Door type tower cable-stayed bridge suspension cable stiffening expansion structure and construction method
By adding new main cables and suspenders to both sides of the cable-stayed bridge towers, a cable-stayed-suspension combined system was formed, solving the problem of expanding cable-stayed bridges, increasing the number of roadways and improving load-bearing capacity, saving land, and optimizing project investment and landscape harmony.
Patent Information
- Application Number
- CN202510777938.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-11
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2045-06-11
AI Technical Summary
Expansion of existing cable-stayed bridges is difficult to increase the number of lanes, and the availability of new bridge sites is limited, resulting in large project investments, poor landscape coordination, and ineffective utilization of the existing structure.
New spatial main cables are installed on both sides of the existing cable-stayed bridge towers to form a cable-stayed-suspension combined system. The new spatial main cables bear the weight and load of the roadway. The tower columns are expanded laterally on the outer side of the bridge towers, and the existing structure is used to widen the bridge. The new suspenders are arranged alternately with the existing cable stays to control the cable force from increasing.
This increased the number and width of lanes, improved the load-bearing capacity of the cable-stayed bridge, saved land, reduced project investment, ensured structural performance and driving comfort, and avoided stress concentration in the anchoring devices.
Smart Images

Figure CN120830293B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of bridge engineering technology, specifically to a suspension stiffening and expansion structure for a portal tower cable-stayed bridge and its construction method. Background Technology
[0002] With the development of productivity, the improvement of people's living standards and the continuous increase in per capita car ownership, some early-built highways are gradually reaching traffic saturation, urgently requiring reconstruction and expansion to improve traffic capacity, enhance efficiency, and conserve resources. Bridges, especially large-scale bridges such as cable-stayed bridges, are a key and challenging aspect of reconstruction and expansion. Expanding existing cable-stayed bridges in situ to increase the number of lanes is the most economical and environmentally friendly method, making full use of the existing structure and effectively saving land.
[0003] The deck of a cable-stayed bridge can be widened by adding stiffening beams; the bridge towers are mainly compression structures, and the settlement during operation has stabilized, giving them a certain overload capacity; however, the load-bearing cable stays are generally prefabricated cables, and the cross-section cannot be increased due to limitations in the matching anchor heads and anchoring systems; therefore, direct expansion of cable-stayed bridges is difficult to achieve.
[0004] In engineering practice, cable-stayed bridges that require expansion are often constructed by building a new cable-stayed bridge next to the existing one. However, due to limitations such as navigation, flood control, and bridge site planning, the new bridge site is either far from the existing one, and the connection between the new project and the existing bridge's double-sided widening and connecting lines has a large impact area, generally resulting in poor project route smoothness and high investment; or the new project has a significantly larger bridge span than the existing one, leading to poor landscape coordination and huge investment. Summary of the Invention
[0005] To address one or more shortcomings of the existing technology, this invention provides a suspension stiffening expansion structure and construction method for a portal tower cable-stayed bridge. The expansion increases the number of lanes in the existing cable-stayed bridge, and the dead and live loads of the new lanes are borne by the two newly added main cables. This fully utilizes the existing cable-stayed bridge structure, is simple and compact, effectively saves land, improves material utilization, and is conducive to energy conservation and emission reduction.
[0006] To achieve the above objectives, the present invention adopts one or more of the following technical solutions: Firstly, a portal tower cable-stayed bridge suspension stiffening expansion structure is provided, including an existing cable-stayed bridge: an existing bridge tower and a stiffening beam divided into three spans by the bridge tower. Along the length direction of the existing stiffening beam, several existing cable stays are provided on both sides of the existing bridge tower. The bottom of the existing cable stays is connected to the existing stiffening beam, and the top is connected to the existing bridge tower. The existing full-bridge stiffening girder is widened by extending stiffening girders on both sides to increase the width and number of lanes. New spatial main cables are installed on both sides of the centerline of the far-axis of the bridge tower. These new spatial main cables are located outside the existing cable plane and at a certain angle to the vertical plane, forming a cable-stayed-suspension combined system. The new spatial main cables are connected to the extended stiffening girder of the side and mid-span by new suspension cables. The weight of the extended stiffening girder and the operating load of the new lanes are borne by the new spatial main cables.
[0007] The newly added main cable tower is supported on the bridge tower by a new main cable saddle, which transmits vertical pressure to the bridge tower. On the side span (outer side of the bridge tower), the tension of the main cable is transmitted to the new anchorage foundation through cable saddles and anchoring systems. To accommodate the vertical pressure transmitted to the bridge tower by the new main cable, the cross-section of the bridge tower is expanded in both the longitudinal and transverse directions.
[0008] Preferably, the top of the newly added spatial main cable tower is located at the center of the cross-section of the expanded bridge tower column, and is connected at mid-span to the anchorage device of the expanded stiffening beam located on the far center line of the bridge axis of the expanded driving lane via a newly added suspender cable; that is, the lateral distance between the lowest point of the newly added spatial main cable at mid-span and the bridge axis is greater than the lateral distance between the highest point of the tower top and the bridge axis, and the plane of the newly added spatial main cable forms a certain angle with the vertical plane; this is the spatial main cable. The inclination angle between the newly added spatial main cable and the vertical plane is related to the distance from the anchor point on the newly added suspender beam to the center line of the bridge axis, the lateral distance from the newly added spatial main cable located at the lateral center point of the tower column at the top of the expanded bridge tower to the center line of the bridge axis, the height difference between the lowest point of the newly added spatial main cable at mid-span and the top of the bridge tower, and the cable force of the newly added suspender cable, etc. The angle range between the newly added spatial main cable and the vertical plane can be 1º to 17.5º; however, to avoid the oblique suspender cable corresponding to the spatial cable encroaching on the driving lane space, the angle range can generally be 1º to 5º.
[0009] As a further implementation, the lower end anchor point of the newly added suspender corresponding to the new spatial main cable is located on the outside of the expanded stiffening girder (away from the bridge axis centerline), with a fixed lateral distance from the bridge axis centerline. The upper end connects to the new spatial main cable, and the lateral distance from the bridge axis centerline gradually increases from the tower top to the mid-span, always less than the distance from the anchor point on the beam to the bridge axis centerline. That is, the new suspender is laterally inclined and longitudinally vertically arranged. The anchor points on the new suspender beam are arranged alternately with the existing cable-stayed beam anchor points longitudinally. The new suspender bears the dead and live loads of the expanded stiffening girder, thereby controlling the cable force of the existing cable-stayed beams to not increase after the expansion of the stiffening girder.
[0010] As a further implementation, the existing bridge tower is a portal tower or column tower, that is, the bridge tower has a small lateral slope to accommodate the vertical pressure transmitted by the newly added spatial cable; the expansion tower column is achieved by increasing the cross-sectional dimensions of the existing bridge tower in the longitudinal and transverse directions to improve the load-bearing capacity of the existing bridge tower; the existing bridge tower is a concrete bridge tower, and the expansion tower is connected to the existing bridge tower as a whole by embedding steel bars in the existing bridge tower; the existing bridge tower is a steel structure bridge tower, and the expansion tower is connected to the existing bridge tower as a whole by welding or bolting to share the load.
[0011] As a further implementation, the saddle groove shape of the main cable saddle at the top of the expanded bridge tower is adapted to the shape of the main cable in the newly added space, and is arranged at an angle, with the angle of the angle being the same as the inclination angle of the main cable in the newly added space.
[0012] As a further implementation, in the cable-stayed-suspension combined system formed by the expansion, the existing cable stays, the newly added spatial main cables, and the main cable suspenders are all arranged laterally symmetrically relative to the bridge axis.
[0013] As a further implementation method, the newly added cable saddles and anchorage systems, as well as the newly added anchor foundations on the side span of the new spatial cable (the side of the far tower), are located on the lateral outer side of the stiffening girder of the extended side span; the anchor foundations on the left and right sides can be set up independently, or they can be connected into a whole under the stiffening girder of the side span as needed.
[0014] As a further implementation method, since the existing bridge towers are relatively taller than those of general suspension bridge towers, in order to achieve uniform stiffness of the existing cable-stayed supports and main cable suspension supports, the sag-to-span ratio of the newly added spatial main cable is 1 / 10 to 1 / 12.
[0015] On the other hand, a construction method for cable-stayed bridge with portal tower suspension stiffening and expansion is provided, including the following steps: The installation of the new space main cable is as follows: Install the main cable saddle at the top of the expanded bridge tower, install the catwalk for the new spatial main cable, and erect the new spatial main cable; after erection, under its own weight, the new spatial main cable in the middle span appears as a planar main cable (the distance from the top of the tower and the midpoint of the span to the transverse centerline of the bridge axis is equal). Multiple cross braces are used between the mid-spans of the two newly added spatial main cables. By gradually adding sections and pushing, the mid-spans of the two newly added spatial main cables are opened up to achieve the spatial cable state after the bridge expansion. New suspenders are installed at the set distances, and at this time the new suspenders are not tensioned. The construction of the expanded stiffening beam is as follows: The widening and expansion sections on both sides of the stiffening beam are longitudinally segmented and transported to their destination using a beam-on-beam transportation method.
[0016] Two sets of separate self-propelled cable-mounted cranes, supported by two newly added main cables, symmetrically hoisted and installed beam segments from the bridge towers towards the mid-span (the central side of the two bridge towers), tensioning the new suspenders until the mid-span closure position. At the mid-span closure position, the hoisted expanded beam segments were pushed to both sides, and after being pushed into place, the mid-span closure expanded beam segments were installed, completing the mid-span closure and obtaining the expanded stiffening girder of the mid-span. Temporary connections were used between the longitudinal beam segments of the widened and expanded sections on both sides of the mid-span stiffening girder and between them and the existing stiffening girder segments.
[0017] Two sets of separate self-propelled cable-mounted cranes, supported on two newly added main cables, sequentially hoist the extended beam segments of the side span from the outer end of the side span (towards the far tower) towards the existing tower, until the side span is closed at the tower. The extended beam segments of the middle span and the side span on both sides of the side span closure point are pushed to the sides respectively to install the side span closure segment, completing the side span closure and obtaining the extended stiffening beam of the side span. Temporary connections are used between the longitudinal beam segments of the widened and expanded parts on both sides of the side span stiffening beam and between them and the existing stiffening beam segments.
[0018] After the expansion sections of the side spans and mid-span stiffening girders were closed, the tension of the newly added suspension cables was slightly adjusted; the elevation of the interface between the expanded stiffening girder and the existing stiffening girder was slightly adjusted, and the temporary connection was changed to a permanent connection such as welding or high-strength bolts, so that the newly added main cable and the expanded stiffening girder reached the bridge alignment.
[0019] The bridge is now operational, specifically as follows: The process involves wrapping the main cable with wire for protection in the newly added space; then dismantling the catwalk; completing the enclosure of the new cable saddles and anchoring system, as well as the new main cable saddles; and finally, acceptance and opening to traffic.
[0020] As a further implementation method, before erecting the new main cable, an expansion tower column will be constructed on the outer side of the existing bridge tower, specifically as follows: New bored pile foundations are added laterally on the outer side of the existing bridge towers; new pile caps are poured on the top of the new bored piles, and steel bars are inserted into the existing pile caps and connected to the steel bars of the new pile caps to form an integral pile-pile-pile-cap foundation. On the new pile-pile-pile-cap foundation, the cross-section of the existing bridge tower columns is expanded along the longitudinal direction of the bridge and laterally on the outer side to form expanded tower columns.
[0021] As a further implementation, the new main cable saddle corresponding to the new spatial main cable at the top of the tower is at a certain distance from the existing stay cable in the lateral position at the top of the tower; preferably, the distance between the main cable saddle and the existing stay cable is not less than one times the diameter of the new spatial main cable, so as to avoid mutual interference during the cabling process of the new spatial main cable.
[0022] By adopting the above technical solution, the beneficial effects of the present invention are as follows: 1. In bridge expansion, this invention combines an expanded stiffening girder with newly added spatial main cables. These two new spatial main cables are located outside the existing cable-stayed bridge surface. On one hand, this fully utilizes the cable-stayed bridge's structure, increasing the number and width of lanes. On the other hand, the newly added spatial main cables form a cable-stayed / suspension combined system with the existing cables. The weight of the expanded stiffening girder and the operating load of the new lanes are borne by the newly added spatial main cables, significantly improving the cable-stayed bridge's load-bearing capacity. The existing cable-stayed bridge deck can be widened as needed, ensuring the structural performance of the expanded structure. This achieves the engineering significance of widening the cable-stayed bridge, reducing project investment and improving economic efficiency.
[0023] 2. This invention directly widens and expands both sides of the existing stiffening girder of the cable-stayed bridge, which is easy to connect with the connecting line, occupies less land, and is highly economical; at the same time, the corresponding route indicators are higher, which can improve driving comfort and meet the needs of modern transportation.
[0024] 3. In this invention, the newly added main cable is connected to the existing stiffening beam by an obliquely added suspension cable. The anchor points of the newly added suspension cable and the anchor points of the existing stay cables are arranged alternately in the longitudinal direction and are located on the outside of the expanded stiffening beam in the transverse direction. The anchor points of the suspension cable and the anchor points of the existing stay cables maintain a certain distance in both the longitudinal and transverse directions. The anchoring devices of the existing stay cables and the newly added suspension cable are evenly arranged, the force is smooth, and stress concentration at the anchoring device is avoided.
[0025] 4. The highest point of the newly added main cable tower is located at the top of the bridge tower, and the stiffening beam anchoring device corresponding to the newly added suspenders is located outside the expanded stiffening beam. Under the action of the lateral force of the suspenders, the newly added main cable is a spatial cable, that is, the lateral distance between the lowest point of the newly added main cable at mid-span and the bridge axis is greater than the lateral distance between the highest point of the tower and the bridge axis. The newly added main cable forms a certain angle with the vertical plane, thus being a spatial cable. The spatial cable makes full use of the existing bridge tower, and the bridge tower can be expanded in situ to bear the vertical pressure transmitted by the spatial cable. The expanded tower columns are added to the lateral outer side and longitudinal cross-section of the existing bridge tower. The expanded tower columns and foundations occupy a small area, saving land.
[0026] 5. In this invention, the existing stiffening girder can be widened and expanded using box girders, truss girders, or plate girders. After widening, the stiffening girder is supported only by stay cables or main cable suspenders on the same cross section, ensuring clear force transmission. The dead and live loads of the expanded stiffening girder are borne by the newly added suspenders, which can control the cable force of the existing stay cables to be less than or equal to the cable force before expansion, making full use of the existing stay cables and avoiding the need to replace them.
[0027] 6. In this invention, the newly added spatial main cables and stay cables on both sides of the bridge tower are arranged symmetrically in the transverse direction relative to the bridge axis, and the main cable saddle of the newly added spatial main cable is kept at a certain distance from the existing stay cables, which can avoid mutual interference during the main cable laying process; thus, the newly added spatial main cable and the existing stay cables form a cable-stayed-suspension combined system. Attached Figure Description
[0028] The accompanying drawings, which form part of this invention, are used to provide a further understanding of the invention. The illustrative embodiments of the invention and their descriptions are used to explain the invention and do not constitute an improper limitation of the invention.
[0029] Figure 1 This is a plan and elevation view of the cable-stayed bridge before expansion and the suspension stiffening expansion structure after expansion, in one or more embodiments of the present invention. Figure 2 This is a schematic diagram of the arrangement of the newly added main cable saddle at the top of the tower and the existing stay cables in one or more embodiments of the present invention; Figure 3 This is a three-dimensional schematic diagram of a half-span suspension stiffening extension structure in one or more embodiments of the present invention. Figure 1 ; Figure 4 This is a three-dimensional schematic diagram of a half-span suspension stiffening extension structure in one or more embodiments of the present invention. Figure 2 ; Figure 5 This is a top view of half a span of the suspension stiffening and expansion structure in one or more embodiments of the present invention; Figure 6 This is a schematic cross-sectional view of the suspension stiffening and expansion structure using newly added suspension cables in one or more embodiments of the present invention (this cross-section has no existing cable anchor points). Figure 7 This is a schematic cross-sectional view of the suspension stiffening and expansion structure using existing cable-stayed cables in one or more embodiments of the present invention (this cross-section has no newly added cable anchor points). Figure 8 This is a schematic diagram of the construction process in Embodiment 2 of the present invention. Figure 1 ; Figure 9 This is a schematic diagram of the construction process in Embodiment 2 of the present invention. Figure 2 ; In the diagram: 1. New main cable; 2. New suspenders; 3. Existing cable stays; 4. Existing stiffening girder; 5. Widened section of stiffening girder; 6. Existing bridge tower; 7. Expanded tower column; 8. Existing bridge tower foundation; 9. Expanded section of bridge tower foundation; 10. New cable saddle at the top of the tower; 11. Tower-beam connection device; 12. Existing side span pier of cable-stayed bridge; 13. New cable saddle and anchoring system; 14. New anchorage foundation. Detailed Implementation
[0030] It should be noted that the following detailed description is illustrative and intended to provide further explanation of the invention. Unless otherwise specified, all technical and scientific terms used in this invention have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains.
[0031] It should be noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the exemplary embodiments of the present invention. As used herein, the singular form is intended to include the plural form as well, unless the context clearly indicates otherwise. Furthermore, it should be understood that when the terms "comprising" and / or "including" are used in this specification, they indicate the presence of features, steps, operations, devices, components, and / or combinations thereof. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without inventive effort are within the scope of protection of the present invention.
[0032] Example 1 In one typical embodiment of this application, a suspension stiffening and expansion structure for a portal tower cable-stayed bridge is provided, such as... Figure 1-4 As shown, the new main cable 1, new suspension cable 2, existing cable stay 3, existing stiffening girder 4, stiffening girder widening section 5, existing bridge tower 6, expanded tower column 7, existing bridge tower foundation 8, bridge tower foundation expansion section 9, new cable saddle at the top of the tower 10, tower-beam connection device 11, existing cable-stayed bridge side span pier 12, new cable saddle and anchoring system 13, and new anchor foundation 14 are shown.
[0033] The existing portal tower cable-stayed bridge includes an existing stiffening girder 4 and an existing bridge tower 6. Along the length of the existing stiffening girder 4, several existing cable stays 3 are provided on both sides of the existing bridge tower 6. The bottom of the existing cable stays 3 is connected to the existing stiffening girder 4, and the top is connected to the existing bridge tower 6. The existing stiffening girder 4 is widened by extending stiffening girders on both sides in the width direction to increase the width and number of lanes. New spatial main cables 1 are installed on both sides of the existing bridge tower 6 in the transverse direction. The new spatial main cables 1 are located outside the existing cable stays 3 to form a cable stay-suspension combination system. The new spatial main cables 1 are connected to the widened part 5 of the stiffening girder by new suspenders 2. The weight of the widened part 5 of the stiffening girder and the operating load of the new lanes are borne by the new spatial main cables 1.
[0034] Specifically, existing cable-stayed bridge widening techniques typically involve adjusting the bridge deck layout to add lanes or sidewalks while maintaining the same bridge deck weight. However, because the load-bearing cable stays cannot be increased, the existing widening methods can only increase the bridge deck width to a very limited extent, failing to achieve true bridge expansion. The suspension stiffening expansion structure provided in this embodiment adds two new spatial main cables 1 to both sides of the bridge towers of the cable-stayed bridge, improving the load-bearing capacity of the existing cable-stayed bridge. It can be combined with the existing stiffening girder 4 for bridge deck widening, effectively expanding the number and width of lanes while ensuring safe load-bearing capacity, thus achieving an engineering-level expansion of the original cable-stayed bridge.
[0035] To fully utilize the bearing capacity of the existing cable-stayed bridge towers, it is necessary to control the tower bending moment caused by the main cable force and reduce the eccentricity between the main cable pressure and the tower axis. This applies only to cable-stayed bridges with relatively small tower inclination, such as portal and single-column bridges.
[0036] like Figure 1 As shown, the existing cable-stayed bridge structure includes an existing stiffening girder 4, existing stay cables 3, and existing bridge towers 6. Several lanes are provided on the top surface of the existing stiffening girder 4. The existing bridge towers 6 are portal towers with a relatively small inclination, approaching verticality, and typically consist of two towers. The existing stiffening girder 4 transfers its own weight and other dead and live loads to the existing bridge towers 6 via the existing stay cables 3. Along the length of the existing stiffening girder 4, the top of the existing stay cables 3 is connected to the existing bridge towers 6, and the bottom is connected to the existing stiffening girder 4.
[0037] like Figure 1 As shown, the existing stiffening girder 4 has stiffening girder widening sections 5 on both sides of its transverse direction, widening the bridge deck and increasing the number and width of the additional lanes. The existing stiffening girder 4 and the stiffening girder widening sections 5 can be connected as a whole by embedding steel bars, welding, or high-strength bolts, depending on the materials used, to share the load. Two new spatial main cables 1 are installed on each side of the expanded bridge tower's transverse direction. These two new spatial main cables 1 are located outside the cable surface of the existing stay cables 3 and are connected to the stiffening girder widening sections 5 on both sides of the bridge deck via new suspenders 2 to bear the self-weight load and traffic load of the stiffening girder widening sections 5.
[0038] like Figure 1 , Figure 3 , Figure 4 As shown, the newly added main cable 1, the newly added suspension cable 2, and the existing cable stay cable 3 form a cable-stayed-suspension cooperative system to jointly bear the dead and live loads of the stiffening beam after the expansion is completed.
[0039] Specifically, in combination Figure 2 , Figure 3 , Figure 4As shown, the newly added main cable 1 is supported on the bridge tower by a newly added saddle 10 at the top of the tower, which changes the shape of the main cable. The main cable of the side span transfers the tension of the main cable to the newly added anchor foundation 14 through the newly added saddle and anchoring system 13. In order to bear the vertical pressure at the top of the tower transmitted by the newly added main cable, the existing bridge tower 6 is expanded. The outer sides of the bridge tower on both sides of the transverse direction are provided with expanded tower columns 7. The expanded tower columns 7 are connected to the existing bridge tower 6 as a whole by inserting steel bars or welding, so as to share the load together.
[0040] like Figure 3 As shown, to avoid collisions between the newly added spatial main cable 1 and the existing cable stay 3 under strong winds after the expansion is completed, the newly added spatial main cable 1 is a spatial cable. That is, the lateral distance between the center of the newly added spatial main cable 1 and the center line of the bridge axis gradually increases from the top of the tower to the middle of the span, and the lateral distance between the middle point of the span and the bridge axis is the largest. The lateral distance between the middle point of the newly added spatial main cable 1 and the center line of the bridge axis is greater than the lateral distance between the top of the tower and the center line of the bridge axis. That is, the newly added spatial main cable 1 is at a certain angle to the vertical plane. The tilt angle between the newly added spatial main cable 1 and the vertical plane is determined by the coordinates of the middle of the span of the newly added spatial main cable 1.
[0041] like Figure 2 As shown, the apex of the newly added spatial main cable 1 tower (corresponding to the position of the main cable saddle) maintains a certain lateral distance from the existing cable 3, controlled according to the diameter D of the newly added spatial main cable 1, to ensure the construction space during the cable-laying process of the newly added spatial main cable 1; the saddle groove of the newly added cable saddle 10 at the top of the tower corresponding to the newly added spatial main cable 1 is arranged obliquely, and the oblique inclination angle between the axis of the saddle groove of the newly added cable saddle 10 at the top of the tower and the vertical plane is the same as the oblique inclination angle between the spatial plane where the newly added spatial main cable 1 is located and the vertical plane.
[0042] like Figure 1 , Figure 3 , Figure 4 As shown, each newly added spatial main cable 1 includes a mid-span main cable located between adjacent bridge towers and a side-span main cable located outside the bridge towers; the mid-span main cable is connected to the mid-span (between bridge towers) stiffening girder widening section 5 by newly added suspenders 2, and the side-span main cable is connected to the side-span stiffening girder (far bridge tower side) by newly added suspenders 2.
[0043] In this embodiment, since the existing bridge tower 6 is relatively tall compared to conventional suspension bridges, in order to achieve uniform stiffness of the existing cable stay 3 support and the main cable suspension support, the sag-to-span ratio of the newly added spatial main cable 1 is controlled between 1 / 10 and 1 / 12.
[0044] like Figure 3 , Figure 4 , Figure 5As shown, after the expansion, in the operational state of the completed bridge, the newly added spatial main cable 1 has a spatial cable shape, meaning that the distance from the mid-span of the newly added spatial main cable 1 to the centerline of the bridge axis is greater than the distance from the top of the tower to the centerline of the bridge axis. In the completed bridge state, the spatial cable shape of the newly added spatial main cable 1 is due to the lateral tension of the newly added suspender 2; that is, the spatial cable shape of the newly added spatial main cable 1 is constrained by the self-weight of the main cable and the tension of the newly added suspender 2. The newly added suspender 2 is inclined on the cross-section of the existing stiffening girder 4, forming a certain angle with the vertical plane. That is, the distance from the cable clamp at the connection point between the upper end of the newly added suspender 2 and the newly added spatial main cable 1 to the centerline of the bridge axis is less than the distance from the anchorage device at the connection point between the lower end of the newly added suspender 2 and the stiffening girder widening section 5 to the centerline of the bridge axis. The anchor head at the lower end of the newly added suspender 2 is connected to the stiffening girder widening section 5 using anchor head bearing or pin-type anchorage devices; these anchor head bearing or pin-type anchorage devices are manufactured and installed as a single unit with the stiffening girder widening section 5.
[0045] Specifically, such as Figure 3 , Figure 4 The main cable suspenders and the existing cable stays 3 are arranged alternately in the longitudinal direction, so that the vertical load borne by each group of cable stays and main cable suspenders is basically the same. This controls the cable force of the existing cable stays 3 to be less than or equal to the cable force before the width expansion is completed, so as to ensure the stability and durability of the expansion structure.
[0046] Specifically, such as Figure 1 , Figure 3 , Figure 4 As shown, the newly added spatial main cables 1 on both sides of the bridge tower are arranged symmetrically with respect to the bridge axis. The newly added spatial main cables 1 on each side are connected to the expanded stiffening beam through the newly added main cable suspension cables. The lateral distance between the midpoint of the span and the bridge axis is greater than the lateral distance between the top of the tower and the bridge axis. That is, the newly added spatial main cables 1 are inclined at a certain angle to the vertical plane. The newly added spatial main cables 1 and the existing cable stays 3 form a cable stay-suspension combination system.
[0047] like Figure 1 , 3 As shown in Figures 4 and 5, the newly added cable saddle and anchorage system 13, and the newly added anchorage foundation 14 on the side span side (far tower side) of the new spatial main cable 1 are located laterally outside the integral formed by the existing stiffening girder 4 and the widened part of the stiffening girder 5 on the side span side; this is to avoid interference between the new spatial main cable 1 and the new suspenders 2 and the widened part of the stiffening girder 5 on the side span side. The newly added anchorage foundations 14 located on the left and right sides of the widened part of the stiffening girder 5 on the side span side can be set independently, or they can be connected into an integral whole under the stiffening girder of the side span as needed.
[0048] In the cable-stayed-suspension combined system formed in this embodiment, the cable stays, the newly added space main cable 1, and the main cable suspenders are all arranged symmetrically in the transverse direction. The angle between the newly added space main cable 1 and the vertical plane is controlled at 1º-5º, which can ensure that the diagonal main cable suspenders in the middle of the span do not encroach on the driving space.
[0049] like Figure 6 , Figure 7 As shown, the existing stiffening girder 4 of the cable-stayed bridge can be a box girder, truss girder, or plate girder, and anchorage devices are installed on the outer lateral side of the widened portion 5 of the stiffening girder. For example... Figure 1 , Figure 3 , Figure 4 As shown, the upper end of the newly added suspender 2 is connected to the newly added main cable 1, and the lower end is connected to the stiffening girder widening section 5 through an anchoring device. That is, the stiffening girder widening section 5 is suspended and supported on the newly added main cable 1 by the newly added suspender 2. The newly added driving lane is separated from the existing driving lane by the existing crash barrier and the existing cable stay 3. After the bridge deck widening is completed on the basis of the existing stiffening girder 4, only the main cable suspenders or cable stays are transversely supported on the same cross section of the stiffening girder, which can ensure that the cable stays, main cable suspenders and stiffening girder are clearly stressed.
[0050] Example 2 In another typical embodiment of the present invention, a construction method for cable-stayed bridge suspension stiffening and expansion is provided, based on a portal tower cable-stayed bridge suspension stiffening and expansion structure of Embodiment 1, including the following steps (e.g. Figure 8 , Figure 9 (as shown) The installation of the new space main cable 1 is as follows: After the expansion, a new main cable saddle is installed on the top of the bridge tower, the main cable traction cable is erected, the catwalk is installed, the main cable strands are erected, the cable is tightened, and the cable clamps are installed. Under its own weight, the mid-span of the newly added spatial main cable 1 is presented as a planar main cable, that is, the lateral position of the top of the tower and the mid-span of the newly added spatial main cable 1 is the same.
[0051] Multiple cross braces were used, and the new main spatial cable 1 was opened to the state of a completed bridge spatial cable by adding sections and pushing. The main cable suspenders were then installed. Among them, the cross braces adopted a walking-type jacking device that can arbitrarily change the span within a certain range. The installation of the widened and expanded stiffening girder section is as follows: The mid-span expansion beam segment was symmetrically hoisted from the existing bridge towers in six directions, such as... Figure 8 , Figure 9 As shown, the longitudinal segmentation of the stiffening girder widening section 5 can be transported from the existing stiffening girder 4 bridge deck to the installation location using beam transport machinery. Then, a separate self-propelled cable-mounted crane supported on the newly added main cable 1 is used for hoisting into position, followed by temporary connection with the existing stiffening girder 4 beam segment. The separate self-propelled cable-mounted crane gradually moves laterally from the expanded bridge towers (including 6 and 7) towards the mid-span, symmetrically hoisting the stiffening girder widening section 5. Temporary connections are used between the longitudinal segments of the stiffening girder widening section 5 and between it and the existing stiffening girder 4. After the stiffening girder widening section 5 beam segments are hoisted and connected in position, the corresponding newly added slings 2 are tensioned. The separate self-propelled cable crane, supported on the newly added main cable 1, gradually moves from the bridge tower side to the mid-span side, continuing to hoist the stiffening beam widening section 5 until the mid-span closure beam section; jacks are used to push the widened beam sections on both sides of the closure section towards the bridge tower side into place, and then the stiffening beam widening section 5 of the mid-span closure section is hoisted and installed, and temporarily connected longitudinally with the existing stiffening beam 4 and the stiffening beam widening section 5 of the mid-span closure section to complete the mid-span closure and obtain the expanded stiffening beam of the mid-span section; Starting from the outer end of the existing cable-stayed bridge side span and moving towards the existing bridge tower 6, the stiffening girder widening section 5 is hoisted sequentially until the side span closure position at the existing bridge tower 6 is reached, thus obtaining the extended stiffening girder of the side span section. The mid-span expansion beam segments and side-span expansion beam segments on both sides of the side-span closure point are pushed to both sides respectively, and the side-span closure segment is installed. The side-span closure segment is temporarily connected to the existing stiffening beam 4 and the adjacent expansion beam segment to complete the side-span closure and obtain the expansion stiffening beam.
[0052] To bear the vertical axial pressure transmitted to the bridge tower by the newly added main cable 1, the cross-section of the tower column on the outer side of the existing bridge tower 6 is expanded before the new main cable 1 is erected. Specifically, a bored pile foundation is added to the outer side of the existing bridge tower 6; a new pile cap is poured on top of the new bored piles, and the new pile cap is connected to the existing pile cap by reinforcing steel bars inserted into the existing pile cap to form a new pile-pile-pile-cap foundation; on the new pile-pile-pile-cap foundation, the cross-section of the tower column of the existing bridge tower 6 is expanded along the outer side to form an expanded tower column. The expanded tower column added to the outer side of the existing bridge tower 6 can bear the vertical force of the new bridge deck formed by the expanded stiffening girder and the new main cable 1. Furthermore, the expanded tower column and foundation occupy a small area, saving land.
[0053] In this embodiment, the detailed construction steps of the cable-stayed bridge suspension stiffening and expansion construction method are as follows: (1) Expand the main tower foundation: add a bored pile foundation on the outer side of the foundation cap of the existing bridge tower 6; pour a new cap on the top of the new bored pile to form a pile-cap foundation; the new cap and the foundation cap of the existing bridge tower 6 are integrated by reinforcing bars in the foundation cap of the existing bridge tower 6.
[0054] (2) Construction of the expanded tower column: Based on the newly added cast-in-place pile-cap, the cross-section of the existing gantry bridge tower is expanded longitudinally and laterally (towards the centerline of the far bridge axis). The new and old cross-sections of the bridge tower are connected into a whole by inserting reinforcing bars into the existing concrete bridge tower, or by welding and high-strength bolts to connect it into a whole with the existing steel structure bridge tower, thus obtaining the expanded tower column after construction. The main cable saddle corresponding to the newly added spatial main cable 1 is installed at the top of the expanded tower column.
[0055] (3) Construction of main cable anchorage system: While expanding the cross-section of the existing bridge tower 6, anchorage foundations are set on the side span of the cable-stayed bridge, and cable saddles and main cable anchorage system are installed.
[0056] For the above construction sections, provided that relevant safety measures are in place, the existing portal tower cable-stayed bridges can operate normally; for the following construction sections, the existing cable-stayed bridges must be closed for construction.
[0057] (4) Preliminary erection of the new space main cable 1: erect the main cable traction cable, install the catwalk, erect the main cable strands, tighten the cable and install the cable clamps; the catwalk is converted to a hoist. In this stage, the new space main cable 1 only bears its own weight. The mid-span of the new space main cable 1 is a planar main cable, that is, the top of the main cable tower and the mid-span are in the same lateral position.
[0058] (5) The new space main cable 1 is formed; multiple cross braces are used in the main span of the new space main cable 1. By adding sections and pushing, the new space main cable 1 is stretched to the bridge state and the main cable suspenders are installed. Among them, the cross braces adopt a walking-type jacking device that can arbitrarily change the span within a certain range.
[0059] (6) Preliminary construction of the mid-span expansion stiffening girder: Two sets of separate self-propelled cable-mounted cranes, supported on two newly added main cables 1, symmetrically hoist and install beam segments from the bridge towers towards the mid-span (the central side of the two bridge towers), and tension the newly added suspenders 2 until the mid-span closure position. Using jacks, the beam segments on both sides of the closure section, which have already been widened, are pushed into place towards the bridge towers. Then, the mid-span closure expansion beam segments are installed to complete the mid-span closure, resulting in the mid-span expansion stiffening girder. Temporary connections are used between the longitudinal beam segments of the widened expansion section on both sides of the mid-span stiffening girder and between it and the existing stiffening girder 4 beam segments.
[0060] (7) Preliminary construction of the expansion and stiffening beam of the side span: Two sets of separate self-propelled cable cranes supported on two newly added spatial main cables 1 will sequentially lift the side span expansion beam segments from the outer end of the side span (outer side of the bridge tower) towards the existing bridge tower 6 until the side span closure position at the bridge tower; push the middle span expansion beam segments and the side span expansion beam segments on both sides of the side span closure position into place respectively, and then install the side span closure segment to obtain the expansion and stiffening beam of the side span; temporary connections are adopted between the longitudinal beam segments of the widened expansion part on both sides of the side span stiffening beam and between the beam segments of the existing stiffening beam 4.
[0061] (8) The expansion and stiffening girder erection is completed: After the expansion of the side span and the middle span stiffening girder is closed, the tension of the newly added suspenders 2 is slightly adjusted so that the main cable 1 of the newly added space reaches the bridge alignment; the elevation of the interface between the expansion of the stiffening girder and the existing stiffening girder 4 is slightly adjusted, and the temporary connection is adjusted to a permanent connection such as welding or high-strength bolts. (9) Bridge deck construction; main cable winding and protection. Catwalk removal, completion of anchorage and main cable saddle closure works.
[0062] (10) Open to traffic.
[0063] During the above process, the newly added spatial main cable 1 is fixed at a certain lateral distance from the main cable saddle at the top of the expanded bridge tower and the existing cable stay 3. Specifically, the distance between the main cable saddle and the existing cable stay 3 is not less than one times the diameter of the newly added spatial main cable 1, so as to avoid mutual interference during the cable laying process of the newly added spatial main cable 1.
[0064] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit it. Those skilled in the art should understand that the present invention can have various modifications and variations. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A suspension stiffening and expansion structure for a portal tower cable-stayed bridge, characterized in that, Including existing cable-stayed bridges: existing bridge towers and stiffening girders that are divided into three spans by the bridge towers. Along the length of the existing stiffening girders, several existing cable stays are installed on both sides of the existing bridge towers. The bottom of the existing cable stays is connected to the existing stiffening girders, and the top is connected to the existing bridge towers. The existing stiffening girder is widened by extending stiffening girders on both sides to increase the width and number of lanes. New spatial main cables are installed on both sides of the center line of the far axis of the bridge tower. The new spatial main cables are located outside the cable surface of the existing cable stays and are inclined at a certain angle to the vertical plane, forming a cable stay-suspension combined system. The new spatial main cables are connected to the extended stiffening girder by new suspension cables. The weight of the extended stiffening girder and the operating load of the new lanes are borne by the new spatial main cables.
2. The suspension stiffening and expansion structure for a portal tower cable-stayed bridge as described in claim 1, characterized in that, The newly added space at the top of the main cable tower is located in the center of the cross section of the expanded bridge tower column, and at the mid-span, it is connected to the anchorage device of the expanded stiffening beam located on the far-center line of the bridge axis of the expanded carriageway through the newly added suspenders.
3. The suspension stiffening and expansion structure for a portal tower cable-stayed bridge as described in claim 2, characterized in that, The anchor point on the lower end of the newly added suspender corresponding to the newly added spatial main cable is located on the outside of the expanded stiffening beam, and its lateral distance from the center line of the bridge axis is fixed; the upper end is connected to the newly added spatial main cable, and the lateral distance from the center line of the bridge axis gradually increases from the top of the tower to the middle of the span, and is always less than the distance from the anchor point on the beam to the center line of the bridge axis. That is, the newly added suspender is set with a lateral inclination and arranged vertically in the longitudinal direction.
4. The suspension stiffening and expansion structure for a portal tower cable-stayed bridge as described in claim 3, characterized in that, The existing bridge tower is a portal tower or a column tower; or, the existing bridge tower is a concrete bridge tower, and the expanded bridge tower is connected to the existing bridge tower as a whole by inserting steel bars into the existing bridge tower; or, the existing bridge tower is a steel structure bridge tower, and the expanded bridge tower is connected to the existing bridge tower as a whole by welding or bolting.
5. The suspension stiffening and expansion structure for a portal tower cable-stayed bridge as described in claim 4, characterized in that, The saddle groove shape of the main cable saddle at the top of the expanded bridge tower is adapted to the shape of the main cable in the new space, and is arranged at an angle, with the angle of the angle being the same as the inclination angle of the main cable in the new space.
6. The suspension stiffening and expansion structure for a portal tower cable-stayed bridge as described in claim 1, characterized in that, In the cable-stayed-suspension combined system formed by the expansion, the existing cable stays, the newly added spatial main cables, and the main cable suspenders are all arranged laterally symmetrically with respect to the bridge axis.
7. The suspension stiffening and expansion structure for a portal tower cable-stayed bridge as described in claim 6, characterized in that, The sag-to-span ratio of the newly added spatial main cable is 1 / 10 to 1 / 12.
8. A construction method for cable-stayed bridge with suspension stiffening and expansion, based on the cable-stayed bridge with suspension stiffening and expansion structure as described in any one of claims 1-7, comprising the following steps: The installation of the new space main cable is as follows: Install the main cable saddle at the top of the expanded bridge tower, install the catwalk for the new spatial main cable, and erect the new spatial main cable; after erection, the new spatial main cable will appear as a planar main cable in the middle span under its own weight. Multiple cross braces are used between the mid-spans of the two newly added spatial main cables. By gradually adding sections and pushing, the mid-spans of the two newly added spatial main cables are opened up to achieve the spatial cable state after the bridge expansion. New suspenders are installed at the set distances, and at this time the new suspenders are not tensioned. The construction of the expanded stiffening beam is as follows: The widening and expansion sections on both sides of the stiffening girder are longitudinally segmented and transported to their designated locations using a beam-on-beam transportation method. Two sets of separate self-propelled cable-mounted cranes, supported on two newly added main cables, symmetrically hoist and install beam segments from the bridge towers towards the mid-span, tensioning the new suspenders until the mid-span closure position is reached. The mid-span expansion beam at the mid-span closure position is then pushed to both sides to install the mid-span closure expansion beam segment, completing the mid-span closure and obtaining the mid-span expansion stiffening beam. Temporary connections are used between the longitudinal beam segments of the widened expansion section on both sides of the mid-span stiffening beam and between it and the existing stiffening beam segments. Two sets of separate self-propelled cable-mounted cranes, supported on two newly added main cables, sequentially hoist the side span expansion beam segments from the outer end of the side span towards the existing bridge tower, until the side span closure position at the bridge tower; the mid-span expansion beam segments and side span expansion beam segments on both sides of the side span closure position are pushed to both sides respectively to install the side span closure segment, resulting in the expansion stiffening beam of the side span segment; temporary connections are used between the longitudinal beam segments of the widened expansion section on both sides of the side span stiffening beam and between it and the existing stiffening beam segments; After the expansion sections of the side spans and middle span stiffening girders were closed, the tension of the newly added suspenders was slightly adjusted so that the main cable of the newly added space could achieve the shape of the completed bridge; the elevation of the interface between the expansion section of the stiffening girder and the existing stiffening girder was slightly adjusted, and the temporary connection was changed to a permanent connection by welding or high-strength bolts. The bridge is now operational, specifically as follows: The process involves wrapping the main cable with wire for protection in the newly added space; then dismantling the catwalk; completing the enclosure of the new cable saddles and anchoring system, as well as the new main cable saddles; and finally, acceptance and opening to traffic.
9. The construction method for cable-stayed bridge suspension stiffening and expansion as described in claim 8, characterized in that, An expansion tower column will be constructed on the outer side of the existing bridge tower, specifically as follows: New bored pile foundations are added laterally on the outer side of the existing bridge tower; a new pile cap is poured on the top of the new bored piles, and steel bars are inserted into the existing pile cap and connected to the steel bars of the new pile cap to form a whole, so that the new pile cap, the existing pile cap, the new bored piles, and the existing bored piles form a whole. On the new bored pile-pile cap foundation, the cross section of the tower column of the existing bridge tower is expanded laterally on the outer side to form an expanded tower column.
10. The construction method for cable-stayed bridge suspension stiffening and expansion as described in claim 9, characterized in that, The newly added main cable saddle at the top of the tower corresponds to a certain distance between the lateral position of the tower top and the lateral position of the existing stay cable; the distance between the main cable saddle and the existing stay cable is not less than one times the diameter of the newly added main cable.
Citation Information
Patent Citations
Composite material structural system for broadening bridge
CN103882814A
Four-main-cable suspension bridge extension structure for transforming single-layer traffic into double-layer traffic
CN119491461A