Quick assembly type underhand drift filling method

By using prefabricated components for on-site splicing and a top-down layered filling scheme, the problems of complex bottom-entry filling construction and low roof connection rate were solved, achieving efficient and controllable filling and roof connection, and improving the safety and economic benefits of mining.

CN120830539BActive Publication Date: 2026-11-24CHINA MINMETALS CHANGSHA MINING RES INST +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410469533.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-18
Publication Date
2026-11-24
Estimated Expiration
2044-04-18

AI Technical Summary

Technical Problem

Existing down-entry filling methods suffer from problems such as complex construction, low efficiency, and low filling-to-roof ratio. Especially in the mining of high-grade ore under unstable rock conditions, traditional methods are difficult to achieve efficient and controllable filling-to-roof ratio.

Method used

The rapid assembly-type downward inlet filling method is adopted. By prefabricating components in the workshop and assembling them on site, combined with the top-down layered filling scheme, pre-embedded assembled pipes and gate valves are used for filling, realizing standardized process operation and secondary filling.

Benefits of technology

It significantly improved the filling and top-connection rate, simplified the construction process, reduced the intensity and cost of manual labor, improved construction efficiency and controllability of the filling process, and avoided waste of resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120830539B_ABST
    Figure CN120830539B_ABST
Patent Text Reader

Abstract

This invention provides a rapid prefabricated downward access filling method, comprising: prefabricating the required components in a workshop; dividing the ore body into several layers from top to bottom, and dividing each layer into several access routes for mining, with the mining sequence from top to bottom; further dividing each access route into a first layer, a second layer, and a third layer from top to bottom; after completing the mining of the first layer and laying a false bottom, assembling the components and filling the first layer; then mining the second layer, laying a false bottom and assembling the filling pipes after completion, and then filling the second layer. The third layer is then mined and filled after completion; this cycle continues until all layers have been mined and filled. This invention simplifies the access filling construction process through prefabricated component assembly, greatly improving filling efficiency; the pre-embedded pipe method fills empty areas from top to bottom, ensuring the stability of the filling pipeline while improving the filling roof connection rate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of mining access backfilling technology, and in particular to a rapid assembly-type downward access backfilling method. Background Technology

[0002] Downward-entry backfilling mining primarily involves tunneling to recover ore bodies and is mainly suitable for underground mining of high-grade ores in unstable rock conditions. The access road is often small, and the backfilling process is simple, generally involving: laying an artificial roof – constructing a backfill retaining wall – pumping slurry. Downward-entry backfilling mining requires extremely high roof contact ratios, as this is a crucial factor in ensuring safe production. A low roof contact ratio will affect the overall strength of the artificial roof, which is highly detrimental to the safe recovery of the underlying ore body.

[0003] Currently, the main method for access road filling and roof connection involves erecting filling pipes before constructing the retaining wall, filling the middle part of the stope first, and then gradually withdrawing the pipes to fill the remaining part, which is called retreat filling. This method severely limits the filling pump pressure, making it difficult for the filling paste to completely connect with the roof; moreover, moving the filling pipe is difficult, and the timing of movement is also hard to determine. Patent CN114046176B discloses an access road method for stope filling and roof connection, which sets at least three filling branch pipes of different lengths at the top of the access road to achieve multi-point material feeding, and judges the roof connection status through the overflow pipe. The disadvantages of this method are still that the filling pump pressure cannot be too high, it is impossible to judge whether the roof connection is successful at a distance from the overflow port, and secondary filling and roof connection cannot be performed. Patent CN114909176A provides a long-depth open-field roof connection method, which requires constructing filling holes above the stope and fixing the pipes with metal supports. This method is complex to construct, requires high manual labor intensity, and has high cost.

[0004] Therefore, it is necessary to design an improved down-entry stope filling method to solve the above problems. Summary of the Invention

[0005] The purpose of this invention is to provide a rapid prefabricated downward-entry filling method. This method improves construction efficiency by prefabricating components in a workshop and then assembling them on-site. Furthermore, it increases the filling-to-roof ratio by pre-embedding prefabricated pipes in the upper layers to fill the lower-level goaf. This process is simple and flexible in its construction organization. The prefabricated filling pipes are assembled on-site, greatly simplifying the filling process and enabling standardized, streamlined operations. The top-down filling scheme significantly improves the filling-to-roof ratio and allows for secondary filling, with controllable filling process and results. It overcomes the shortcomings of traditional downward-entry filling methods, such as complexity, low efficiency, and large areas of open roof.

[0006] To achieve the above-mentioned objective, the present invention provides a rapid assembly-type downward-entry filling method, characterized in that the method includes the following steps:

[0007] S1. The required components are processed in the workshop;

[0008] S2. The ore body is divided into several layers from top to bottom. Each layer is further divided into several access routes for mining. The mining sequence is from top to bottom, and each access route is divided into the first layer, the second layer, and the third layer from top to bottom.

[0009] S3. After the first layer of the access road is mined out to form the first goaf, an artificial false bottom is laid in the first goaf, and then the required components are assembled.

[0010] S4. After assembly, the first layer is filled. After the first layer is filled and connected to the top, the second layer is excavated. After the second layer is excavated, an artificial false bottom is set up. At the same time, the filling pipe is assembled and the second layer is filled. After the filling is connected to the top, the third layer is excavated. After the third layer is excavated, the third layer is filled.

[0011] S5. Similarly, mine the ore body from top to bottom and fill the empty areas of each layer until the ore body is completely mined and filled.

[0012] As a further improvement of the present invention, the components in step S1 include several straight pipes, elbow pipes, tees, gate valves, and pipe supports.

[0013] As a further improvement of the present invention, the straight pipe, the elbow pipe and the tee pipe are all equipped with threaded flanges, and the tee pipe includes a first tee pipe, a second tee pipe and a third tee pipe, wherein a check valve is provided in the second tee pipe.

[0014] As a further improvement of the present invention, the gate valve includes a first gate valve and a second gate valve located in the first layer and a third gate valve located in the second layer.

[0015] As a further improvement of the present invention, the assembly method of the components in step S3 includes the following steps:

[0016] Several pipe supports are arranged along the access direction of the first layer, and the two ends of the pipe supports are respectively connected to the top plate and the artificial false bottom of the first layer;

[0017] Bottom pipes and top pipes are respectively laid at the bottom and top of the first layer; the bottom pipes include alternating straight pipes and first tee pipes, one end of the first tee pipes is connected to the second layer; the top pipes include alternating straight pipes and second tee pipes, one end of the second tee pipes equipped with a check valve is connected to the first goaf; the top pipes are connected to the pipe supports.

[0018] Both ends of the top pipe are connected to one end of the elbow pipe, the other end of the elbow pipe is connected to one end of the third tee pipe, and the other two ends of the third tee pipe are connected to the end of the bottom pipe and the main filling pipe in the tunnel.

[0019] As a further improvement of the present invention, a first gate valve is provided at one end of the third tee pipe connected to the bottom pipe, and a second gate valve is provided at one end of the third tee pipe connected to the elbow pipe.

[0020] As a further improvement of the present invention, in step S4, the assembly method of the filling pipe component of the second layer includes:

[0021] A second bottom pipe is laid at the bottom of the second layer. The second bottom pipe includes alternating straight pipes and a first tee pipe. One end of the first tee pipe is connected to the third layer. Both ends of the second bottom pipe are connected to the main filling pipe in the roadway. A third gate valve is installed between the two ends of the second bottom pipe and the main filling pipe.

[0022] As a further improvement of the present invention, in step S4, the first gate valve is opened when filling the first layer, the second gate valve is opened when filling the second layer, and the third gate valve is opened when filling the third layer.

[0023] As a further improvement of the present invention, in step S3, the number of the first tee pipes is not less than 3, the number of the second tee pipes is not less than 3, and the number of the pipe supports is not less than 3.

[0024] As a further improvement of the present invention, in step S3, each of the pipe supports is provided with a fixing hole, which is located close to the top plate of the first layer, and the straight pipe passes through the fixing hole.

[0025] The beneficial effects of this invention are:

[0026] 1. This invention provides a rapid prefabricated downward-entry filling method that significantly improves construction efficiency by prefabricating components in a workshop and then quickly assembling them on-site. The advantage of this method lies in its simple and flexible construction organization; the prefabricated filling pipes can be easily assembled on-site, greatly simplifying the traditionally complex filling construction process. This simplified process makes the construction process more standardized and streamlined, thereby improving overall operational efficiency. Simultaneously, the standardized production of prefabricated components reduces error and rework rates during construction, decreases labor intensity, and thus lowers overall construction costs, bringing significant economic benefits to mining enterprises.

[0027] 2. This invention provides a rapid prefabricated downward access filling method, employing a top-down filling scheme. By pre-embedding assembled pipes in the upper layers, it effectively fills the goaf areas in the lower layers, significantly improving the filling roof connection rate. This method not only enables single-stage filling but also allows for secondary filling, ensuring the controllability of the filling process and its effects. This innovative process overcomes many shortcomings of traditional access filling construction, such as complex construction, low efficiency, and the tendency to generate large areas of empty roofs, providing an efficient and controllable solution for underground filling operations in industries such as mining.

[0028] 3. The rapid assembly-type downward-entry filling method provided by this invention achieves precise control of the filling process by setting up multiple filling pipes and gate valves. This design allows for adjustment of the filling rate and pressure according to actual needs, avoiding resource waste caused by overfilling. The gate valves also provide the ability to quickly adjust the filling process, ensuring that each layer of filling achieves the expected results. This improves the reliability of the filling system and the operational efficiency of the mine. Attached Figure Description

[0029] Figure 1 This is a schematic diagram of the filling pipeline setup in the rapid assembly downward inlet filling method provided by the present invention.

[0030] Figure 2 This is a schematic diagram of the first tee pipe in the rapid assembly downward inlet filling method provided by the present invention.

[0031] Figure 3 This is a schematic diagram of the second tee pipe for the rapid assembly downward inlet filling method provided by the present invention.

[0032] Figure 4 A schematic diagram of the third tee pipe and its connection to the first gate valve and the second gate valve in the rapid assembly downward inlet filling method provided by the present invention.

[0033] Figure 5 This is a schematic diagram of a straight pipe for the rapid assembly downward inlet filling method provided by the present invention.

[0034] Figure 6 This is a schematic diagram of the elbow pipe for the rapid assembly downward inlet filling method provided by the present invention.

[0035] Figure 7 A schematic diagram of the pipe support for the rapid assembly downward inlet filling method provided by the present invention.

[0036] Figure Labels

[0037] 1-First layer; 2-Second layer; 3-Third layer; 4-Straight pipe; 51-First tee pipe; 52-Second tee pipe; 53-Third tee pipe; 6-Main filling pipe; 7-Elbow pipe; 8-Pipe support; 81-Fixing hole; 9-First gate valve; 10-Second gate valve; 11-Third gate valve; 12-Artificial false bottom; 13-Main transport roadway. Detailed Implementation

[0038] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be described in detail below with reference to the accompanying drawings and specific embodiments.

[0039] It should also be noted that, in order to avoid obscuring the present invention with unnecessary details, only the structures and / or processing steps closely related to the present invention are shown in the accompanying drawings, while other details that are not closely related to the present invention are omitted.

[0040] Additionally, it should be noted that the terms “comprising,” “including,” or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.

[0041] Please refer to the following: Figures 1-6 This invention provides a rapid assembly-type downward-entry filling method, characterized in that the method includes the following steps:

[0042] S1. The required components are processed in the workshop;

[0043] S2. The ore body is divided into several layers from top to bottom. Each layer is divided into several access routes for mining. The mining sequence is from top to bottom, and each access route is divided into layer 1, layer 2 and layer 3 from top to bottom.

[0044] S3. After the first layer 1 is mined out to form the first goaf, an artificial false bottom 12 is laid in the first goaf, and then the required components are assembled.

[0045] S4. After assembly, the first layer 1 is filled. After the first layer 1 is filled and connected to the top, the second layer 2 is excavated. After the second layer 2 is excavated, an artificial false bottom 12 is set up. At the same time, the filling pipe is assembled and the second layer 2 is filled. After the filling is connected to the top, the third layer 3 is excavated. After the third layer 3 is excavated, the third layer 3 is filled.

[0046] S5. Similarly, mine the ore body from top to bottom and fill the empty areas of each layer until the ore body is completely mined and filled.

[0047] Please refer to the following: Figures 2-5 The components described in step S1 include several straight pipes 4, elbow pipes 7, tee pipes, gate valves, and pipe supports 8. The straight pipes 4, elbow pipes 7, and tee pipes are all equipped with threaded flanges. The tee pipes include a first tee pipe 51, a second tee pipe 52, and a third tee pipe 53. The second tee pipe 52 is equipped with a check valve. The first tee pipe 51 is a conventional tee pipe, the second tee pipe 52 is a tee pipe with a check valve at one end, and the third tee pipe 53 has gate valves installed at both ends. This configuration improves on-site construction efficiency. The pipes with threaded flanges can be quickly connected and disassembled to adapt to different mine layouts and filling requirements. The tee pipes with check valves prevent backflow of filling material in the pipes, reducing material waste.

[0048] The gate valves include a first gate valve 9 and a second gate valve 10 located in the first layer 1, and a third gate valve 11 located in the second layer 2. The first gate valve 9 is installed at one end of the third tee pipe 53 connected to the bottom pipe, and the second gate valve 10 is installed at the other end of the third tee pipe 53 connected to the elbow pipe 7. Both the third tee pipe 53 and the elbow pipe 7 are located within the main transport tunnel 13. This arrangement allows for effective control and regulation of the flow of the filling material.

[0049] As a further improvement of the present invention, the assembly method of the components in step S3 includes the following steps:

[0050] Several pipe supports 8 are arranged along the access direction of the first layer 1, and the two ends of the pipe supports 8 are respectively connected to the top plate of the first layer 1 and the artificial false bottom 12.

[0051] Bottom pipes and top pipes are respectively laid at the bottom and top of the first layer 1; the bottom pipes include alternating straight pipes 4 and first tee pipes 51, one end of the first tee pipes 51 is connected to the second layer 2; the top pipes include alternating straight pipes 4 and second tee pipes 52, one end of the second tee pipes 52 equipped with a check valve is connected to the first goaf area; the top pipes are connected to the pipe support 8;

[0052] Both ends of the top pipe are connected to one end of the elbow pipe 7, and the other end of the elbow pipe 7 is connected to one end of the third tee pipe 53. The other two ends of the third tee pipe 53 are connected to the end of the bottom pipe and the main filling pipe 6 in the tunnel, respectively.

[0053] In the above steps, the first tee pipe 51 and the second tee pipe 52 are not only used to transport the filling material to the goaf, but also ensure the stability of the pipes. The check valve installed in the second tee pipe 52 can also effectively prevent the filling material from flowing back. In some embodiments of the present invention, the first tee pipe 51 is embedded in the artificial false bottom 12, with its end tightly attached to the bottom plate of the goaf and connected to the goaf of the second layer 2 to provide uniform filling. The bottom end of the pipe support 8 is embedded in the artificial false bottom 12 by direct welding or fixing it into the concrete.

[0054] In some embodiments of the present invention, the number of first tee pipes 51 used in step S3 is not less than 3, the number of second tee pipes 52 is not less than 3, and the number of pipe supports 8 is not less than 3.

[0055] Each pipe support 8 is provided with a fixing hole 81, which is located close to the top plate of the first layer 1, allowing the straight pipe 4 in the top pipe to pass through the fixing hole 81. This arrangement provides sufficient pipe branches and support points, ensuring the stability and reliability of the filling system. The position of the fixing hole 81 close to the top plate helps to maximize space utilization, reduce material waste, and improve construction efficiency. The number of fixing holes 81 can be one, two, or more, preferably two, but the straight pipe 4 only passes through one of the fixing holes 81, which provides support for the straight pipe 4. The other holes are for backup and facilitate height adjustment.

[0056] In step S4, the assembly method of the filling pipe component of the second layer 2 includes:

[0057] A second bottom pipe is installed at the bottom of the second layer 2. This second bottom pipe includes alternating straight pipes 4 and first tee pipes 51, one end of which connects to the third layer 3. Both ends of the second bottom pipe connect to the main filling pipe 6 within the tunnel. A third gate valve 11 is installed between the two ends of the second bottom pipe and the main filling pipe 6. In step S4, the first gate valve 9 is opened when filling the first layer 1, the second gate valve 10 is opened when filling the second layer 2, and the third gate valve 11 is opened when filling the third layer 3. Both ends of the second bottom pipe and the main filling pipe 6 are located within the main transport tunnel 13. This arrangement allows for independent filling control of each layer, improving operational flexibility and safety. This design also facilitates maintenance and repair work while ensuring the smooth progress of the entire filling process.

[0058] The working principle of the present invention will be further explained below with reference to specific embodiments:

[0059] (1) Machining components

[0060] The required components are processed in the workshop, including straight pipes 4, elbows 7, tees 5, gate valves, and pipe supports 8.

[0061] (2) Ore body layer

[0062] The ore body is divided into several layers from top to bottom, and each layer is further divided into several access routes for mining. The mining sequence is from top to bottom, and each access route is divided into layer 1, layer 2, and layer 3 from top to bottom.

[0063] (3) Mining and assembly

[0064] The following explanation uses only one mining method from a single route as an example:

[0065] First, the access road to the uppermost layer 1 is excavated to form the first goaf, and an artificial false floor 12 is laid in this goaf. Then, the processed components are assembled into a filling pipeline system. The assembly method is as follows:

[0066] Three pipe supports are installed along the access direction of the first layer 1. The bottom end of the pipe support 8 is embedded into the artificial false bottom 12 and fixed by pouring concrete. The third tee pipe 53 is connected to the main filling pipe 6 in the tunnel, and a first gate valve 9 and a second gate valve 10 are installed at both ends. The end with the first gate valve 9 is connected to one end of the elbow pipe 7, and the other end of the elbow pipe 7 is connected to the second tee pipe 52. The second tee pipe 52 is connected to the other second tee pipes 52 through the straight pipe 4. The second tee pipes 52 are installed at intervals. The straight pipe 4 passes through the fixing hole of the pipe support 8 and is thus fixed to the top of the first layer 1.

[0067] (4) Filling layer

[0068] After assembly, the first gate valve 9 is opened, and the filling material flows sequentially through the main filling pipe 6 and the second tee pipe 52 to fill the first layer 1. After the first layer 1 is filled and connected to the roof, the second layer 2 is excavated. After the excavation of the second layer 2 is completed, an artificial false bottom 12 and an assembly filling pipe are installed. The assembly method is as follows:

[0069] Pipes are laid at the bottom of the second layer 22, and the filling pipes are connected to both ends of the pipes at the bottom of the second layer 2. A third gate valve 11 is installed at the connection point. The first tee pipe 51 at the bottom of the second layer 2 is connected to several first tee pipes 51 through straight pipes 4 to form a pipe network.

[0070] One end of the first three-way pipe 51 is connected to the third layer 3; both ends of the bottom pipe of the second layer 2 are connected to the main filling pipe 6 in the tunnel, and a third gate valve 11 is installed between the two ends of the bottom pipe of the second layer 2 and the main filling pipe 6. When the second gate valve 10 is opened, the filling material flows sequentially through the main filling pipe 6 and the first three-way pipe 51 to fill the second layer 2 until the second layer 2 is filled. Then the third layer 3 is excavated. After the excavation is completed, the third gate valve 11 located in the second layer 2 is opened to fill the third layer 3 until it is filled.

[0071] In summary, this invention provides a rapid prefabricated downward-entry filling method. This method, through the processing and rapid on-site assembly of prefabricated components, and the layered mining and filling approach, improves construction efficiency, avoids the complexity and time consumption of traditional on-site construction, and ensures the safety of mining operations. This invention employs a top-down filling scheme, effectively filling the goaf in the lower layers by pre-embedding assembled pipes in the upper layers, significantly improving the filling roof connection rate. By setting multiple filling pipes and gate valves, precise control of the filling process is achieved.

[0072] The above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention.

Claims

1. A rapid assembly-type downward-approach filling method, characterized in that, Includes the following steps: S1. The required components are processed in the workshop; S2. The ore body is divided into several layers from top to bottom. Each layer is further divided into several access routes for mining. The mining sequence is from top to bottom, and each access route is divided into the first layer, the second layer, and the third layer from top to bottom. S3. After the first layer of the access road is mined out to form the first goaf, an artificial false bottom is laid in the first goaf, and then the required components are assembled. S4. After assembly, the first layer is filled. After the first layer is filled and connected to the top, the second layer is excavated. After the second layer is excavated, an artificial false bottom is set up. At the same time, the filling pipe is assembled and the second layer is filled. After the filling is connected to the top, the third layer is excavated. After the third layer is excavated, the third layer is filled. S5. And so on, mining the ore body from top to bottom and filling the empty areas of each layer until the ore body is mined and filled. The components mentioned in step S1 include several straight pipes, elbow pipes, tee pipes, gate valves, and pipe supports; the gate valves include a first gate valve and a second gate valve located on the first layer, and a third gate valve located on the second layer. The assembly method of the components in step S3 includes the following steps: Several pipe supports are laid along the access direction of the first layer, and the two ends of the pipe supports are respectively connected to the top plate and the artificial false bottom of the first layer; Bottom pipes and top pipes are respectively laid at the bottom and top of the first layer; the bottom pipes include alternating straight pipes and first tee pipes, one end of the first tee pipes being connected to the second layer; The top pipeline includes alternating straight pipes and second tee pipes, with one end of the second tee pipe equipped with a check valve connected to the first goaf. The top pipe is connected to the pipe support; both ends of the top pipe are connected to one end of the elbow pipe, the other end of the elbow pipe is connected to one end of the third tee pipe, and the other two ends of the third tee pipe are connected to the end of the bottom pipe and the main filling pipe in the tunnel. In step S4, the assembly method of the filling pipe component of the second layer includes: A second bottom pipe is laid at the bottom of the second layer. The second bottom pipe includes alternating straight pipes and first tee pipes. One end of the first tee pipe is connected to the third layer. The two ends of the second bottom pipe are respectively connected to the main filling pipe in the roadway, and a third gate valve is provided between the two ends of the second bottom pipe and the main filling pipe. In step S4, the first gate valve is opened when filling the first layer, the second gate valve is opened when filling the second layer, and the third gate valve is opened when filling the third layer.

2. The rapid assembly downward-entry filling method according to claim 1, characterized in that: The straight pipe, the elbow pipe, and the tee pipe are all equipped with threaded flanges. The tee pipe includes a first tee pipe, a second tee pipe, and a third tee pipe. The second tee pipe is equipped with a check valve.

3. The rapid assembly downward-entry filling method according to claim 1, characterized in that: A first gate valve is provided at one end of the third tee pipe that connects to the bottom pipe, and a second gate valve is provided at the other end of the third tee pipe that connects to the elbow pipe.

4. The rapid assembly downward-entry filling method according to claim 1, characterized in that: In step S3, the number of the first tee pipes is not less than 3, the number of the second tee pipes is not less than 3, and the number of pipe supports is not less than 3.

5. The rapid assembly downward-entry filling method according to claim 1, characterized in that: In step S3, each pipe support is provided with a fixing hole, which is located close to the top plate of the first layer, and the straight pipe passes through the fixing hole.

Citation Information

Patent Citations

  • Access mining area backfilling and roofing device and method

    CN114046176B

  • Long-depth empty field filling roof-contacting method

    CN114909176A

  • Stope roof-contacted filling method suitable for downward high sublevel filling mining method

    CN111980704A

  • Filling mining method for improving filling roof contact rate of drift mining

    CN116498322A

  • Quick assembly type downward drift filling device

    CN222010283U