一种基于声发射b值的岩石破坏预警方法及装置
By collecting data using an acoustic emission probe, the target amplitude interval and probe are determined, and the b-value sequence is obtained using an analysis model. This solves the problem of inconsistent determination of acoustic emission b-values and improves the accuracy of rock damage early warning.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CCTEG COAL MINING RES INST
- Filing Date
- 2025-06-19
- Publication Date
- 2026-07-17
AI Technical Summary
In existing technologies, the determination of acoustic emission b-values is affected by a variety of factors, and the problem of unifying the b-values obtained from different factors remains unsolved, which reduces the accuracy of rock damage early warning.
By collecting the number and time of acoustic emission events using at least one acoustic emission probe, the target amplitude interval and target acoustic emission probe are determined. The b-value sequence under different parameter conditions is determined using a target analysis model to provide early warning of rock damage.
This improves the scientific rigor of determining the b-value and its evolutionary trend during the loading process, thereby enhancing the accuracy of rock failure early warning.
Smart Images

Figure CN120651969B_ABST