This invention discloses a method for driving large-diameter pipe piles in rubble-filled soil layers, belonging to the field of pile foundation engineering construction. The method employs a casing drilling rig, whose power head can be selectively connected to either a down-the-hole hammer drill or a reaming drill, with double clamps at the top and bottom to hold the casing or pipe pile respectively. During construction, the down-the-hole hammer drill is first used for rock-breaking drilling, simultaneously lowering the steel casing to the design depth to form a temporary retaining wall. After backfilling with rock debris, the steel casing is pulled out. Subsequently, the reaming drill is switched to, and in-situ reaming drilling is performed while simultaneously driving the pipe pile to the design elevation. This method integrates a dust removal and slag removal system to collect the dust and slag discharged from the borehole, uses an electromagnetic vibration pile-pulling tong with sliding rail positioning to retrieve the steel casing, and utilizes a portable measuring device to control the verticality of the driven pile. This invention solves the problems of easy borehole collapse, grout leakage, off-center drilling, and large concrete filling coefficient in traditional rubble-filled soil layers, achieving large-diameter pipe pile driving construction with no mud slurry retaining wall and low pollution.
Need to check novelty before this filing date? Find Prior Art
Citation Information
Patent Citations
Construction methods for retaining wall drilling in areas with deep rock fill and silt
CN113669003B
Deep and thick rockfill layer down-the-hole hammer hole guiding and rotary jet drilling and spraying integrated pile forming equipment
CN114703840A
Construction method for staged upward pulling of self-propelled steel casing in complex stratum
CN117051834A
Construction method for gravel pile of thick dyke layer
CN119121897A
Drilling rig with following pipe pile and construction method for following pipe pile
CN102561946A