By combining a gravity balancing mechanism and a vertical displacement power mechanism, the problems of excessive power load and operational instability of existing cross-fault tunnel simulation test devices under large-tonnage test environments have been solved, achieving stable operation and improved safety of the large-tonnage test system.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- SHANDONG UNIV
- Filing Date
- 2025-11-20
- Publication Date
- 2026-07-17
AI Technical Summary
Existing cross-fault tunnel simulation test equipment has problems such as excessive power device load, unsuitability for large-tonnage working conditions, excessively high power and structural strength requirements, and insufficient operational stability and safety, especially during large-tonnage vertical reciprocating motion, which is prone to impact and vibration.
The gravity balancing mechanism (including spring balancer and damping spring damper) is combined with the vertical displacement power mechanism. The gravity balancing mechanism shares the weight of the model box, so that the displacement simulation cylinder only needs to provide the driving force for vertical reciprocating motion. Combined with the sliding constant force clamping mechanism and reaction frame, the stable operation of the large-tonnage test system is achieved.
It significantly reduces the pressure on the hydraulic cylinder and its associated power source, lowers the drive power requirements and structural strength requirements, improves the operational stability and safety of the device, avoids problems such as insufficient drive power or structural fatigue, and extends the service life of the device.