Mine air cooler selection calculation method considering latent heat load

CN121524463BActive Publication Date: 2026-08-28CHINA COAL CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202511617465.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-11-06
Publication Date
2026-08-28
Estimated Expiration
2045-11-06

AI Technical Summary

Technical Problem

这种方法缺乏理论依据,在极度潮湿或干燥的矿井环境中,误差巨大,使总冷负荷计算不足,所选空冷器制冷量无法将空气处理到设计要求的温湿度状态点,造成降温除湿效果不达标;若是采用简化粗略的潜热负荷处理方法,又可能导致对负荷的计算不准确,所选空冷器制冷量过大,不仅增加了初期设备投资,更会导致设备在部分工况下频繁启停或低效运行,浪费大量电能

Benefits of technology

本发明通过确定空冷器进、出口空气状态及矿井风流体积流量;然后基于焓湿学原理,计算空气处理过程的焓差,从而精确得到包含显热和潜热两部分的总冷负荷;最后根据此总冷负荷值,考虑安全余量后对空冷器进行选型;

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121524463B_ABST
    Figure CN121524463B_ABST
Patent Text Reader

Abstract

The application discloses a kind of mine air cooler selection calculation method considering latent heat load, comprising the following steps: S1, determine mine working face;S2, determine mine basic design parameters, including mine working face design parameters, total cooling capacity of mine;S3, calculate mine air cooler selection parameters, including calculating air cooler total refrigerating capacity Q qt And calculating air cooler sensible heat ratio SHR;S4, air cooler selection, select air cooler that satisfies air cooler total refrigerating capacity Q qt And calculating air cooler sensible heat ratio SHR two selection indexes simultaneously.The application can realize the accurate, scientific selection of air cooler, ensure that cooling and dehumidification can achieve the expected effect, and avoid the deficiency or redundancy of equipment capacity.