电力电缆铺设施工设备及方法
By installing front and rear clamping booster sections and a pitch detection mechanism in the power cable laying equipment, the problem of interrupted booster force in the tracked conveyor was solved, enabling continuous and uninterrupted cable laying with a constant booster force over long distances. This improved the safety and continuity of construction and reduced labor costs.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- JILIN YIXING ELECTRIC POWER ENGINEERING CO LTD
- Filing Date
- 2025-12-24
- Publication Date
- 2026-07-17
AI Technical Summary
In existing cable laying construction, the booster force of the tracked conveyor is interrupted during the switching process between clamping the traction rope and the cable, which leads to a sudden drop in cable speed and the risk of traction rope overload and breakage. In addition, a large amount of manual operation is required, which affects the safety and continuity of construction.
A power cable laying construction device was designed, which uses two front and rear pressing and pushing sections. The cable end position is automatically identified by a variable pitch detection mechanism to ensure that the pushing force is uninterrupted during the switching process and to reduce the need for manual operation.
It improves the continuity and safety of cable laying, reduces construction costs, reduces the number of operators required, and improves response speed and operational accuracy.
Smart Images

Figure CN121395145B_ABST