Extra-high voltage overhead line project supervision cost counting method

CN120804872APending Publication Date: 2025-10-17CHINA ELECTRIC POWER DEV RES INST CO LTD +1
0 Cites 0 Cited by

Patent Information

Application Number
CN202510881448.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-06-27
Publication Date
2025-10-17

Smart Images

  • Figure CN120804872A_ABST
    Figure CN120804872A_ABST
Patent Text Reader

Abstract

The invention discloses an extra-high voltage overhead line project supervision cost column counting method, which comprises the following steps: S1, acquiring project GIS data and column counting data of an extra-high voltage overhead line, and associating the project GIS data and the column counting data through preprocessing; and S2, extracting characteristic variables of the extra-high voltage overhead line project from the project GIS data and the column counting data based on the analysis model to form a data set. The invention belongs to the technical field of engineering supervision cost listing, and aims to solve the problem that the supervision content and cost level difference caused by different terrains is difficult to truly reflect in the prior art, so that the supervision cost listing result has large deviation with the actual demand. The technical effect is that the method solves the problem that the supervision content and the cost level difference caused by different terrains are difficult to truly reflect, so that the supervision cost listing result has a large deviation with the actual demand.