Flood forecasting method, device and equipment based on field monitoring and real-time modeling

CN120805783BActive Publication Date: 2026-01-27TSINGHUA UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202511264302.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-09-05
Publication Date
2026-01-27
Estimated Expiration
2045-09-05

Smart Images

  • Figure CN120805783B_ABST
    Figure CN120805783B_ABST
Patent Text Reader

Abstract

The application relates to the technical field of flood forecasting, in particular to a flood forecasting method, device and equipment based on field monitoring and real-time modeling, wherein the method comprises the following steps: collecting terrain data files and surface data texts of a target region to construct a sub-meter DEM (Digital Elevation Model); acquiring radar real-time base data, radar and ground rainfall historical observation data, brightness temperature data and geographic coordinate information of the target region to solve actual radar real-time base data, short-term forecast data of rainstorm and soil moisture data; then, the data are used to operate a preset hydrological model to obtain a mountain torrent gully basin distributed hydrological model result; and a hydrology-hydrodynamics coupled model is established according to the sub-meter DEM digital elevation model and the mountain torrent gully basin distributed hydrological model result to forecast a current flood state and a future flood state. Therefore, the problems that a current hydrological model in a mountainous area cannot completely reflect a current state of a basin and a simulation error of a hydrodynamics model is large are solved.
Need to check novelty before this filing date? Find Prior Art