一种基于BIM和GNN模型的装配式建筑施工管理系统及方法
The construction management system based on BIM and GNN models enables real-time monitoring and dynamic scheduling of prefabricated building construction, solving the problems of insufficient integration, intelligence and visualization in existing systems, and improving the efficiency and safety of construction management.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- TIANJIN CHENGJIAN UNIV
- Filing Date
- 2025-06-26
- Publication Date
- 2026-07-17
AI Technical Summary
Existing construction management systems for prefabricated buildings are inadequate in terms of integration, intelligence, visualization, and cost-effectiveness. They are unable to effectively address the dynamic coordination needs of prefabricated component production, logistics transportation, and on-site assembly, resulting in delayed construction progress, resource waste, and safety hazards.
The construction management system, based on BIM and GNN models, collects heterogeneous data from multiple sources through a data acquisition module, performs data fusion and feature extraction through a data processing module to generate structured decision recommendations, adjusts resource allocation through a data application module, and displays construction progress and resource distribution through a data visualization module, thereby achieving real-time monitoring and dynamic scheduling.
It enables real-time monitoring of detailed information throughout the entire construction process, accurately predicts construction progress and risks, optimizes resource utilization, reduces construction costs, improves safety management and decision-making efficiency, and ensures that projects are completed on time.
Smart Images

Figure CN120706942B_ABST