Typical construction measure and pricing method for river network area
CN120805562APending Publication Date: 2025-10-17CHINA ELECTRIC POWER DEV RES INST CO LTD +1
0 Cites 0 Cited by
Patent Information
- Application Number
- CN202510881450.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-27
- Publication Date
- 2025-10-17
Smart Images

Figure CN120805562A_ABST
Abstract
The invention discloses a typical construction measure and pricing method for a river network region, and the method comprises the following steps: S1, building a digital rule model based on the core data in a typical construction scheme of a historical river network region, and generating a three-dimensional decision matrix of the core data; s2, acquiring parameters of a river network area needing to be constructed, inputting the parameters into the digital rule model, and generating a construction measure scheme based on the decision matrix; and S3, calculating and optimizing the construction measure scheme through the optimization model. The invention belongs to the technical field of river network region construction, and aims to solve the problems that in the prior art, measure schemes cannot be dynamically matched according to typical working conditions of a river network region, and meanwhile, pricing depends on static quota, so that the matching degree of pricing and construction measures is low. The technical effect is that the problem that the matching degree of pricing and construction measures is low due to the fact that the measure scheme cannot be dynamically matched according to typical working conditions of a river network area and pricing depends on static quota is solved.
Need to check novelty before this filing date? Find Prior Art