A geographic information survey data management system and method using GIS technology
By preprocessing geographic information survey data and adjusting elevation data differences, combined with gradient fusion and physical constraint smoothing algorithms, the problem of terrain structure deviation in the splicing of time-series geographic survey information data was solved, and high-precision and efficient digital terrain 3D model construction was achieved.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- HUAIYIN TEACHERS COLLEGE
- Filing Date
- 2025-07-08
- Publication Date
- 2026-07-21
AI Technical Summary
In existing technologies for stitching together time-series geographic survey information, there are discrepancies between the terrain structure at the stitching point and the actual terrain structure, which affects the accuracy of the digital terrain 3D model.
By preprocessing multi-source information data collected by geographic information surveying equipment, a splicable time-series data structure and a transitional data structure are constructed. The elevation data difference is calculated, the relative positional relationship between the target time-series data structure and adjacent time-series data structures is adjusted, and smoothing is performed through a splicing transition model. The transition region is smoothed by combining gradient fusion and physical constraints.
It improves the global consistency and geometric accuracy of digital terrain 3D models, reduces the amount of computation, ensures smooth and natural elevation transitions at the stitching points, preserves the true structure and detailed features of the terrain to the greatest extent, and avoids excessive smoothing distortion.
Smart Images

Figure CN120929548B_ABST