A data management system for oil and gas field fracturing processes

CN121480976BActive Publication Date: 2026-06-16CHENGDU ZHENHUA WANXING TECHNOLOGY DEVELOPMENT CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
CHENGDU ZHENHUA WANXING TECHNOLOGY DEVELOPMENT CO LTD
Filing Date
2025-11-13
Publication Date
2026-06-16

AI Technical Summary

Technical Problem

Existing oil and gas field fracturing processes suffer from significant material waste and fail to achieve the expected fracturing results, while lacking an effective data management system for integration and management.

Method used

A data management system for oil and gas field fracturing processes is provided. It acquires and stores historical data on consumables, equipment, monitoring and production through historical data units, establishes data linkage relationships, collects and processes data in real time, and adjusts equipment parameters in real time to optimize the utilization of consumables.

🎯Benefits of technology

This achieved efficient use of consumables, improved fracturing effect, reduced waste, and ensured optimization of fracturing process and production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121480976B_ABST
    Figure CN121480976B_ABST
Patent Text Reader

Abstract

The application discloses a kind of data management systems for oil and gas field fracturing process, it is related to oil and gas field data management technical field, complete fracturing process is obtained and stored under different time and space four kinds of historical data of consumables, equipment, monitoring and production by historical data unit, and corresponding data set is established;With the help of data linkage unit, analyze historical data, process consumables and monitoring historical data into curve diagram as matching reference, use production historical data as adjustment reference, use equipment historical data corresponding equipment parameter as adjustment target, and build up linkage relationship between four kinds of data;Through real-time data unit, real-time consumables, monitoring data in fracturing process are collected and curve diagram is handled, and equipment parameters are collected simultaneously;Through adjustment unit, real-time curve diagram is matched with historical data corresponding curve diagram, and according to matching result and linkage relationship, equipment parameters are adjusted in real time.The application solves the problems of existing fracturing process consumable waste and fracturing effect difficult to achieve the expected result.
Need to check novelty before this filing date? Find Prior Art