Multi-technology combined measurement method for ultra-long seabed double-hole railway tunnel and service tunnel
CN120947594AActive Publication Date: 2025-11-14CHINA RAILWAY DESIGN GRP CO LTD
Patent Information
- Application Number
- CN202511476605.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-16
- Publication Date
- 2025-11-14
- Estimated Expiration
- 2045-10-16
Smart Images

Figure CN120947594A_ABST
Abstract
The invention discloses a multi-technology combined measurement method for a super-long seabed double-hole railway tunnel and a service tunnel. The multi-technology combined measurement method comprises the steps of GNSS measurement outside holes, traverse measurement considering vertical line deviation correction, deep shaft free observation station coordinate transmission measurement, free observation station in the holes, crossed double traverse and gyro orientation combined measurement. The distance of the subsea tunnel at the connection position of the transverse tunnel is short, and direction and distance transmission is conducted through an encryption station setting method. A combined lead is adopted in the hole to increase gyro orientation measurement, and azimuth angle precision is improved. According to the method, the measurement advantages of the GNSS and the total station are utilized, the measurement efficiency of the long and large tunnel deep shaft is improved, meanwhile, the coordinate transmission precision of the deep shaft is improved, in addition, direction and distance transmission is carried out in the transverse hole by adopting an encryption station setting method, closed networking is carried out among different transverse holes, the reliability of tunnel plane control measurement precision is improved, and the measurement precision is improved. And complete unification of coordinate systems of the left and right tunnels and the service tunnel is ensured.
Need to check novelty before this filing date? Find Prior Art
Citation Information
Patent Citations
EQUIPMENT AND METHOD FOR SURVEYING, IN PARTICULAR FOR SURVEYING TUNNEL BREAKS
AT11099U1
Testing method for laying ballastless tracks in early stage before overall completion of super long tunnel
CN102174893A
Tunnel ultra-deep vertical shaft connection survey method
CN115451924A
Tunnel control measurement method using high-precision gyro edge to participate in directional adjustment
CN116357393A
Through type service tunnel with functions of auxiliary construction, ventilation, drainage and rescue
CN222797494U