固井注替排量确定方法及装置

By acquiring wellbore structure and fluid information, calculating the hydrostatic column pressure and frictional pressure drop window, and using the bisection method to iteratively solve the displacement window, the problem of insufficient injection displacement design in marine pressure-controlled cementing was solved, thus improving construction safety and quality.

CN121047523BActive Publication Date: 2026-07-17CHINA OILFIELD SERVICES LTD
View PDF 2 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
CHINA OILFIELD SERVICES LTD
Filing Date
2025-10-20
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In the existing technology, there is a lack of effective cementing displacement design methods in marine pressure controlled cementing construction, which makes it difficult to guarantee construction safety and quality. Reliance on experience from nearby wells seriously restricts the refined development of marine pressure controlled cementing.

Method used

By acquiring wellbore structural dimensions, cementing fluid properties, and injection information, the positional distribution of the fluid within the wellbore is determined, the hydrostatic column pressure is calculated, and the frictional pressure drop window is obtained through bisection iterative solution. Then, the displacement window is determined, and the cementing displacement rate is determined by combining the fluid injection information.

Benefits of technology

It enables precise calculation of cementing displacement, improves the safety and quality of marine pressure-controlled cementing operations, and supports the refined development of marine pressure-controlled cementing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121047523B_ABST
    Figure CN121047523B_ABST
Patent Text Reader

Abstract

本发明公开了一种固井注替排量确定方法及装置,方法包括:获取井筒结构尺寸、固井流体性能以及固井流体注入信息;根据井筒结构尺寸、固井流体性能以及固井流体注入信息,确定各固井流体在井筒内的位置分布;根据各固井流体在井筒内的位置分布,计算得到各位置的静液柱压力,并根据各位置的静液柱压力,确定井筒各地层的摩阻压降窗口;根据井筒各地层的摩阻压降窗口,利用二分法迭代求解得到各地层的排量窗口;排量窗口包括最大排量曲线与最小排量曲线;根据排量窗口,结合固井流体注入信息,确定固井注替排量,从而解决现有技术中无法实现固井注替排量的确定问题。
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Offshore pressure-controlled well cementation injection displacement design method

    CN115952747A

  • Annular back pressure correction method and device in pressure control well cementation construction and computer equipment

    CN118052162A