一种充电控制方法、充电控制器及电子设备

By introducing shared memory into the charging controller and utilizing the collaborative work of the first and second processes, the communication problem between the CCU and the powered device is solved, reducing hardware footprint and meeting real-time communication requirements.

CN120658778BActive Publication Date: 2026-07-17XFUSION DIGITAL TECH CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
XFUSION DIGITAL TECH CO LTD
Filing Date
2025-06-18
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In a charging pile, the CCU and TCU are two independent hardware units, which occupy a large space and are complex. The CCU process cannot communicate with the powered equipment through the GB/T 27930 protocol in a real-time running environment.

Method used

A shared memory is introduced into the charging controller. Data is generated by the first process and stored in the shared memory. The second process reads from the shared memory and forwards it to the powered device, thus realizing communication between the CCU and the powered device.

Benefits of technology

This reduces the space occupied by the charging controller within the charging pile and enables the CCU to communicate with the powered equipment in a real-time operating environment, meeting the real-time requirements of charging control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120658778B_ABST
    Figure CN120658778B_ABST
Patent Text Reader

Abstract

本申请实施例提供一种充电控制方法、充电控制器及电子设备,涉及充电技术领域,用于解决CCU进程无法在实时运行环境中通过预设通信协议与受电设备通信的问题。该充电控制方法包括:基于预设通信协议生成第一数据,将第一数据存入共享内存,以使得第二进程从共享内存中读取第一数据并将第一数据转发给受电设备,第一数据用于指示控制受电设备充电。
Need to check novelty before this filing date? Find Prior Art