Cooling towers and their construction methods

By optimizing the cooling tower base structure and using internal flow channels and pouring holes for continuous concrete pouring, the problem of complex scaffolding erection in traditional cooling tower construction has been solved, achieving rapid construction and cost reduction.

CN121363334BActive Publication Date: 2026-11-10STATE NUCLEAR ELECTRIC POWER PLANNING DESIGN & RES INST CO LTD +1
View PDF 2 Cites -1 Cited by

Patent Information

Application Number
CN202511702709.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-11-19
Publication Date
2026-11-10
Estimated Expiration
2045-11-19

AI Technical Summary

Technical Problem

During the construction of conventional power plant cooling towers, the vertical support system of reinforced concrete structures requires the erection of a large-scale and highly complex scaffolding support system, resulting in a large workload, high material and labor input, and a long construction period.

Method used

By optimizing the base structure, the main body is formed by splicing the first support component and connecting it with the support component, achieving efficient connection and rapid construction between the tower body and the foundation. The internal flow channel and pouring hole are used for continuous concrete pouring, reducing the reliance on external scaffolding.

Benefits of technology

It significantly shortened the construction cycle of cooling towers, reduced construction difficulty and costs, increased the level of construction mechanization, reduced safety risks and material consumption, and improved the overall progress control capability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121363334B_ABST
    Figure CN121363334B_ABST
Patent Text Reader

Abstract

This application provides a cooling tower and its construction method. The cooling tower includes: a tower body; a base supported on the ground, the tower body being disposed on the base, the base including: a main body including a plurality of first support members, the plurality of first support members being connected in a circumferential manner to form the main body, and adjacent two first support members being fixedly connected; a support portion disposed above the main body, the upper side of the support portion defining a casting groove; a flow channel defined within the first support members, the first support members having casting holes communicating with the flow channel, and the flow channel communicating with the casting groove, both the flow channel and the casting groove being filled with concrete. The cooling tower of this application is beneficial for shortening the construction period of the cooling tower and reducing construction difficulty and cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to power plant cooling towers, and more particularly to a cooling tower and its construction method. Background Technology

[0002] As an indispensable key structure in the thermal cycle system of a power plant, the cooling tower plays a vital role in ensuring the safe, stable, and efficient operation of the generator units. Through a circulating cooling water system, the cooling tower effectively removes the waste heat generated during unit operation, reducing the equipment's operating temperature. This not only helps extend the service life of critical equipment but also significantly improves the overall thermal efficiency and power generation capacity of the power plant.

[0003] Currently, conventional power plant cooling towers mostly use reinforced concrete structures, and their vertical support systems are typically designed as X-shaped or Y-shaped inclined columns. During construction, such structures require the erection of large-scale, highly complex scaffolding support systems to ensure structural stability and construction safety during concrete pouring. This not only results in a huge amount of scaffolding work, high material and labor costs, but also a long construction period. Summary of the Invention

[0004] This application provides a cooling tower and its construction method. By optimizing the structure of the base, the main body is formed by splicing the first support member, and then connected with the support member to form the base. This achieves efficient connection and rapid construction between the tower body and the foundation, which helps to shorten the construction cycle of the cooling tower and reduce construction difficulty and cost.

[0005] In a first aspect, embodiments of this application provide a cooling tower, comprising: a tower body; a base supported on the ground, the tower body being disposed on the base, the base comprising: a main body including a plurality of first support members, the plurality of first support members being connected in a circumferential manner to form the main body, and adjacent two first support members being fixedly connected; a support portion disposed above the main body, the upper side of the support portion defining a casting groove; a flow channel defined within the first support members, the first support members having casting holes communicating with the flow channel, and the flow channel communicating with the casting groove, both the flow channel and the casting groove being filled with concrete.

[0006] In some embodiments, the first support member has a first support end away from the tower body along the height direction and a second support end close to the tower body. Along the circumference of the base, there are two of each of the first and second support ends. The interval between the two first support ends is greater than the interval between the two second support ends.

[0007] According to some embodiments of the present invention, the first support member is formed as an X-shaped tube.

[0008] According to some embodiments of the present invention, the first support ends of two adjacent first support members are fixedly connected by concrete column bases.

[0009] According to some embodiments of the present invention, the first support end is provided with a plurality of studs, and the plurality of stud arrays are provided on the peripheral wall of the first support end; and / or, the first support end is provided with a plurality of shear ring plates arranged at intervals along the height direction; and / or, the first support end is provided with a plurality of reinforcing ribs, the reinforcing ribs being arranged at intervals around the peripheral wall of the first support end.

[0010] According to some embodiments of the present invention, a base plate is provided on the end face of the first support end away from the tower body, and an installation hole is provided on the base plate through the height direction; the main body further includes: a ground anchor, the end of the ground anchor away from the tower body is inserted into the ground and bent to form a hook, the end of the ground anchor near the tower body passes through the installation hole, and a limiting member abutting against the base plate is fixedly connected to the end of the ground anchor passing through the installation hole.

[0011] In some embodiments, reinforcing plates are provided at equal intervals along the height direction inside the flow channel. The reinforcing plates have flow holes that penetrate along the height direction, and a portion of the edge of the reinforcing plate is spaced apart from the inner wall of the flow channel to form a vent.

[0012] In some embodiments, the support includes a plurality of first connectors and a plurality of second connectors. The first connectors define a first groove segment at one end facing the tower body, and the second connectors define a second groove segment at one end facing the tower body. The first connectors are fixedly connected to the top end of the first support member. The top end of the first support member defines an outlet communicating with the flow channel. The first connectors are provided with a through-hole corresponding to the outlet, and the through-hole communicates with the first groove segment. The plurality of first connectors and second connectors are arranged at intervals and connected end to end. The plurality of first groove segments communicate with the second groove segments to form the casting groove. And / or, when constructing the cooling tower, the first connectors and the first support member are an integral piece.

[0013] In some embodiments, a plurality of first reinforcing bars and a plurality of second reinforcing bars are arranged in an array in the casting trough. The two ends of the first reinforcing bars are fixedly connected to the two side walls of the casting trough, respectively. The second reinforcing bars extend along the circumference of the tower body and are fixedly connected to the first reinforcing bars. And / or, when constructing the cooling tower, the first reinforcing bars and the first connector / second connector are integral parts.

[0014] Secondly, this application provides a construction method for a cooling tower, applied to the aforementioned cooling tower, comprising:

[0015] S1: Multiple first support members are aligned with ground anchors on the ground and pre-tightened by limiting members to form the main body;

[0016] S2: Hoist the second connector to the top of the main body, and weld the first connector and the second connector in sequence to form a support part;

[0017] S3: Secure the limiting component;

[0018] S4: Multiple pouring equipment are simultaneously positioned to pour concrete from the pouring hole into the flow channel, filling the flow channel in the main body and the pouring groove of the support part.

[0019] S5: Pour concrete column base;

[0020] S6: Cast the tower body above the support.

[0021] The cooling tower and its construction method of this invention form a main body by splicing together a first support member, which is then connected to the support member to form a base. A flow channel and pouring holes are provided inside the first support member, enabling continuous pouring of concrete from the internal flow channel upwards to the pouring trough. Compared to the traditional construction method that relies on external scaffolding for concrete transport and formwork support, this significantly reduces the scope and height of tall and complex scaffolding, thereby significantly reducing scaffolding material consumption and labor input. The elimination of large-scale scaffolding simplifies on-site construction organization, reduces material rental, transportation, and labor costs, while freeing up construction site space, facilitating cross-operation of other processes, and improving the overall progress control capability of power plant construction. Attached Figure Description

[0022] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with this application and, together with the description, serve to explain the principles of this application.

[0023] Figure 1 This is a schematic diagram of the cooling tower according to an embodiment of the present invention;

[0024] Figure 2 This is a schematic diagram of the structure of the first support member with the first connector according to an embodiment of the present invention;

[0025] Figure 3 This is a schematic diagram of the first support member of this invention installed on the ground according to an embodiment of the invention;

[0026] Figure 4 This is a schematic diagram of the structure of the second connector connected to the first connector to form a partial support portion according to an embodiment of the present invention;

[0027] Figure 5 This is a schematic diagram of the structure in an embodiment of the present invention where the first connecting members are connected by concrete column bases;

[0028] Figure 6 This is one of the structural schematic diagrams of the first support end in an embodiment of the present invention;

[0029] Figure 7 This is a second schematic diagram of the structure of the first support end according to an embodiment of the present invention;

[0030] Figure 8 This is a schematic diagram of the connection between the first support end and the ground anchor in an embodiment of the present invention;

[0031] Figure 9 This is a cross-sectional view of the first support member with a first connector according to an embodiment of the present invention;

[0032] Figure 10 This is a schematic diagram of the structure of the first connector according to an embodiment of the present invention;

[0033] Figure 11 This is a schematic diagram of the structure of a first connector provided with a first reinforcing bar and a second reinforcing bar according to an embodiment of the present invention;

[0034] Figure 12 This is a flowchart illustrating the construction method according to an embodiment of the present invention.

[0035] Figure label:

[0036] 100 - Cooling Tower;

[0037] 10-The tower body;

[0038] 20-Base;

[0039] 21-Main body; 211-First support member; 2111-First support end; 2111a-Stud; 2111b-Shear ring plate; 2111c-Reinforcing rib plate; 2112-Second support end; 212-Pouring hole; 213-Base plate; 2131-Mounting hole; 214-Reinforcing plate; 215-Flow hole; 216-Ventilation port;

[0040] 22-Support section; 2211-First groove section; 2212-Second groove section; 222-First connector; 2221-Pass-through; 223-Second connector; 224-First reinforcing bar; 225-Second reinforcing bar;

[0041] 23- Concrete column base;

[0042] 24-Ground anchor; 241-Hook;

[0043] 25 - Limiting component.

[0044] The accompanying drawings illustrate specific embodiments of this application, which will be described in more detail below. These drawings and descriptions are not intended to limit the scope of the concept in any way, but rather to illustrate the concept of this application to those skilled in the art through reference to particular embodiments. Detailed Implementation

[0045] Exemplary embodiments will now be described in detail, examples of which are illustrated in the accompanying drawings. When the following description relates to the drawings, unless otherwise indicated, the same numbers in different drawings denote the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with this application. Rather, they are merely examples of apparatuses and methods consistent with some aspects of this application as detailed in the appended claims.

[0046] As an indispensable key structure in the thermal cycle system of a power plant, the cooling tower plays a vital role in ensuring the safe, stable, and efficient operation of the generator units. Through a circulating cooling water system, the cooling tower effectively removes the waste heat generated during unit operation, reducing the equipment's operating temperature. This not only helps extend the service life of critical equipment but also significantly improves the overall thermal efficiency and power generation capacity of the power plant.

[0047] Currently, conventional power plant cooling towers mostly use reinforced concrete structures, and their vertical support systems are typically designed as X-shaped or Y-shaped inclined columns. During construction, such structures require the erection of large-scale, highly complex scaffolding support systems to ensure structural stability and construction safety during concrete pouring. This not only results in a huge amount of scaffolding work, high material and labor costs, but also a long construction period.

[0048] In view of this, the present application provides a cooling tower and its construction method. By optimizing the structure of the base, the main body is formed by splicing the first support member, and then connected with the support member to form the base. This achieves efficient connection and rapid construction between the tower body and the foundation, which helps to shorten the construction cycle of the cooling tower and reduce construction difficulty and cost.

[0049] The technical solution of this application and how the technical solution of this application solves the above-mentioned technical problems are described in detail below with specific embodiments. These specific embodiments can be combined with each other, and the same or similar concepts or processes may not be described again in some embodiments. The embodiments of this application will now be described with reference to the accompanying drawings.

[0050] refer to Figures 1 to 11 In one aspect, embodiments of this application provide a cooling tower 100, which includes a tower body 10 and a base 20.

[0051] The tower body 10 is the main structure of the cooling tower 100. It is used to house cooling equipment (such as water spraying devices, packing, etc.) and form an air circulation channel to realize heat exchange between circulating water and air and complete the heat dissipation function.

[0052] The base 20 is supported on the ground, and the tower body 10 is set on the base 20, forming the load-bearing foundation of the cooling tower 100, directly supporting the tower body 10 and transferring its load to the ground.

[0053] The base 20 includes a main body 21 and a support 22. The main body 21 includes multiple first support members 211, which are connected in a ring-like or near-ring-like manner to form the main body 21, creating a stable structural system. The main body 21 not only bears the vertical load transmitted from the tower body 10, but also has good resistance to overturning and lateral forces, providing stable support for the tower body 10.

[0054] The two adjacent first support members 211 are fixedly connected. For example, the two adjacent first support members 211 can be fixed by welding, or a transition connector (such as a connecting plate) can be provided between the two first support members 211. The transition connector can be provided with connecting holes at different positions to provide a certain adjustment margin for the installation of the first support members 211. The positions of the two adjacent first support members 211 can be finely adjusted, which is conducive to forming a stable main body 21.

[0055] The support part 22 is located above the main body 21. The upper side of the support part 22 defines a casting groove for casting the upper structure of the cooling tower 100 base 20. During the construction phase, the support part 22 serves as both a template and a support. Its structural design facilitates the formation of a complete base 20 in conjunction with the main body 21 and provides a flat and stable connection surface for the installation of the tower body 10.

[0056] The first support member 211 defines a flow channel, and the first support member 211 has a pouring hole 212 that communicates with the flow channel. The flow channel is also connected to the pouring trough. Both the flow channel and the pouring trough are filled with concrete. Thus, during the construction phase, concrete can be poured into the flow channel using a pouring device to fill the flow channel and the pouring trough, so that the base 20 forms an integral structure, which helps to improve the integrity of the base 20 and play a role in supporting and stabilizing the tower body 10.

[0057] The cooling tower 100 of the present invention optimizes the structure of the base 20. The main body 21 is formed by splicing together first support members 211, which are then connected to the support members 22 to form the base 20. By setting flow channels and opening pouring holes 212 inside the first support members 211, a continuous pouring method is achieved, where concrete is continuously transported upwards from the internal flow channels to the pouring trough. Compared to the traditional construction method that relies on external scaffolding for concrete transport and formwork support, this significantly reduces the scope and height of tall and complex scaffolding, thereby significantly reducing the amount of scaffolding materials and labor input. Furthermore, by reducing the scaffolding erection and dismantling work during high-altitude operations, the safety risks of falls from heights and scaffold instability are reduced. Simultaneously, the concrete is pumped through flow channels, simplifying the pouring process, improving the degree of mechanization and work efficiency, and shortening the construction cycle of the cooling tower 100 base 20. The elimination of the need for large-scale scaffolding simplifies on-site construction organization, reduces material rental, transportation, and labor costs, frees up construction site space, facilitates cross-operation of other processes, and improves the overall progress control capability of power plant construction.

[0058] In addition, the design of connecting the flow channel, pouring hole 212 and pouring trough allows the concrete to be poured continuously and evenly between the main body 21 and the support 22, avoiding the cold joint or poor bonding problems that may occur in traditional segmented construction, and improving the integrity and durability of the base 20 structure.

[0059] In some possible embodiments, the support portion 22 can be a split structure, which is hoisted onto the first support member 211 after the main body 21 is installed in place to form the support portion 22. Part of the structure of the support portion 22 can be an integral structure with the first support member 211 (such as the first connector 222 described later), further reducing construction steps and improving construction efficiency. Alternatively, the support portion 22 and the first support member 211 can be independent of each other before construction to facilitate storage and transportation.

[0060] refer to Figure 2 , Figure 3 , Figure 4 and Figure 9In some embodiments, the first support member 211 has a first support end 2111 away from the tower body 10 along the height direction and a second support end 2112 close to the tower body 10. Along the circumference of the base 20, there are two of each of the first support end 2111 and the second support end 2112. The interval between the two first support ends 2111 is greater than the interval between the two second support ends 2112. Thus, multiple first support members 211 are connected in a ring to form an outwardly spreading conical support structure. This structure has good anti-overturning ability and horizontal load dispersion ability, effectively resisting wind loads, seismic action, and eccentric loads transmitted by the tower body 10, thus improving the overall stability of the base 20. Simultaneously, the outwardly spreading conical support structure effectively transmits the vertical pressure and bending moment of the superstructure to a wider area of ​​the foundation through the inclined first support members 211, reducing local foundation stress and improving load-bearing efficiency.

[0061] refer to Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 9 According to some embodiments of the present invention, the first support member 211 is formed as an X-shaped tube. Specifically, a single first support member 211 has a spatially intersecting X-shaped structure, which is formed by two tubular members extending diagonally and intersecting and fixedly connected at the middle. The first support member 211 has two first support ends 2111 (away from the tower body 10) and two second support ends 2112 (close to the tower body 10) along the height direction, and the lateral distance between the two first support ends 2111 is greater than the distance between the two second support ends 2112, forming a "wider outside and narrower inside" spatial configuration. Thus, the X-shaped structure itself has excellent resistance to lateral forces. After multiple X-shaped tubes are arranged circumferentially on the base 20, the intersections of each X-shape are connected to each other to form a circumferentially continuous spatial truss support system. This system can effectively resist horizontal wind loads, seismic action, and shear forces and bending moments caused by asymmetrical loads, significantly improving the overall stiffness and stability of the base 20. The two diagonal braces of the X-shaped pipe fitting can simultaneously bear loads from different directions, allowing the concentrated force transmitted by the tower body 10 to be evenly diffused to all sides through the X-shaped structure, avoiding local stress concentration and improving the symmetry and balance of load transmission.

[0062] In some possible embodiments, each of the two inclined bars of the X-shaped fitting has a through flow channel, and a pouring hole 212 communicating with the pouring trough is provided near the upper intersection area or the connection of the support 22. Concrete can be pumped to the top pouring area through the flow channel of either inclined bar, realizing dual-channel material supply and improving pouring efficiency and reliability.

[0063] According to some embodiments of the present invention, the first support ends 2111 of two adjacent first support members 211 are fixedly connected by concrete column bases 23. Although a single first support member 211 has good lateral resistance, multiple independent members arranged around it still have the problems of weak nodes and insufficient coordinated force bearing. Connecting the first support ends 2111 of two adjacent first support members 211 by concrete column bases 23 makes all the first support members 211 form a continuous closed ring frame structure around the base 20, which is beneficial to improving the overall rigidity and spatial coordination of the base 20. During operation, the cooling tower 100 is prone to circumferential tensile stress or uneven settlement due to temperature changes, differences in wind load symmetry, or local deformation of the foundation. As a circumferential connecting member, the concrete column bases 23 can effectively bear and transmit these circumferential internal forces, coordinate the deformation between the support members, and prevent local cracking or instability.

[0064] In some possible embodiments, during the pouring of the concrete column base 23, the exposed end of the first support member 211 can be wrapped at the same time to reinforce and seal the outlet area of ​​its internal flow channel, prevent grout leakage or pressure loss during concrete pumping, and ensure the normal operation of the flow channel.

[0065] refer to Figure 6 , Figure 7 and Figure 8 According to some embodiments of the present invention, the first support end 2111 is provided with a plurality of studs 2111a, and the array of studs 2111a is arranged on the peripheral wall of the first support end 2111. The studs, as typical shear connectors, are fixed to the outer peripheral wall of the first support end 2111 by welding or pre-embedding, forming a dense "stud array". During the pouring of the concrete column base 23, the studs 2111a are encased in the concrete, and through mechanical interlocking and friction, the interface shear resistance between the first support member 211 (metal structure) and the concrete column base 23 (concrete structure) is significantly enhanced. This effectively prevents relative slippage between the two during the stress process, achieving synergistic work between steel and concrete, and improving the integrity and durability of the joint.

[0066] In some embodiments, the first support end 2111 is provided with a plurality of shear ring plates 2111b arranged at intervals along the height direction. Exemplarily, the shear ring plates 2111b can be annular steel plates, perpendicular to the axis of the first support member 211, and arranged at equal or varying intervals along the height direction of the first support end 2111. When the concrete column base 23 is poured, concrete fills the spaces between the shear ring plates 2111b, forming "anchoring teeth." Through the circumferential constraint and radial bearing capacity of the concrete by the shear ring plates 2111b, the shear bearing capacity and pull-out resistance between the first support end 2111 and the concrete are significantly improved. Furthermore, the ring plate structure can effectively suppress cracking and spalling of concrete in high-stress areas, improving the ductility and energy dissipation capacity of the joint.

[0067] In some embodiments, the first support end 2111 is provided with a plurality of reinforcing ribs 2111c, which are spaced apart around the peripheral wall of the first support end 2111. One end of each reinforcing rib 2111c is connected to the wall of the first support member 211, and the other end can extend into the interior of the concrete column base 23. The reinforcing ribs 2111c are used to enhance the local stiffness and deformation resistance of the first support end 2111, preventing buckling or twisting of the pipe wall due to concentrated stress during concrete pouring or loading. At the same time, the reinforcing ribs 2111c form a "fin effect" in the concrete, increasing the contact area and mechanical interlocking force between the metal and the concrete, and helping to bear shear force and bending moment.

[0068] Specifically, the reinforcing rib 2111c can be a triangular structure, a trapezoidal structure, or a fan-shaped structure. One side wall of the reinforcing rib 2111c is welded to the peripheral wall of the first support end 2111, and the other side wall is welded to the bottom plate 213 located at the end of the first support end 2111 away from the tower body 10, thereby improving the overall structural stability of the first support end 2111.

[0069] Understandably, when the above three structures (stud 2111a, shear ring plate 2111b, and stiffening plate 2111c) are used individually or in combination, multiple reinforcement mechanisms can be superimposed: "point-line-surface" composite anchorage: stud 2111a provides point shear resistance, shear ring plate 2111b provides line anchorage, and stiffening plate 2111c provides surface stiffness support, forming a multi-layered, highly reliable connection system. Adaptability to different stress modes: Under the combined action of axial pressure, shear force, bending moment, and torque, multiple structures respond collaboratively, ensuring the stability of the joint under various working conditions. Improved construction tolerance and quality controllability: Even if there are minor defects in local concrete pouring, other reinforcement structures can still ensure overall connection performance, reducing the impact of construction quality fluctuations on structural safety.

[0070] refer to Figure 6 , Figure 7 and Figure 8 According to some embodiments of the present invention, a base plate 213 is provided on the end face of the first support end 2111 away from the tower body 10. The base plate 213 is fixed to the end face of the first support end 2111 and serves as a pressure-bearing platform for force transmission, uniformly transmitting the axial pressure, bending moment and other loads borne by the first support member 211 to the concrete column foot 23 and the foundation below. The base plate 213 is provided with an installation hole 2131 that runs through the height direction to provide an installation interface for connecting the ground anchor system and enhancing the anchoring capacity between the support end and the foundation.

[0071] The main body 21 also includes a ground anchor 24. The end of the ground anchor 24 away from the tower body 10 is inserted into the ground and bent to form a hook 241. The hook 241 is deeply embedded in the foundation (such as a concrete foundation or soil layer) and resists the upward pull force through mechanical anchoring, preventing the first support end 2111 from being pulled up under the action of overturning moment. As a prestressed or passive load-bearing component, the ground anchor 24 continuously provides downward restraint force during the operation of the cooling tower 100, improving the overall stability of the base 20.

[0072] One end of the ground anchor 24 near the tower body 10 passes through the mounting hole 2131. The limiting member 25, which abuts against the base plate 213, is fixedly connected to the end of the ground anchor that passes through the mounting hole 2131. The limiting member is fixedly connected to the end of the ground anchor 24 that passes through the mounting hole 2131 (e.g., by threaded connection, welding or mechanical snap-fit) and abuts against the base plate 213. This is used to lock the ground anchor 24, prevent it from retracting or loosening during the stress process, and ensure that the anchoring force remains effective.

[0073] Optionally, the limiting member 25 can be a nut, and the end of the ground anchor 24 facing the tower body 10 is provided with a thread. The limiting member 25 and the ground anchor 24 are threaded together to adjust the support state of the first support member 211.

[0074] refer to Figure 6 , Figure 7 and Figure 9 In some embodiments, reinforcing plates 214 are evenly spaced along the height direction within the flow channel. Each reinforcing plate 214 has a through-hole 215 extending along the height direction. Thus, the first support member 211, as a load-bearing component, withstands complex axial forces, bending moments, and shear forces during construction and operation. The reinforcing plates 214, acting as transverse stiffeners, effectively restrain local buckling of the flow channel wall, improving the overall stability and load-bearing capacity of the support member. During concrete pumping, high-speed flowing concrete is prone to segregation or bubble accumulation in long, inclined pipes. The reinforcing plates 214 segment the flow channel, acting as a "rectifier," mitigating sudden changes in flow velocity and improving the uniformity of concrete flow.

[0075] A portion of the edge of the reinforcing plate 214 is spaced apart from the inner wall of the flow channel, forming a vent 216. When concrete is pumped upwards along the inclined or vertical flow channel, air is easily compressed and accumulates above the reinforcing plate 214, forming an "airlock" that hinders concrete flow and may even cause pumping interruption. The vent 216 provides an escape channel for air, allowing it to escape upwards along the flow channel wall and avoiding airlock. After the gas is successfully discharged, the pressure distribution within the flow channel is more uniform, reducing pulsating pressure caused by the gas-liquid two-phase flow, which helps protect the pumping equipment and improves construction stability.

[0076] refer to Figure 1 , Figure 4 , Figure 5 and Figure 10In some embodiments, the support portion 22 includes multiple first connectors 222 and multiple second connectors 223. The first connectors 222 define a first groove segment 2211 at their ends facing the tower body 10, and the second connectors 223 define a second groove segment 2212 at their ends facing the tower body 10. The multiple first connectors 222 and second connectors 223 are arranged at intervals and connected end-to-end. The multiple first groove segments 2211 and second groove segments 2212 communicate to form a casting groove. The first connectors 222 are key load-bearing and functional units of the support portion 22, forming the first groove segment 2211 at their ends facing the tower body 10, constituting a component of the casting groove. The second connectors 223 are arranged alternately with the first connectors 222, their ends forming the second groove segment 2212, which, together with the first groove segment 2211, forms a complete annular casting groove.

[0077] The first connector 222 is fixedly connected to the top of the first support 211 (by welding or bolting) to ensure continuous force transmission in the structure. The top of the first support 211 defines an outlet that communicates with the flow channel. The first connector 222 is provided with a passage 2221 corresponding to the outlet. The passage 2221 communicates with the first trough section 2211 to form an unobstructed channel for concrete from the flow channel to the pouring trough, ensuring continuous pumping.

[0078] In this way, through alternating splicing, a closed ring structure is formed, connecting multiple first groove segments 2211 with second groove segments 2212 to form a complete and continuous casting groove. This design achieves "segmented prefabrication and integral molding," which facilitates transportation and hoisting while ensuring the integrity of the final structure. After the beginning and end are welded or connected, the support part 22 itself has sufficient rigidity and can serve as a stable platform for the subsequent construction of the tower body 10.

[0079] In some embodiments, when constructing the cooling tower 100, the first connector 222 and the first support 211 are integral parts. For example, the first connector 222 and the first support 211 can be welded into one part, which helps to eliminate the connection nodes between the first connector 222 and the first support 211, improves the structural continuity and strength, simplifies the on-site installation process, improves the construction efficiency of the cooling tower 100, and also ensures the precise alignment of the outlet 2221 and the flow channel outlet, avoiding misalignment that could lead to flow channel blockage.

[0080] Optionally, both the first connector 222 and the second connector 223 can be U-shaped. To avoid serious interference during assembly, the two second connectors can be connected to one first connector 222 at the same time. The length of the first connector 222 can be greater than the distance between the two second connectors and less than the distance between the two first connectors. The length of the second connector 223 can be equal to the distance between the two first connectors 222.

[0081] refer to Figure 11In some embodiments, multiple first reinforcing bars 224 and multiple second reinforcing bars 225 are arrayed within the casting trough. The two ends of the first reinforcing bars 224 are fixedly connected to the two side walls of the casting trough, forming transversely penetrating tie bars. During the operation of the cooling tower 100, the support 22 bears the circumferential tensile force and local bending moment from the tower body 10. The first reinforcing bars 224, acting as transverse reinforcing bars, effectively resist these loads and prevent cracking or breakage. Before the concrete solidifies, the first reinforcing bars 224 can serve as a temporary support frame, maintaining the geometry of the formwork (i.e., the first connector 222 and the second connector 223) and preventing deformation. By tying the two side walls together with the first reinforcing bars 224, it ensures that the load is evenly distributed circumferentially, avoiding localized stress concentration.

[0082] The second reinforcing bar 225 extends circumferentially along the tower body 10 and is fixedly connected to the first reinforcing bar 224. The second reinforcing bar 225 forms a circumferential reinforcement system. Under wind load, temperature changes, or internal operating pressure, the upper structure of the base 20 of the cooling tower 100 is prone to circumferential tensile stress. The second reinforcing bar 225, as the main load-bearing reinforcement, effectively bears this tensile force and prevents the development of circumferential cracks. After being fixed at intersections with the first reinforcing bar 224, it forms a spatial steel mesh, significantly enhancing the confinement effect and crack resistance of the concrete. The presence of the second reinforcing bar 225 improves the structure's plastic deformation capacity, allowing it to absorb more energy under earthquakes or sudden loads, preventing brittle failure.

[0083] In some embodiments, when constructing the cooling tower 100, the first reinforcing steel bar 224 and the first connector 222 are integrally formed. The steel bar and the metal connector are rigidly connected, avoiding the loosening or misalignment problems that may exist in traditional binding connections, ensuring a direct and reliable force path. The first reinforcing steel bar 224 and the first connector 222 are prefabricated in the factory, eliminating the need for binding each bar individually on site, reducing high-altitude work time and labor input, and accelerating the construction progress.

[0084] refer to Figures 1 to 12 Secondly, this application provides a construction method for a cooling tower 100, applicable to the aforementioned cooling tower 100, comprising:

[0085] refer to Figure 2 and Figure 3 S1: Multiple first support members 211 are aligned with ground anchor members 24 on the ground and pre-tightened by limiting members 25 to form the main body 21.

[0086] The prefabricated first support member 211 (X-shaped pipe fitting) is precisely installed on the foundation according to the design position, so that the mounting hole 2131 on its base plate 213 is aligned with the pre-embedded ground anchor member 24. The ground anchor member 24 is initially pre-tightened by the limiting member 25 (such as a nut) to achieve temporary fixation and spatial positioning of the first support member 211, forming a stable annular main body 21 skeleton.

[0087] In this way, the installation of the main load-bearing structure can be completed without the need to erect tall scaffolding, providing a stable platform for subsequent hoisting operations.

[0088] Optionally, during construction, to improve the installation stability of the first support member 211, it can be supported and fixed using guy ropes. Once the base 20 is formed, the guy ropes can be removed, facilitating construction.

[0089] The first support member 211 and the first connector 222 can be welded into an integral structure.

[0090] refer to Figure 4 S2: Hoist the second connector 223 above the main body 21, and weld the first connector 222 and the second connector 223 in sequence to form the support part 22.

[0091] The second connector 223 is hoisted to the top of the installed first support 211, alternating with the first connector 222 pre-fixed to the first support 211. The first connector 222 and the second connector 223 are then welded together end-to-end to form a continuous, closed ring structure—the support section 22. The first groove segment 2211 and the second groove segment 2212 are connected to form a pouring groove. This forms a self-supporting formwork system, eliminating the need for additional formwork supports. The welded connection ensures structural integrity and sealing, preventing grout leakage during pouring.

[0092] Optionally, the first reinforcing steel bar 224 and the first connecting member 222 can be an integral structure, and the first reinforcing steel bar 224 and the second connecting member 223 can also be an integral structure. These are prefabricated, integrated structural components when transported to the construction site, reducing construction steps and accelerating the construction progress. After the first connecting member 222 and the second connecting member 223 are welded to form the support part 22, the second reinforcing steel bar 225 is connected to the first reinforcing steel bar 224 through binding and welding to form a spatial steel mesh, thereby improving the structural strength of the base 20.

[0093] S3: Tighten the limiting component 25. Tighten the limiting component 25 and the ground anchor 24 to apply prestress, so that the first support component 211 forms a rigid anchor between itself and the foundation, thereby improving the overall anti-overturning capacity, realizing the active constraint mechanism of "installation before tensioning", and improving the initial stiffness of the base 20.

[0094] Continue to refer to Figure 4S4: Multiple pouring equipment are in place at the same time, pouring concrete into the flow channel from the pouring hole 212 to fill the flow channel in the main body 21 and the pouring groove of the support 22.

[0095] Multiple pouring devices (such as concrete pump trucks) are used to pump concrete directly from the ground into the pouring hole 212 on the side wall of the first support member 211. The concrete flows upward through the flow channel, enters the outlet 2221 through the top outlet, and finally flows into the pouring trough. Under the action of gravity and pump pressure, the concrete synchronously fills the flow channel of the first support member 211 and the pouring trough of the support part 22 (forming a ring beam structure), realizing integrated continuous pouring. At this time, the reinforcing plate 214 and the vent 216 in the flow channel ensure smooth concrete flow and smooth gas discharge, avoiding air blockage.

[0096] In one specific embodiment, the flow channel is moistened with water vapor before pumping concrete, which facilitates venting during pumping. This, combined with the vent 216 formed by the reinforcing plate 214 and the flow channel, ensures dense pouring. During concrete pumping, multiple pouring devices can be positioned simultaneously, symmetrically and synchronously lifting concrete at each first support end 2111, or synchronously lifting concrete at equal intervals, ensuring consistent internal pouring of each first support 211.

[0097] During the pouring process, key data such as pressure in the flow channel, internal deformation of the first support member 211, and lifting height are monitored to assess the structural strength of the base 20.

[0098] refer to Figure 5 S5: Casting concrete column base 23. Formwork is erected between the first support ends 2111 of adjacent first support members 211, and concrete column base 23 is cast, rigidly connecting the first support ends 2111 of each first support member 211 into a single unit. The concrete column base 23 simultaneously encloses reinforcing structures such as studs 2111a, shear ring plates 2111b, and reinforcing ribs 2111c, forming a closed ring foundation and enhancing overall stability. The concrete column base 23 diffuses the upper load to a wider area of ​​the foundation, reducing local compressive stress.

[0099] S6: Cast the tower body 10 above the support 22.

[0100] In one specific embodiment, the completed support section 22 serves as the starting platform for the slipform system, and the tower body 10 cylinder wall is continuously cast using a slipform casting process. The flat, high-strength annular structural surface provided by the support section 22 ensures smooth operation and accurate trajectory of the slipform system. The tower body 10 and the base 20 are structurally continuously formed, with a clear force transmission path.

[0101] The cooling tower 100 and its construction method of the present invention form a main body 21 by splicing together a first support member 211, which is then connected to a support member 22 to form a base 20. A flow channel and a pouring hole 212 are provided inside the first support member 211, enabling continuous pouring of concrete by conveying it upwards from the internal flow channel to the pouring trough. Compared to the traditional construction method that relies on external scaffolding for concrete delivery and formwork support, this significantly reduces the scope and height of tall and complex scaffolding, thereby significantly reducing the amount of scaffolding materials and labor input. The elimination of large-scale scaffolding simplifies on-site construction organization, reduces material rental, transportation, and labor costs, while freeing up construction site space, facilitating cross-operation of other processes, and improving the overall progress control capability of power plant construction.

[0102] Finally, it should be noted that other embodiments of the invention will readily occur to those skilled in the art upon consideration of the specification and practice of the invention disclosed herein. This invention is intended to cover any variations, uses, or adaptations of the invention that follow the general principles of the invention and include common knowledge or customary techniques in the art not disclosed herein, and is not limited to the precise structures described above and shown in the accompanying drawings, and various modifications and changes can be made without departing from its scope. The scope of the invention is limited only by the appended claims.

Claims

1. A cooling tower (100), characterized in that, include: Tower body (10); A base (20) is supported on the ground, and the tower body (10) is disposed on the base (20). The base (20) includes: The main body (21) includes a plurality of first support members (211), which are connected in a circumferential manner to form the main body (21), and adjacent first support members (211) are fixedly connected to each other. A support part (22) is provided above the main body part (21), and a casting groove is defined on the upper side of the support part (22); a flow channel is defined in the first support member (211), and a casting hole (212) communicating with the flow channel is provided in the first support member (211), and the flow channel is communicating with the casting groove, and concrete is poured in both the flow channel and the casting groove.

2. The cooling tower (100) according to claim 1, characterized in that, The first support member (211) has a first support end (2111) away from the tower body (10) along the height direction and a second support end (2112) close to the tower body (10). Along the circumference of the base (20), both the first support end (2111) and the second support end (2112) are provided in two. The interval between the two first support ends (2111) is greater than the interval between the two second support ends (2112).

3. The cooling tower (100) according to claim 2, characterized in that, The first support member (211) is formed as an X-shaped tube.

4. The cooling tower (100) according to claim 3, characterized in that, The first support ends (2111) of two adjacent first support members (211) are fixedly connected by concrete column bases (23).

5. The cooling tower (100) according to claim 4, characterized in that, The first support end (2111) is provided with a plurality of studs (2111a), and the plurality of studs (2111a) are arranged in an array on the peripheral wall of the first support end (2111); and / or, The first support end (2111) is provided with a plurality of shear ring plates (2111b) arranged at intervals along the height direction; and / or, The first support end (2111) is provided with a plurality of reinforcing ribs (2111c), which are arranged at intervals around the peripheral wall of the first support end (2111).

6. The cooling tower (100) according to claim 2, characterized in that, The first support end (2111) is provided with a base plate (213) on the end face away from the tower body (10), and the base plate (213) is provided with a mounting hole (2131) that runs through the height direction. The main body (21) also includes: a ground anchor (24), one end of which is inserted into the ground away from the tower body (10) and is bent to form a hook (241), the other end of which is close to the tower body (10) passes through the mounting hole (2131), and a limiting member (25) that abuts against the base plate (213) is fixedly connected to the end of the ground anchor that passes through the mounting hole (2131).

7. The cooling tower (100) according to claim 1, characterized in that, The flow channel is provided with reinforcing plates (214) at equal intervals along the height direction. The reinforcing plates (214) have flow holes (215) that penetrate along the height direction, and a portion of the edge of the reinforcing plates (214) is spaced apart from the inner wall of the flow channel to form a vent (216).

8. The cooling tower (100) according to any one of claims 1-7, characterized in that, The support (22) includes a plurality of first connectors (222) and a plurality of second connectors (223). The first connectors (222) define a first groove (2211) at one end facing the tower body (10), and the second connectors (223) define a second groove (2212) at one end facing the tower body (10). The first connector (222) is fixedly connected to the top end of the first support (211). The top end of the first support (211) defines an outlet that communicates with the flow channel. The first connector (222) is provided with a through-hole (2221) corresponding to the outlet. The through-hole (2221) communicates with the first groove segment (2211). Multiple first connectors (222) and second connectors (223) are arranged at intervals and connected end to end; multiple first groove segments (2211) and second groove segments (2212) communicate to form the casting groove; and / or, When constructing the cooling tower (100), the first connector (222) and the first support (211) are integral parts.

9. The cooling tower (100) according to claim 8, characterized in that, The casting trough is arrayed with multiple first reinforcing bars (224) and multiple second reinforcing bars (225). The two ends of the first reinforcing bars (224) are fixedly connected to the two side walls of the casting trough, respectively. The second reinforcing bars (225) extend circumferentially along the tower body (10) and are fixedly connected to the first reinforcing bars (224); and / or, When constructing the cooling tower (100), the first reinforcing steel bar (224) is integrated with the first connector (222) / the second connector (223).

10. A construction method for a cooling tower (100), characterized in that, The cooling tower (100) applied to any one of claims 1-9 comprises: S1: Multiple first support members (211) are aligned with ground anchor members (24) on the ground and pre-tightened by limiting members (25) to form the main body (21). S2: Hoist the second connector (223) to the top of the main body (21), and alternately arrange the first connector (222) and the second connector (223) that are pre-fixed to the top of the first support (211) and weld them in sequence to form the support (22). S3: Fasten the limiting member (25); S4: Multiple pouring equipment are positioned simultaneously to pour concrete into the flow channel from the pouring hole (212) to fill the flow channel in the main body (21) and the pouring groove of the support (22); S5: Pour concrete column base (23); S6: Cast the tower body (10) above the support (22).

Citation Information

Patent Citations

  • Building information modeling (BIM)-based construction method for arc-shaped stiff structure ring beam in extra-large space of venue

    CN118855230A

  • Partially prefabricated modular foundation system

    WO2008036934A2