一种急倾斜厚大矿体盘区式分段充填采矿法
By using the panel-type segmented backfilling mining method, the problems of large amount of preparation work and high risk of roof damage in the mining of steeply inclined thick ore bodies have been solved, achieving safe, efficient and low-cost mining, reducing the amount of auxiliary engineering and improving the backfilling roof connection rate.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CHINA MINMETALS CHANGSHA MINING RES INST
- Filing Date
- 2025-08-05
- Publication Date
- 2026-07-17
AI Technical Summary
Existing technologies for mining steeply inclined, thick ore bodies have problems such as large preparation work, long construction period, severe roof collapse and damage, and high mining safety risks. In particular, medium-deep hole blasting is prone to ground pressure manifestation and high roof suspension rate, which affects the filling and roof connection rate and the stability of the mining area.
The panel-type segmented filling mining method is adopted. The ore body is divided into three levels: middle section, panel, and segment. The first-stage stope and the second-stage pillar stope are arranged alternately perpendicular to the strike of the ore body. The first-stage stope is mined and filled first. Cutting roadways and material unloading channels are formed by using forward blasting. The strength zoning of the filling body is designed, and the filling body is forced to the roof by using the blasting reserved channel. The return air duct is arranged independently to reduce the amount of auxiliary engineering.
This approach reduces the amount of preparation work, increases the backfilling and roof connection rate, reduces the risk of roof damage, improves the deep working environment, ensures safe and efficient low-cost mining, and avoids the chain reaction of roof collapse and ground pressure transmission instability.
Smart Images

Figure CN121047588B_ABST
Abstract
Citation Information
Patent Citations
Open stope subsequent filling mining method for wedge-shaped top pillar segmented rock drilling stage of thick and large ore body
CN113530542A
Panel type cutting roadway two-step sublevel open-stoping subsequent filling mining method
CN114562266A