Disaster damage monitoring method and identification device for power facilities

By employing a disaster damage monitoring method based on multi-dimensional feature profiling and a decoupled architecture, and dynamically scheduling a pre-layered model, combined with static thresholds and dynamic trend analysis, the problem of insufficient multi-source data fusion in power facility disaster damage monitoring is solved, achieving efficient and real-time disaster damage identification and early warning.

CN121542837BActive Publication Date: 2026-11-24DONGFANG ELECTRONICS CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202511680384.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-11-17
Publication Date
2026-11-24
Estimated Expiration
2045-11-17

AI Technical Summary

Technical Problem

Existing power facility disaster monitoring technologies suffer from problems such as insufficient fusion of multi-source heterogeneous data, low efficiency in computing resource utilization, poor real-time response, and rigid algorithm models. These issues result in incomplete and inaccurate perception of disaster status, making it difficult to achieve early warning and adaptive optimization.

Method used

By constructing multi-dimensional feature profiles, dynamically scheduling pre-layered models, adopting a decoupled architecture to process classification and localization tasks in parallel, integrating static thresholds and dynamic trend analysis, establishing a cloud-edge collaborative intelligent canary release mechanism, and forming a closed-loop self-evolving system.

Benefits of technology

It significantly improved the accuracy of disaster damage identification and early warning capabilities, extended the emergency response window, enhanced the accuracy and predictability of the monitoring system, and achieved a leap from delayed alarms to early warnings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121542837B_ABST
    Figure CN121542837B_ABST
Patent Text Reader

Abstract

This invention relates to a method and device for monitoring and identifying disaster damage to power facilities, belonging to the field of power facility disaster damage monitoring technology. The method includes: constructing a multi-dimensional feature profile of the disaster damage identification device by collecting multi-source data, and dynamically scheduling and matching a pre-layered model for concurrent tasks based on the multi-dimensional feature profile; performing decoupled analysis on the multi-dimensional feature profile using the pre-layered model to complete classification and localization in parallel; training a new model by aggregating data uploaded by all disaster damage identification devices, calculating a comprehensive score based on multi-dimensional feature weights set according to the release target, and selecting gray-scale release targets. This invention achieves dynamic scheduling of model resources through multi-dimensional feature profiles, improving the efficiency of edge-side resource utilization and real-time response; adopts a decoupled architecture to process classification and localization tasks in parallel, improving identification accuracy; and builds a closed-loop self-evolving system based on a cloud-edge collaborative intelligent gray-scale release mechanism, comprehensively improving monitoring accuracy, predictability, and continuous optimization capabilities.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of power facility disaster damage monitoring technology, specifically relating to a power facility disaster damage monitoring method and identification device. Background Technology

[0002] As a critical asset related to the national economy and people's livelihood, power infrastructure is facing severe challenges from sudden natural disasters such as torrential rains and floods, earthquakes, landslides, and mudslides. These disasters can easily trigger a chain reaction of damage to power facilities, from mechanical damage to electrical failure, leading to large-scale power outages.

[0003] However, existing disaster loss monitoring technologies have significant limitations: at the perception level, most systems rely on monitoring a single type of mechanical or electrical quantity, failing to effectively integrate multi-source heterogeneous data. This results in an unclear understanding of the disaster loss evolution mechanism coupled with the "mechanical-electrical" relationship, leading to incomplete and inaccurate perception of disaster loss status. At the analysis and decision-making level, traditional methods often employ fixed models and static threshold criteria, making it difficult to adapt to the heterogeneous hardware resources of field-deployed terminals and dynamically changing disaster scenarios. This results in low computational resource utilization efficiency, poor real-time response, and an inability to provide early warnings based on changing trends in the early stages of a disaster. At the system evolution level, the updating and verification process of algorithm models is rigid, lacking a risk-controlled, progressive, intelligent release and closed-loop optimization mechanism in a real operating environment, which limits the overall system's adaptability and continuous improvement capabilities. Summary of the Invention

[0004] To address the aforementioned problems in existing technologies, this invention provides a disaster monitoring method and identification device for power facilities. It achieves dynamic scheduling of model resources through multi-dimensional feature profiling, improving edge resource utilization efficiency and real-time response. A decoupled architecture is employed to process classification and localization tasks in parallel, significantly improving identification accuracy. Static thresholds and dynamic trend analysis are integrated to achieve early warning. A closed-loop self-evolving system is constructed based on a cloud-edge collaborative intelligent grayscale release mechanism, comprehensively enhancing monitoring accuracy, predictability, and continuous optimization capabilities.

[0005] The objective of this invention can be achieved through the following technical solutions: The first aspect of this disclosure provides a method for monitoring disaster damage to power facilities, comprising the following steps: S1. Data perception and dynamic scheduling: By collecting multi-source data, a multi-dimensional feature profile of the disaster damage identification device is constructed, and a pre-layered model is matched for dynamic scheduling of concurrent tasks based on the multi-dimensional feature profile. S2, Decoupled Identification and On-site Early Warning: Decoupled analysis of multi-dimensional feature profiles is performed through a pre-layered model, and classification and localization are completed in parallel. On-site early warning and data upload are triggered based on the analysis results according to preset thresholds. S3, Optimization and Intelligent Gray-Scale Release: A new model is generated by aggregating data uploaded by all disaster damage identification devices, and a comprehensive score is calculated based on the release target by setting multi-dimensional feature weights to select gray-scale release targets; The decoupling identification and on-site early warning include the following steps: S21. Intelligent identification: Based on scheduling instructions, load the selected pre-hierarchical model and perform decoupling analysis on the incoming sensor data to complete the classification and localization tasks; S22. Local Early Warning: Based on the results of decoupling analysis, early warning is issued according to preset threshold rules, and the identification results, key feature data and the applied pre-layered model ID are encapsulated and uploaded through the optimal communication link.

[0006] Furthermore, the data perception and dynamic scheduling includes the following steps: S11. Multi-dimensional feature profile construction: Construct a multi-dimensional digital profile for each disaster damage identification device, including hardware performance, environmental risks, and business criticality; S12. Model pre-layering and dynamic scheduling: Based on the multi-dimensional feature profile, select a pre-layered model from a pre-processed library of pre-layered models with different computational depths for multiple concurrent recognition tasks and generate scheduling instructions.

[0007] Furthermore, the pre-layered model library includes pre-layered processing based on a chip-level disaster assessment device: For each disaster damage identification DNN model, multiple splitting points are selected for pre-stratification; Generate a model hierarchy from fast response to fine analysis, and record the computational cost, memory access cost, and output data size for each pre-hierarchical model; Construct a pre-hierarchical combined solution set to prepare optional models with multiple computational depths for each AI task.

[0008] Furthermore, the decoupling analysis includes the following steps: The raw data of the multidimensional feature profile is standardized, and features are extracted from the standardized data based on the selected pre-hierarchical model to generate a set of shared feature maps containing information at different levels. The shared feature maps are fed into two independent decoding branches for parallel processing, including: Classification branch: A hierarchical semantic enhancement module is used to determine the type of disaster damage by aggregating features from different semantic levels; Location Branch: Using a spatial information refinement module, combined with high and low resolution features, it accurately predicts the location, shape, or extent of disaster damage.

[0009] Furthermore, the step of issuing warnings based on preset threshold rules includes executing: Time series data of monitoring indicators are constructed from the state variables of the decoupling analysis results. The first and second derivatives of each indicator are calculated, and a trend analysis model with a sliding time window is established. A dual-criteria approach is used to determine the warning level: Threshold criterion: Emergency threshold: Monitored value > 90% of preset safety threshold; Note the threshold: The monitored value is greater than 70% of the preset safety threshold and less than or equal to 90%. Acceleration rate criterion: Emergency acceleration rate: Variable acceleration > 80% of the acceleration threshold; Note the acceleration rate: the change in acceleration is greater than 50% of the acceleration threshold and less than or equal to 80%.

[0010] Furthermore, the step of issuing warnings based on preset threshold rules also includes executing: Early warning level decision: When the monitored value enters the emergency threshold range and the change in acceleration enters the emergency acceleration state, a red alert is immediately triggered. An orange alert is triggered when the monitored value enters the emergency threshold range and the change in acceleration is in the state of attention acceleration. A yellow alert is triggered when the monitored value is within the attention threshold range and the change in acceleration enters the emergency acceleration state. A blue alert is triggered when the monitored value is within the attention threshold range and the acceleration change is also within the attention acceleration state.

[0011] Furthermore, the optimization and intelligent canary release includes the following steps: S31. Data Aggregation and Model Optimization: The cloud computing center gathers the identification results and raw data reported from all disaster damage identification devices, starts a distributed training task, adopts a strategy that combines pre-training and fine-tuning, and introduces machine learning methods to optimize specific features. The trained new model is subjected to the same pre-layering process as the old model, generating a series of sub-models with different computational loads and storing them in the pre-layered model library. S32, Intelligent Gray-Scale Release Decision: After the new model has passed basic verification, a release task is automatically created on the gray-scale release platform, and the preset weight configuration scheme is called according to the release target; Calculate the comprehensive score of all disaster damage identification devices based on the current weight configuration scheme, and automatically filter out the gray target list from the comprehensive score ranking according to the preset release ratio. S33. Offloading and Deployment: Based on the grayscale target list, the container management application deploys the new model algorithm container to the target disaster assessment device accurately and automatically through a secure channel; S34. Dual-track monitoring and closed-loop decision-making: Run the new model and the old model in parallel, monitor and compare their performance indicators, and use statistical methods to determine whether the new model has achieved the expected results.

[0012] Furthermore, the preset weight configuration scheme includes: During the stability verification phase, the weights are set as follows: hardware performance: 0.6, environmental risk: 0.2, and business criticality: 0.2. During the performance verification phase, the weights are set as follows: hardware performance: 0.3, environmental risk: 0.5, and business criticality: 0.2. During the effectiveness verification phase, the weights are set as follows: hardware performance: 0.2, environmental risk: 0.4, and business criticality: 0.4.

[0013] The second aspect of this disclosure provides a disaster damage identification device for power facilities, which performs a disaster damage monitoring method for power facilities as described above, including a multi-dimensional feature perception module, an edge computing module, a decoupled identification and analysis module, an on-site early warning module, and a containerized operation and maintenance module; The multi-dimensional feature perception module is used for the collection, aggregation and standardization of multi-source heterogeneous data, and provides energy management and communication link self-adaptation functions for the disaster damage identification device. The edge computing module is used to perform resource-aware model loading and computation adaptation, and to call and instantiate the specified AI model in the local pre-layered model library according to the scheduling instructions to complete the inference task; The decoupled identification and analysis module is used to perform feature extraction and parallel decoding based on deep neural networks, respectively complete the classification and regression tasks of the input data, and output the disaster type confidence and spatial location information.

[0014] As a preferred technical solution of the present invention, the local early warning module is used to perform rule-based state assessment and early warning decision on the identification results, and manage the northbound communication protocol stack to realize the encapsulation and uploading of alarm information and key data. The containerized operation and maintenance module is responsible for the containerized lifecycle management and resource isolation of the upper-layer application software of the disaster loss identification device, as well as the reception, deployment and A / B testing of new version algorithm models.

[0015] The beneficial effects of this invention are as follows: This invention constructs a multi-dimensional feature profile of the disaster damage identification device, enabling dynamic and precise scheduling and adaptation of model resources, effectively improving edge computing efficiency and task real-time performance. Furthermore, it employs a decoupled identification architecture to process classification and location tasks in parallel, significantly enhancing disaster damage identification accuracy. By integrating static thresholds and dynamic trend analysis, it achieves a leap from delayed alarms to early warnings, greatly extending the emergency response window. Finally, through data aggregation and intelligent gray-scale release mechanisms, it forms a closed-loop self-evolving system with cloud-based iterative optimization and controllable edge risks, comprehensively improving the accuracy, predictability, and continuous optimization capabilities of the monitoring system. Attached Figure Description

[0016] To facilitate understanding by those skilled in the art, the present invention will be further described below with reference to the accompanying drawings.

[0017] Figure 1 A schematic diagram illustrating the steps of a disaster damage monitoring method for power facilities provided in an embodiment of the present invention; Figure 2 This is a schematic diagram illustrating the steps of data perception and dynamic scheduling provided in an embodiment of the present invention; Figure 3 This is a schematic diagram illustrating the steps of decoupling identification and on-site early warning provided in an embodiment of the present invention; Figure 4 This is a schematic diagram illustrating the optimization and intelligent grayscale release steps provided in an embodiment of the present invention; Figure 5 This is a schematic diagram of the structure of a power facility damage identification device provided in an embodiment of the present invention. Detailed Implementation

[0018] To further illustrate the technical means and effects of the present invention in achieving its intended purpose, the following detailed description of the specific implementation methods, structures, features, and effects of the present invention, in conjunction with the accompanying drawings and preferred embodiments, is provided.

[0019] This embodiment provides a method for monitoring disaster damage to power facilities, such as... Figure 1 As shown, it includes the following steps: S1. Data Awareness and Dynamic Scheduling: By collecting multi-source data, a multi-dimensional feature profile of the disaster damage identification device is constructed. Based on this multi-dimensional feature profile, a pre-layered model is matched for dynamic scheduling of concurrent tasks, such as... Figure 2 As shown, it includes the following steps: S11. Multi-dimensional feature profile construction: Construct a multi-dimensional digital profile for each disaster damage identification device, including hardware performance, environmental risks, and business criticality.

[0020] It should be noted that the hardware performance dimension includes status data from the device's own operating system and hardware monitoring unit, such as CPU / GPU utilization, memory usage, battery level, and chip temperature; the environmental risk dimension includes historical disaster data, real-time meteorological / geological early warning levels, and heterogeneous data collected by MEMS sensors (triaxial acceleration, tilt, settlement, displacement, etc.); and the business criticality dimension comes from the power grid company's asset management system and dispatch system, which are pre-configured, relatively static metadata, such as load importance, network structure location, and recovery difficulty.

[0021] In this embodiment, the disaster damage identification device collects data from all sensors via RS485 bus (southbound communication) and Modbus protocol; and encapsulates multi-source heterogeneous data into a unified internal data format, achieving decoupling from the underlying hardware sensors. Simultaneously, the device automatically selects the optimal communication path based on the deployment scenario, such as prioritizing RJ45 wired network, followed by 4G wireless communication (supporting APN private network) or BeiDou short message service as backup. Seamless power switching is employed: in scenarios with readily available power (power plants, distribution centers), broadband AC / DC power supply is used. In scenarios without mains power (transmission towers), a solar + lithium iron phosphate battery power supply scheme is used.

[0022] S12. Model pre-layering and dynamic scheduling: Based on the multi-dimensional feature profile, the most suitable model combination is selected from the pre-processed pre-layered model library with different computational depths for multiple concurrent identification tasks (such as simultaneous earthquake and landslide analysis), and scheduling instructions are generated.

[0023] Specifically, the status of the disaster damage assessment device is first obtained through multi-dimensional feature profiling. Then, the metadata of all available models in the pre-layered model library of the cloud computing center is queried, including computational load, memory usage, and recognition accuracy. Based on the current status of the disaster damage assessment device (resource constraints and task priorities), the most suitable model layer is selected for each concurrent task through a multi-objective optimization algorithm. For example, a deep model is selected for fine recognition when computing power is sufficient, and a shallow model is selected to ensure rapid response when resources are scarce. After generating a scheduling instruction containing the specific model version and resource allocation, it is sent to the edge computing module of the device. After receiving the instruction, the edge computing module loads the specified model and completes the dynamic adaptation of computing resources, thereby maximizing resource utilization efficiency while ensuring real-time performance.

[0024] The pre-layered model library includes pre-layered processing based on chip-level disaster detection devices: For each disaster damage identification DNN model (earthquake identification, landslide identification, flood identification, etc.), multiple splitting points are selected for pre-layering; Generate a model hierarchy from fast response to fine analysis, and record the computational cost, memory access cost, and output data size for each pre-hierarchical model; Construct a pre-hierarchical combined solution set to prepare optional models with multiple computational depths for each AI task.

[0025] It should be noted that pre-layering processing enables the system to dynamically balance computational efficiency and recognition accuracy based on real-time resource conditions, providing the optimal model configuration scheme for disaster loss monitoring tasks in different scenarios.

[0026] S2. Decoupled Identification and On-Site Early Warning: A pre-layered model is used to decouple and analyze multi-dimensional feature profiles, performing classification and localization in parallel. Based on the results, on-site early warnings and data uploads are triggered according to preset thresholds. Figure 3 As shown, it includes the following steps: S21. Intelligent identification: Based on scheduling instructions, load the selected pre-hierarchical model and perform decoupling analysis on the incoming sensor data to complete the classification and localization tasks.

[0027] The decoupling analysis includes the following steps: The raw data of the multidimensional feature profile is standardized, and features are extracted from the standardized data based on the selected pre-hierarchical model to generate a set of shared feature maps containing information at different levels. The shared feature maps are fed into two independent decoding branches for parallel processing, including: Classification branch: Adopting a structure such as the hierarchical semantic enhancement module (HSEM), it focuses on learning the high-level semantic information of the target by aggregating features from different semantic levels, judging the type of disaster damage, and outputting a classification confidence score to answer the question "what is it" (e.g., "This is a seismic wave, confidence score 97%"). The localization branch employs a structure similar to the Spatial Information Refinement Module (SIRM). Combining high- and low-resolution features, it focuses on the spatial details and texture information of the features to accurately predict the location, shape, or extent of damage. Within this branch, an IoU-aware prediction sub-branch is introduced, specifically to evaluate the overlap between the predicted bounding box and the actual location, thereby strengthening the correlation between classification results and localization quality. This branch ultimately outputs localization information, answering the questions "Where is it, and how severe is it?" (e.g., "Tower deviated 15 degrees east, settlement 3 cm").

[0028] It should be noted that classification tasks focus on high-level semantic features, while localization tasks require fine texture details. Coupled with one module, the two will interfere with each other. Therefore, they are decoupled and each is assigned to the most suitable network structure for processing.

[0029] S22. Local Early Warning: Based on the results of decoupling analysis, early warning is issued according to preset threshold rules, and the identification results, key feature data and the applied pre-layered model ID are encapsulated and uploaded through the optimal communication link.

[0030] Issue an alert based on preset threshold rules and execute the following: From the state variables of the decoupling analysis results, construct time series data of monitoring indicators (such as tilt angle, settlement rate, vibration frequency, etc.), calculate the first derivative (rate of change) and second derivative (acceleration of change) of each indicator, and establish a trend analysis model of the sliding time window (such as the most recent 10 sampling periods); A dual-criteria approach is used to determine the warning level: Threshold criterion: Emergency threshold: Monitored value > 90% of preset safety threshold; Note the threshold: The monitored value is greater than 70% of the preset safety threshold and less than or equal to 90%. Acceleration rate criterion: Emergency acceleration rate: Variable acceleration > 80% of the acceleration threshold; Note the acceleration rate: the change in acceleration is greater than 50% of the acceleration threshold and less than or equal to 80%; Early warning level decision: Red Alert (Highest Level): Triggered immediately when the monitored value enters the emergency threshold range and the change in acceleration enters the emergency acceleration rate state; Orange alert: Triggered when the monitored value enters the emergency threshold range, but the change in acceleration is only in the attention acceleration state; Yellow alert: Triggered when the monitored value is within the attention threshold range, but the change in acceleration enters the emergency acceleration state; Blue alert (lowest level): Triggered when the monitored value is within the attention threshold range and the change acceleration is also in the attention acceleration state.

[0031] In this embodiment, the on-site early warning decision-making mechanism has evolved from an alarm mode based on static threshold criteria to a dynamic trend early warning mode that integrates real-time change rate and acceleration analysis. It can not only issue alarms when monitored parameters exceed static safety thresholds, but also issue early warning signals before the absolute value of the parameters reaches the critical threshold by identifying a significant increase in the rate of change of the monitored parameters. This trend prediction-based early warning strategy significantly extends the response time window for emergency response and effectively suppresses the probability of emergency response failure caused by the sudden acceleration of the disaster damage evolution process.

[0032] S3. Optimization and Intelligent Gray-Scale Release: A new model is generated by aggregating data uploaded from all disaster damage identification devices. Based on the release target, multi-dimensional feature weights are set to calculate a comprehensive score and filter gray-scale targets, such as... Figure 4 As shown, it includes the following steps: S31. Data Aggregation and Model Optimization: The cloud computing center gathers the identification results and raw data reported from all disaster damage identification devices, starts a distributed training task, adopts a strategy that combines pre-training and fine-tuning, and introduces machine learning methods to optimize specific features. The trained new model is subjected to the same pre-layering process as the old model, generating a series of sub-models with different computational loads and storing them in the pre-layered model library.

[0033] S32. Intelligent Gray-Scale Release Decision: After the new model has passed basic verification, a release task is automatically created on the gray-scale release platform, and the preset weight configuration scheme is called according to the release goal (such as verifying stability).

[0034] The preset weight configuration scheme includes: During the stability verification phase, the weights were set as follows: hardware performance: 0.6, environmental risk: 0.2, and business criticality: 0.2. Devices with strong computing power, sufficient memory, and low load were prioritized, while high-risk disaster areas and business-critical equipment were avoided to keep the risks to a minimum.

[0035] During the performance verification phase, the weights were set as follows: hardware performance: 0.3, environmental risk: 0.5, and business criticality: 0.2. Devices in medium- to high-risk areas were gradually included to verify the performance of the new algorithm in real disaster scenarios. This included medium-critical equipment to test the algorithm's adaptability in important but not core scenarios.

[0036] During the effective verification phase, the weights were set as follows: hardware performance: 0.2, environmental risk: 0.4, and business criticality: 0.4. Ultimately, the algorithm was covered to verify the maximum value of the algorithm in core business scenarios and ensure that critical infrastructure received optimal protection.

[0037] Calculate the comprehensive score of all disaster damage identification devices based on the current weight configuration scheme, and automatically filter out the gray target list from the comprehensive score ranking according to the preset release ratio (e.g., 5%).

[0038] S33. Offloading and Deployment: Based on the grayscale target list, the container management application deploys the new model algorithm container to the target disaster assessment device accurately and automatically through a secure channel; S34. Dual-track monitoring and closed-loop decision-making: Run the new model and the old model in parallel, monitor and compare their performance indicators, and use statistical methods to determine whether the new model has achieved the expected results.

[0039] The performance metrics include business metrics (such as recognition accuracy, false alarm rate, and false negative rate) and system metrics (such as model inference time, CPU / memory usage, and energy consumption).

[0040] Automated decision-making based on confidence intervals: Success criteria: When a 95% confidence level is reached to confirm that the new version is significantly better than the old version in core metrics, the weighting strategy is automatically adjusted and the release scope is gradually expanded (50%→100%). Circuit breaker mechanism: When a key indicator deteriorates to the threshold (such as a false positive rate increase of >5%), the release will be automatically paused immediately, upgraded devices will be rolled back to the old version, and the root cause analysis will be recorded.

[0041] This embodiment also provides a disaster damage identification device for power facilities, such as... Figure 5 As shown, it includes a multi-dimensional feature perception module, an edge computing module, a decoupled identification and analysis module, an on-site early warning module, and a containerized operation and maintenance module.

[0042] The multi-dimensional feature perception module is used for the collection, aggregation and standardization of multi-source heterogeneous data, and provides energy management and communication link self-adaptation functions for the disaster damage identification device.

[0043] Specifically, the multi-dimensional feature sensing module periodically polls various connected MEMS sensors via a southbound RS485 bus, following the Modbus protocol, to acquire their state measurement data. Simultaneously, the power management unit within the module monitors the input power status and seamlessly switches between a wideband AC / DC power supply and a solar photovoltaic + lithium iron phosphate battery energy storage system according to a preset strategy. The communication unit dynamically selects the optimal path among multi-mode communication interfaces (RJ45, 4G, BeiDou) based on link status and strategies, and standardizes and encapsulates all collected heterogeneous data before transmitting it to the edge computing core.

[0044] The edge computing module is used to perform resource-aware model loading and computation adaptation, and to call and instantiate the specified AI model in the local pre-layered model library according to the scheduling instructions to complete the inference task.

[0045] Specifically, the edge computing module receives and parses scheduling instructions from the cloud, which include the identifier of the target model and resource allocation requirements. Subsequently, the module accesses the local pre-layered model library, loads the corresponding model files into memory, and allocates computing units (CPU / GPU cores) and memory resources to the model instances according to the instructions, completing the construction and initialization of the computing graph and preparing for subsequent data inference.

[0046] The decoupled identification and analysis module is used to perform feature extraction and parallel decoding based on deep neural networks, respectively complete the classification and regression tasks of the input data, and output the disaster type confidence and spatial location information.

[0047] Specifically, the decoupled identification and analysis module receives preprocessed and standardized sensor data streams and inputs them into an instantiated pre-layered model. The model's feedforward network first performs multi-layer convolutions and nonlinear transformations on the input data to generate a set of shared feature maps. These feature maps are then fed into two independent decoder branches: the classification branch outputs a probability distribution vector representing different damage types through global pooling and fully connected layers; the localization branch outputs a tensor containing the target bounding box coordinates or keypoint locations through deconvolution or upsampling operations, combined with spatial information preserved by skip connections.

[0048] The local early warning module is used to perform rule-based status assessment and early warning decisions on the identification results, and manage the northbound communication protocol stack to encapsulate and upload alarm information and key data.

[0049] Specifically, the on-site early warning module continuously receives structured results output by the decoupled identification and analysis module. The early warning decision unit performs sliding window analysis on the time-series data of the monitoring indicators based on a preset threshold rule base, calculates their first derivative (rate of change) and second derivative (acceleration of change), and integrates static thresholds and dynamic trend criteria to generate corresponding early warning level signals. Simultaneously, the communication protocol stack (e.g., supporting the IEC 104 protocol) encapsulates the early warning information, key data features, and metadata into application service data units of a specific protocol, which are then sent to the main station system via an established physical link session.

[0050] The containerized operation and maintenance module is responsible for the containerized lifecycle management and resource isolation of the upper-layer application software of the disaster loss identification device, as well as the reception, deployment and A / B testing of new version algorithm models.

[0051] Specifically, the containerized operations and maintenance module runs a container management engine. When it receives a deployment command and a new version model image from the canary release platform, the engine creates a new containerized isolated environment locally and loads the image. Subsequently, the engine starts the new container according to a policy, allowing it to run in parallel with the old version container (dual-track operation). The monitoring agent continuously collects performance metrics of the two container instances and reports the data. The decision-making unit compares the differences in metrics based on a preset statistical verification method, and ultimately performs version switching, scaling up production, or rollback operations based on the results.

[0052] This invention constructs a multi-dimensional feature profile of the disaster damage identification device, enabling dynamic and precise scheduling and adaptation of model resources, effectively improving edge computing efficiency and task real-time performance. Furthermore, it employs a decoupled identification architecture to process classification and location tasks in parallel, significantly enhancing disaster damage identification accuracy. By integrating static thresholds and dynamic trend analysis, it achieves a leap from delayed alarms to early warnings, greatly extending the emergency response window. Finally, through data aggregation and intelligent gray-scale release mechanisms, it forms a closed-loop self-evolving system with cloud-based iterative optimization and controllable edge risks, comprehensively improving the accuracy, predictability, and continuous optimization capabilities of the monitoring system.

[0053] This invention first constructs a multi-dimensional feature profile of the disaster damage identification device through multi-source data acquisition, and then dynamically schedules the optimal model combination in the pre-layered model library based on the profile; subsequently, decoupled identification is performed at the edge, and classification and location results are output in parallel; hierarchical early warning is triggered according to the dual-criteria trend model; finally, the on-site data is aggregated to train a new model, and grayscale targets are screened through a weighted scoring mechanism to achieve closed-loop optimization, forming a complete monitoring chain from data perception to system self-evolution.

[0054] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention in any way. Although the present invention has been disclosed above with reference to preferred embodiments, it is not intended to limit the present invention. Any person skilled in the art can make some modifications or alterations to the above-disclosed technical content to create equivalent embodiments without departing from the scope of the present invention. Any simple modifications, equivalent changes and alterations made to the above embodiments based on the technical essence of the present invention without departing from the scope of the present invention shall still fall within the scope of the present invention.

Claims

1. A method for monitoring disaster damage to power facilities, characterized in that: Includes the following steps: Data perception and dynamic scheduling: By collecting multi-source data, a multi-dimensional feature profile of the disaster damage identification device is constructed, and a pre-layered model is matched for dynamic scheduling of concurrent tasks based on the multi-dimensional feature profile; Decoupled identification and on-site early warning: Decoupled analysis of multi-dimensional feature profiles is performed through a pre-layered model, and classification and localization are completed in parallel. On-site early warning and data upload are triggered based on the analysis results according to preset thresholds. Optimization and Intelligent Gray-Scale Release: A new model is generated by aggregating data uploaded by all disaster damage identification devices, and a comprehensive score is calculated based on the release target by setting multi-dimensional feature weights to select gray-scale release targets; The decoupling identification and on-site early warning include the following steps: Intelligent identification: Based on scheduling instructions, the selected pre-hierarchical model is loaded, and decoupling analysis is performed on the incoming sensor data to complete the classification and localization tasks; Local early warning: Based on the results of decoupling analysis, early warning is issued according to preset threshold rules, and the identification results, key feature data and the applied pre-hierarchical model ID are encapsulated and uploaded through the optimal communication link; The data perception and dynamic scheduling include the following steps: Multi-dimensional feature profile construction: Construct a multi-dimensional digital profile for each disaster damage assessment device, including hardware performance, environmental risks, and business criticality; Model pre-hierarchy and dynamic scheduling: Based on the multi-dimensional feature profile, a pre-hierarchical model is selected from a pre-processed library of pre-hierarchical models with different computational depths for multiple concurrent recognition tasks, and scheduling instructions are generated. The pre-layered model library includes pre-layered processing based on chip-level disaster detection devices: For each disaster damage identification DNN model, multiple splitting points are selected for pre-stratification; Generate a model hierarchy from fast response to fine analysis, and record the computational cost, memory access cost, and output data size for each pre-hierarchical model; Construct a pre-hierarchical combined solution set to prepare optional models with multiple computational depths for each AI task; The optimization and intelligent canary release include the following steps: Data aggregation and model optimization: The cloud computing center gathers the identification results and raw data reported from all disaster damage identification devices, starts a distributed training task, adopts a strategy that combines pre-training and fine-tuning, and introduces machine learning methods to optimize specific features. The trained new model is subjected to the same pre-layering process as the old model, generating a series of sub-models with different computational loads and storing them in the pre-layered model library. Intelligent canary release decision: After the new model has passed basic validation, a release task is automatically created on the canary release platform, and the preset weight configuration scheme is called according to the release target; Calculate the comprehensive score of all disaster damage identification devices based on the current weight configuration scheme, and automatically filter out the gray target list from the comprehensive score ranking according to the preset release ratio. Offloading and Deployment: Based on the grayscale target list, the container management application deploys the new model algorithm containers to the target disaster assessment device in a precise and automated manner through a secure channel; Dual-track monitoring and closed-loop decision-making: The new model and the old model are run in parallel, their performance indicators are monitored and compared, and statistical methods are used to determine whether the new model has achieved the expected results.

2. The method for monitoring disaster damage to power facilities according to claim 1, characterized in that: The decoupling analysis includes the following steps: The raw data of the multidimensional feature profile is standardized, and features are extracted from the standardized data based on the selected pre-hierarchical model to generate a set of shared feature maps containing information at different levels. The shared feature maps are fed into two independent decoding branches for parallel processing, including: Classification branch: A hierarchical semantic enhancement module is used to determine the type of disaster damage by aggregating features from different semantic levels; Location Branch: Using a spatial information refinement module, combined with high and low resolution features, it accurately predicts the location, shape, or extent of disaster damage.

3. The method for monitoring disaster damage to power facilities according to claim 2, characterized in that: The method of issuing warnings based on preset threshold rules includes executing: Time series data of monitoring indicators are constructed from the state variables of the decoupling analysis results. The first and second derivatives of each indicator are calculated, and a trend analysis model with a sliding time window is established. A dual-criteria approach is used to determine the warning level: Threshold criterion: Emergency threshold: Monitored value > 90% of preset safety threshold; Note the threshold: The monitored value is greater than 70% of the preset safety threshold and less than or equal to 90%. Acceleration rate criterion: Emergency acceleration rate: Variable acceleration > 80% of the acceleration threshold; Note the acceleration rate: the change in acceleration is greater than 50% of the acceleration threshold and less than or equal to 80%.

4. The method for monitoring disaster damage to power facilities according to claim 3, characterized in that: The method of issuing warnings based on preset threshold rules also includes executing: Early warning level decision: When the monitored value enters the emergency threshold range and the change in acceleration enters the emergency acceleration state, a red alert is immediately triggered. An orange alert is triggered when the monitored value enters the emergency threshold range and the change in acceleration is in the state of attention acceleration. A yellow alert is triggered when the monitored value is within the attention threshold range and the change in acceleration enters an emergency acceleration state. A blue alert is triggered when the monitored value is within the attention threshold range and the acceleration change is also within the attention acceleration state.

5. The method for monitoring disaster damage to power facilities according to claim 1, characterized in that: The preset weight configuration scheme includes: During the stability verification phase, the weights are set as follows: hardware performance: 0.6, environmental risk: 0.2, and business criticality: 0.

2. During the performance verification phase, the weights are set as follows: hardware performance: 0.3, environmental risk: 0.5, and business criticality: 0.

2. During the effectiveness verification phase, the weights are set as follows: hardware performance: 0.2, environmental risk: 0.4, and business criticality: 0.

4.

6. A disaster damage identification device for power facilities, executing a disaster damage monitoring method for power facilities as described in any one of claims 1-5, characterized in that: It includes a multi-dimensional feature perception module, an edge computing module, a decoupled identification and analysis module, an on-site early warning module, and a containerized operation and maintenance module; The multi-dimensional feature perception module is used for the collection, aggregation and standardization of multi-source heterogeneous data, and provides energy management and communication link self-adaptation functions for the disaster damage identification device. The edge computing module is used to perform resource-aware model loading and computation adaptation, and to call and instantiate the specified AI model in the local pre-layered model library according to the scheduling instructions to complete the inference task; The decoupled identification and analysis module is used to perform feature extraction and parallel decoding based on deep neural networks, respectively complete the classification and regression tasks of the input data, and output the disaster type confidence and spatial location information.

7. A disaster damage identification device for power facilities according to claim 6, characterized in that: The local early warning module is used to perform rule-based status assessment and early warning decision-making on the identification results, and manage the northbound communication protocol stack to realize the encapsulation and uploading of alarm information and key data. The containerized operation and maintenance module is responsible for the containerized lifecycle management and resource isolation of the upper-layer application software of the disaster loss identification device, as well as the reception, deployment and A / B testing of new version algorithm models.

Citation Information

Patent Citations

  • Equipment shadow-based equipment gray scale upgrading method and device, equipment and medium

    CN118337624A

  • House safety detection method, system, equipment and medium

    CN120429826A