AI Technical Summary

Technical Problem

[0003]相关技术中,在载台缺料开始叫料时,通常是先锁定载台,然后控制AGV(Automated Guided Vehicle,自动导引车)小车搬送物料至目标区域开始上料,因此,大大影响了生产设备的生产效率

Benefits of technology

本发明在接收到叫料请求并控制目标AGV小车运送物料至目标上料区的过程中,控制所述上下料载台持续工作,在目标AGV小车处于目标上料区时,再控制上下料载台停止工作,从而能够确保生产设备的生产效率。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121020062B_ABST
    Figure CN121020062B_ABST
Patent Text Reader

Abstract

The application discloses a kind of mobile upper and lower material loading platform automation carrying management method and system, wherein, upper and lower material loading platform is multiple, the method includes: after receiving call material request instruction, in the first preset range of material storage rack, select target AGV trolley from multiple idle AGV trolley;Control target AGV trolley to move to material storage rack with first preset trajectory;After target AGV trolley receives target quantity of goods from material storage rack, control target AGV trolley to move to target loading area according to second preset trajectory;Wherein, in the process of target AGV trolley movement, control upper and lower material loading platform to continue to work;When target AGV trolley moves to target loading area, control upper and lower material loading platform to stop working, and control target AGV trolley to load material vacancy platform.According to the mobile upper and lower material loading platform automation carrying management method of the application, the production efficiency of production equipment can be ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of automated material handling technology, specifically to an automated conveying and management method and system for a mobile loading and unloading platform. Background Technology

[0002] During the production process, the production equipment is equipped with multiple loading and unloading platforms. The production is completed by moving the platforms left and right to the production port.

[0003] In related technologies, when the platform is short of material and starts calling for material, the platform is usually locked first, and then the AGV (Automated Guided Vehicle) is controlled to transport the material to the target area to start loading. Therefore, the production efficiency of the production equipment is greatly affected. Summary of the Invention

[0004] To solve the above-mentioned technical problems, this invention provides an automated handling management method for a mobile loading and unloading platform. During the process of receiving a material request and controlling the target AGV to transport materials to the target loading area, the loading and unloading platform is controlled to continue working. When the target AGV is in the target loading area, the loading and unloading platform is then controlled to stop working, thereby ensuring the production efficiency of the production equipment.

[0005] The technical solution adopted in this invention is as follows: An automated handling management method for mobile loading and unloading platforms, wherein there are multiple loading and unloading platforms, and the automated handling management method includes the following steps: after receiving a material request instruction, selecting a target AGV from multiple idle AGVs within a first preset range of the material shelf; controlling the target AGV to move to the material shelf along a first preset trajectory; after the target AGV receives a target quantity of materials from the material shelf, controlling the target AGV to move to a target loading area along a second preset trajectory; wherein, during the movement of the target AGV, the loading and unloading platforms continue to operate; when the target AGV moves to the target loading area, controlling the loading and unloading platforms to stop operating, and controlling the target AGV to load materials onto empty platforms.

[0006] In one embodiment of the present invention, the automated handling management method for mobile loading and unloading platforms further includes: after receiving a material request instruction, predicting the time required for the target AGV trolley to move to the target loading area according to the first preset trajectory and the second preset trajectory to obtain a first predicted time, and predicting the time required for the remaining material on the loading and unloading platforms currently in operation to be consumed to obtain a second predicted time; determining whether the first predicted time is less than the second predicted time; if the first predicted time is less than the second predicted time, then the target quantity is the number of loading and unloading platforms currently in a material shortage state; if the first predicted time is greater than or equal to the second predicted time, then the target quantity is the number of loading and unloading platforms currently in a material shortage state plus one.

[0007] In one embodiment of the present invention, selecting a target AGV from a plurality of idle AGVs within a first preset range of the material shelf includes: obtaining the sustainable travel distance of each idle AGV within the first preset range; obtaining the total trajectory length of the first preset trajectory and the second preset trajectory; extracting from the idle AGVs the idle AGVs whose sustainable travel distance is greater than or equal to the total trajectory length as candidate AGVs; and extracting from the candidate AGVs the AGV closest to the material shelf as the target AGV.

[0008] In one embodiment of the present invention, obtaining the sustainable driving distance of the idle AGV specifically includes: obtaining the current power reserve of the idle AGV; obtaining the power consumed by the idle AGV per unit distance traveled in previous transport tasks to obtain the unit power consumption; and obtaining the sustainable driving distance of the idle AGV based on the current power reserve and the unit power consumption.

[0009] An automated handling management system for mobile loading and unloading platforms, comprising multiple loading and unloading platforms, the system includes: a selection module, used to select a target AGV from multiple idle AGVs within a first preset range of a material shelf after receiving a material request instruction; a first control module, used to control the target AGV to move to the material shelf along a first preset trajectory; a second control module, used to control the target AGV to move to a target loading area along a second preset trajectory after receiving a target quantity of materials from the material shelf; wherein, during the movement of the target AGV, the loading and unloading platforms are continuously operated; and a third control module, used to control the loading and unloading platforms to stop operating after the target AGV has reached the target loading area, and to control the target AGV to load materials onto an empty platform.

[0010] A computer device includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it implements the above-described automated handling and management method for a mobile loading and unloading platform.

[0011] A non-transitory computer-readable storage medium storing a computer program that, when executed by a processor, implements the aforementioned automated handling management method for mobile loading and unloading platforms.

[0012] The beneficial effects of this invention are: In the process of receiving a material request and controlling the target AGV to transport materials to the target loading area, the present invention controls the loading and unloading platform to work continuously. When the target AGV is in the target loading area, the loading and unloading platform is controlled to stop working, thereby ensuring the production efficiency of the production equipment. Attached Figure Description

[0013] Figure 1 This is a flowchart of an automated handling and management method for a mobile loading and unloading platform according to an embodiment of the present invention. Figure 2 This is a block diagram of the automated handling management system for mobile loading and unloading platforms according to an embodiment of the present invention. Detailed Implementation

[0014] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0015] Figure 1 This is a flowchart of an automated handling and management method for a mobile loading and unloading platform according to an embodiment of the present invention.

[0016] The mobile loading and unloading platform may include K loading and unloading platforms, where K is greater than or equal to 2 and can be set according to actual conditions, for example, it can be 3.

[0017] like Figure 1 As shown, the automated handling and management method for the mobile loading and unloading platform according to an embodiment of the present invention may include the following steps: S1, after receiving the material request instruction, selects the target AGV from multiple idle AGVs within the first preset range of the material shelf.

[0018] It should be noted that when there is a shortage of material on N loading and unloading platforms, a material request command is issued, where N is greater than or equal to 1 and less than K.

[0019] In one embodiment of the present invention, selecting a target AGV from a plurality of idle AGVs within a first preset range of the material shelf specifically includes the following steps: S11, obtain the sustainable travel distance of each idle AGV within the first preset range.

[0020] In one embodiment of the present invention, obtaining the sustainable driving distance of an idle AGV vehicle specifically includes: firstly, obtaining the current power reserve of the idle AGV vehicle, and then obtaining the power consumed by the idle AGV vehicle per unit distance traveled in previous transport tasks to obtain the unit power consumption; and then obtaining the sustainable driving distance of the idle AGV vehicle based on the current power reserve and the unit power consumption.

[0021] S12, obtain the total trajectory length of the first preset trajectory and the second preset trajectory.

[0022] S13, extract from each idle AGV that has a sustainable travel distance greater than or equal to the total trajectory length as candidate AGVs.

[0023] S14: Extract the AGV closest to the material shelf from the candidate AGVs and select it as the target AGV.

[0024] Specifically, firstly, based on the sustainable travel distance and total trajectory length of each idle AGV, idle AGVs with a sustainable travel distance greater than or equal to the total trajectory length are selected from the idle AGVs within a first preset range as candidate AGVs. In other words, idle AGVs capable of traveling the total trajectory length are first selected as candidate AGVs. Then, from the candidate AGVs, the AGV closest to the material rack is selected as the target AGV. This ensures that the selected target AGV can reach the target loading area, avoiding situations where the target AGV's current power reserve is insufficient to support its journey to the target loading area, thus preventing normal loading.

[0025] S2, control the target AGV to move to the material shelf along the first preset trajectory.

[0026] S3: After the target AGV receives the target quantity of materials from the material rack, control the target AGV to move towards the target loading area along the second preset trajectory. During the movement of the target AGV, the loading and unloading platform continues to operate.

[0027] It is understood that each loading / unloading platform can hold a quantity of material of 1. Upon receiving a material request instruction, the target quantity of material required by the loading / unloading platform can be calculated in advance.

[0028] Specifically, in one embodiment of the present invention, the automated handling and management method for mobile loading and unloading platforms further includes: S31, after receiving the material request instruction, predict the time required for the target AGV to move to the target loading area according to the first preset trajectory and the second preset trajectory to obtain the first predicted time, and predict the time required for the remaining material on the loading and unloading platform currently in working state to be consumed to obtain the second predicted time.

[0029] S32, determine whether the first prediction time is less than the second prediction time.

[0030] S33, if the first prediction time is less than the second prediction time, the target quantity is the number of loading and unloading platforms that are currently in a material shortage state.

[0031] S34, if the first prediction time is greater than or equal to the second prediction time, the target quantity is the number of loading and unloading platforms currently in a material shortage state plus one.

[0032] Specifically, since the loading and unloading platforms are continuously working as the target AGV moves to the target loading area along the first and second preset trajectories, the number of loading and unloading platforms in a material shortage state when the target AGV moves to the target loading area can be determined based on the first and second prediction times. If the first prediction time is less than the second prediction time, the number of loading and unloading platforms in a material shortage state when the target AGV moves to the target loading area is the same as the number of loading and unloading platforms in a material shortage state when the target AGV starts moving, i.e., the current number of loading and unloading platforms in a material shortage state. Correspondingly, the target number is the current number of loading and unloading platforms in a material shortage state. If the first prediction time is greater than or equal to the second prediction time, the number of loading and unloading platforms in a material shortage state when the target AGV moves to the target loading area is the same as the number of loading and unloading platforms in a material shortage state when the target AGV starts moving plus one, i.e., the current number of loading and unloading platforms in a material shortage state plus one. Correspondingly, the target number is the current number of loading and unloading platforms in a material shortage state plus one.

[0033] This allows for the accurate delivery of materials to the loading and unloading platforms, thereby further ensuring the production efficiency of the equipment.

[0034] S4. When the target AGV trolley moves to the target loading area, control the loading and unloading platform to stop working, and control the target AGV trolley to load materials onto the empty platform.

[0035] Therefore, when receiving a material request and controlling the target AGV to transport materials to the target loading area, the loading and unloading platform is controlled to work continuously. When the target AGV is in the target loading area, the loading and unloading platform is controlled to stop working, thereby ensuring the production efficiency of the production equipment.

[0036] In summary, the automated handling management method for mobile loading and unloading platforms according to embodiments of the present invention, upon receiving a material request instruction, selects a target AGV from multiple idle AGVs within a first preset range of the material rack, and controls the target AGV to move to the material rack along a first preset trajectory. After the target AGV receives the target quantity of materials from the material rack, it is controlled to move towards the target loading area along a second preset trajectory. During the movement of the target AGV, the loading and unloading platform continues to operate, and after the target AGV reaches the target loading area, the platform stops operating, and the target AGV loads materials onto an empty platform. Therefore, by continuously operating the loading and unloading platform while receiving a material request and controlling the target AGV to transport materials to the target loading area, and stopping the platform only when the target AGV is in the target loading area, the production efficiency of the production equipment can be ensured.

[0037] Corresponding to the automated handling management method for mobile loading and unloading platforms in the above embodiments, the present invention also proposes an automated handling management system for mobile loading and unloading platforms.

[0038] The mobile loading and unloading platform may include K loading and unloading platforms, where K is greater than or equal to 2 and can be set according to actual conditions, for example, it can be 3.

[0039] like Figure 2 As shown, the mobile loading and unloading platform automated transport management system of this invention may include: a selection module 100, a first control module 200, a second control module 300, and a third control module 400.

[0040] The selection module 100 is used to select a target AGV from multiple idle AGVs within a first preset range of the material shelf after receiving a material request instruction; the first control module 200 is used to control the target AGV to move to the material shelf along a first preset trajectory; the second control module 300 is used to control the target AGV to move to the target loading area along a second preset trajectory after receiving the target quantity of materials from the material shelf; wherein, during the movement of the target AGV, the loading and unloading platform is controlled to continue working; the third control module 400 is used to control the loading and unloading platform to stop working after the target AGV moves to the target loading area, and to control the target AGV to load materials onto the empty loading platform.

[0041] In one embodiment of the present invention, the first control module 200 is further configured to: after receiving a material request instruction, predict the time required for the target AGV trolley to move to the target loading area according to a first preset trajectory and a second preset trajectory to obtain a first predicted time, and predict the time required for the remaining material on the loading and unloading platform currently in working state to be consumed to obtain a second predicted time; determine whether the first predicted time is less than the second predicted time; if the first predicted time is less than the second predicted time, the target quantity is the number of loading and unloading platforms currently in a material shortage state; if the first predicted time is greater than or equal to the second predicted time, the target quantity is the number of loading and unloading platforms currently in a material shortage state plus one.

[0042] In one embodiment of the present invention, the selection module 100 is specifically used to: obtain the sustainable driving distance of each idle AGV within a first preset range; obtain the total trajectory length of the first preset trajectory and the second preset trajectory; extract from each idle AGV the idle AGVs the idle AGVs whose sustainable driving distance is greater than or equal to the total trajectory length as candidate AGVs; and extract from the candidate AGVs the AGV closest to the material shelf as the target AGV.

[0043] In one embodiment of the present invention, the selection module 100 is specifically used to: obtain the current power reserve of the idle AGV; obtain the power consumed by the idle AGV for each unit distance traveled in previous handling tasks, so as to obtain the unit power consumption; and obtain the sustainable travel distance of the idle AGV based on the current power reserve and the unit power consumption.

[0044] It should be noted that for details not disclosed in the mobile loading and unloading platform automated transport management system of this invention embodiment, please refer to the details disclosed in the above-described mobile loading and unloading platform automated transport management method, which will not be elaborated here.

[0045] According to an embodiment of the present invention, the automated handling management system for mobile loading and unloading platforms, upon receiving a material request instruction, selects a target AGV from multiple idle AGVs within a first preset range on the material shelf via a selection module. A first control module controls the target AGV to move along a first preset trajectory to the material shelf. A second control module, after receiving the target quantity of materials from the material shelf, controls the target AGV to move along a second preset trajectory to the target loading area. During the movement of the target AGV, the loading and unloading platform continues to operate. A third control module, upon the target AGV reaching the target loading area, stops the loading and unloading platform and controls the target AGV to load materials onto an empty platform. Thus, by continuously operating the loading and unloading platform while receiving a material request and controlling the target AGV to transport materials to the target loading area, and stopping the platform only when the target AGV is in the target loading area, the production efficiency of the production equipment can be ensured.

[0046] Corresponding to the above embodiments, the present invention also proposes a computer device.

[0047] The computer device in this embodiment of the invention includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it implements the automated handling and management method for the mobile loading and unloading platform described in the above embodiment.

[0048] According to the computer equipment of the present invention, when receiving a material request and controlling the target AGV trolley to transport materials to the target loading area, the loading and unloading platform is controlled to work continuously. When the target AGV trolley is in the target loading area, the loading and unloading platform is controlled to stop working, thereby ensuring the production efficiency of the production equipment.

[0049] Corresponding to the above embodiments, the present invention also proposes a non-transitory computer-readable storage medium.

[0050] The non-transitory computer-readable storage medium of this invention stores a computer program that, when executed by a processor, implements the above-described automated handling and management method for mobile loading and unloading platforms.

[0051] According to the embodiments of the present invention, a non-transitory computer-readable storage medium controls the loading and unloading platform to work continuously during the process of receiving a material request and controlling the target AGV trolley to transport materials to the target loading area. When the target AGV trolley is in the target loading area, the loading and unloading platform is controlled to stop working, thereby ensuring the production efficiency of the production equipment.

[0052] In the description of this invention, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. "A plurality of" means two or more, unless otherwise explicitly specified.

[0053] In this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.

[0054] In this invention, unless otherwise explicitly specified and limited, "above" or "below" the second feature can mean that the first feature is in direct contact with the second feature, or that the first feature is in indirect contact with the second feature through an intermediate medium. Furthermore, "above," "over," and "on top" of the second feature can mean that the first feature is directly above or diagonally above the second feature, or simply that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature can mean that the first feature is directly below or diagonally below the second feature, or simply that the first feature is at a lower horizontal level than the second feature.

[0055] In the description of this specification, the references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of the present invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Furthermore, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.

[0056] Furthermore, the functional units in the various embodiments of the present invention can be integrated into a processing module, or each unit can exist physically separately, or two or more units can be integrated into a module. The integrated module can be implemented in hardware or as a software functional module. If the integrated module is implemented as a software functional module and sold or used as an independent product, it can also be stored in a computer-readable storage medium.

[0057] Although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention. Those skilled in the art can make changes, modifications, substitutions and variations to the above embodiments within the scope of the present invention.

Claims

1. A method for automated handling and management of a mobile loading and unloading platform, characterized in that, The loading and unloading platforms are multiple, and the automated conveying management method includes the following steps: Upon receiving a material request instruction, the target AGV cart is selected from multiple idle AGV carts within the first preset range of the material rack; Control the target AGV to move to the material shelf along a first preset trajectory; After the target AGV receives the target quantity of materials from the material rack, the target AGV is controlled to move towards the target loading area along a second preset trajectory; wherein, during the movement of the target AGV, the loading and unloading platform is controlled to work continuously. When the target AGV trolley moves to the target loading area, the loading / unloading platform is controlled to stop working, and the target AGV trolley is controlled to load materials onto the empty platform; wherein, the automated handling management method for the mobile loading / unloading platform also includes: After receiving the material request instruction, the system predicts the time required for the target AGV to move to the target loading area according to the first preset trajectory and the second preset trajectory to obtain the first predicted time, and predicts the time required for the remaining material on the loading and unloading platform currently in working state to be consumed to obtain the second predicted time. Determine whether the first prediction time is less than the second prediction time; If the first prediction time is less than the second prediction time, then the target quantity is the number of loading and unloading platforms that are currently in a material shortage state. If the first prediction time is greater than or equal to the second prediction time, then the target quantity is the number of loading and unloading platforms currently in a material shortage state plus one.

2. The automated conveying and management method for mobile loading and unloading platforms according to claim 1, characterized in that, The step of selecting a target AGV from multiple idle AGVs within a first preset range of the material rack includes: Obtain the sustainable travel distance of each idle AGV within the first preset range; Obtain the total trajectory length of the first preset trajectory and the second preset trajectory; From each of the idle AGVs, the idle AGVs whose sustainable travel distance is greater than or equal to the total trajectory length are extracted as candidate AGVs; The AGV closest to the material shelf is selected from the candidate AGVs and designated as the target AGV.

3. The automated conveying and management method for mobile loading and unloading platforms according to claim 2, characterized in that, Obtaining the sustainable travel distance of the idle AGV specifically includes: Obtain the current power reserve of the idle AGV; The electrical energy consumed per unit distance traveled by the idle AGV in previous transport tasks is obtained to obtain the unit electrical energy consumption. The sustainable travel distance of the idle AGV is obtained based on the current power reserve and the unit power consumption.

4. A mobile loading and unloading automated conveying management system, characterized in that, The loading and unloading platforms are multiple, and the automated conveying management system includes: The selection module is used to select a target AGV from multiple idle AGVs within a first preset range of the material shelf after receiving a material request instruction. A first control module is used to control the target AGV to move to the material shelf along a first preset trajectory. The second control module is used to control the target AGV to move towards the target loading area along a second preset trajectory after the target AGV receives the target quantity of materials from the material rack; wherein, during the movement of the target AGV, the loading and unloading platform is controlled to work continuously. The third control module is used to control the loading / unloading platform to stop working after the target AGV trolley moves to the target loading area, and to control the target AGV trolley to load materials onto the empty loading platform; wherein, the first control module is further used to: after receiving a material request instruction, predict the time required for the target AGV trolley to move to the target loading area according to the first preset trajectory and the second preset trajectory to obtain a first predicted time, and predict the time required for the remaining materials on the loading / unloading platform currently in working state to be consumed to obtain a second predicted time; determine whether the first predicted time is less than the second predicted time; if the first predicted time is less than the second predicted time, then the target quantity is the number of loading / unloading platforms currently in a material shortage state; if the first predicted time is greater than or equal to the second predicted time, then the target quantity is the number of loading / unloading platforms currently in a material shortage state plus one.

5. A computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the computer program, it implements the automated handling and management method for the mobile loading and unloading platform according to any one of claims 1-3.

6. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that, When the program is executed by the processor, it implements the automated handling management method for the mobile loading and unloading platform according to any one of claims 1-3.

Citation Information

Patent Citations

  • Production line material transfer management method and system

    CN108803507A