Underground continuous wall construction method
By real-time monitoring and automatic adjustment of mud properties, combined with precise sediment detection and trench wall evaluation, the problems of unstable trench walls and inaccurate sediment control in the construction of diaphragm walls have been solved, improving construction efficiency and quality reliability.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- BEIJING URBAN CONSTR XINJIE RAIL TRANSIT ENG CONSULTING CO LTD
- Filing Date
- 2025-10-11
- Publication Date
- 2026-07-21
AI Technical Summary
In the construction of diaphragm walls, the dynamic changes in mud properties lead to instability of the trench walls and inaccurate control of sediment at the bottom of the trench, affecting construction efficiency and quality, and lacking real-time data and quantitative control.
The mud performance is monitored in real time using an online mud densitometer and a Marshall funnel viscometer. The mud density and viscosity are adjusted by automatically adding bentonite slurry and carboxymethyl cellulose solution. The thickness of the sediment is detected by combining the air lift device for hole cleaning and the measuring rope. The central processing unit is used to achieve automatic emergency reinforcement. The tank wall is evaluated and repaired in conjunction with scanning imaging equipment and a micro pressure sensor array.
It enables real-time dynamic control of mud properties, ensuring the stability of the tank wall and thorough removal of sediment, improving the accuracy and reliability of construction, and reducing uncertainties and rework probability during construction.