further implementation of this embodiment, the high-level tunnel grouting is filled through a retractable filling pipe, and the filling pipe is provided with a flow sensor, a high-definition camera, a pressure sensor and an explosion-proof monitor.

[0088] High-definition cameras are used to monitor the filling status in real time and transmit the signals directly to the remote control via wired signals; pressure sensors are used to ensure real-time monitoring of the internal pressure of the pipeline, timely detection and early warning; explosion-proof monitors are used to monitor the flow and pressure in the pipeline in real time, which effectively solves the problem of irregular high-hanging void spaces and goaf areas 5 formed after horizontal segmented fully-mechanized caving of steeply inclined and extra-thick coal seams, which are subsequently closed. It is suitable for the characteristics of large grouting filling volume, no mutual influence between mining and filling, precise matching of large mining-caving ratio, and subsequent closure of irregular high-hanging void spaces. It has a simple structure, low cost, simple application, accurate measurement, and is widely applicable.

[0089] Correspondingly, the present invention is compatible with a variety of filling modes, such as single-layer full filling, single-layer interval filling, multi-layer staggered filling, and multi-layer interval filling. The appropriate filling mode can be selected according to different spatial conditions of the goaf, which can effectively curb the dynamic disasters caused by the extension of mining depth.

[0090] The integrated time-space connection technology of "mining-caving-exploration-filling-control" integrates the core links of horizontal segmented comprehensive caving mining (mining and caving), comprehensive caving subsequent spatial detection (exploration), hole-by-hole grouting and filling (filling) of high-level process tunnels, and filling body stability control (control), and the integrated time-sharing and zoned digital intelligent driven connection technology of "mining, caving, exploration, filling and control".

[0091] The precise hole-by-hole filling function of goaf 5 is supported by the goaf hole-by-hole injection precise filling device 21 arranged in the "lane-tunnel-hole" filling subsystem. It has the functions of improving the measurement accuracy and efficiency of grouting work, enhancing the visualization of the construction process, etc., providing strong support for the smooth implementation and quality assurance of grouting work, and realizing precise filling of goaf 5.

[0092] Example 1

[0093] like Figure 1-Figure 5 As shown, this embodiment specifically introduces the implementation process of a backfill mining method for a steeply inclined, nearly vertical, and extra-thick coal seam:

[0094] The nearly vertical extra-thick coal seam 4 is divided into different sections of 20 to 40 m, and a low-level mining and caving system 2 is arranged at the horizontal position of the junction between this section and the lower section, and coal mining 16 and coal caving 17 operations are carried out under the cover of the top coal filling mining mesh slurry retaining support 10; a high-level tunnel filling system 1 is arranged in the roof or floor rock pillar at the horizontal position of the junction between this section and the upper section, and after the bottom coal mining 16 and coal caving 17 operations are completed, the filling detection hole 8 in the high-level tunnel filling system 1 is used to use the detection device 22 to perform space detection 18 of the goaf 5, and after the detection 18 characterization is completed, a precise grouting robot is used to perform filling 12 operations through the filling grouting hole.

[0095] Furthermore, based on the geological conditions of the steeply inclined and extra-thick coal seam 4, an integrated time-space connection mining process of mining, caving, exploration, filling and control is designed.

[0096] Furthermore, the integrated time-space connection mining process of mining, caving, exploration, filling and control is characterized in that: after the low-level mining and caving system 2 process is implemented, the space detection 18 and hole-by-hole filling 19 processes are performed in the filling chamber 7 with a certain step delay, and the low-level top coal caving filling mining mesh slurry blocking support 10 performs the slurry blocking process, combined with the filling body stability control 20 process, an overall mining and filling process flow of a nearly vertical and extra-thick coal seam 4 including the "mining, caving, exploration, filling and control" process is formed.

[0097] Furthermore, the low-level mining and placing system 2 is arranged at the bottom of the horizontal segment, including an opening eye, a transport tunnel, a return air tunnel 9, a connecting tunnel, an auxiliary transport tunnel, a transport chute, and a return air chute.

[0098] Furthermore, the high-level tunnel filling system 1 is arranged in the roof or floor rock column at the horizontal position of the junction between the current section and the upper section, and includes a return air tunnel 9, a high-level tunnel 6, and a filling chamber 7.

[0099] Furthermore, the coal mining 16 and coal caving 17 processes are carried out in the horizontal segmented working face in the low-level mining and caving system 2, and are carried out under the cover of the top coal filling mining mesh slurry blocking support 10.

[0100] Furthermore, after the coal mining 16 and coal placing 17 processes are completed, the detection 18 and filling 19 processes are carried out. The detection 18 and filling 19 are carried out in the high-level tunnel 6 filling process tunnel and the filling chamber 7 in the high-level tunnel filling system 1.

[0101] Furthermore, during the forward movement of the mesh-laying slurry-blocking support 10 in top coal filling mining, an isolation mesh is laid on the bottom plate of the goaf 5. When the goaf 5 reaches a certain volume, the slurry-blocking isolation cloth is arranged through the slurry-blocking mechanism 14 of the mesh-laying slurry-blocking support 10.

[0102] Furthermore, each time the low-level mining and discharge system 2 is implemented, there is at least one corresponding filling detection hole 8 connected to the goaf 5 .

[0103] Furthermore, the injection-type filling device 21 for hole-by-hole exploration of the goaf 5 is arranged in the detection and filling chamber 7 in the high-level tunnel 6, and has the function of accurately detecting 18 the space of the high-suspended goaf 5.

[0104] Furthermore, the detection device 22 performs high-altitude space detection 18 on the high-altitude goaf 5 through the filling detection hole 8, obtaining spatial contour, spatial volume, and residual coal quantity, and other rheological parameters such as concentration and diffusion of the filling body 3 based on the residual coal quantity, spatial shape, and contour. After filling 19 is completed, the filling detection hole 8 is sealed 11.

[0105] Furthermore, the mesh-laying and slurry-blocking support 10, mesh-laying mechanism 15 and slurry-blocking mechanism 14 cooperate with each other to execute process actions and complete the process of coal laying 17, mesh-laying and slurry-blocking in the horizontal segmented fully-mechanized caving and filling mining technology.

[0106] Furthermore, it includes a top coal caving hydraulic support, a mesh laying mechanism 15 and a slurry blocking mechanism 14; the top coal caving hydraulic support is composed of an inverted four-link support body, a split shielding beam mechanism, and a coal caving mechanism 17.

[0107] Furthermore, the inverted four-bar support body includes a load-bearing beam, an inverted four-bar linkage, two groups of hydraulic columns, and a base. The inverted four-bar linkage is hinged to the load-bearing beam, and the hinge angle is designed to be 15°-45°. The two groups of hydraulic columns include two front columns and two rear columns, which are respectively hinged to the load-bearing beam and the base.

[0108] Furthermore, the split shielding beam mechanism includes a shielding beam, a shielding beam lifting column, a shielding beam lifting cylinder, and a shielding beam swing cylinder. The shielding beam lifting column is hinged to the shielding beam, and the shielding beam lifting cylinder and the shielding beam swing cylinder are hinged to the shielding beam and the base respectively.

[0109] Furthermore, the mesh-laying and slurry-blocking support 10, mesh-laying mechanism 15 and slurry-blocking mechanism 14 cooperate with each other to execute process actions and complete the process of coal laying 17, mesh-laying and slurry-blocking in the horizontal segmented fully-mechanized caving and filling mining technology.

[0110] Furthermore, the mesh-laying slurry-blocking support 10 is arranged in the working surface, and the isolation mesh is laid on the bottom plate through the mesh-laying mechanism 15 to form a segmented interface; the slurry filling 19 of the goaf 5 is isolated through the slurry-blocking mechanism 14.

[0111] Furthermore, the injection filling device 21 is composed of a retractable pipe, an explosion-proof grouting (anti-corrosion) flow meter sensor, a high-definition camera, a pressure sensor, and an explosion-proof monitoring instrument. After the comprehensive caving, the high-suspended empty cave space is probed hole by hole into the injection filling device 21 through the filling detection hole 8 to enter the high-suspended goaf area 5 for grouting filling 19.

[0112] Furthermore, the filling device 21 is arranged in the filling detection chamber 7 of the high-level tunnel 6, and performs grouting filling 19 on the goaf 5 through the filling detection hole 8.

[0113] It should be noted that, in this document, relational terms such as first and second, etc., are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not explicitly listed, or elements inherent to such process, method, article, or apparatus.

[0114] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A backfill mining method for steeply inclined, nearly vertical, and extra-thick coal seams, characterized in that: The following steps are involved: Dividing the steeply inclined, nearly vertical, and extra-thick coal seam into a plurality of horizontal segments; A low-level mining and placing system (2) is established at the bottom of each horizontal segment, and a high-level lane filling system (1) is established at the horizontal position where each horizontal segment intersects with the previous horizontal segment; The low-level mining and caving system (2) is used to perform fully mechanized caving mining, and coal mining (16) and coal caving (17) operations are performed on the horizontal segmented coal seam to form a goaf (5); During the advancement of the fully mechanized caving mining working face, an isolation net is laid on the bottom plate of the goaf (5) by using a mesh-laying slurry blocking support (10) in the process of moving the support forward, and when the working face advances to a certain distance, a slurry blocking mechanism (14) is started to lay out the slurry blocking isolation cloth; A detection device (22) is sent into the goaf (5) through a filling detection hole (8) of a high-level lane filling system (1) to perform spatial detection, thereby obtaining detection information of the goaf, including spatial contour, volume, and amount of coal residue; Adjusting filling parameters based on the detection information, and grouting the goaf (5) through the filling detection hole (8) using a filling device (21) to form a filling body (3); After the filling is completed, the filling detection hole (8) is sealed, and the stability of the filling body is controlled by the displacement monitoring optical fiber.

2. The backfill mining method for steeply inclined, nearly vertical, and extra-thick coal seams according to claim 1 is characterized in that: The steps of establishing the low-level mining and placing system (2) include excavating a cutting hole, a transport lane, a return air lane (9), a connecting lane, an auxiliary transport lane, a transport chute and a return air chute at the bottom of the current horizontal segment; The transport chute connects the transport tunnel with the current horizontal segment, the return air chute connects the auxiliary transport tunnel and the return air tunnel (9) with the current horizontal segment, the transport chute and the return air chute are connected via a connecting tunnel and a protective coal pillar is reserved, and the cutting eye is located at the boundary of the protective coal pillar.

3. The backfill mining method for steeply inclined, nearly vertical, and extra-thick coal seams according to claim 1 is characterized in that: The steps of establishing the high-position tunnel filling system (1) include excavating a high-position filling process tunnel (6) in the top or bottom rock column at the horizontal position of the intersection of the current horizontal segment and the previous horizontal segment, then arranging the filling chamber (7) at intervals of 10 to 20 meters in the high-position filling process tunnel (6), filling the chamber (7) and filling detection holes (8), and then drilling the filling detection holes (8) from the filling chamber (7) toward the goaf (5).

4. The backfill mining method for steeply inclined, nearly vertical, and extra-thick coal seams according to claim 1 is characterized in that: Adjacent horizontal segments adopt a staggered filling process so that the filling bodies (3) between the segments form a staggered block structure.

5. The backfill mining method for steeply inclined, nearly vertical, and extra-thick coal seams according to claim 1 is characterized in that: The preset value of the width of the goaf (5) is 10 to 20 m.

6. The backfill mining method for steeply inclined, nearly vertical, and extra-thick coal seams according to claim 1 is characterized in that: The height of each horizontal segment is 20 to 40 meters.

7. A steeply inclined, nearly vertical, and extra-thick coal seam backfill mining system implementing any of the methods of claims 1-6, characterized in that: include: The low-level mining and placing system (2) is arranged at the bottom of the horizontal segment, and specifically includes a connected cutting eye, a transport lane, a return air lane (9), a connecting lane, an auxiliary transport lane, a transport chute and a return air chute; A mesh-laying slurry-blocking support (10) is located in the working surface when the low-level mining and caving system (2) performs fully mechanized caving mining. The mesh-laying slurry-blocking support (10) lays an isolation mesh on the bottom plate of the goaf (5) during the process of moving the support forward. A high-level tunnel filling system (1) is arranged in a roof or floor rock column at a horizontal position where a horizontal segment intersects with a previous horizontal segment, and includes a high-level filling process tunnel (6), filling chambers (7) arranged at intervals, and filling detection holes (8), wherein the filling detection holes (8) connect the goaf (5) and the filling chambers (7); A filling device (21) is fixed in the filling chamber (7), comprising a retractable pipe for conveying filling slurry to the goaf (5); a flow sensor, a high-definition camera, a pressure sensor and an explosion-proof monitor are provided on the filling pipe, wherein the flow sensor is used to monitor the slurry flow in real time to regulate the slurry concentration and diffusion, the high-definition camera monitors the grouting state in real time and collects images of the filling state; the pressure sensor is used to monitor the pressure of the retractable pipe, and the explosion-proof monitor is used to integrate and control flow and pressure parameters; and, The detection device (22) passes through the filling detection hole (8) and is arranged in the filling chamber (7) of the high-level roadway filling system (1), performs three-dimensional detection of the goaf, and communicates with the filling device (21), including a three-dimensional scanning module and a coal residue detection module, which are used to obtain spatial contour shape, volume and coal residue data and feed them back to the filling device (21) to adjust the explosion-proof grouting flow meter sensor and pressure sensor.

8. The steeply inclined, nearly vertical, and extra-thick coal seam backfill mining system according to claim 7 is characterized in that: The paving and slurry blocking support (10) comprises: A top coal caving hydraulic support, comprising a hydraulic support base, an inverted four-link support body, a split shield beam mechanism and a coal caving mechanism; wherein the coal caving mechanism comprises a coal shearer and a conveyor; A net laying mechanism (15) is arranged at the bottom of the top coal caving hydraulic support and lays an isolation net on the bottom plate of the goaf during the process of moving the support forward; The slurry blocking mechanism (14) is arranged on the side of the top coal caving hydraulic support and is used to deploy a slurry blocking isolation cloth at the boundary of the goaf (5).

9. The steeply inclined, nearly vertical, and extra-thick coal seam backfill mining system according to claim 8 is characterized in that: The inverted four-bar linkage support body includes a load-bearing beam, an inverted four-bar linkage mechanism and two groups of hydraulic columns. The inverted four-bar linkage mechanism is hinged to the load-bearing beam, and the hinge angle is 15° to 45°. The two groups of hydraulic columns include two front columns and two rear columns. The two groups of hydraulic columns are hinged between the load-bearing beam and the hydraulic support base.

10. The steeply inclined, nearly vertical, and extra-thick coal seam backfill mining system according to claim 9 is characterized in that: The split shielding beam mechanism includes a shielding beam, a shielding beam lifting column, a shielding beam lifting cylinder and a shielding beam swing cylinder; the shielding beam lifting column is hinged to the shielding beam, the shielding beam lifting cylinder is hinged to the shielding beam, and the shielding beam swing cylinder is hinged to the hydraulic support base.

Citation Information

Patent Citations

  • Steep coal seam section coal pillar roadside filling method

    CN103161498A

  • Planing and grooving type mining method for longitudinal long-wall of steeply pitching seam

    CN106761750A

  • Method for decreasing width of ultra-thick coal seam stopping coal pillar through combination of building and filling

    CN106869933A

  • Grouting and filling combined mining method for goaf of large-dip-angle coal seam

    CN108222938A

  • Steeply inclined thick coal seam horizontal subsection small short-wall fully mechanized caving mining method

    CN111335894A

Cited By

  • Green mining method for filling, preventing and controlling disasters of nearly upright extra-thick coal seam

    CN120291874A

  • A green mining method for disaster prevention and control in near-vertical super-thick coal seam filling

    CN120291874B

  • Collaborative method for mining, discharging and filling process flow of nearly-upright extra-thick coal seam

    CN120444024A

  • A near-vertical super-thick coal seam mining and caving process flow coordination method

    CN120444024B

  • Cooperative process based on intelligent sorting of underground mining waste rocks and in-situ filling of tailings

    CN121701203A