Radial panel uphole method for deep and thick ore body

By adopting a radial panel-based upward staged mining method in deep, thick ore bodies, the stope structure and mining sequence were optimized, solving the problems of large pillar requirements, poor stope stability, and insufficient blasting compensation space under high stress conditions, thus achieving safe and efficient mining.

CN120906554BActive Publication Date: 2026-11-20CHINA MINMETALS CHANGSHA MINING RES INST +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202511356857.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-09-22
Publication Date
2026-11-20
Estimated Expiration
2045-09-22

AI Technical Summary

Technical Problem

Existing deep mining methods suffer from high pillar requirements, poor stope stability, and insufficient blasting compensation space under high stress environments, resulting in high rockburst risk, high operating costs, and low mining efficiency.

Method used

The method of ascending stage mining with radial panels in deep, thick ore bodies is adopted. The ore body is divided into equal-angled fan-shaped panels along the strike and numbered sequentially. A diagonal skip mining mode is adopted, combined with a pre-buried filling pipeline system and a ring cutting roadway to form a reasonable stope structure and blasting free face, thereby optimizing stress distribution and mining sequence.

Benefits of technology

It significantly reduces the amount of pillars required, improves stope stability and blasting efficiency, reduces rockburst risk, lowers operating costs, and enhances mine productivity and economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120906554B_ABST
    Figure CN120906554B_ABST
Patent Text Reader

Abstract

The application provides an uplink type stage mining method for a radial panel of a deep thick ore body, and belongs to the field of mine exploitation. The ore body is divided into panels along the strike, a central raise is arranged at the center of the upper panel, the ore body is divided into a plurality of fan-shaped panels with equal angles with the central raise as the center, the fan-shaped panels are divided into inner ring stope and outer ring stope and numbered in sequence, the diagonal skip mining mode is adopted to sequentially extract the inner ring odd stope, the outer ring even stope, the inner ring even stope and the outer ring odd stope, and after each step of extraction, the filling is performed through the pre-embedded filling pipe system, the next step of extraction is performed after the filling body reaches the predetermined strength, and the whole stage of ore body extraction is completed. Through the arrangement of the radial panel, the annular uplink type mining and the pre-embedded setting of the filling pipe, the demand of the mine production capacity can be met, the directional regulation of the stress field can be realized, the rock burst risk can be reduced, and the economic benefit of the mine can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of deep mining technology in metal mines, specifically to a method for upward-moving stage mining of radial panels in deep, thick ore bodies. Background Technology

[0002] As metal and non-metal mining progresses to deeper levels, problems such as rockburst risks, large deformations of surrounding rock, and thermal disasters caused by high ground stress environments are becoming increasingly prominent, posing a key bottleneck to safe and efficient mining. Actual measurement data shows that in a copper mine at a depth of 1050m, the peak vertical stress reached 35MPa, 1.8 times its own weight stress, directly causing the stress concentration factor of the pillars in traditional mining methods to exceed 2.5. Statistics indicate that 78% of rockburst events in deep mines occur in the disturbance zone during mining operations, reflecting the insufficient adaptability of existing stope structures to high-stress environments.

[0003] In current mining methods, rectangular pillar layouts require a width-to-height ratio of ≥0.6 to maintain stability, but this results in a permanent ore loss rate as high as 25%-40%. While rhomboid pillar schemes improve stress distribution, the complexity of the stope structure leads to a significant increase in construction precision requirements. Layered backfilling methods, with a layer height of only 3-4 meters, result in a long mining-backfilling cycle. Downward-entry methods, while using cemented backfill as the roof to improve safety, have lower mining intensity and higher costs. Subgrade stope backfilling methods can improve mining intensity, but when the stage height exceeds 50 meters, the roof displacement is large in environments with a burial depth of over 800 meters, and the risk of collapse is uncontrollable. While mechanized backfilling methods in the panel improve operational efficiency, the rectangular panel layout still increases the number of pillars required, and rockbursts frequently occur in right-angle stress concentration areas.

[0004] In summary, existing deep mining methods generally suffer from the following three common structural defects: first, continuous mining disturbances lead to significant stress superposition effects; second, the blasting free face system is systematically lacking; and third, the filling system is fragmented, resulting in high operating costs.

[0005] In view of this, it is necessary to design an upward-moving stage mining method for radial panels of deep, thick ore bodies to solve the above problems. Summary of the Invention

[0006] In view of the technical problems existing in the background art, this application provides an upward stage mining method for radial panels of deep and thick ore bodies, which aims to solve the technical problems of large pillar retention, poor stope stability and insufficient blasting compensation space under high stress environment.

[0007] This application provides a method for upward-moving staged mining of radial panels in deep, thick ore bodies, including the following steps: S1. Divide the ore body into panels along the strike, set a central ceiling in the center of the upper panel of the panel, and divide the ore body into several fan-shaped panels with equal angles, with the central ceiling as the center. S2. Divide the sector-shaped area into an inner ring stope and an outer ring stope, and number them sequentially; S3. The diagonal skip mining mode is adopted, and the inner ring odd-numbered stopes, outer ring even-numbered stopes, inner ring even-numbered stopes, and outer ring odd-numbered stopes are mined in sequence. After each step of mining, the stopes are filled through the pre-embedded filling pipeline system. The next step of mining is carried out after the filling body reaches the predetermined strength, until the mining of the entire ore body is completed.

[0008] As a further improvement to this application, wedge-shaped pillars are left between the fan-shaped disk areas.

[0009] As a further improvement of this application, the wedge-shaped pillar is an isosceles trapezoid in the horizontal plane, with a top width W1 = 0.15H and a bottom width W2 = W1 × tan(90° - α), where H is the height of the middle section and α is the angle of the sector.

[0010] As a further improvement of this application, an annular cutting roadway and isolation retaining wall are provided between the inner ring mining area and the outer ring mining area.

[0011] As a further improvement of this application, radial cutting wells are provided upwards in the annular cutting roadway, and the outer ring mining area forms a blasting free face through the annular cutting roadway and the radial cutting wells.

[0012] As a further improvement of this application, the inner ring even-numbered mining area adopts a pre-splitting blasting method at the filling body interface to form a blasting free surface.

[0013] As a further improvement to this application, the filling pipeline system includes a surface filling station, a vertical borehole, a mid-section annular main pipe, a pre-embedded pillar casing, and a stope hose.

[0014] As a further improvement of this application, the 28-day strength of the filling body is ≥2MPa.

[0015] As a further improvement to this application, after blasting, ore is extracted using a retreating ore extraction method from the outside of the panel towards the central well.

[0016] As a further improvement to this application, the ore body has a burial depth of >800m and a thickness of >50m.

[0017] The beneficial effects of this application are as follows: This application provides a method for upward-moving stage mining of deep, thick ore bodies in radial panels. The method involves dividing the ore body into panels along its strike, setting a central raise in the center of the hanging wall of each panel, and using the central raise as the center to divide the ore body into several equiangular sector panels. Each sector panel is further divided into inner and outer ring stopes, which are numbered sequentially. A diagonal skip-mining pattern is adopted, sequentially mining the inner ring odd-numbered stopes, the outer ring even-numbered stopes, the inner ring even-numbered stopes, and the outer ring odd-numbered stopes. After each mining step, backfilling is performed using a pre-embedded backfilling pipeline system. The next mining step is carried out only after the backfill reaches a predetermined strength, until the entire ore body is mined. This application utilizes methods such as radial panel layout, annular upward mining, segmented drilling-stage micro-differential caving, pre-excavated annular cutting roadways, radial cutting risers, pre-splitting blasting of filling body interfaces, and pre-embedded filling pipelines. These methods not only meet the mine's production capacity requirements but also enable directional control of the stress field, reduce the risk of rockbursts, and improve the mine's economic benefits.

[0018] The above description is only an overview of the technical solution of this application. In order to better understand the technical means of this application and to implement it in accordance with the contents of the specification, and to make the above and other objects, features and advantages of this application more obvious and understandable, the following are specific embodiments of this application. Attached Figure Description

[0019] To more clearly illustrate the technical solution of this application, the accompanying drawings used in this application will be briefly described below. Obviously, the drawings described below are merely some embodiments of this application. For those skilled in the art, other drawings can be obtained from these drawings without any creative effort.

[0020] Figure 1 This is a layout diagram of the preparatory engineering for the radial panel of a deep, thick ore body in the embodiments of this application; Figure 2 This is a schematic diagram of the mining area division in an embodiment of this application; Figure 3 This is a schematic diagram of the mining sequence in the embodiments of this application; Explanation of reference numerals in the attached diagram: 1. Central riser; 2. External vein roadway; 3. External vein connecting roadway; 4. Drilling roadway; 5. Wedge-shaped pillar; 6. Circular cutting roadway; 7. Isolation wall; 801. First inner ring stope; 802. Second inner ring stope; 803. Third inner ring stope; 804. Fourth inner ring stope; 805. Fifth inner ring stope; 806. Sixth inner ring stope; 901. First outer ring stope; 902. Second outer ring stope; 903. Third outer ring stope; 904. Fourth outer ring stope; 905. Fifth outer ring stope; 906. Sixth outer ring stope. Detailed Implementation

[0021] The embodiments of the technical solution of this application will now be described in detail with reference to the accompanying drawings. These embodiments are only used to more clearly illustrate the technical solution of this application and are therefore merely examples, and should not be used to limit the scope of protection of this application.

[0022] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application pertains; the terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the application; the terms “comprising” and “having”, and any variations thereof, in the specification, claims, and foregoing description of the drawings are intended to cover non-exclusive inclusion.

[0023] In this document, the term "embodiment" means that a particular feature, structure, or characteristic described in connection with an embodiment may be included in at least one embodiment of this application. The appearance of this phrase in various places throughout the specification does not necessarily refer to the same embodiment, nor is it a separate or alternative embodiment mutually exclusive with other embodiments. It will be explicitly and implicitly understood by those skilled in the art that the embodiments described herein can be combined with other embodiments.

[0024] In the description of the embodiments of this application, the term "multiple" refers to two or more (including two), similarly, "multiple sets" refers to two or more (including two sets), and "multiple pieces" refers to two or more (including two pieces).

[0025] In the description of the embodiments of this application, the technical terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," and "circumferential" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing the embodiments of this application and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the embodiments of this application.

[0026] Current mining technology faces the following core contradictions: the geometric contradiction between excessive pillar length and the difficulty in optimizing stress distribution; the temporal contradiction between the accumulation of disturbances induced by continuous mining and the reduced efficiency of interval mining; and the systemic contradiction of blocking pipelines and blasting channels after the filling body closes the mining area. These bottlenecks severely restrict the economic exploitability of deep resources, and there is an urgent need to achieve the goal of safe, efficient, and low-loss mining through innovative mining methods.

[0027] To address the technical challenges of large pillar requirements, poor stope stability, and insufficient blasting compensation space under high-stress environments, this application provides an upward-moving stage mining method for radial panels in deep, thick ore bodies. By collaboratively optimizing the stope geometry and mining sequence, this method can significantly reduce pillar requirements, improve overall stope stability, optimize the blasting compensation space layout, and achieve efficient and safe mining.

[0028] Please refer to Figure 1 This application provides a method for upward-moving staged mining of radial panels in deep, thick ore bodies, comprising the following steps: S1. Divide the ore body into panels along the strike, set a central well 1 in the center of the hanging wall of the panel, and divide the ore body into several fan-shaped panels with equal angles with the central well 1 as the center. S2. Divide the sector into inner and outer ring mining areas and number them sequentially; S3. The diagonal skip mining mode is adopted, and the inner ring odd-numbered stopes, outer ring even-numbered stopes, inner ring even-numbered stopes, and outer ring odd-numbered stopes are mined in sequence. After each step of mining, the stopes are filled through the pre-embedded filling pipeline system. The next step of mining is carried out after the filling body reaches the predetermined strength, until the mining of the entire ore body is completed.

[0029] In the technical solution of this application embodiment, a ring-shaped panel layout is adopted to reduce the stress concentration phenomenon formed by rectangular layout stopes. The ring layout can effectively control the stress distribution during the mining process, which plays an important role in deep, high-stress stopes. Through the synergistic optimization of geometric structure and mining sequence, the technical problems such as large pillar retention, poor stope stability, and insufficient blasting compensation space under high-stress environments are effectively alleviated. This method divides the ore body into several equiangular sector panels along the strike and implements diagonal skip mining using an inner and outer ring stope combination. Combined with timely support from the backfill body, it forms an orderly and stable mining system. By dividing the panels radially with the central riser 1 as the center, the stope layout becomes more rational, the stress distribution is more uniform, the amount of pillars left is significantly reduced, and the ore body recovery rate is improved. The diagonal skip mining mode, through alternating mining in the order of odd inner ring, even outer ring, even inner ring, and odd outer ring, effectively avoids stress concentration and disturbance accumulation caused by continuous mining, and improves the overall stability of the stope. After each mining step, backfilling is immediately carried out through a pre-embedded backfilling pipeline system. The next operation is carried out only after the backfill body reaches the predetermined strength. This not only ensures the stability of the surrounding rock of the stope, but also provides reasonable compensation space for subsequent blasting, solving the problem of pipeline and blasting channel blockage after the backfill body closes the stope. Specifically, the external works of this application include inclined ramps, main transport roadways, segmented transport roadways, main ore passes, etc. The layout of these works is similar to the conventional segmented filling method or segmented open space subsequent filling method. Compared with the traditional mining preparation works layout, the difference of this application is that the external connecting roadway 3, which is connected to the external roadway 2, is arranged in a ring around the ore body, and the drilling roadway 4 is excavated from the opening of the external connecting roadway 3 to the central riser 1.

[0030] Furthermore, in some embodiments, wedge-shaped pillars 5 are provided between the fan-shaped disk areas. The wedge-shaped pillars 5 are isosceles trapezoids on the horizontal plane, with a top width W1 = 0.15H and a bottom width W2 = W1 × tan(90°-α), where H is the height of the middle section and α is the angle of the fan-shaped disk area.

[0031] In the technical solution of this application embodiment, the wedge-shaped pillar 5 forms a supporting structure between stopes, which can effectively disperse and transfer high stress, avoiding stress concentration that could lead to pillar instability or roof collapse. The top width is proportional to the middle section height, and the bottom width is adjusted according to the fan-shaped angle, so that the pillar forms a reasonable support gradient in the horizontal direction, adapting to the stress field changes in the radial panel structure. Compared with traditional rectangular pillars, the wedge-shaped pillar 5 reduces unnecessary pillar volume while ensuring support strength, thereby improving resource recovery rate.

[0032] Furthermore, in some embodiments, an annular cutting roadway 6 and an isolation retaining wall 7 are provided between the inner and outer annular mining areas.

[0033] In the technical solution of this application embodiment, the ore body is divided into inner and outer ring stopes by an annular cutting roadway 6, which facilitates phased and regional mining and improves mining efficiency. Simultaneously, the annular cutting roadway 6 effectively releases stress around the stope, reducing the risk of rock mass damage or collapse caused by stress concentration. The isolation wall 7, constructed of high-strength materials, forms a physical barrier to support the surrounding rock of the stope, prevent rock mass instability, effectively isolate the inner and outer ring stopes, reduce disturbance of the goaf to unmined areas, and ensure the safety of subsequent mining operations. The combined use of the annular cutting roadway 6 and the isolation wall 7 not only optimizes the structural layout of the stope but also significantly improves the safety and economy of ore body mining.

[0034] Furthermore, in some embodiments, radial cutting wells are provided upward in the annular cutting roadway 6, and the outer ring mining area forms a blasting free face through the annular cutting roadway 6 and the radial cutting wells.

[0035] In the technical solution of this application embodiment, the radial cutting well provides the necessary compensation space for subsequent large-scale blasting, reduces blasting resistance, and improves the utilization rate of explosive energy; the combination of the annular cutting tunnel 6 and the radial cutting well forms a three-dimensional intersecting free surface network, which allows the rock mass to expand in multiple directions during blasting, significantly improving blasting efficiency.

[0036] Furthermore, in some embodiments, the inner even-numbered mining area adopts a pre-splitting blasting method at the filling body interface to form a blasting free surface.

[0037] In the technical solution of this application embodiment, pre-splitting blasting can effectively avoid the dissipation of blasting energy, provide good compensation space for subsequent main blasting, ensure blasting effect, and reduce the disturbance of the main blasting to the filling body and surrounding rock by pre-forming cracks, which is conducive to maintaining the stability of the mining structure and optimizing blasting efficiency.

[0038] Furthermore, in some embodiments, the filling pipeline system includes a surface filling station, a vertical borehole, a mid-level annular main pipe, a pre-embedded pillar casing, and a stope hose.

[0039] In the technical solution of this application embodiment, the filling pipeline system achieves efficient transportation and precise distribution of filling materials through the synergistic effect of surface filling station, vertical borehole, intermediate ring main pipe, pre-embedded sleeve of mine pillar and stope hose, providing an important guarantee for safe and efficient mining.

[0040] Furthermore, in some embodiments, the 28-day strength of the filling material is ≥2 MPa.

[0041] In the technical solution of this application embodiment, the 28-day strength of the backfill is a key parameter for measuring its mechanical properties, ensuring that the backfill has sufficient bearing capacity and stability in the goaf, and providing a safety guarantee for subsequent mining.

[0042] Furthermore, in some embodiments, after blasting, ore is extracted using a retreating ore extraction method from the outside of the panel towards the central well 1.

[0043] In the technical solution of this application embodiment, the use of retreating ore extraction can effectively reduce the impact of ground pressure during the mining process and reduce disturbance to the surrounding rock, thereby improving the overall efficiency and safety of mining.

[0044] Furthermore, in some embodiments, the ore body has a burial depth of >800m and a thickness of >50m.

[0045] In the technical solution of this application embodiment, for ore bodies with a burial depth greater than 800 meters and a thickness greater than 50 meters, the stress field is controlled by optimizing the mining structure, mining sequence and backfilling process, so as to achieve the purpose of controlling ground pressure and realizing safe and efficient mining.

[0046] The following are some specific embodiments. It should be noted that the embodiments described below are exemplary and are only used to explain this application, and should not be construed as limiting this application. Where specific technologies or conditions are not specified in the embodiments, they shall be performed in accordance with the technologies or conditions described in the literature in this field or in accordance with the product manual.

[0047] Example This embodiment provides a method for upward-moving staged mining of radial panels in deep, thick ore bodies, including the following steps: S1. As Figure 1 As shown, a ring-shaped panel layout is adopted, with a ore body thickness of 60m. The ore body is divided into a large panel with a strike length of 120m. A central well 1 is set in the center of the upper panel. With the central well 1 as the center, the horizontal projection of the ore body is divided into six equal-angled sector panels. The central angle of each sector panel is 30°. Wedge-shaped pillars 5 are left between the sector panels. The wedge-shaped pillars 5 are isosceles trapezoids in the horizontal plane. In the section perpendicular to the dip of the ore body, the two sides of the wedge-shaped pillars 5 are parallel to the ore layer to form a parallelogram. The construction positioning roadway is radiated from the center to the boundary of the ore body through precise layout using a total station to form the panel division baseline. S2. For example Figure 2 As shown, the sector-shaped panel is divided into an inner ring stope and an outer ring stope. A ring-shaped cutting roadway 6 and an isolation wall 7 are set between the inner ring stope and the outer ring stope. Radial cutting wells are set upwards from the ring-shaped cutting roadway 6, with a spacing of 20m. The inner ring stopes are numbered sequentially as the first inner ring stope 801, the second inner ring stope 802, the third inner ring stope 803, the fourth inner ring stope 804, the fifth inner ring stope 805, and the sixth inner ring stope 806. The outer ring stopes are numbered as the first outer ring stope 901, the second outer ring stope 902, the third outer ring stope 903, the fourth outer ring stope 904, the fifth outer ring stope 905, and the sixth outer ring stope 906. S3. The external connecting tunnel 3 is arranged in a ring around the ore body. A drilling tunnel 4 is excavated from the opening of the external connecting tunnel 3 towards the central riser 1. During mining, a diagonal skip-mining mode is adopted to provide stress isolation in time and space, such as... Figure 3 As shown, the specific mining sequence is as follows: S31. First, mine the odd-numbered inner ring mining areas (first inner ring mining area 801, third inner ring mining area 803, and fifth inner ring mining area 805). After the mining is completed, use pre-embedded filling pipelines to fill in the filling in a timely manner. When the filling body has a strength of ≥2MPa after 28 days, proceed to the next mining step. S32. The even-numbered outer ring mining areas (second outer ring mining area 902, fourth outer ring mining area 904, and sixth outer ring mining area 906) are spatially offset from step S31. After mining is completed, the pre-embedded filling pipeline is used for timely filling. When the filling body has a strength of ≥2MPa after 28 days, the next mining step is carried out. S33. The even-numbered inner ring stopes (second inner ring stope 802, fourth inner ring stope 804, and sixth inner ring stope 806) are protected by backfill barriers on both sides to ensure safe mining. At the same time, the inner ring wedge pillar 5 can be partially recovered. After mining is completed, backfilling is carried out in a timely manner using pre-buried backfilling pipelines. The next mining step will be carried out when the backfill strength is ≥2MPa after 28 days. S34. The odd-numbered outer ring stopes (first outer ring stope 901, third outer ring stope 903, fifth outer ring stope 905) are mined, and the 7 sections of the isolation wall are recovered. At this point, the mining of the entire section is completed, and the mining of the entire ore body in all stages begins. After blasting, a loader is used to extract ore from the outside of the panel to the central well 1 in a backward manner.

[0048] Compared with the traditional rectangular pillar layout, this application has the following significant advantages: 1. Reduction of stress concentration factor: The stress concentration factor of the pillar is ≥2.5 by traditional methods. This application can reduce the stress concentration factor to ≤1.6 by radial layout and control of the timing of skip mining. 2. Reduced rockburst occurrence rate: The disturbance during mining is dispersed by spatial misalignment and the "pressure relief" of the free face of the ring cutting, reducing the rockburst occurrence rate from a high-risk condition commonly seen in deep mining to <8%, and the overall rockburst energy level decreases by 1-2 levels; 3. Roof displacement control: Under the condition of stage height > 50m, the roof displacement is reduced from ≥200mm in traditional construction methods to ≤60mm; the peak displacement of adjacent mining areas is significantly staggered. 4. Reduced ore loss rate: By setting up wedge-shaped pillars and implementing "backfilling-secondary recovery", the ore loss rate is ≤12% and the dilution rate is ≤10%, which is significantly lower than the ore loss rate of 25-40% commonly seen in traditional layouts. 5. Reduced pillar length: Compared with the traditional isosceles trapezoidal (parallelogram) pillar length, radial / ring segmentation reduces the proportion of pillars in the panel from 30-40% to 12-18%, increasing the recovery rate by 8-15 percentage points; 6. Sufficient free face and significantly reduced cutting workload: Pre-excavated annular cutting roadways + radial cutting risers (approximately 20m spacing) create a continuous free face, reducing the cutting ratio per unit ore volume from approximately 35m. 3 / kt dropped to 22-25m 3 / kt; 7. Shorter mining-filling cycle: The diagonal skip mining and pre-splitting-filling-recovery method shortens the mining-filling cycle by 20-30%, and the construction period of a single stope can be shortened by 10-15 days; 8. Reduced operating costs: The three-dimensional pipeline network of "surface station - vertical shaft - intermediate ring pipe - mine pillar casing - stope hose" is pre-set at one time, and the outer ring / subsequent stopes do not need to rebuild the transportation system, saving about RMB 600,000 to RMB 1.2 million in system modification / expansion construction and production stoppage losses per mining area; 9. Smooth ore extraction and ventilation: The loader extracts ore from the outside to the inside in a backward manner, and the central shaft reduces the need for reloading and cross-operations, reducing direct mining and transportation costs by 3-6% and reducing personnel exposure time; 10. Significant overall benefits: With the combined effect of increased recovery rate and shortened cycle, the annual production capacity of the panel increases by about 10-20%; considering cutting, ventilation / pipeline and maintenance expenses, the overall cost per unit of ore is reduced by about 8-15%.

[0049] It should be noted that this application is not limited to the above-described embodiments. The above embodiments are merely examples, and any embodiments with the same structure and effect as the technical concept within the scope of this application are included in the technical scope of this application. Furthermore, various modifications that can be conceived by those skilled in the art to the embodiments, and other ways of constructing by combining some of the constituent elements of the embodiments, without departing from the spirit of this application, are also included in the scope of this application.

Claims

1. A method for ascending stage mining of radial panels in deep, thick ore bodies, characterized in that, Includes the following steps: S1. Divide the ore body into panels along the strike, set a central ceiling in the center of the hanging wall of each panel, and divide the ore body into several equidistant sector panels with the central ceiling as the center; leave wedge-shaped pillars between the sector panels; S2. The sector-shaped area is divided into an inner ring stope and an outer ring stope, and numbered sequentially; a ring-shaped cutting roadway and isolation retaining wall are provided between the inner ring stope and the outer ring stope; Radial cutting wells are set upwards in the annular cutting roadway, and the outer ring mining area forms a blasting free face through the annular cutting roadway and the radial cutting wells; S3. A diagonal skip mining pattern is adopted, and the inner ring odd-numbered stopes, outer ring even-numbered stopes, inner ring even-numbered stopes, and outer ring odd-numbered stopes are mined sequentially. After each step of mining, backfilling is carried out through a pre-embedded backfilling pipeline system, which includes a surface backfilling station, vertical boreholes, a central ring main pipe, a pre-embedded pillar casing, and a stope hose. The next step of mining is carried out after the backfill body reaches the predetermined strength, until the mining of the entire ore body is completed.

2. The method for upward-moving stage mining of deep, thick ore bodies in radial panels according to claim 1, characterized in that, The wedge-shaped pillar is an isosceles trapezoid in the horizontal plane, with a top width W1 = 0.15H and a bottom width W2 = W1 × tan(90°-α), where H is the height of the middle section and α is the angle of the sector.

3. The method for upward-moving stage mining of deep, thick ore bodies in radial panels according to claim 1, characterized in that, The inner ring even-numbered mining area adopts the pre-splitting blasting method at the interface of the filling body to form the blasting free surface.

4. The method for upward-moving stage mining of deep, thick ore bodies in radial panels according to claim 1, characterized in that, The 28-day strength of the filling material is ≥2 MPa.

5. The method for upward-moving stage mining of deep, thick ore bodies in radial panels according to claim 1, characterized in that, After blasting, ore is extracted using a retreating ore extraction method from the outside of the panel towards the central well.

6. The method for upward-moving stage mining of deep, thick ore bodies in radial panels according to claim 1, characterized in that, The ore body has a burial depth of >800m and a thickness of >50m.

Citation Information

Patent Citations

  • Phosphorite mining method

    CN120667117A