用于高海拔超长小断面隧道的一体化智能施工设备及方法

By integrating intelligent construction equipment and methods and streamlining the construction process, the project has solved the problem of long construction periods for ultra-long, small-section tunnels at high altitudes, improved engineering safety and personnel health protection, and is suitable for the construction of ultra-long, small-section tunnels in high-altitude areas.

CN120720032BActive Publication Date: 2026-07-17CHINA RAILWAY 23RD CONSTR BUREAU LTD +2

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
CHINA RAILWAY 23RD CONSTR BUREAU LTD
Filing Date
2025-08-04
Publication Date
2026-07-17

Smart Images

  • Figure CN120720032B_ABST
    Figure CN120720032B_ABST
Patent Text Reader

Abstract

本发明公开了用于高海拔超长小断面隧道的一体化智能施工设备及方法,包括台车本体、位于所述台车本体两侧的基础平台,所述台车本体的前侧端面设置纵向延伸的第一滑轨,所述第一滑轨上滑动配合钻孔平台,所述钻孔平台上设置第二滑轨,所述第二滑轨上滑动配合第一机械臂,所述第一机械臂上安装凿岩机;所述第二滑轨横向延伸,且第二滑轨与第一滑轨相互垂直。本发明提供用于高海拔超长小断面隧道的一体化智能施工设备及方法,以解决现有技术中超长距离小断面隧道的施工工期较长、在高海拔地区作业时对于工程安全和人员健康均不利的问题,实现降低超长距离小断面隧道的施工工期、提高在高海拔地区作业的适应性的目的。