Method, system and apparatus for leak testing low voltage electrical penetrations
By applying a short-circuit current to low-voltage electrical penetrations and constructing temperature and pressure change curves, the problem of inaccurate detection by traditional pressure sensors is solved, enabling efficient airtightness detection of low-voltage electrical penetrations in nuclear power plants and improving the safety of nuclear power plants.
Patent Information
- Application Number
- CN202510943200.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-09
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2045-07-09
AI Technical Summary
Traditional technologies that use pressure sensors to detect the airtightness of low-voltage electrical penetrations are inaccurate, especially in the unstable pressure environment inside the containment of a nuclear power plant, making it difficult to accurately detect airtightness risks.
By applying a short-circuit current to the conductor assembly of the low-voltage electrical penetration, recording the application time, and constructing temperature and pressure change curves, the airtightness is tested using the temperature and pressure data, thus avoiding the influence of unstable air pressure.
It improves the accuracy and timeliness of airtightness testing of low-voltage electrical penetrations, enhances the safety of nuclear power plants, and avoids airtightness risks to the containment.
Smart Images

Figure CN120628439B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of nuclear power technology, and in particular to a method, system, apparatus, computer equipment, computer-readable storage medium, and computer program product for airtightness testing of low-voltage electrical penetrations. Background Technology
[0002] With the development of nuclear industry technology, nuclear energy has gradually begun to be applied to daily life and production. For example, the electricity generated by nuclear power plants is used in daily life and production. The safety of nuclear power plants is of paramount importance. The containment vessel in a nuclear power plant is an important safety barrier. The containment vessel has the functions of preventing nuclear leakage, maintaining negative pressure, and preventing explosions. The containment vessel is equipped with low-voltage electrical penetrations. Wires enter the containment vessel through the low-voltage electrical penetrations. However, the low-voltage electrical penetrations have the risk of airtightness, which makes the containment vessel airtight.
[0003] In traditional technology, the air pressure of low-voltage electrical penetrations is usually detected by air pressure sensors. However, the air pressure inside the containment is unstable, and air tightness detection by air pressure sensors is inaccurate. Summary of the Invention
[0004] Therefore, it is necessary to provide a method, system, apparatus, computer equipment, computer-readable storage medium, and computer program product for testing the airtightness of low-voltage electrical penetrations, which can improve the accuracy of airtightness testing of low-voltage electrical penetrations, in response to the above-mentioned technical problems.
[0005] In a first aspect, this application provides a method for airtightness testing of a low-voltage electrical penetration component, which is used in the containment of a nuclear reactor. The method includes: applying a short-circuit current to at least one conductor assembly in the low-voltage electrical penetration component and recording the application time; and during the application of the short-circuit current, acquiring temperature and pressure data of the protective layer collected by a sensing device on at least one conductor assembly; constructing a temperature change curve based on the application time and temperature data, and constructing a pressure change curve based on the application time and pressure data; the temperature change curve and pressure change curve are used to test the airtightness of the target low-voltage electrical penetration component.
[0006] In one embodiment, applying a short-circuit current to at least one conductor assembly in the low-voltage electrical penetration and recording the application time includes: applying a short-circuit current to all conductor assemblies in the low-voltage electrical penetration and recording the application time, or applying a short-circuit current to a portion of conductor assemblies in the low-voltage electrical penetration and applying a rated current to a portion of conductor assemblies in the low-voltage electrical penetration, and recording the application time of the portion of conductor assemblies for which the short-circuit current is applied; the rated current is less than the short-circuit current.
[0007] In one embodiment, applying a short-circuit current to all conductor assemblies in a low-voltage electrical penetration and recording the application time includes: acquiring multiple preset current intensities, applying short-circuit currents of multiple current intensities to all conductor assemblies, and recording multiple application times corresponding to the short-circuit currents of each current intensity; and stopping the application of short-circuit currents of each current intensity when a protective layer failure is detected.
[0008] In one embodiment, a short-circuit current is applied to a portion of the conductor assembly in the low-voltage electrical penetration, and a rated current is applied to a portion of the conductor assembly in the low-voltage electrical penetration, and the application time of the short-circuit current applied to the portion of the conductor assembly is recorded, including: acquiring a plurality of preset application times; applying a short-circuit current for a plurality of preset application times to the portion of the conductor assembly to which the short-circuit current is applied, and applying a rated current for a plurality of preset application times to the portion of the conductor assembly to which the rated current is applied.
[0009] In one embodiment, the protective layer includes an insulating layer and a sealing terminal layer. A temperature change curve is constructed based on application time and temperature data, including: constructing a first temperature change curve based on each current intensity, each application time, and a first temperature data corresponding to the insulating layer; the first temperature change curve represents the correspondence between the current intensity of each short-circuit current applied to the low-voltage electrical penetration component, the application time of each short-circuit current, and the temperature of the insulating layer under a short-circuit current application scenario; and constructing a second temperature change curve based on each current intensity, each application time, and a second temperature data corresponding to the sealing terminal layer; the second temperature change curve represents the correspondence between the current intensity of each short-circuit current applied to the low-voltage electrical penetration component, the application time of each short-circuit current, and the temperature of the sealing terminal layer under a short-circuit current application scenario.
[0010] In one embodiment, constructing a temperature change curve based on application time and temperature data further includes: constructing a third temperature change curve based on third temperature data corresponding to the cable insulation layer of the low-voltage electrical penetration component, each current intensity, each application time, and the application time of each short-circuit current applied by the low-voltage electrical penetration component in the scenario of applying a short-circuit current; constructing a fourth temperature change curve based on fourth temperature data corresponding to the conductor assembly applying the short-circuit current, each current intensity, each application time, and the application time of each short-circuit current applied by the low-voltage electrical penetration component in the scenario of applying a short-circuit current, and the application time of each short-circuit current applied by the conductor assembly applying the short-circuit current; the fourth temperature change curve is used to represent the correspondence between the current intensity, the application time of each short-circuit current applied by the low-voltage electrical penetration component, and the application time of each short-circuit current applied by the conductor assembly applying the short-circuit current.
[0011] In one embodiment, constructing a pressure change curve based on application time and pressure data includes: constructing a first pressure change curve based on first pressure data between the insulation layer and the sealing terminal layer of the protective layer, based on each current intensity, each application time, and the application time of each short-circuit current applied by the low-voltage electrical penetration component in the scenario of applying a short-circuit current; and constructing a second pressure change curve based on second pressure data between the sealing terminal layer of the protective layer and the steel barrel, based on each current intensity, each application time, and the application time of each short-circuit current applied by the low-voltage electrical penetration component in the scenario of applying a short-circuit current, and the application time of each short-circuit current applied by the low-voltage electrical penetration component in the scenario of applying a short-circuit current, and the application time of each short-circuit current.
[0012] In one embodiment, the method further includes: determining a temperature alarm threshold for the low-voltage electrical penetration based on a temperature change curve, and determining a pressure alarm threshold for the low-voltage electrical penetration based on a pressure change curve; obtaining the current temperature value of the protective layer of the conductor assembly of the target low-voltage electrical penetration, and determining an airtightness abnormality of the target low-voltage electrical penetration if the temperature value is greater than the temperature alarm threshold; or, obtaining the current pressure value of the protective layer of the conductor assembly of the target low-voltage electrical penetration, and determining an airtightness abnormality of the target low-voltage electrical penetration if the pressure value is greater than the pressure alarm threshold.
[0013] In one embodiment, the method further includes: determining a short-circuit time threshold for the low-voltage electrical penetration based on temperature change curves and pressure change curves; obtaining the current short-circuit time of the target low-voltage electrical penetration; and determining an airtightness anomaly in the target low-voltage electrical penetration if the short-circuit time is greater than the short-circuit time threshold.
[0014] In one embodiment, the method further includes: applying a short-circuit current to the test conductor assembly of the low-voltage electrical penetration according to the test time, and obtaining the test temperature value and test pressure value of the test protective layer of the test conductor assembly; the test time is less than the application time; if the test temperature value is greater than the temperature value corresponding to the test time in the temperature change curve, and the test pressure value is greater than the pressure value corresponding to the test time in the pressure change curve, the airtightness of the low-voltage electrical penetration is determined to be abnormal.
[0015] Secondly, this application also provides an airtightness testing system for low-voltage electrical penetrations, including a low-voltage electrical penetration, a sensing device, a cable, and a testing device; the testing device is used to perform the steps of the method described in the first aspect above.
[0016] Thirdly, this application also provides an airtightness testing device for low-voltage electrical penetrations, comprising: a data acquisition module, used to apply a short-circuit current to at least one conductor assembly in the low-voltage electrical penetration and record the application time, and during the application of the short-circuit current, acquire temperature data and pressure data of the protective layer collected by a sensing device on at least one conductor assembly; a curve construction module, used to construct a temperature change curve based on the application time and temperature data, and construct a pressure change curve based on the application time and pressure data; the temperature change curve and pressure change curve are used to detect the airtightness of the target low-voltage electrical penetration.
[0017] Fourthly, this application also provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to implement the steps of the method described in the first aspect.
[0018] Fifthly, this application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the method described in the first aspect.
[0019] In a sixth aspect, this application also provides a computer program product, including a computer program that, when executed by a processor, implements the steps of the method described in the first aspect above.
[0020] The aforementioned method, apparatus, computer equipment, computer-readable storage medium, and computer program product for airtightness testing of low-voltage electrical penetrations apply a short-circuit current to at least one conductor assembly in the low-voltage electrical penetration and record the application time. The low-voltage electrical penetration is tested by simulating a short circuit in a real environment. During the application of the short-circuit current, temperature and pressure data of the protective layer collected by a sensing device on at least one conductor assembly are acquired. A temperature change curve is constructed based on the application time and temperature data, and a pressure change curve is constructed based on the application time and pressure data. The airtightness of the electrical penetrations configured in the containment of a nuclear reactor is tested using these temperature and pressure change curves. By simulating a short circuit in the low-voltage electrical penetration, the temperature and pressure change curves of the low-voltage electrical penetration under short-circuit conditions are constructed, avoiding the influence of unstable air pressure in the containment on airtightness testing. This converts airtightness testing into temperature and pressure testing, improving the accuracy of airtightness testing. Attached Figure Description
[0021] To more clearly illustrate the technical solutions in the embodiments of this application or related technologies, the drawings used in the description of the embodiments of this application or related technologies will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.
[0022] Figure 1 This is an application environment diagram of a method for testing the airtightness of low-voltage electrical penetrations in one embodiment;
[0023] Figure 2 This is a flowchart illustrating a method for testing the airtightness of low-voltage electrical penetrations in one embodiment.
[0024] Figure 3 This is a schematic diagram of the structure of a low-voltage electrical penetration component in one embodiment;
[0025] Figure 4 This is a flowchart illustrating step 201 in one embodiment;
[0026] Figure 5 This is a flowchart illustrating step 201 in another embodiment;
[0027] Figure 6 This is a schematic diagram of a process in one embodiment of applying a short-circuit current to all conductor assemblies and recording the application time;
[0028] Figure 7 This is a schematic diagram of a process for applying a short-circuit current to a portion of a conductor assembly and recording the application time in one embodiment.
[0029] Figure 8 This is a schematic diagram of the process for constructing a temperature change curve in one embodiment;
[0030] Figure 9 This is a cross-sectional schematic diagram of a low-voltage electrical penetration in one embodiment;
[0031] Figure 10 This is a schematic diagram of the connection of a detection device for low-voltage electrical penetrations in one embodiment;
[0032] Figure 11 A schematic diagram of the process for constructing a temperature change curve in another embodiment;
[0033] Figure 12 This is a schematic diagram of the process for constructing a pressure change curve in one embodiment;
[0034] Figure 13 This is a cross-sectional schematic diagram of a low-voltage electrical penetration in another embodiment;
[0035] Figure 14 This is a schematic diagram of the airtightness test process for a low-voltage electrical penetration component in one embodiment;
[0036] Figure 15 This is a schematic diagram of the airtightness test process for low-voltage electrical penetrations in another embodiment;
[0037] Figure 16 This is a schematic diagram of the testing process for a low-voltage electrical penetration component in one embodiment;
[0038] Figure 17 This is a flowchart illustrating a method for testing the airtightness of low-voltage electrical penetrations in another embodiment.
[0039] Figure 18 This is a structural block diagram of a low-voltage electrical penetration testing device in one embodiment;
[0040] Figure 19 This is an internal structural diagram of a computer device in one embodiment. Detailed Implementation
[0041] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application.
[0042] It should be noted that the terms "first," "second," etc., used in this application can be used to describe various elements, but these elements are not limited by these terms. These terms are only used to distinguish the first element from the second element. The terms "comprising" and "having," and any variations thereof, used in this application, are intended to cover non-exclusive inclusion. The term "multiple" used in this application refers to two or more. The term "and / or" used in this application refers to one of the embodiments, or any combination of multiple embodiments.
[0043] The airtightness testing method for low-voltage electrical penetrations provided in this application embodiment can be applied to, for example... Figure 1 The application environment shown includes at least a low-voltage electrical penetration 101 and a detection device 102; in addition, the implementation environment may also include an external power supply 103.
[0044] The low-voltage electrical penetration 101 is used to connect to the testing equipment 102, and can also be connected to an external power supply 103. The low-voltage electrical penetration 101 may include a wire assembly and a protective layer for the wire assembly.
[0045] The detection device 102 is used to acquire temperature and pressure data of the protective layer of the conductor assembly of the low-voltage electrical penetration 101. The detection device 102 can also be used to control the external power supply 103 to apply a short-circuit current to the low-voltage electrical penetration 101 and record the application time. The detection device 102 can be, but is not limited to, various personal computers, laptops, smartphones, tablets, drones, low-altitude aircraft, IoT devices, and portable wearable devices. IoT devices can include smart speakers, smart TVs, smart air conditioners, smart in-vehicle devices, projection devices, etc. Portable wearable devices can include smartwatches, smart bracelets, head-mounted devices, etc. Head-mounted devices can include virtual reality (VR) devices, augmented reality (AR) devices, smart glasses, etc. The detection device 102 can also be a server.
[0046] The external power source 103 can be a battery, power output device, etc., used to apply current to the low-voltage electrical penetrations according to control commands.
[0047] In one exemplary embodiment, such as Figure 2 As shown, a method for testing the airtightness of low-voltage electrical penetrations is provided, which can be applied to... Figure 1 The following steps, 201 to 202, are used as an example of the testing equipment.
[0048] Step 201: Apply a short-circuit current to at least one conductor assembly in the low-voltage electrical penetration and record the application time. During the application of the short-circuit current, acquire temperature and pressure data of the protective layer collected by the sensing device of at least one conductor assembly.
[0049] In practical applications, the containment vessel of a nuclear power plant needs to house electrical equipment, such as ventilation equipment, filtration equipment, instrumentation equipment, and / or sensing equipment. The electrical power required for this equipment is obtained through external wiring and / or conductors. However, the containment vessel requires high airtightness. To address this, low-voltage electrical penetrations can be installed on the surface of the containment vessel, allowing multiple conductors to enter the containment vessel through these penetrations. For example, ... Figure 3 As shown, the low-voltage electrical penetration component 301 may contain multiple wire assemblies 302, which are connected to the cable 304 via terminals 303. The low-voltage electrical penetration component also includes a cylinder 305 and end caps 306 on both sides.
[0050] If a short circuit occurs in the conductor, the temperature rises, softening the protective layer of the low-voltage electrical penetrations. Combined with the Ampere force (electromagnetic force) of the current, the conductors attract each other directly. The softened protective layer is more susceptible to deformation under the influence of electromagnetic forces, leading to abnormal airtightness of the low-voltage electrical penetrations, and consequently, abnormal airtightness of the containment structure. Low-voltage electrical penetrations are used in the containment structure of nuclear reactors.
[0051] This application utilizes testing equipment to perform short-circuit tests on low-voltage electrical penetrations, obtaining temperature and pressure change curves for the protective layer of the conductor assembly under short-circuit conditions. By comparing the temperature and pressure changes of the protective layer of the conductor assembly in a real-world scenario with these curves, the airtightness of the low-voltage electrical penetrations is assessed. This improves the accuracy of airtightness testing and enhances its timeliness through pre-monitoring data, thereby improving the safety of nuclear power plants. Optionally, the testing equipment includes a terminal and / or a server.
[0052] During implementation, low-voltage electrical penetrations are typically used to allow multiple sets of conductors to enter the containment. The testing equipment can apply a short-circuit current to at least one set of conductors in the low-voltage electrical penetration and record the application time of the short-circuit current. At the same time as applying the short-circuit current, the temperature and pressure data of the protective layer of the conductor assembly are collected by the sensing device on the conductor assembly.
[0053] The short-circuit current can be a high-intensity current generated when a simulated circuit is short-circuited, such as a current of 8kA-18kA, which can be AC or DC. Correspondingly, the application time refers to the application time of the short-circuit current. The application time can be a pre-configured fixed time, such as 50ms-1s, or it can be variable, such as the application time including the time of airtightness failure of low-voltage electrical penetrations.
[0054] During the process, the testing equipment can control an external power supply to apply a short-circuit current to the low-voltage electrical penetration, or simply record the current intensity and / or application time of the short-circuit current. During the application of the short-circuit current, the short-circuit current can be applied to all conductor assemblies of the low-voltage electrical penetration, or a short-circuit current can be applied to a portion of the conductors of the low-voltage electrical penetration while no current is applied to another portion of the conductors. Alternatively, a short-circuit current can be applied to a portion of the conductors of the low-voltage electrical penetration while a safe rated current is applied to another portion of the conductors, in order to obtain temperature and pressure data of the protective layer of the conductor assembly under different conditions.
[0055] In real-world scenarios, temperature and pressure data can be collected using small, physically stable sensing devices that do not affect airtightness. Fiber optic sensors can also be used for data collection, ensuring accurate temperature and pressure data without compromising the airtightness of low-voltage electrical penetrations.
[0056] During the acquisition of temperature and pressure data, the detection equipment can acquire and demodulate the data sent by the fiber optic temperature sensor to obtain temperature data, and acquire and demodulate the data sent by the fiber optic thin-film pressure sensor to obtain pressure data. The detection equipment can perform demodulation using a configured fiber optic grating demodulator. In addition, the fiber optic temperature sensor and the fiber optic thin-film pressure sensor can be replaced with other sensors, such as infrared temperature sensors and thin-film pressure sensors.
[0057] Step 202: Construct a temperature change curve based on the application time and temperature data, and construct a pressure change curve based on the application time and pressure data.
[0058] Among them, the temperature change curve and the pressure change curve are used to detect the airtightness of the target low-voltage electrical penetration; the target low-voltage electrical penetration is installed in the containment of the nuclear power plant.
[0059] During implementation, the testing equipment constructs temperature change curves of the protective layer and the short-circuit current application time based on the short-circuit current application time and the temperature data of the protective layer of the conductor assembly, and constructs pressure change curves of the protective layer and the short-circuit current application time based on the short-circuit current application time and the pressure data of the protective layer of the conductor assembly; wherein, the pressure can be Ampere force and / or electromagnetic force.
[0060] During execution, the temperature change curve can be a curve for a fixed short-circuit current intensity, i.e., the temperature change curve includes a single curve, where the horizontal axis can be the application time and the vertical axis can be the temperature, characterizing the temperature change of the protective layer with the application time. The temperature change curve can also be a curve for short-circuit currents of multiple intensities, i.e., the temperature change curve includes multiple curves. Furthermore, in the case of short-circuit currents of multiple intensities, multiple curves can be fitted together to obtain a single temperature change curve. Correspondingly, the pressure change curve can also be a single curve, multiple curves, and / or a single curve fitted from multiple curves. The specific curve generation process can be determined with reference to the temperature change curve described above, and will not be elaborated further here.
[0061] In real-world scenarios, when a pressure sensor performs an airtightness test, a leak has already occurred if an airtightness abnormality is detected, lacking a way to monitor it in advance. However, this application uses temperature change curves and pressure change curves to compare temperature and pressure with these curves, which can identify airtightness abnormalities in advance and improve the timeliness of airtightness detection.
[0062] During execution, the airtightness of low-voltage electrical penetrations can be tested using temperature and pressure change curves. The safety thresholds for temperature and / or pressure of the conductor assembly's protective layer can be pre-determined based on these curves. During testing, the testing equipment acquires temperature and / or pressure data for the configured low-voltage electrical penetrations and checks whether these data exceed the safety thresholds. If so, an airtightness anomaly is determined for the low-voltage electrical penetrations. Specifically, an airtightness anomaly can be determined if both temperature and pressure exceed the safety thresholds simultaneously, or if either temperature or pressure exceeds the safety threshold.
[0063] In addition, the current intensity threshold of the conductor assembly can be determined based on the temperature change curve and the pressure change curve. During the detection process, the detection equipment can also detect whether the current intensity passing through the conductor assembly is greater than the current intensity threshold. If so, it can be determined that the airtightness of the low-voltage electrical penetration is abnormal.
[0064] Alternatively, the test current and test time for low-voltage electrical penetrations can be determined through temperature and pressure change curves, and temperature and / or pressure thresholds corresponding to the test current and test time can be set. For the produced low-voltage electrical penetrations, the test current is applied according to the test time, and the test temperature and test pressure values are obtained. If the test temperature value is less than the temperature threshold, the airtightness of the low-voltage electrical penetration is determined to be abnormal; or, if the test pressure value is less than the pressure threshold, the airtightness of the low-voltage electrical penetration is determined to be abnormal.
[0065] In the aforementioned method for airtightness testing of low-voltage electrical penetrations, a short-circuit current is applied to at least one conductor assembly in the low-voltage electrical penetration, and the application time is recorded. The low-voltage electrical penetration is tested by simulating a short circuit in a real environment. During the application of the short-circuit current, temperature and pressure data of the protective layer collected by a sensing device on at least one conductor assembly are acquired. A temperature change curve is constructed based on the application time and temperature data, and a pressure change curve is constructed based on the application time and pressure data. The airtightness of the electrical penetrations configured in the containment of the nuclear reactor is tested using the temperature and pressure change curves. By simulating a short circuit in the low-voltage electrical penetration, the temperature and pressure change curves of the low-voltage electrical penetration under short-circuit conditions are constructed, avoiding the influence of unstable air pressure in the containment on the airtightness test. The airtightness test is converted into a temperature and pressure test, improving the accuracy of the airtightness test.
[0066] Based on the above exemplary embodiment, the following provides a method for airtightness testing of low-voltage electrical penetrations in one or more exemplary embodiments, which is applied to... Figure 1 Taking the testing equipment in the example, the following content will be included.
[0067] In practical applications, all conductor assemblies in a low-voltage electrical penetration may experience a short circuit. In this case, the application time of all conductor assemblies is recorded. In one optional embodiment provided in this application, such as... Figure 4 As shown, step 201 includes step 401.
[0068] Step 401: Apply a short-circuit current to all conductor assemblies in the low-voltage electrical penetration and record the application time.
[0069] During the process, the testing equipment can control the external power supply, or control the external power supply through an external system, to apply a short-circuit current to all conductor groups in the low-voltage electrical penetrations, and record the application time of the short-circuit current.
[0070] Alternatively, a partial short circuit may have occurred in the low-voltage electrical penetrations. In this case, the application time of the short-circuited wire assembly is recorded; another optional embodiment provided in this application, such as Figure 5 As shown, step 201 includes step 501.
[0071] Step 501: Apply a short-circuit current to a portion of the conductor assembly in the low-voltage electrical penetration and apply a rated current to a portion of the conductor assembly in the low-voltage electrical penetration, and record the application time of the short-circuit current to the portion of the conductor assembly.
[0072] The rated current is less than the short-circuit current. Optionally, the rated current intensity is less than the short-circuit current intensity.
[0073] During implementation, the testing equipment can control an external power supply, or control an external power supply through an external system, to apply a short-circuit current to some conductor assemblies in the low-voltage electrical penetrations and apply a rated current to the remaining conductor assemblies. At the same time, the application time of the short-circuit current to the conductor assemblies can be recorded. The conductor assemblies to which the short-circuit current is applied can be one or more.
[0074] In one optional embodiment provided in this application, short-circuit current is applied to the conductor assembly of the low-voltage electrical penetration component in two ways to simulate the conditions of full and partial short circuits in actual scenarios, thereby improving the accuracy and versatility of the temperature change curve and pressure change curve, and thus improving the accuracy of the airtightness test of the low-voltage electrical penetration component.
[0075] Based on the two methods of applying short-circuit current provided above, the following will further explain the two methods.
[0076] To address the scenario where a short-circuit current is applied to all conductor assemblies, simulating a short circuit in a low-voltage electrical penetration component during practical application, it is found that a short circuit in all conductor assemblies causes the protective layer of the conductor assembly to heat up faster and generates a larger Ampere force, making the airtightness of the low-voltage electrical penetration component more susceptible to abnormalities. To counteract this, short-circuit currents of varying intensities can be applied to the conductor assemblies destructively, and the application time corresponding to each current intensity can be obtained. In one optional embodiment provided in this application, a short-circuit current is applied to all conductor assemblies and the application time is recorded, such as... Figure 6 The process includes steps 601 to 602:
[0077] Step 601: Obtain multiple preset current intensities, apply short-circuit currents of multiple current intensities to all conductor assemblies, and record multiple application times corresponding to the short-circuit currents of each current intensity.
[0078] During implementation, the detection equipment acquires multiple preset current intensities, controls the external power supply or controls the external power supply through an external system, and applies a short-circuit current to all conductor assemblies according to the current intensity for each current intensity and records the application time of the short-circuit current for that current intensity. The application of short-circuit current for the remaining current intensities is carried out in the same way as the above-mentioned application method for the short-circuit current of the current intensities until the short-circuit current of multiple current intensities has been applied and the application time of the short-circuit current corresponding to each current intensity is recorded.
[0079] Step 602: If the protective layer fails, stop applying short-circuit current of each current intensity.
[0080] This application applies short-circuit currents of varying intensities to a low-voltage electrical penetration component in a destructive manner, thereby obtaining the temperature and pressure of the low-voltage electrical penetration component when its airtightness fails. This is used to generate accurate temperature and pressure change curves, thus improving the reliability of the temperature and pressure change curves.
[0081] During implementation, if the detection equipment detects a failure of the protective layer, or if the detection equipment receives information about the failure of the protective layer through an external system and / or device, it controls the external power supply or controls the external power supply through an external system to stop applying short-circuit current to the low-voltage electrical penetrations.
[0082] For example, a short-circuit current of 2kA can be applied to two conductor assemblies with a wire diameter of 3.26mm. After the electrical penetration is damaged, two conductor assemblies with a wire diameter of 6.54mm can be replaced and a short-circuit current of 8kA can be applied. After the electrical penetration is damaged, two conductor assemblies with a wire diameter of 18mm can be replaced and a short-circuit current of 18kA can be applied. The short-circuit current is continuously applied until the airtightness of the low-voltage electrical penetration decreases or the insulation material softens. Alternatively, only the current intensity can be changed without changing the wire diameter, and / or only the wire diameter can be changed without changing the current intensity.
[0083] It should be noted that after a destructive short-circuit current is applied to a low-voltage electrical penetration, a different low-voltage electrical penetration can be used to apply a short-circuit current of a different current intensity. The selected low-voltage electrical penetration can be obtained by sampling from multiple low-voltage electrical penetrations produced and can be considered a standard and qualified low-voltage electrical penetration.
[0084] In one optional embodiment provided by this application, the upper limit of the low-voltage electrical penetration is determined by applying a destructive short-circuit current to all conductor assemblies of the low-voltage electrical penetration. At the same time, multiple current intensities are set to test the low-voltage electrical penetration, making the temperature change curve and pressure change curve more reliable, thereby improving the reliability of the airtightness test of the low-voltage electrical penetration.
[0085] Regarding the application of short-circuit current to a portion of the conductor assembly, this simulates a scenario in practical applications where some conductor groups are short-circuited while the others remain normal. The resulting temperature and ampere force are lower in this case compared to a complete short circuit, allowing for repeated application to a single low-voltage electrical penetration. Another optional embodiment provided in this application involves applying short-circuit current to a portion of the conductor assembly and recording the short-circuit time. Figure 7 The process includes steps 701 to 702:
[0086] Step 701: Obtain multiple preset application times.
[0087] In practical applications, the response speed after a short circuit occurs is relatively fast. In nuclear power plants, the response speed after a short circuit occurs is also relatively fast, and adjustments are usually made within a few seconds. Short circuits usually do not occur simultaneously. To address this, multiple application times can be preset to apply short-circuit current to low-voltage electrical penetrations.
[0088] During implementation, the testing equipment acquires multiple preset application times to apply short-circuit current to the low-voltage electrical penetrations according to the preset application times.
[0089] Step 702: Apply short-circuit current for a preset application time to a portion of the conductor assembly to which short-circuit current is applied, and apply rated current for a preset application time to a portion of the conductor group to which rated current is applied.
[0090] During implementation, the testing equipment can control the external power supply, or control the external power supply through an external system, to apply short-circuit current to a portion of the conductor components for each preset application time, and apply rated current to the remaining conductor components, until the short-circuit current corresponding to all preset times has been applied.
[0091] It should be noted that in the above-mentioned case of applying short-circuit current to some conductor assemblies, short-circuit currents and / or rated currents of different current intensities can also be used. For example, multiple preset application times and multiple current intensities can be obtained; multiple preset application times and multiple current intensities of short-circuit current can be applied to some conductor assemblies to which short-circuit current is applied, and multiple preset application times and multiple current intensities of rated current can be applied to some conductor groups to which rated current is applied.
[0092] For example, the preset application time is 50ms, 100ms, 200ms, 400ms, 600ms, 800ms, 1s. Current is passed through two conductor components 11 with a wire diameter of 3.26mm respectively. One conductor component 11 is carried by a short-circuit current of 2kA, and the other conductor component 11 is carried by a rated current of 37.6A.
[0093] For example, the preset application time is 50ms, 100ms, 200ms, 400ms, 600ms, 800ms, 1s. Current is passed through two conductor assemblies with a wire diameter of 6.54mm, one of which carries a short-circuit current of 8kA and the other carries a rated current of 88A.
[0094] For example, the preset application time is 50ms, 100ms, 200ms, 400ms, 600ms, 800ms, 1s. Current is passed through two conductor assemblies with a wire diameter of 18mm, one of which carries a short-circuit current of 18kA and the other carries a rated current of 428A.
[0095] In another optional embodiment provided in this application, a short-circuit current is applied to the low-voltage electrical penetration component according to multiple preset application times, simulating the actual scenario. This improves the adaptability of the temperature change curve and pressure change curve to the actual scenario while saving samples of the low-voltage electrical penetration component. By controlling the preset application time to test the low-voltage electrical penetration component, the impact of sample replacement on the temperature change curve and pressure change curve is avoided, thereby improving the reliability of the curve and increasing the efficiency of curve construction.
[0096] In practical applications, the protective layer of a low-voltage electrical penetration component may include multiple layers, each with different functions, to jointly protect the conductor and ensure the airtightness of the low-voltage electrical penetration component. To this end, temperature data can be collected for each layer of the protective layer to generate multiple temperature change curves. Optionally, the protective layer includes an insulation layer and a sealing terminal layer. In one optional embodiment provided in this application, the temperature change curves are constructed as follows: Figure 8 As shown, steps 801 to 802 are included:
[0097] Step 801: Construct a first temperature change curve based on the first temperature data corresponding to each current intensity, each application time, and the insulation layer.
[0098] The first temperature change curve is used to represent the relationship between the current intensity of each short-circuit current applied to the low-voltage electrical penetration component, the application time of each short-circuit current, and the temperature of the insulation layer under the scenario of applying a short-circuit current.
[0099] During implementation, the testing equipment can acquire first temperature data of the insulation layer of the conductor assembly of the low-voltage electrical penetration component relative to the short-circuit current at each current intensity and the application time of the short-circuit current at each current intensity, collected by the sensing device, and construct a first temperature change curve based on the first temperature data, the current intensity of each short-circuit current and the application time of each short-circuit current.
[0100] During the construction process, the current intensity, application time, and corresponding temperature data of each applied short-circuit current are set as a group, and a first temperature change curve is constructed based on each group of data. During execution, a temperature change curve can be constructed for the current intensity, temperature data, and application time in each group of data, and multiple temperature change curves are fitted into a first temperature change curve. Optionally, the first temperature change curve includes at least one curve.
[0101] Step 802: Construct a second temperature change curve based on the second temperature data corresponding to each current intensity, each application time, and the sealing terminal layer.
[0102] The second temperature change curve is used to represent the relationship between the current intensity of each short-circuit current applied to the low-voltage electrical penetration component, the application time of each short-circuit current, and the temperature of the sealing terminal layer under the scenario of applying a short-circuit current.
[0103] During implementation, the testing equipment constructs a second temperature change curve based on the second temperature data corresponding to each current intensity, each application time, and the sealing terminal layer. The specific data acquisition and curve construction process can be performed with reference to the process of the first temperature change curve described above, and will not be repeated here. Furthermore, the second temperature change curve may also include at least one curve, and the specific curve construction process can also be performed with reference to the process of the first temperature change curve described above.
[0104] For example, short-circuit times are 50ms, 100ms, 200ms, 400ms, 600ms, 800ms, and 1s. The temperature status of the conductor (copper core), conductor outer insulation layer (PEEK insulation layer), PEEK sealing terminal layer, and cable insulation layer of the low-voltage electrical penetration component is acquired each time current flows through. The temperature and pressure status are acquired by fiber optic temperature sensors installed at corresponding locations. During acquisition, the fiber optic temperature sensors are connected to a fiber optic demodulator to obtain the temperature rise variation of the conductor, conductor outer PEEK layer, and cable insulation layer at each short-circuit time, and establish the correlation curve between the short-circuit time and the above characteristic parameters.
[0105] Temperature data can be acquired through a sensing device, which can be positioned at the insulating layer and the sealed terminal layer. The temperature data is then obtained by demodulating the data from the sensing device using a corresponding demodulation device. For example... Figure 9 As shown, insulation layer 901 is located outside the copper core 902 of the conductor assembly, sealing terminal layer 903 is located outside insulation layer 901, temperature measuring point of insulation layer 901 is located at interface 904, temperature measuring point of sealing terminal layer is located at interface 905, steel barrel 906 is located outside sealing terminal layer 903, and cylinder 907 is located at the outermost layer of low-voltage electrical penetration component, as shown. Figure 10 As shown, the fiber optic demodulator 1001 is used to demodulate the data from the fiber optic temperature sensor to obtain temperature data; furthermore, the temperature measurement point of the copper core of the conductor assembly can be located at interface 908.
[0106] In one optional embodiment provided by this application, the protective layer of the conductor assembly of the low-voltage electrical penetration component is further divided to construct temperature change curves of the insulation layer and sealing terminal layer of the conductor assembly. This allows for the detection of the airtightness of the low-voltage electrical penetration component using multiple temperature data. The effectiveness of the temperature change curves is improved by constructing multiple data points, thereby enhancing the effectiveness of airtightness detection. Furthermore, the use of multiple temperature change curves allows for airtightness detection even when some temperature measurements are inaccurate, improving the robustness of airtightness detection.
[0107] Furthermore, additional temperature measurement points can be added to obtain third temperature data of the copper core of the conductor assembly of the low-voltage electrical penetration component and fourth temperature data of the cable insulation layer of the cable connecting the low-voltage electrical penetration component, thereby constructing third and fourth temperature change curves; in one optional embodiment provided by this application, such as Figure 11 As shown, constructing the temperature change curve also includes steps 1101 to 1102:
[0108] Step 1101: Construct a third temperature change curve based on the third temperature data corresponding to the cable insulation layer of each current intensity, each application time, and low-voltage electrical penetration.
[0109] The third temperature change curve is used to represent the relationship between the current intensity of each short-circuit current applied to the low-voltage electrical penetration component, the application time of each short-circuit current, and the temperature of the cable insulation layer under the scenario of applying short-circuit current.
[0110] During implementation, the testing equipment first acquires the third temperature data corresponding to the cable insulation layer, and constructs a third temperature change curve based on the third temperature data corresponding to the cable insulation layer of each current intensity, each application time, and low-voltage electrical penetrations. The specific construction method of the temperature change curve can refer to the construction method of the first temperature curve and / or the second temperature curve mentioned above.
[0111] Step 1102: Construct a fourth temperature change curve based on the fourth temperature data corresponding to each current intensity, each applied time, and the applied short-circuit current conductor assembly.
[0112] The fourth temperature change curve is used to represent the relationship between the current intensity of each short-circuit current applied to the low-voltage electrical penetration component, the application time of each short-circuit current, and the temperature of the conductor assembly to which the short-circuit current is applied.
[0113] During implementation, the testing equipment first acquires the fourth temperature data of the copper core of the conductor assembly of the low-voltage electrical penetration component, and constructs a fourth temperature change curve based on the fourth temperature data corresponding to the conductor assembly with each current intensity, each applied time, and the applied short-circuit current. The specific construction method of the temperature change curve can refer to the construction method of the first temperature curve and / or the second temperature curve mentioned above.
[0114] In one optional embodiment provided by this application, the robustness of airtightness testing is further improved by adding a third temperature change curve and a fourth temperature change curve. At the same time, by detecting the temperature of the cable insulation layer, the cable connection can be disconnected when the temperature of the cable insulation layer reaches a threshold. By detecting the cable temperature, the airtightness of low-voltage electrical penetrations is tested, which further improves the diversity of airtightness testing and thus enhances the safety of the containment.
[0115] During the construction of the pressure change curve, pressure data between multiple layers of the protective layer of the conductor assembly can also be obtained to obtain an accurate and reliable pressure change curve; in one optional embodiment provided in this application, the pressure change curve is constructed as follows: Figure 12 As shown, steps 1201 to 1202 are included:
[0116] Step 1201: Construct a first pressure change curve based on the first pressure data between the insulation layer and the sealing terminal layer of the protective layer, each current intensity, each application time, and each current.
[0117] The first pressure change curve is used to represent the current intensity of each short-circuit current applied to the low-voltage electrical penetration component under the scenario of applying short-circuit current, the application time of each short-circuit current, and the correspondence between the insulation layer and the sealing terminal layer.
[0118] During implementation, when the conductor assemblies of the low-voltage electrical penetration are short-circuited, they will be attracted or repelled by the Ampere force, which will compress the protective layer. The detection equipment can acquire the first pressure data of the insulation layer and sealing terminal layer of the protective layer relative to the short-circuit current at each current intensity and the application time of the short-circuit current at each current intensity collected by the sensing device, and construct a first pressure change curve based on the first pressure data between the insulation layer and sealing terminal layer of the protective layer at each current intensity, each application time, and each current intensity.
[0119] During the construction process, the current intensity, application time, and corresponding pressure data of each applied short-circuit current can be set as a group, and a first pressure change curve can be constructed based on each group of data. During execution, a pressure change curve can be constructed for the current intensity, pressure data, and application time in each group of data, and multiple pressure change curves can be fitted into a first pressure change curve. Optionally, the first pressure change curve includes at least one curve.
[0120] Step 1202: Construct a second pressure change curve based on the second pressure data between the sealing terminal layer of the protective layer and the steel barrel, according to the current intensity, application time, and the second pressure data.
[0121] The second pressure variation curve is used to represent the current intensity of each short-circuit current applied to the low-voltage electrical penetration component under the scenario of applying short-circuit current, the application time of each short-circuit current, and the corresponding relationship between the insulation layer and the sealing terminal layer.
[0122] During implementation, the detection equipment acquires the second pressure data between the sealing terminal layer of the protective layer and the steel barrel collected by the sensing device. Based on the current intensity, application time, and second pressure data between the sealing terminal layer of the protective layer and the steel barrel, a second pressure change curve is constructed. The specific construction process of the pressure change curve can refer to the construction process of the first pressure change curve described above.
[0123] For example, short-circuit times are 50ms, 100ms, 200ms, 400ms, 600ms, 800ms, and 1s. During each current flow, the pressure status of the conductor (copper core), conductor outer insulation layer (PEEK insulation layer), PEEK sealing terminal layer, and cable insulation layer of the low-voltage electrical penetration component is acquired. This pressure status is acquired by corresponding thin-film pressure sensors installed at each location. During acquisition, the thin-film pressure sensors are connected to a pressure tester to obtain the pressure information collected by the thin-film pressure sensors at each short-circuit time. This pressure information is used to characterize the electromagnetic force change law between conductor components at different short-circuit times, and to establish the spatiotemporal distribution characteristics of electromagnetic force during the short circuit process.
[0124] Pressure data can be acquired through a sensing device, which can be positioned between the insulating layer and the sealed terminal layer. The pressure data is then demodulated using a corresponding demodulation device. For example... Figure 13 As shown, the insulation layer 1301 is located outside the copper core 1302 of the conductor assembly, the sealing terminal layer 1303 is located outside the insulation layer 1301, the first pressure test point 1304 is located between the insulation layer 1301 and the sealing terminal layer 1303, the second pressure test point 1305 is located between the sealing terminal layer 1303 and the steel barrel 1306, and the outermost layer of the low-voltage electrical penetration component is the cylinder 1307, as shown. Figure 10 As shown, the pressure tester 1002 is used to demodulate the data from the thin-film sensor to obtain pressure data; wherein, the cable 1003 is connected to the wire assembly 1005 of the low-voltage electrical penetration through the terminal block 1004, the end cap 1006 of the low-voltage electrical penetration is located on both sides of the low-voltage electrical penetration, and the cylinder 1007 is located on the outermost layer of the low-voltage electrical penetration.
[0125] In one optional embodiment provided by this application, the pressure data is further divided into different levels of pressure data to improve the reliability and effectiveness of the pressure change curve in production. At the same time, by adding pressure change curves, the overall airtightness test will not be affected even if there is an error in one pressure data, thus improving the robustness of the airtightness test and thereby improving the effectiveness of the airtightness test of low-voltage electrical penetrations.
[0126] This application provides an embodiment of an airtightness test. When a short circuit occurs in the low-voltage electrical penetration for 1 second, the component temperature reaches 186.36°C. The temperatures of the penetrations and cables of three wire diameters increase approximately linearly. The electromagnetic force generated by the short-circuit current produces a pressure of 86N between the conductor insulation and the sealing terminal of the penetration, and a pressure of approximately 200N between the sealing terminal and the steel barrel. Within 3 seconds of the short circuit, the cable fails first, while the airtightness of the low-voltage electrical penetration has not yet decreased significantly. At this time, the conductor temperature of the penetration reaches 226°C, and the cable temperature reaches 178°C.
[0127] In practical scenarios, it is also necessary to perform airtightness testing on the configured first electrical penetration component using temperature and pressure change curves. A temperature alarm threshold can be set based on the temperature change curve, and a pressure alarm threshold can be set based on the pressure change curve. Airtightness testing is then performed based on the temperature alarm threshold and / or the pressure alarm threshold. One optional implementation method provided in this application is as follows: Figure 14 As shown, it also includes steps 1401 to 1402:
[0128] Step 1401: Determine the temperature alarm threshold of the low-voltage electrical penetration based on the temperature change curve, and determine the pressure alarm threshold of the low-voltage electrical penetration based on the pressure change curve.
[0129] The temperature change curve and pressure change curve in this embodiment refer to the temperature change curve and pressure change curve of the low-voltage electrical penetration from the time the short-circuit current is applied until failure. That is, the temperature change curve and pressure change curve include the failure temperature and failure pressure of the low-voltage electrical penetration.
[0130] During implementation, the testing equipment determines the temperature alarm threshold of the electrical penetration based on the failure temperature value in the temperature change curve, and determines the pressure alarm threshold of the low-voltage electrical penetration based on the failure pressure value in the pressure change curve.
[0131] During execution, the temperature alarm threshold can be set to a temperature value that is 1°C lower than the failure temperature value, and the pressure alarm threshold can be set to a pressure value that is 2 N lower than the failure pressure value.
[0132] Step 1402: Obtain the current temperature value of the protective layer of the conductor assembly of the target low-voltage electrical penetration component, and determine that the airtightness of the target low-voltage electrical penetration component is abnormal if the temperature value is greater than the temperature alarm threshold; or, obtain the current pressure value of the protective layer of the conductor assembly of the target low-voltage electrical penetration component, and determine that the airtightness of the target low-voltage electrical penetration component is abnormal if the pressure value is greater than the pressure alarm threshold.
[0133] During implementation, the detection equipment acquires the current temperature and pressure values of the protective layer of the conductor assembly of the target low-voltage electrical penetration in the containment configuration of the nuclear reactor. It detects whether the current temperature value is greater than the temperature alarm threshold. If it is, it determines that the airtightness of the target low-voltage electrical penetration is abnormal. Alternatively, it detects whether the current pressure value is greater than the pressure alarm threshold. If it is, it determines that the airtightness of the target low-voltage electrical penetration is abnormal.
[0134] It should be noted that the airtightness detection method provided in this embodiment can determine the airtightness of the target low-voltage electrical penetration component when either the temperature or the pressure is greater than the corresponding threshold, or when both the temperature and the pressure are greater than the corresponding threshold.
[0135] It should also be noted that the current temperature and pressure values of the protective layer of the conductor assembly of the target low-voltage electrical penetration can be the latest temperature and / or pressure values obtained by the testing equipment according to a preset time step.
[0136] In one optional embodiment provided by this application, the temperature alarm threshold and pressure alarm threshold of the target low-voltage electrical penetration are determined by temperature change curves and pressure change curves. By detecting the current temperature value and the temperature alarm threshold or the pressure value and the pressure alarm threshold, the misjudgment of the pressure sensor under unstable air pressure conditions inside the containment is avoided, thus improving the accuracy of airtightness detection. At the same time, setting the temperature alarm threshold and pressure alarm threshold to values before the failure temperature and failure pressure allows the detection equipment to detect the airtightness of the low-voltage electrical penetration in advance, improving the timeliness of airtightness detection.
[0137] Alternatively, the short-circuit time threshold of the low-voltage electrical penetration can be determined based on the temperature and pressure change curves, and the airtightness of the target low-voltage electrical penetration can be determined based on the short-circuit time threshold; another optional embodiment provided in this application, such as Figure 15 As shown, it also includes steps 1501 to 1502:
[0138] Step 1501: Determine the short-circuit time threshold of the low-voltage electrical penetration based on the temperature change curve and the pressure change curve.
[0139] In practical applications, the data related to the temperature change curve and the pressure change curve are the current intensity and application time of the short-circuit current, which can be determined based on the short-circuit time of the target low-voltage electrical penetration.
[0140] During implementation, the detection equipment acquires the application time corresponding to the temperature failure value in the temperature change curve and the application time corresponding to the pressure failure value in the pressure change curve, and determines the short-circuit time threshold of the electrical penetration component based on the application time.
[0141] During execution, the short-circuit time threshold can be the smaller of the application time corresponding to the temperature failure value and the application time corresponding to the pressure failure value, minus x3 seconds. Furthermore, the temperature change curve and the pressure change curve may include multiple curves. Accordingly, different short-circuit time thresholds can be configured for different current intensities, or the short-circuit time thresholds corresponding to different current intensities can be fitted to obtain the short-circuit time threshold for airtightness detection.
[0142] Step 1502: Obtain the current short-circuit time of the target low-voltage electrical penetration component, and if the short-circuit time is greater than the short-circuit time threshold, determine that the airtightness of the target low-voltage electrical penetration component is abnormal.
[0143] During implementation, the testing equipment obtains the current short-circuit time of the target low-voltage electrical penetration by detecting the current intensity of the conductor assembly of the low-voltage electrical penetration, or the testing equipment receives the short-circuit time sent by an external device. If the short-circuit time is greater than the short-circuit time threshold, the airtightness of the target low-voltage electrical penetration is determined to be abnormal.
[0144] One optional implementation provided in this application improves data processing efficiency by converting the temperature and pressure of the temperature change curve and pressure change curve into a single short-circuit time value. This converts two detection values into one detection value, reduces the amount of data calculation and the difficulty of calculation, and improves the efficiency of airtightness detection.
[0145] In practical applications, temperature and pressure change curves can be set as standards for low-voltage electrical penetrations. By performing short-circuit current tests on newly manufactured low-voltage electrical penetrations, the test data generated from the temperature and pressure change curves can be compared with the test data from the short-circuit current test to complete the quality inspection of the newly manufactured low-voltage electrical penetrations. In one optional embodiment provided in this application, such as… Figure 16 As shown, the method also includes steps 1601 to 1602.
[0146] Step 1601: Apply short-circuit current to the test conductor assembly of the low-voltage electrical penetration component according to the test time, and obtain the test temperature value and test pressure value of the test protective layer of the test conductor assembly.
[0147] The test time is shorter than the application time.
[0148] During implementation, the short-circuit current and test current intensity can be preset. The short-circuit current is applied to the test conductor assembly of the low-voltage electrical penetration according to the test current intensity and test time. The testing equipment can control the external power supply or control the external power supply to apply the short-circuit current through an external system. While testing the short-circuit current of the low-voltage electrical penetration, the testing equipment obtains the test temperature value and test pressure value of the test protective layer of the test conductor assembly. The specific methods for obtaining the test temperature value and test pressure value can refer to the above methods for obtaining temperature data and pressure data.
[0149] Step 1602: If the test temperature value is greater than the temperature value corresponding to the test time in the temperature change curve, and the test pressure value is greater than the pressure value corresponding to the test time in the pressure change curve, then the airtightness of the tested low-voltage electrical penetration component is determined to be abnormal.
[0150] During the implementation process, the testing equipment checks whether the test temperature value is greater than the temperature value corresponding to the test time in the temperature change curve. If so, it checks whether the test pressure value is greater than the pressure value corresponding to the test time in the pressure change curve. If so, it indicates that the low-voltage electrical penetration component has failed the short circuit test, indicating that the airtightness of the low-voltage electrical penetration component is poor.
[0151] It should be noted that samples can be selected from newly produced low-voltage electrical penetrations for short-circuit current testing, and the airtightness of the batch of low-voltage electrical penetrations can be determined based on the airtightness data of the samples.
[0152] One optional implementation provided in this application uses temperature change curves and pressure change curves to perform airtightness testing on newly manufactured low-voltage electrical penetrations. This method is more versatile in nuclear power plant scenarios. At the same time, it takes into account the softening of the protective layer caused by temperature and the extrusion of the wires under the influence of ampere force, thereby improving the reliability of the quality inspection results of new products.
[0153] In one embodiment, see Figure 17 The document illustrates a flowchart of a method for testing the airtightness of a low-voltage electrical penetration according to an embodiment of this application. This method can be applied to... Figure 1 The testing equipment shown. For example... Figure 17 As shown, the airtightness testing method for this low-voltage electrical penetration component may include the following steps:
[0154] Step 1701: Apply a short-circuit current to a portion of the conductor assembly in the low-voltage electrical penetration and apply a rated current to a portion of the conductor assembly in the low-voltage electrical penetration, and record the application time of the short-circuit current to the portion of the conductor assembly.
[0155] Step 1702: During the application of short-circuit current, acquire temperature and pressure data of the protective layer collected by the sensing device of at least one conductor assembly.
[0156] Optionally, the protective layer includes an insulating layer, a sealing terminal layer, and a steel barrel.
[0157] Step 1703: Construct a first temperature change curve based on the first temperature data corresponding to each current intensity, each application time, and the insulating layer; construct a second temperature change curve based on the second temperature data corresponding to each current intensity, each application time, and the sealing terminal layer.
[0158] Step 1704: Construct a third temperature change curve based on the third temperature data corresponding to the cable insulation layer of each current intensity, each application time, and the low-voltage electrical penetration component; construct a fourth temperature change curve based on the fourth temperature data corresponding to the conductor assembly with each current intensity, each application time, and the applied short-circuit current.
[0159] Step 1705: Construct a first pressure change curve based on the first pressure data between the insulation layer and the sealing terminal layer of the protective layer, each current intensity, each application time, and the second pressure change curve between the sealing terminal layer and the steel barrel of the protective layer, each current intensity, each application time, and the second pressure data between the sealing terminal layer and the steel barrel of the protective layer.
[0160] Step 1706: Determine the temperature alarm threshold of the low-voltage electrical penetration based on the first temperature change curve, the second temperature change curve, the third temperature change curve, and the fourth temperature change curve, and determine the pressure alarm threshold of the low-voltage electrical penetration based on the first pressure change curve and the second temperature change curve.
[0161] Step 1707: Obtain the current temperature and pressure values of the protective layer of the conductor assembly of the target low-voltage electrical penetration, and determine that the airtightness of the target low-voltage electrical penetration is abnormal if the temperature value is greater than the temperature alarm threshold and the pressure value is greater than the pressure alarm threshold.
[0162] It should be noted that any one or more of steps 1701 to 1707 can be combined to form a new implementation method according to the needs of implementation and deployment. Furthermore, any one or more technical features in the technical solution composed of steps 1701 to 1707 can also be combined to form a new implementation method according to the actual deployment needs, or technical features in one or more optional implementation methods provided by one or more of the above embodiments can be combined to form a new implementation method. These will not be elaborated on here.
[0163] It should be understood that although the steps in the flowcharts of the embodiments described above are shown sequentially according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least some steps in the flowcharts of the embodiments described above may include multiple steps or multiple stages. These steps or stages are not necessarily completed at the same time, but can be executed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed alternately or in turn with other steps or at least some of the steps or stages in other steps. It is understood that the steps in different embodiments can be freely combined as needed, and all non-contradictory solutions formed by such combinations are within the scope of protection of this application.
[0164] Based on the same inventive concept, this application also provides an airtightness testing device for low-voltage electrical penetrations, used to implement the airtightness testing method for low-voltage electrical penetrations described above. The solution provided by this device is similar to the solution described in the above method; therefore, the specific limitations of one or more airtightness testing device embodiments of low-voltage electrical penetrations provided below can be found in the limitations of the airtightness testing method for low-voltage electrical penetrations described above, and will not be repeated here.
[0165] In one exemplary embodiment, such as Figure 18 As shown, a device for detecting the airtightness of a low-voltage electrical penetration is provided, comprising: a data acquisition module 1801 and a curve construction module 1802, wherein: the data acquisition module 1801 is used to apply a short-circuit current to at least one conductor assembly in the low-voltage electrical penetration and record the application time, and during the application of the short-circuit current, acquire temperature data and pressure data of the protective layer collected by the sensing device on at least one conductor assembly; the curve construction module 1802 is used to construct a temperature change curve based on the application time and temperature data, and construct a pressure change curve based on the application time and pressure data; the temperature change curve and pressure change curve are used to detect the airtightness of the target low-voltage electrical penetration.
[0166] In one embodiment, the data acquisition module 1801 includes an application time recording unit, wherein the application time recording unit is used to: apply a short-circuit current to all conductor assemblies in the low-voltage electrical penetration and record the application time, or apply a short-circuit current to some conductor assemblies in the low-voltage electrical penetration and apply a rated current to some conductor assemblies in the low-voltage electrical penetration, and record the application time of the conductor assemblies to which the short-circuit current is applied; the rated current is less than the short-circuit current.
[0167] In one embodiment, the application time recording unit includes a first recording unit for applying short-circuit current to all conductor assemblies. The first recording unit is configured to: acquire multiple preset current intensities, apply short-circuit currents of multiple current intensities to all conductor assemblies, and record multiple application times corresponding to the short-circuit currents of each current intensity; and stop applying short-circuit currents of each current intensity when a protective layer failure is detected.
[0168] In one embodiment, the application time recording unit includes a second recording unit for applying a short-circuit current to a portion of the conductor assembly. The second recording unit is configured to: acquire multiple preset application times; apply a short-circuit current for multiple preset application times to the portion of the conductor assembly to which the short-circuit current is applied, and apply a rated current for multiple preset application times to the portion of the conductor assembly to which the rated current is applied.
[0169] In one embodiment, the curve construction module 1802 includes a first temperature change curve construction unit and a second temperature change curve construction unit, wherein the first temperature change curve construction unit is used to: construct a first temperature change curve based on the first temperature data corresponding to each current intensity, each application time, and the insulating layer; and the second temperature change curve construction unit is used to construct a second temperature change curve based on the second temperature data corresponding to each current intensity, each application time, and the sealing terminal layer.
[0170] In one embodiment, the curve construction module 1802 further includes a third temperature change curve construction unit and a fourth temperature change curve construction unit. The third temperature change curve construction unit is used to construct a temperature change curve based on the application time and temperature data, and further includes constructing a third temperature change curve based on the third temperature data corresponding to the cable insulation layer of the low-voltage electrical penetration component for each current intensity, each application time, and each application time. The fourth temperature change curve construction unit is used to construct a fourth temperature change curve based on the fourth temperature data corresponding to the conductor assembly for each current intensity, each application time, and the applied short-circuit current.
[0171] In one embodiment, the curve construction module 1802 includes a first pressure change curve construction unit and a second pressure change curve construction unit, wherein the first pressure change curve construction unit is used to: construct a first pressure change curve based on first pressure data between the insulating layer and the sealing terminal layer of the protective layer, each current intensity, each application time, and the protective layer; the second pressure change curve construction unit is used to: construct a second pressure change curve based on second pressure data between the sealing terminal layer and the steel barrel, each current intensity, each application time, and the protective layer.
[0172] In one embodiment, the device further includes an alarm threshold determination module and a first airtightness detection module. The alarm threshold determination module is used to determine a temperature alarm threshold for the low-voltage electrical penetration based on a temperature change curve, and to determine a pressure alarm threshold for the low-voltage electrical penetration based on a pressure change curve. The first airtightness detection module is used to obtain the current temperature value of the protective layer of the conductor assembly of the target low-voltage electrical penetration, and to determine that the airtightness of the target low-voltage electrical penetration is abnormal if the temperature value is greater than the temperature alarm threshold; or, to obtain the current pressure value of the protective layer of the conductor assembly of the target low-voltage electrical penetration, and to determine that the airtightness of the target low-voltage electrical penetration is abnormal if the pressure value is greater than the pressure alarm threshold.
[0173] In one embodiment, the device further includes a time threshold determination module and a second airtightness detection module, wherein the time threshold determination module is used to determine the short-circuit time threshold of the low-voltage electrical penetration based on the temperature change curve and the pressure change curve; the second airtightness detection module is used to obtain the current short-circuit time of the target low-voltage electrical penetration, and if the short-circuit time is greater than the short-circuit time threshold, determine that the airtightness of the target low-voltage electrical penetration is abnormal.
[0174] In one embodiment, the device further includes a test current application module and a third airtightness detection module. The test current application module is used to apply a short-circuit current to the test conductor assembly of the low-voltage electrical penetration component according to the test time, and to obtain the test temperature value and test pressure value of the test protective layer of the test conductor assembly. The third airtightness detection module is used to determine that the airtightness of the low-voltage electrical penetration component is abnormal when the test temperature value is greater than the temperature value corresponding to the test time in the temperature change curve, and the test pressure value is greater than the pressure value corresponding to the test time in the pressure change curve.
[0175] Each module in the aforementioned airtightness testing device for low-voltage electrical penetrations can be implemented entirely or partially through software, hardware, or a combination thereof. These modules can be embedded in or independent of the processor in a computer device, or stored in the memory of a computer device as software, so that the processor can call and execute the corresponding operations of each module.
[0176] In one exemplary embodiment, a computer device is provided, which may be a terminal, and its internal structure diagram may be as follows: Figure 19As shown, the computer device includes a processor, memory, input / output interface, communication interface, display unit, and input device. The processor, memory, and input / output interface are connected via a system bus, and the communication interface, display unit, and input device are also connected to the system bus via the input / output interface. The processor provides computing and control capabilities. The memory includes non-volatile storage media and internal memory. The non-volatile storage media stores the operating system and computer programs. The internal memory provides an environment for the operation of the operating system and computer programs in the non-volatile storage media. The input / output interface is used for exchanging information between the processor and external devices. The communication interface is used for wired or wireless communication with external terminals; wireless communication can be achieved through Wi-Fi, mobile cellular networks, Near Field Communication (NFC), or other technologies. When executed by the processor, the computer program implements a method for airtightness detection of low-voltage electrical penetrations. The display unit is used to form a visually visible image and can be a display screen, projection device, or virtual reality imaging device. The display screen can be an LCD screen or an e-ink screen. The input device of the computer device can be a touch layer covering the display screen, or buttons, trackballs, or touchpads set on the casing of the computer device, or external keyboards, touchpads, or mice, etc.
[0177] Those skilled in the art will understand that Figure 19 The structure shown is merely a block diagram of a portion of the structure related to the present application and does not constitute a limitation on the computer device to which the present application is applied. Specific computer devices may include more or fewer components than those shown in the figure, or combine certain components, or have different component arrangements.
[0178] In one exemplary embodiment, a computer device is provided, including a memory and a processor. The memory stores a computer program, and the processor executes the computer program to perform the following steps: applying a short-circuit current to at least one conductor assembly in a low-voltage electrical penetration and recording the application time; and during the application of the short-circuit current, acquiring temperature data and pressure data of the protective layer collected by a sensing device on at least one conductor assembly; constructing a temperature change curve based on the application time and temperature data, and constructing a pressure change curve based on the application time and pressure data; the temperature change curve and pressure change curve are used to detect the airtightness of the target low-voltage electrical penetration.
[0179] In one embodiment, when the processor executes the computer program, it specifically implements the following steps: applying a short-circuit current to all conductor assemblies in the low-voltage electrical penetration and recording the application time; or, applying a short-circuit current to some conductor assemblies in the low-voltage electrical penetration and applying a rated current to some conductor assemblies in the low-voltage electrical penetration, and recording the application time of the conductor assemblies for which the short-circuit current is applied; the rated current is less than the short-circuit current.
[0180] In one embodiment, when the processor executes the computer program, it specifically implements the following steps: acquiring multiple preset current intensities, applying short-circuit currents of multiple current intensities to all conductor assemblies, and recording multiple application times corresponding to the short-circuit currents of each current intensity; and stopping the application of short-circuit currents of each current intensity when a protective layer failure is detected.
[0181] In one embodiment, when the processor executes the computer program, it specifically implements the following steps: obtaining a plurality of preset application times; applying a short-circuit current for a plurality of preset application times to a portion of the conductor assembly to which a short-circuit current is applied, and applying a rated current for a plurality of preset application times to a portion of the conductor group to which a rated current is applied.
[0182] In one embodiment, when the processor executes the computer program, it specifically implements the following steps: constructing a first temperature change curve based on the first temperature data corresponding to each current intensity, each application time, and the insulating layer; and constructing a second temperature change curve based on the second temperature data corresponding to each current intensity, each application time, and the sealing terminal layer.
[0183] In one embodiment, when the processor executes the computer program, it specifically implements the following steps: constructing a third temperature change curve based on third temperature data corresponding to the cable insulation layer of the low-voltage electrical penetration element, based on each current intensity, each application time, and the third temperature data corresponding to the conductor assembly with applied short-circuit current, and constructing a fourth temperature change curve based on fourth temperature data corresponding to each current intensity, each application time, and the applied short-circuit current.
[0184] In one embodiment, when the processor executes the computer program, it specifically implements the following steps: constructing a first pressure change curve based on first pressure data between the insulating layer and the sealing terminal layer of the protective layer, each current intensity, each application time, and second pressure data between the sealing terminal layer and the steel barrel of the protective layer, each current intensity, each application time, and second pressure data.
[0185] In one embodiment, when the processor executes the computer program, it further performs the following steps: determining a temperature alarm threshold for the low-voltage electrical penetration based on a temperature change curve, and determining a pressure alarm threshold for the low-voltage electrical penetration based on a pressure change curve; obtaining the current temperature value of the protective layer of the conductor assembly of the target low-voltage electrical penetration, and determining an airtightness abnormality of the target low-voltage electrical penetration if the temperature value is greater than the temperature alarm threshold; or, obtaining the current pressure value of the protective layer of the conductor assembly of the target low-voltage electrical penetration, and determining an airtightness abnormality of the target low-voltage electrical penetration if the pressure value is greater than the pressure alarm threshold.
[0186] In one embodiment, when the processor executes the computer program, it further performs the following steps: determining the short-circuit time threshold of the low-voltage electrical penetration based on the temperature change curve and the pressure change curve; obtaining the current short-circuit time of the target low-voltage electrical penetration; and determining that the airtightness of the target low-voltage electrical penetration is abnormal if the short-circuit time is greater than the short-circuit time threshold.
[0187] In one embodiment, when the processor executes the computer program, it further performs the following steps: applying a short-circuit current to the test conductor assembly of the low-voltage electrical penetration according to the test time, and obtaining the test temperature value and test pressure value of the test protective layer of the test conductor assembly; if the test temperature value is greater than the temperature value corresponding to the test time in the temperature change curve, and the test pressure value is greater than the pressure value corresponding to the test time in the pressure change curve, it determines that the airtightness of the low-voltage electrical penetration is abnormal.
[0188] In one embodiment, a computer-readable storage medium is provided having a computer program stored thereon, which, when executed by a processor, implements the steps in the methods described above.
[0189] In one embodiment, a computer program product is provided, including a computer program that, when executed by a processor, implements the steps in the methods described above.
[0190] Based on the same inventive concept, this application also provides an airtightness testing system for low-voltage electrical penetrations, used to implement the airtightness testing method for low-voltage electrical penetrations described above. The solution provided by this device is similar to the solution described in the above method; therefore, the specific limitations of one or more airtightness testing device embodiments of low-voltage electrical penetrations provided below can be found in the limitations of the airtightness testing method for low-voltage electrical penetrations described above, and will not be repeated here.
[0191] In one exemplary embodiment, a system for testing the airtightness of a low-voltage electrical penetration is provided, comprising: a low-voltage electrical penetration, a sensing device, a cable, and a testing device. The testing device is used to perform the steps described in the above-described method embodiments.
[0192] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, data stored, data displayed, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of the relevant data must comply with relevant regulations.
[0193] Those skilled in the art will understand that all or part of the processes in the above embodiments can be implemented by a computer program instructing related hardware. The computer program can be stored in a non-volatile computer-readable storage medium, and when executed, it can include the processes of the embodiments of the above methods. Any references to memory, databases, or other media used in the embodiments provided in this application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM can take many forms, such as Static Random Access Memory (SRAM) or Dynamic Random Access Memory (DRAM). The databases involved in the embodiments provided in this application may include at least one type of relational database and non-relational database. Non-relational databases may include, but are not limited to, blockchain-based distributed databases. The processors involved in the embodiments provided in this application may be general-purpose processors, central processing units, graphics processing units, digital signal processors, programmable logic devices, quantum computing-based data processing logic devices, artificial intelligence (AI) processors, etc., and are not limited to these.
[0194] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.
[0195] The embodiments described above are merely illustrative of several implementation methods of this application, and while the descriptions are specific and detailed, they should not be construed as limiting the scope of this patent application. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this application, and these all fall within the protection scope of this application. Therefore, the protection scope of this application should be determined by the appended claims.
Claims
1. A method for testing the airtightness of low-voltage electrical penetrations, characterized in that, The low-voltage electrical penetration component is applied to the containment vessel of a nuclear reactor, and the method includes: A short-circuit current is applied to at least one conductor assembly in a low-voltage electrical penetration and the application time is recorded. During the application of the short-circuit current, temperature and pressure data of the protective layer collected by the sensing device of the at least one conductor assembly are acquired. A temperature change curve is constructed based on the application time and the temperature data, and a pressure change curve is constructed based on the application time and the pressure data; the temperature change curve and the pressure change curve are used to detect the airtightness of the target low-voltage electrical penetration.
2. The method according to claim 1, characterized in that, The application of a short-circuit current to at least one conductor assembly in a low-voltage electrical penetration and the recording of the application time include: The short-circuit current is applied to all conductor assemblies in the low-voltage electrical penetration and the application time is recorded; or, the short-circuit current is applied to a portion of the conductor assemblies in the low-voltage electrical penetration, and a rated current is applied to a portion of the conductor assemblies in the low-voltage electrical penetration, and the application time of the portion of the conductor assemblies to which the short-circuit current is applied is recorded; the rated current is less than the short-circuit current.
3. The method according to claim 2, characterized in that, The process of applying the short-circuit current to all conductor assemblies in the low-voltage electrical penetration and recording the application time includes: Multiple preset current intensities are obtained, and short-circuit currents of the multiple current intensities are applied to all conductor assemblies, and multiple application times corresponding to the short-circuit currents of each current intensity are recorded. If the protective layer fails, the application of short-circuit currents of each of the specified current intensities shall be stopped.
4. The method according to claim 2, characterized in that, The steps of applying the short-circuit current to a portion of the conductor assembly in the low-voltage electrical penetration and applying a rated current to a portion of the conductor assembly in the low-voltage electrical penetration, and recording the application time of the portion of the conductor assembly to which the short-circuit current is applied, include: Obtain multiple preset application times; The short-circuit current is applied to a portion of the conductor assembly to which the short-circuit current is applied for a plurality of preset application times, and the rated current is applied to a portion of the conductor group to which the rated current is applied for a plurality of preset application times.
5. The method according to claim 3, characterized in that, The protective layer includes an insulating layer and a sealing terminal layer; the construction of the temperature change curve based on the application time and the temperature data includes: A first temperature change curve is constructed based on the current intensity, the application time, and the first temperature data corresponding to the insulation layer. The first temperature change curve is used to represent the correspondence between the current intensity of each short-circuit current, the application time of each short-circuit current, and the temperature of the insulation layer when the short-circuit current is applied to the low-voltage electrical penetration component in the scenario of applying the short-circuit current. A second temperature variation curve is constructed based on the current intensity, the application time, and the second temperature data corresponding to the sealing terminal layer. The second temperature variation curve is used to represent the correspondence between the current intensity of each short-circuit current applied by the low-voltage electrical penetration component, the application time of each short-circuit current, and the temperature of the sealing terminal layer in the scenario of applying the short-circuit current.
6. The method according to claim 5, characterized in that, The step of constructing a temperature change curve based on the application time and the temperature data further includes: A third temperature variation curve is constructed based on the third temperature data corresponding to the cable insulation layer of the low-voltage electrical penetration component, the current intensity of each short-circuit current applied by the low-voltage electrical penetration component, the application time of each short-circuit current, and the temperature of the cable insulation layer. The third temperature variation curve is used to represent the correspondence between the current intensity of each short-circuit current applied by the low-voltage electrical penetration component, the application time of each short-circuit current, and the temperature of the cable insulation layer in the scenario of applying the short-circuit current. A fourth temperature variation curve is constructed based on the fourth temperature data corresponding to the current intensity, the application time, and the conductor assembly applying the short-circuit current. The fourth temperature variation curve is used to represent the correspondence between the current intensity of each short-circuit current applied by the low-voltage electrical penetration component, the application time of each short-circuit current, and the temperature of the conductor assembly applying the short-circuit current in the scenario of applying the short-circuit current.
7. The method according to claim 3, characterized in that, The step of constructing a pressure change curve based on the application time and the pressure data includes: A first pressure variation curve is constructed based on the current intensity, the application time, and the first pressure data between the insulation layer and the sealing terminal layer of the protective layer. The first pressure variation curve is used to represent the current intensity of each short circuit current applied by the low-voltage electrical penetration component in the scenario of applying the short circuit current, the application time of each short circuit current, and the correspondence between the insulation layer and the sealing terminal layer. A second pressure variation curve is constructed based on the current intensity, the application time, and the second pressure data between the sealing terminal layer of the protective layer and the steel barrel. The second pressure variation curve is used to represent the current intensity of each short-circuit current applied by the low-voltage electrical penetration component in the scenario of applying the short-circuit current, the application time of each short-circuit current, and the correspondence between the insulating layer and the sealing terminal layer.
8. The method according to claim 1, characterized in that, The method further includes: The temperature alarm threshold of the low-voltage electrical penetration is determined based on the temperature change curve, and the pressure alarm threshold of the low-voltage electrical penetration is determined based on the pressure change curve. Obtain the current temperature value of the protective layer of the conductor assembly of the target low-voltage electrical penetration component, and determine that the airtightness of the target low-voltage electrical penetration component is abnormal if the temperature value is greater than the temperature alarm threshold; or, obtain the current pressure value of the protective layer of the conductor assembly of the target low-voltage electrical penetration component, and determine that the airtightness of the target low-voltage electrical penetration component is abnormal if the pressure value is greater than the pressure alarm threshold.
9. The method according to claim 1, characterized in that, The method further includes: The short-circuit time threshold of the low-voltage electrical penetration component is determined based on the temperature change curve and the pressure change curve. The current short-circuit time of the target low-voltage electrical penetration is obtained, and if the short-circuit time is greater than the short-circuit time threshold, the airtightness of the target low-voltage electrical penetration is determined to be abnormal.
10. The method according to claim 1, characterized in that, The method further includes: The short-circuit current is applied to the test lead assembly of the low-voltage electrical penetration component according to the test time, and the test temperature value and test pressure value of the test protective layer of the test lead assembly are obtained; the test time is less than the application time. If the test temperature value is greater than the temperature value corresponding to the test time in the temperature change curve, and the test pressure value is greater than the pressure value corresponding to the test time in the pressure change curve, then the airtightness of the tested low-voltage electrical penetration component is determined to be abnormal.
11. A system for testing the airtightness of low-voltage electrical penetrations, characterized in that, The system includes low-voltage electrical penetrations, sensing devices, cables, and detection equipment; The detection device is used to perform the method as described in any one of claims 1-10.
12. A device for detecting the airtightness of low-voltage electrical penetrations, characterized in that, The device includes: The data acquisition module is used to apply a short-circuit current to at least one conductor assembly in a low-voltage electrical penetration component and record the application time, and during the application of the short-circuit current, acquire temperature data and pressure data of the protective layer collected by the sensing device of the at least one conductor assembly. The curve construction module is used to construct a temperature change curve based on the application time and the temperature data, and to construct a pressure change curve based on the application time and the pressure data; the temperature change curve and the pressure change curve are used to detect the airtightness of the target low-voltage electrical penetration component.
Citation Information
Patent Citations
Energy -saving special high voltage transmission lines ice -melt of strong loop heavy current system for experiment
CN205049170U
Method for quality testing of a fuel cell stack
DE102022213550A1
