A spacecraft cabin separation test system and method with active gravity compensation
The spacecraft segment separation test system with active gravity compensation uses a tension control system and an integrated control system to control constant tension, which solves the gravity unloading problem during the separation of large spacecraft segments in orbit. It achieves high-precision separation test simulation and data acquisition, and improves the reliability and versatility of separation tests.
Patent Information
- Application Number
- CN202511259991.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-04
- Publication Date
- 2026-11-06
- Estimated Expiration
- 2045-09-04
AI Technical Summary
When large spacecraft modules separate in orbit, existing technologies cannot effectively simulate a zero-gravity environment, resulting in inconsistent forces during the separation process. Furthermore, large-sized, heavy-tonnage modules are difficult to protect during free fall, affecting the reliability and safety of the separation.
The spacecraft segment separation test system employs active gravity compensation. It uses a tension control system and an integrated control system to control constant tension, monitor and adjust the gravity unloading of the separation segment in real time, and ensure that the gravity unloading efficiency is within the range of 95% to 105% during the separation process. After the separation is completed, it performs closed-loop control of position and velocity to keep the segment stable and stationary.
It achieved high-precision gravity unloading, simulated the force state during on-orbit separation, obtained accurate separation speed data, improved the reliability and versatility of separation tests, and adapted to the separation test requirements of different spacecraft.
Smart Images

Figure CN121106764B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to an active gravity-compensated spacecraft segment separation test system and method, belonging to the field of test technology for large manned spacecraft. Background Technology
[0002] Large spacecraft involve multiple separation maneuvers during manned lunar landing missions. For example, during the descent of the lunar lander, the propulsion module separates from the lunar module after completing its main deceleration. Similarly, the manned spacecraft separates from the service module before reentry. Separation technology involves the function and performance of the separation devices between the spacecraft's modules, as well as the control of the separated modules' flight trajectories. Failure to separate the spacecraft could directly lead to the failure of the space mission.
[0003] To improve the reliability of spacecraft module separation in orbit, ground separation tests need to be conducted during the development phase. These tests typically follow overall spacecraft mechanical testing and are used to verify the ability of the unlocking and separation mechanisms to function properly under mechanical conditions, the correctness of the separation process design, the coordination of electromechanical separation, and, based on the separation parameters obtained during the tests, to analyze and predict the effectiveness and safety of the spacecraft's in-orbit separation process.
[0004] Spacecraft in orbit operate in zero-gravity or low-gravity environments, therefore eliminating the influence of the ground gravity field on the separation system is a key technology for ground separation tests. Current domestic and international methods for spacecraft module separation tests mainly include suspension unlocking, horizontal separation, and vertical gravity compensation. However, all of these methods have some limitations.
[0005] For example, Chen Youmei et al., in their paper "Test Method for Separation Parameters of Micro-Nano Satellites" published in Space Measurement Technology, disclosed a suspension-unlocking separation test method. However, due to the presence of gravity, the stress state of the separation surface is inconsistent with the on-orbit state, the separation speed is affected by gravitational acceleration, and the recovery and protection of large spacecraft modules is difficult. Horizontal separation requires the design of specialized tooling for each module to be separated, which is difficult to implement in engineering, and the additional mass and inertia of the tooling will affect the separation parameters. Li Haifei et al., in their paper "Separation Resistance Analysis and Ground Separation Test Verification of Lunar Sample Return Vehicle" published in Spacecraft Environmental Engineering, described a vertical separation method based on counterweight compensation. The structure is simple and easy to implement, but the adaptability is poor, and instantaneous weightlessness occurs when the separation acceleration is greater than the gravitational acceleration.
[0006] The deep space probe separation test device designed in patent CN113348753B, "A Deep Space Probe Separation Test Device and Test Method Thereof", can eliminate the effect of gravity through constant torque follow-up control. However, the multiple pulley mechanisms in the system increase the complexity of the test system, and the long steel wire rope increases the flexibility of the test system. Summary of the Invention
[0007] The technical problem solved by this invention is: addressing the issue that large spacecraft typically lack the capability for horizontal hoisting, and that large-sized, heavy-tonnage modules are difficult to effectively protect during free fall, this invention provides an active gravity-compensated spacecraft module separation test system and method. By using a constant tension control system for gravity compensation, the gravity of the separated modules can be effectively unloaded during the separation stroke, and the modules can be smoothly locked after separation.
[0008] The technical solution of this invention is:
[0009] An active gravity-compensated spacecraft segment separation test system includes: a system support frame, a tension control system, an integrated control system, a tension sensor, a spacecraft to be separated, and a lifting device; the spacecraft to be separated includes a separation segment and a parking segment;
[0010] The spacecraft to be separated is vertically placed under the system support using a transfer platform. The tension control system installed on the top of the system support is connected to the separation module via a lifting device to unload the separation module by gravity. The tension control system is set by the integrated control system to ensure that the separation surface between the separation module and the parking module is in a stress-free state. Tension sensors are connected between the tension control system and the separation module to collect tension data in real time.
[0011] During the separation stroke, the integrated control system uses the collected values from the tension sensor to perform constant tension control on the tension control system to ensure that the unloading efficiency meets the test requirements. After the separation stroke ends, the integrated control system performs position and speed closed-loop control on the tension control system, ignoring tension errors, so that the speed of the separation compartment gradually decreases to zero and keeps it in a stable and stationary state.
[0012] Furthermore, it also includes three high-speed photogrammetry cameras, positioned directly opposite the separation surface, with the line of sight level with the separation surface. Two vertically placed high-speed photogrammetry cameras are used to measure the separation velocity and angular velocity of the compartments, and the third high-speed photogrammetry camera is used to monitor the state of the inter-compartment separation surface throughout the process.
[0013] Furthermore, the tension control system includes a servo motor, a reducer, a brake, a winch, and a wire rope. The output end of the servo motor is connected to the input end of the reducer, and the output end of the reducer is connected to the winch. The rotation of the winch drives the wire rope to rise or fall.
[0014] In the tension control system, a tension sensor is connected in series at the end of the wire rope and connected to the separation section through a lifting device. The tension sensor monitors the tension value acting on the separation section in real time and outputs the tension value to the integrated control system.
[0015] The brake is used to keep the separated compartment in a stable and stationary state after the compartment is separated.
[0016] Furthermore, during the separation stroke, the integrated control system performs constant tension control on the tension control system based on the collected values from the tension sensor, specifically as follows:
[0017] (1) The tension control system loads the output tension to the desired value, the servo motor is in a stall state, and the tension value is in a stable state;
[0018] (2) The integrated control system sets the feedforward start threshold of the tension control system;
[0019] (3) The integrated control system issues a separation command, the inter-cabin connection device is unlocked, the separation spring pre-tightening thrust is applied to the separation cabin, the tension value in the wire rope decreases, and after the tension decreases beyond the set feedforward start threshold, the separation cabin is pulled up under the feedforward control. During this period, the gravity unloading efficiency is always maintained within the range of 95% to 105%.
[0020] (4) After the separation chamber moves beyond the working stroke of the separation spring, the separation chamber moves upward at a constant speed under the combined action of constant tension and gravity.
[0021] Furthermore, the expected value is the sum of the weight of the separation capsule, the weight of the lifting device, the weight of the sensor cable, and the safety margin, with the safety margin being 1% of the total weight of the separation capsule.
[0022] Furthermore, after the separation stroke is completed, the integrated control system performs closed-loop control of the position and speed of the tension control system, specifically as follows:
[0023] (1) The separation chamber moves upward at a constant speed under the combined action of constant tension and gravity. After moving at a constant speed for a certain distance, the integrated control system controls the tension control system to reduce the tension, so that the separation chamber moves at a constant deceleration until the speed of the separation chamber is reduced to zero within the specified height.
[0024] (2) When the speed of the separation chamber is reduced to zero, the brake is activated to keep the entire test system in a stable and static state.
[0025] Secondly, the present invention also proposes a test method for spacecraft segment separation with active gravity compensation, including: test preparation stage and test implementation stage;
[0026] The preparation phase of the experiment includes the following steps:
[0027] (1) Before the separation module and the parking module are docked during the spacecraft assembly stage, the lifting equipment of the separation module is leveled to ensure that the resultant force of the lifting equipment just passes through the center of mass of the separation module and keeps the state of the lifting equipment unchanged.
[0028] (2) Transfer the separation section spreader to the bottom of the system support, directly below the lifting point of the tension control system. Control the lifting point of the tension control system to descend through the integrated control system. After the operator connects the separation section spreader to the lifting point of the tension control system, lift the lifting point of the tension control system through the integrated control system to move the spreader to a high position.
[0029] (3) Move the entire assembly to the bottom of the system support, and make fine adjustments to the position of the transfer platform to ensure that the vertical center of the spreader passes exactly through the center of mass mark of the separation compartment. Then lower the transfer platform support to fix the position.
[0030] (4) Level the separation surface by adjusting the height of each leg of the transfer platform, and use a level to measure until the levelness requirement is met.
[0031] (5) Set up a high-speed photogrammetry camera. The line of sight of the high-speed photogrammetry camera should be level with the separation surface. Attach the high-speed photogrammetry target to the separation compartment. After the connection and debugging are qualified, confirm the field of view of the high-speed photogrammetry camera and the angle of the target.
[0032] (6) The lifting point of the tension control system is slowly lowered through the integrated control system, which drives the spreader to slowly descend. The operator connects the spreader to the separation compartment. After the connection is completed, the spreader is raised through the integrated control system so that the slings of the spreader are slightly taut and the force is even. The operator then confirms whether the reading of the tension sensor is normal.
[0033] (7) Measure the mass of the separation section, lifting gear, and lifting lugs to predict the magnitude of the unloading force during the separation test;
[0034] The trial implementation phase includes the following steps:
[0035] (1) The tension control system loads the output tension to the desired value, the servo motor is in a stall state, and the tension value is in a stable state;
[0036] (2) The integrated control system sets the feedforward start threshold of the tension control system;
[0037] (3) The integrated control system issues a separation command, the inter-cabin connection device is unlocked, the separation spring pre-tightening thrust is applied to the separation cabin, the tension value in the wire rope decreases, and after the tension decreases beyond the set feedforward start threshold, the separation cabin is pulled up under the feedforward control. During this period, the gravity unloading efficiency is always maintained within the range of 95% to 105%.
[0038] (4) After the separation chamber moves beyond the working stroke of the separation spring, the separation chamber moves upward at a constant speed under the combined action of constant tension and gravity.
[0039] (5) The separation chamber moves upward at a constant speed under the combined action of constant tension and gravity. After moving at a constant speed for a certain distance, the integrated control system controls the tension control system to reduce the tension, so that the separation chamber moves at a constant deceleration until the speed of the separation chamber is reduced to zero within the specified height.
[0040] (6) When the speed of the separation chamber is reduced to zero, the brake is activated to keep the entire test system in a stable and static state.
[0041] Furthermore, the expected value is the sum of the weight of the separation capsule, the weight of the lifting device, the weight of the sensor cable, and the safety margin, with the safety margin being 1% of the total weight of the separation capsule.
[0042] Furthermore, it also includes a trial withdrawal phase, which includes the following operational steps:
[0043] (1) Confirm that there is a sufficient safe distance between the lowest point of the separation section and the top of the parking section, and that there is no motion interference;
[0044] (2) Raise the outriggers of the transfer platform, and the transfer platform will drive the parking compartment to be removed from under the system support and parked in place;
[0045] (3) The parking fixture for the separation compartment is placed into the test bracket and positioned directly below the separation compartment;
[0046] (4) The lifting point of the descent control system is lowered through the integrated control system to drive the separation compartment to descend until it is smoothly placed on the parking fixture;
[0047] (5) Disconnect the connection between the separation compartment and the lifting equipment, and use the integrated control system to lift the lifting equipment until a safe distance is left between it and the separation compartment;
[0048] (6) The separation section is rotated out from under the system support and parked in place;
[0049] (7) The integrated control system slowly lowers the lifting device to the ground and disconnects the lifting device from the tension control system;
[0050] (8) The lifting device is removed from the test support and the tension control system is restored to a safe state.
[0051] The advantages of this invention compared to the prior art are:
[0052] (1) This invention proposes a separation test method for gravity unloading of separation compartments using an active pull control system. The correctness of the separation test method has been verified through multiple tests, and effective data has been obtained. Compared with the separation method of hoisting and balancing, it has the characteristics of high unloading accuracy and good versatility.
[0053] (2) During the separation process of spacecraft modules, the gravity unloading efficiency of the separation module is within 95% to 105%, which can simulate the stress state during on-orbit separation more realistically. Based on this, the separation speed obtained is closer to the theoretical separation speed.
[0054] (3) For the separation test requirements of different spacecraft, only the parameters of the control system need to be adjusted to meet the requirements. This invention has the advantages of high efficiency and good versatility. Attached Figure Description
[0055] Figure 1 This is a schematic diagram of a force-controlled vertical separation test system;
[0056] Figure 2 This is a diagram showing the placement of the high-speed camera;
[0057] Figure 3 This is a schematic diagram of the dynamic model of a force-controlled vertical separation test system, in which... Figure 3 'a' represents the separated travel path. Figure 3 b represents the end of the separation process;
[0058] Figure 4 This is a schematic diagram of the control principle of an active vertical separation test system. Detailed Implementation
[0059] The specific embodiments of the present invention will now be described in further detail with reference to the accompanying drawings.
[0060] Since large spacecraft typically lack the capability for horizontal hoisting, and large-sized, heavy-tonnage modules are difficult to protect effectively during free fall, this invention proposes a vertical separation test scheme that uses an active tension control system to perform gravity unloading. The gravity of the separated modules can be effectively unloaded during the separation stroke, and the modules can be smoothly locked after separation.
[0061] like Figure 1 As shown, the present invention proposes an active gravity-compensated spacecraft segment separation test system, comprising: a system support, a tension control system, an integrated control system, a tension sensor, a spacecraft to be separated, and a lifting device; the spacecraft to be separated includes a separation segment and a parking segment;
[0062] The spacecraft to be separated is vertically placed under the system support using a transfer platform. The tension control system installed on the top of the system support is connected to the separation module via a lifting device to unload the separation module by gravity. The tension control system is set by the integrated control system to ensure that the separation surface between the separation module and the parking module is in a stress-free state. Tension sensors are connected between the tension control system and the separation module to collect tension data in real time.
[0063] During the separation stroke, the integrated control system uses the collected values from the tension sensor to perform constant tension control on the tension control system to ensure that the unloading efficiency meets the test requirements. After the separation stroke ends, the integrated control system performs position and speed closed-loop control on the tension control system, ignoring tension errors, so that the speed of the separation compartment gradually decreases to zero and keeps it in a stable and stationary state.
[0064] The testing system also includes three high-speed photogrammetry cameras, the placement of which is as follows: Figure 2 As shown. Positioned directly opposite the separation surface, with the line of sight level with the separation surface, two vertically placed high-speed photogrammetry cameras are used to measure the separation velocity and angular velocity of the compartments, and a third high-speed photogrammetry camera is used to monitor the state of the inter-compartment separation surface throughout the process.
[0065] In this invention, the tension control system includes a servo motor, a reducer, a brake, a winch, and a wire rope. The output end of the servo motor is connected to the input end of the reducer, and the output end of the reducer is connected to the winch. The rotation of the winch drives the wire rope to rise or fall. A tension sensor is connected in series at the end of the wire rope in the tension control system and is connected to the separation section through a lifting device. The tension sensor monitors the tension value acting on the separation section in real time and outputs the tension value to the integrated control system. The brake is used to keep the separation section in a stable and stationary state after separation.
[0066] like Figure 3 The figure shows the dynamic model of the system. During the separation stroke, as follows: Figure 3 As shown in Figure a, the integrated control system performs constant tension control on the tension control system based on the data collected by the tension sensor, specifically as follows:
[0067] (1) The tension control system loads the output tension to the desired value, the servo motor is in a stall state, and the tension value is in a stable state;
[0068] (2) The integrated control system sets the feedforward start threshold of the tension control system;
[0069] (3) The integrated control system issues a separation command, the inter-cabin connection device unlocks, the separation spring preload thrust is applied to the separation compartment, the tension in the wire rope decreases, and after the tension decreases beyond the set feedforward start threshold, the separation compartment is pulled upward under feedforward control. During this period, the gravity unloading efficiency remains within the range of 95% to 105%. Figure 4 As shown;
[0070] (4) After the separation chamber moves beyond the working stroke of the separation spring, the separation chamber moves upward at a constant speed under the combined action of constant tension and gravity.
[0071] Preferably, the expected value is the sum of the weight of the separation capsule, the weight of the lifting device, the weight of the sensor cable, and the safety margin, where the safety margin is 1% of the total weight of the separation capsule.
[0072] like Figure 3 As shown in b, after the separation stroke is completed, the integrated control system performs closed-loop control of the position and speed of the tension control system, specifically as follows:
[0073] (1) The separation chamber moves upward at a constant speed under the combined action of constant tension and gravity. After moving at a constant speed for a certain distance, the integrated control system controls the tension control system to reduce the tension, so that the separation chamber moves at a constant deceleration until the speed of the separation chamber is reduced to zero within the specified height.
[0074] (2) When the speed of the separation chamber is reduced to zero, the brake is activated to keep the entire test system in a stable and static state.
[0075] Example:
[0076] This embodiment provides an example of the application of a vertical force-controlled separation test system on a large spacecraft, using this example to illustrate the specific implementation of the test system.
[0077] I. Experimental Preparation
[0078] (1) Before the two modules are docked during the spacecraft assembly stage, the lifting equipment of the separation module is leveled to ensure that the resultant force of the lifting equipment just passes through the center of mass of the separation module and keeps the state of the lifting equipment unchanged.
[0079] (2) Transfer the separation section spreader to the bottom of the system support, directly below the lifting point of the tension control system. Control the lifting point of the tension control system to descend through the integrated control system. After the operator connects the separation section spreader to the lifting point of the tension control system, lift the lifting point of the tension control system through the integrated control system to move the spreader to a high position (the lowest point of the spreader is higher than the highest point of the whole device).
[0080] (3) Move the entire assembly to the bottom of the separation test system support, and make fine adjustments to the position of the transfer platform to ensure that the vertical center of the lifting device passes exactly through the center of mass mark of the separation compartment. Then lower the platform support and fix the position.
[0081] (4) Level the separation surface by adjusting the height of each leg of the transfer platform, and use a level to measure the horizontal state of the flange under the support until the horizontality requirement (1mm) is met.
[0082] (5) Set up a high-speed photogrammetry system. The line of sight of the high-speed camera should be level with the separation surface. Attach the high-speed photogrammetry target to the separation compartment. After the connection and debugging are qualified, confirm the field of view of each camera and the angle of the target.
[0083] (6) The lifting point of the tension control system is slowly lowered through the integrated control system, which drives the spreader to slowly descend. The operator connects the spreader to the separation compartment. After the connection is completed, the spreader is raised through the integrated control system so that the slings of the spreader are slightly taut and the force is even. The operator then confirms whether the reading of the tension sensor is normal.
[0084] (7) Measure the mass of the separation compartment, lifting gear, lifting lugs and other additional mass to predict the magnitude of the unloading force during the separation test.
[0085] II. Implementation of the Experiment
[0086] (1) The tension control system loads the output tension to the desired value, the servo motor is in a stall state, the tension value is in a stable state, and the desired tension value should be the sum of the weight of the separation cabin, the weight of the lifting gear, the weight of the sensor cable and the safety margin. The safety margin is about 1% of the total weight of the cabin.
[0087] (2) The tension control system sets a feedforward start threshold. The smaller the threshold, the more sensitive the control system is.
[0088] (3) When the separation command is issued, the inter-cabin connection device is unlocked, the separation spring pre-tightening thrust is applied to the separation cabin, the tension value in the hoisting rope decreases, and after the tension decreases beyond the set threshold, the separation cabin is pulled up under the feedforward control. During this period, the gravity unloading efficiency is always maintained within the range of 95% to 105%.
[0089] (4) After the cabin moves beyond the working stroke of the separation spring, the separation cabin moves upward at a constant speed under the combined action of constant tension and gravity.
[0090] (5) After moving at a constant speed for a certain distance, the tension control system controls the magnitude of the tension to make it decelerate uniformly until the speed of the cabin is reduced to zero.
[0091] (6) When the speed of the separation chamber is reduced to zero, the brake is activated to keep the entire test system in a stable and static state.
[0092] III. Trial Withdrawal
[0093] (1) Confirm that there is a sufficient safe distance between the lowest point of the separation section and the top of the parking section, and that there is no motion interference;
[0094] (2) Raise the outriggers of the transfer platform, and the transfer platform will pull the parking compartment out from under the test system support and park it in place;
[0095] (3) The parking fixture for the separation compartment is placed into the test bracket and positioned directly below the separation compartment;
[0096] (4) The lunar lander is lowered by the lifting point of the descent tension control system through the integrated control system until it lands smoothly on the parking fixture;
[0097] (5) Disconnect the connection between the separation compartment and the lifting equipment, and use the integrated control system to lift the lifting equipment until a safe distance is left between it and the separation compartment;
[0098] (6) The separation section is rotated out from under the system support and parked in place;
[0099] (7) The integrated control system slowly lowers the lifting device to the ground and disconnects the lifting device from the tension control system;
[0100] (8) The lifting device is removed from the test support and the tension control system is restored to a safe state.
[0101] This invention's tension control system employs a unique control method for the separation capsule during each stage of the test. During the separation stroke, constant tension control is applied, primarily to allow the separation capsule to follow gravity unloading. After the separation stroke, uniform deceleration control is applied to reduce the capsule's speed to zero within a specified altitude, and then the brake is activated to bring the test system to a stable, stationary state. Furthermore, this invention addresses the separation test requirements of different spacecraft segments, requiring only adjustments to the control parameters. The specific selection of these parameters can be determined based on the mass of the separated component, the deceleration distance, and the unloading efficiency. The operational procedure of this invention's active vertical separation test method is clear, avoiding repetitive test steps and improving efficiency.
[0102] The parts of this invention not described in detail are common knowledge to those skilled in the art.
Claims
1. An active gravity-compensated spacecraft segment separation test system, characterized in that, include: System support frame, tension control system, integrated control system, tension sensor, spacecraft to be separated, lifting device; The spacecraft to be separated includes a separation module and a parking module; The spacecraft to be separated is vertically placed under the system support using a transfer platform. The tension control system installed on the top of the system support is connected to the separation module via a lifting device to unload the separation module by gravity. The tension control system is set by the integrated control system to ensure that the separation surface between the separation module and the parking module is in a stress-free state. Tension sensors are connected between the tension control system and the separation module to collect tension data in real time. During the separation stroke, the integrated control system uses the collected values from the tension sensor to perform constant tension control on the tension control system to ensure that the unloading efficiency meets the test requirements. After the separation stroke ends, the integrated control system performs closed-loop position and speed control on the tension control system, ignoring tension errors, so that the speed of the separation section gradually decreases to zero and keeps it in a stable and stationary state. The tension control system includes a servo motor, a reducer, a brake, a winch, and a wire rope. The output of the servo motor is connected to the input of the reducer, and the output of the reducer is connected to the winch. The rotation of the winch drives the wire rope to rise or fall. A tension sensor is connected in series at the end of the wire rope in the tension control system and is connected to the separation section through a lifting device. The tension sensor monitors the tension value acting on the separation section in real time and outputs the tension value to the integrated control system. The brake is used to keep the separation section in a stable and stationary state after separation. During the separation stroke, the integrated control system performs constant tension control on the tension control system based on the values collected by the tension sensor, specifically as follows: (1) The tension control system loads the output tension to the desired value, the servo motor is in a stall state, and the tension value is in a stable state; (2) The integrated control system sets the feedforward start threshold of the tension control system; (3) The integrated control system issues a separation command, the inter-cabin connection device is unlocked, the separation spring pre-tightening thrust is applied to the separation cabin, the tension value in the wire rope decreases, and after the tension decreases beyond the set feedforward start threshold, the separation cabin section is pulled up under the feedforward control. During this period, the gravity unloading efficiency is always maintained within the range of 95%~105%. (4) After the separation chamber moves beyond the working stroke of the separation spring, the separation chamber moves upward at a constant speed under the combined action of constant tension and gravity.
2. The spacecraft segment separation test system with active gravity compensation according to claim 1, characterized in that: It also includes three high-speed photogrammetry cameras, positioned directly opposite the separation surface, with the line of sight level with the separation surface. Two vertically placed high-speed photogrammetry cameras are used to measure the separation velocity and angular velocity of the compartments, and the third high-speed photogrammetry camera is used to monitor the state of the inter-compartment separation surface throughout the process.
3. The spacecraft segment separation test system with active gravity compensation according to claim 1, characterized in that: The expected value is the sum of the weight of the separation capsule, the weight of the lifting device, the weight of the sensor cable, and the safety margin, with the safety margin being 1% of the total weight of the separation capsule.
4. The spacecraft segment separation test system with active gravity compensation according to claim 1, characterized in that: After the separation stroke is completed, the integrated control system performs closed-loop position and speed control on the tension control system, specifically as follows: (1) The separation chamber moves upward at a constant speed under the combined action of constant tension and gravity. After moving at a constant speed for a certain distance, the integrated control system controls the tension control system to reduce the tension, so that the separation chamber moves at a constant deceleration until the speed of the separation chamber is reduced to zero within the specified height. (2) When the speed of the separation chamber is reduced to zero, the brake is engaged to keep the entire test system in a stable and static state.
5. A method for conducting active gravity-compensated spacecraft module separation tests using the active gravity-compensated spacecraft module separation test system according to claim 1, characterized in that, include: Experiment preparation phase; Experiment implementation phase; The preparation phase of the experiment includes the following steps: (1) Before the separation module and the parking module are docked during the spacecraft assembly stage, the lifting equipment of the separation module is leveled to ensure that the resultant force of the lifting equipment just passes through the center of mass of the separation module and keeps the state of the lifting equipment unchanged. (2) Transfer the separation section spreader to the bottom of the system support, directly below the lifting point of the tension control system. Control the lifting point of the tension control system to descend through the integrated control system. After the operator connects the separation section spreader to the lifting point of the tension control system, lift the lifting point of the tension control system through the integrated control system to move the spreader to a high position. (3) Move the entire assembly to the bottom of the system support, and make fine adjustments to the position of the transfer platform to ensure that the vertical center of the spreader passes exactly through the center of mass mark of the separation compartment. Then lower the transfer platform support to fix the position. (4) Level the separation surface by adjusting the height of each leg of the transfer platform, and use a level to measure until the levelness requirement is met; (5) Set up a high-speed photogrammetry camera. The line of sight of the high-speed photogrammetry camera should be level with the separation surface. Attach the high-speed photogrammetry target to the separation compartment. After the connection and debugging are qualified, confirm the field of view of the high-speed photogrammetry camera and the angle of the target. (6) The lifting point of the tension control system is slowly lowered through the integrated control system, which drives the spreader to slowly descend. The operator connects the spreader to the separation compartment. After the connection is completed, the spreader is lifted through the integrated control system so that the slings of the spreader are slightly taut and the force is even. The operator then confirms whether the reading of the tension sensor is normal. (7) Measure the mass of the separation section, lifting gear, and lifting lugs to predict the magnitude of the unloading force during the separation test; The trial implementation phase includes the following steps: (1) The tension control system loads the output tension to the desired value, the servo motor is in a stall state, and the tension value is in a stable state; (2) The integrated control system sets the feedforward start threshold of the tension control system; (3) The integrated control system issues a separation command, the inter-cabin connection device is unlocked, the separation spring pre-tightening thrust is applied to the separation cabin, the tension value in the wire rope decreases, and after the tension decreases beyond the set feedforward start threshold, the separation cabin section is pulled up under the feedforward control. During this period, the gravity unloading efficiency is always maintained within the range of 95%~105%. (4) After the separation chamber moves beyond the working stroke of the separation spring, the separation chamber moves upward at a constant speed under the combined action of constant tension and gravity. (5) The separation chamber moves upward at a constant speed under the combined action of constant tension and gravity. After moving at a constant speed for a certain distance, the integrated control system controls the tension control system to reduce the tension, so that the separation chamber moves at a constant deceleration until the speed of the separation chamber is reduced to zero within the specified height. (6) When the speed of the separation chamber is reduced to zero, the brake is engaged to keep the entire test system in a stable and static state.
6. The spacecraft segment separation test method with active gravity compensation according to claim 5, characterized in that: The expected value is the sum of the weight of the separation capsule, the weight of the lifting device, the weight of the sensor cable, and the safety margin, with the safety margin being 1% of the total weight of the separation capsule.
7. The spacecraft segment separation test method with active gravity compensation according to claim 5, characterized in that: It also includes a trial withdrawal phase, which includes the following operational steps: (1) Confirm that there is a sufficient safe distance between the lowest point of the separation section and the top of the parking section, and that there is no motion interference; (2) Raise the outriggers of the transfer platform, and the transfer platform will drive the parking compartment to move out from under the support system and into place; (3) The parking fixture for the separation compartment is placed in the test support and positioned directly below the separation compartment; (4) The lifting point of the descent control system is controlled by the integrated control system to drive the separation compartment to descend until it is smoothly placed on the parking fixture; (5) Disconnect the connection between the separation section and the spreader, and use the integrated control system to lift the spreader until a safe distance is left between it and the separation section; (6) The separation section is rotated out from under the system support and parked in place; (7) The integrated control system slowly lowers the lifting device to the ground and disconnects the lifting device from the tension control system; (8) The lifting device is removed from the test support and the tension control system is restored to a safe state.
Citation Information
Patent Citations
A deep space detector separation test device and test method thereof
CN113348753B
Design method of unrestricted suspension type initiative gravity compensation system
CN103482089A
Special maintenance verification platform for manned spacecraft
CN118351732A