Dry quenching boiler superheater anti-explosion tube control system and control method
By installing a chlorine meter and pH monitoring system in the superheater of a dry quenching coke boiler, combined with PLC control, real-time monitoring and automatic adjustment of chlorine corrosion can be achieved, solving the problem of tube rupture in the superheater of the dry quenching coke boiler and improving the safety and operating efficiency of the system.
Patent Information
- Application Number
- CN202511906630.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-17
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2045-12-17
AI Technical Summary
Frequent tube ruptures in superheaters of dry-quenched coke boilers are mainly caused by chlorine corrosion and external corrosion. Existing technologies lack real-time monitoring and interlocking control of chloride ion concentration in the steam medium, making it impossible to prevent corrosion risks in a timely manner.
By installing chlorine meters at the outlets of the secondary and primary superheaters, and combining this with pH monitoring of the demineralized water, a multi-point, multi-parameter real-time corrosion monitoring system is constructed. A PLC control cabinet is used to interlock and control the ammonia dosing device, thereby achieving automatic adjustment of chlorine content and pH value, forming a closed-loop control.
It significantly reduces the risk of superheater tube rupture, improves the safety and stability of the system and the efficiency of waste heat recovery, reduces unplanned downtime and maintenance costs, and extends the service life of the equipment.
Smart Images

Figure CN121557467B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of waste heat utilization technology in dry quenching coke ovens, and in particular to a control system and method for explosion-proof tubes of superheaters in dry quenching coke ovens. Background Technology
[0002] Dry quenching technology, as a highly efficient and energy-saving coke cooling and waste heat recovery process, has been widely adopted in my country's coking industry. This technology cools red-hot coke using inert circulating gas and recovers the heat energy from high-temperature flue gas using a waste heat boiler to produce steam for power generation or heating, significantly improving the overall energy utilization efficiency of coking enterprises.
[0003] However, in actual operation, dry quenching coke boiler systems, especially their superheater sections, frequently experience tube rupture accidents, severely impacting the system's safe and stable operation and waste heat recovery efficiency. Statistical analysis of multiple tube rupture accidents revealed that the ruptures mainly occurred in the primary and secondary superheater areas at the top of the boiler. These superheater tubes are typically made of austenitic stainless steel and alloy steel, which, while possessing good high-temperature resistance, face severe corrosion challenges in actual operating environments.
[0004] The main causes of superheater tube rupture can be attributed to the following two aspects: 1. External corrosion: The flue gas in the dry quenching cycle carries corrosive media such as coke powder and sulfides, which continuously scour and chemically corrode the outer wall of the superheater tubes at high temperatures. Over a long period of time, the outer wall of the tubes gradually thins, and its mechanical properties decline.
[0005] 2. Internal corrosion, also known as chloride corrosion: This is a more critical factor leading to superheater failure. If the chloride ion content in the boiler feedwater or steam exceeds the standard, under high temperature and high pressure operating conditions, chloride ions will cause severe stress corrosion and pitting corrosion on the inner walls of the heated tubes made of austenitic stainless steel and alloy steel. Disassembly inspections and analyses of multiple coking plants have shown that the inner walls of ruptured tube superheaters commonly exhibit corrosion pits, cracks, and even perforations caused by chloride ions. This type of corrosion is characterized by its strong concealment and rapid development, making it the primary factor threatening superheater safety.
[0006] In existing technologies, the operation monitoring of dry quenching coke boilers mainly focuses on conventional parameters such as temperature, pressure, and flow rate, lacking continuous, online, and accurate monitoring of key corrosion factors in the steam medium (such as chloride ion concentration). Water quality control also largely relies on manual, timed sampling and testing, resulting in problems such as monitoring lag and untimely adjustments. When the chloride ion concentration quietly rises to a dangerous level, the system often cannot respond quickly, leading to continued corrosion until a tube rupture accident occurs. In addition, traditional chemical dosing control methods (such as adding ammonia to adjust pH) are mostly manual and fail to be interlocked with chloride ion monitoring, thus failing to form a closed-loop control strategy for corrosion prevention.
[0007] Therefore, developing an automated control system capable of real-time monitoring of steam chlorine content, interlocking water quality regulation, and preventing chlorine corrosion at its source is of urgent practical significance and important engineering application value for ensuring the long-term safe and stable operation of dry quenching coke boilers, especially their superheater sections, reducing the risk of unplanned shutdowns, and improving the economic benefits of waste heat recovery systems. Summary of the Invention
[0008] The purpose of this invention is to provide a control system and method for explosion-proof tubes of superheaters in dry quenching coke boilers. This system aims to solve the problem of superheater tube rupture due to chlorine corrosion through interlocking control. The system monitors the chlorine content of superheater steam and the pH value of demineralized water in real time. When the chlorine content exceeds the standard or the pH is abnormal, the PLC controls the ammonia addition device to start and stop, achieving precise water quality adjustment. The control logic is prioritized to ensure that chlorine content control takes precedence. This system can significantly reduce the risk of tube rupture and ensure the safe and stable operation of the boiler.
[0009] To achieve the above objectives, the present invention provides the following technical solution: A control system for explosion-proof pipes of superheater in a dry quenching coke boiler includes: a demineralized water tank 1, a deaerator feed water pump 2, a deaerator 3, a boiler feed water pump 4, a steam drum 5, a primary superheater 6, a water spray desuperheater 7, a secondary superheater 8, an ammonia charging device 9, and a sampler. The demineralized water tank 1, the ammonia charging liquid pipeline mixer 13, the deaerator feed water pump 2, the deaerator 3, the boiler feed water pump 4, and the steam drum 5 are connected in sequence by pipelines. Steam drum 5, primary superheater 6, water spray desuperheater 7, secondary superheater 8 are connected in sequence by pipelines; The outlet of the ammonia addition device 9 is connected to the inlet of the ammonia liquid pipeline mixer 13 via a pipeline; The inlet of the ammonia addition unit 9 is connected to the inlet of the deaerator 3 via a pipeline; The desuperheating water inlet of the spray desuperheater 7 is connected to the outlet of the boiler feed water pump 4 via a pipeline; The sampler is installed on the corresponding pipeline and connected to the corresponding detection instrument; The detection instruments and ammonia dosing device 9 are connected to the PLC control cabinet.
[0010] The samplers include a secondary superheater sampler 10, a primary superheater sampler 11, and a demineralized water sampler 12; the measuring instruments include a secondary superheater chlorine meter 14, a primary superheater chlorine meter 15, and a demineralized water pH meter 16. The secondary superheater sampler 10 is installed on the outlet superheated steam pipeline of the secondary superheater 8, and the secondary superheater sampler 10 is connected to the secondary superheater chlorine meter 14. The primary superheater sampler 11 is installed on the saturated steam pipeline at the outlet of the steam drum 5 between the outlet of the steam drum 5 and the inlet of the primary superheater 6. The primary superheater sampler 11 is connected to the primary superheater chlorine meter 15. The demineralized water sampler 12 is installed on the demineralized water pipeline at the outlet of the deoxygenated water pump 2 between the outlet of the deoxygenated water pump 2 and the inlet of the deaerator 3. The demineralized water sampler 12 is connected to the demineralized water pH meter 16. The secondary superheater chlorine meter 14, the primary superheater chlorine meter 15, and the demineralized water pH meter 16 are connected to the PLC control cabinet.
[0011] The PLC control cabinet is equipped with a control unit 1, which is connected to the secondary superheater chlorine meter 14, the primary superheater chlorine meter 15, the demineralized water pH meter 16, and the ammonia addition device 9 via ports.
[0012] The control unit includes an analog input module, which is connected to the secondary superheater chlorine meter 14, the primary superheater chlorine meter 15, and the demineralized water pH meter 16 via ports.
[0013] Control unit 1 also includes communication module 2. Ammonia adding device 9 includes control unit 2. Control unit 2 includes communication module 3. Communication module 3 is connected to communication module 2 through a port. Communication module 3 and communication module 2 are respectively connected to the main station through a port. Both control unit one and control unit two are PLCs.
[0014] The main station includes a communication module 1 and a CPU module. Communication module 1 is connected to communication modules 2 and 3 via ports, and communication module 1 and the CPU module are also connected via ports.
[0015] A method for controlling the explosion-proof tubes of a superheater in a dry quenching coke boiler includes: S1. Chlorine content control: The control logic is "OR logic". If either the secondary superheater chlorine meter 14 or the primary superheater chlorine meter 15 triggers the interlock, the corresponding action will be executed: If the superheated steam level collected by any chlorine meter is less than 25 ppm, the PLC interlock will stop the ammonia dosing device. If any chlorine meter detects 25 ppm of superheated steam, the PLC will issue an alarm signal. If any chlorine meter detects superheated steam >25 ppm, the PLC will interlock and start the ammonia dosing device. S2, pH control: If the pH value collected by the demineralized water pH meter is <7.5, the PLC will interlock and start the ammonia dosing device. If the pH value collected by the demineralized water pH meter is within the range of 7.5 ≤ pH < 8, the PLC will issue a low alarm signal. If the pH value collected by the demineralized water pH meter is within the range of 8 ≤ pH ≤ 10, the PLC will not operate. If the pH value collected by the demineralized water pH meter is within the range of 10 < pH ≤ 10.5, the PLC will issue a high alarm signal. If the pH value collected by the demineralized water pH meter is > 10.5, the PLC interlock will stop the ammonia dosing device. S3, Control Priority Settings: Chlorine content control takes precedence over pH value control.
[0016] Compared with the prior art, the beneficial effects of the present invention are: 1. By installing chlorine meters at the outlets of the secondary and primary superheaters, and combining this with pH monitoring of the demineralized water, a multi-point, multi-parameter real-time corrosion monitoring system was constructed. This system enables early identification and source control of chlorine corrosion risks, effectively preventing the risk of pipe rupture. 2. A PLC control cabinet is used to centrally process the signals from the chlorine meter and pH meter, and automatically control the start and stop of the ammonia dosing device according to the preset logic, forming a closed-loop control of "monitoring-judgment-execution-feedback", which significantly improves the timeliness and accuracy of water quality adjustment and reduces the lag and operational error of manual intervention. 3. By setting alarm and interlock values, a multi-level response from early warning to automatic intervention can be achieved; in particular, chlorine content control is set to take priority over pH control to ensure that core safety indicators are protected in case of parameter conflicts, thereby improving the system's reliability and responsiveness under complex working conditions. 4. The system can effectively reduce the probability of superheater tube rupture caused by chlorine corrosion, reduce unplanned downtime and maintenance costs, extend equipment service life, and at the same time ensure the continuous and stable operation of dry quenching coke boiler, improve waste heat recovery efficiency and comprehensive energy utilization rate. 5. Separate samplers for the secondary superheater, primary superheater, and demineralized water can be installed to achieve independent and accurate sampling of the medium at key points, avoiding cross-contamination and parameter interference, and improving the representativeness and reliability of monitoring data. 6. The system centrally collects signals from the chlorine meter and pH meter through the analog input module, and displays the operating status and parameters in real time on the HMI human-machine interface screen. The structure is clear and the wiring is simple, which greatly facilitates daily monitoring, fault diagnosis and system maintenance. 7. The distributed structure of the main station and substations connected by communication modules is adopted, which realizes independent control and fault isolation of each subsystem, and ensures centralized data management and unified command scheduling, thereby enhancing the modularity, communication reliability and overall scalability of the system. Attached Figure Description
[0017] Figure 1 This is a schematic diagram of the control system and control method for the explosion-proof tube of the superheater in a dry quenching coke boiler.
[0018] Figure 2 This is a schematic diagram of the control unit.
[0019] Figure 3 This is the wiring diagram for the analog input module.
[0020] In the diagram: 1. Demineralized water tank; 2. Deaerator feed water pump; 3. Deaerator; 4. Boiler feed water pump; 5. Steam drum; 6. Primary superheater; 7. Spray desuperheater; 8. Secondary superheater; 9. Ammonia charging device; 10. Secondary superheater sampler; 11. Primary superheater sampler; 12. Demineralized water sampler; 13. Ammonia charging solution pipeline mixer; 14. Secondary superheater chlorine meter; 15. Primary superheater chlorine meter; 16. Demineralized water pH meter; 17. PLC control cabinet; 18. Demineralized water pipeline at the outlet of the deaerator feedwater pump; 19. Demineralized water pipeline at the inlet of the deaerator feedwater pump; 20. Deaerator water pipeline at the inlet of the boiler feedwater pump; 21. Boiler feedwater pipeline; 22. Saturated steam pipeline at the outlet of the steam drum; 23. Superheated steam pipeline at the inlet of the secondary superheater; 24. Superheated steam pipeline at the outlet of the secondary superheater; 25. Superheated steam pipeline at the outlet of the primary superheater; 26. Desuperheating water pipeline; 27. Ammonia charging pipeline. Detailed Implementation
[0021] The present invention will now be described in detail with reference to the accompanying drawings, but it should be noted that the implementation of the present invention is not limited to the following embodiments.
[0022] The following embodiments are implemented based on the technical solution of the present invention, providing detailed implementation methods and specific operation processes. However, the scope of protection of the present invention is not limited to the following embodiments. Unless otherwise specified, the methods used in the following embodiments are conventional methods.
[0023] Example 1
[0024] See Figure 1An automatic interlocking PLC explosion-proof pipe control system for a dry quenching coke boiler superheater includes a demineralized water tank 1, a deaerator feedwater pump 2, a deaerator 3, a boiler feedwater pump 4, a steam drum 5, a primary superheater 6, a spray desuperheater 7, a secondary superheater 8, an ammonia addition device 9, a secondary superheater sampler 10, a primary superheater sampler 11, a demineralized water sampler 12, an ammonia addition liquid pipeline mixer 13, a secondary superheater chlorine meter 14, a primary superheater chlorine meter 15, a demineralized water pH meter 16, and a PLC control cabinet 17. The primary superheater 6 is used to preheat the saturated steam from the steam drum, increasing its temperature and enthalpy. The secondary superheater 8 is used to reheat the steam from the spray desuperheater to achieve the required superheated steam parameters. The ammonia addition device is used to inject ammonia liquid into the demineralized water to adjust the pH value of the feedwater and steam systems to inhibit chlorine corrosion. The ammonia addition liquid pipeline mixer is used to uniformly mix the ammonia liquid with the demineralized water to ensure stable ammonia addition. The inlet of deaerated feedwater pump 2 is connected to demineralized water tank 1 via demineralized water pipe 19 at the deaerated feedwater pump inlet. The outlet of deaerated feedwater pump 2 is connected to deaerator 3 via demineralized water pipe 18 at the deaerated feedwater pump outlet. The inlet of boiler feedwater pump 4 is connected to deaerator 3 via deaerated water pipe 20 at the boiler feedwater pump inlet. The outlet of boiler feedwater pump 4 is connected to the inlet of steam drum 5 via boiler feedwater pipe 21. The outlet of steam drum 5 is connected to the inlet of primary superheater 6 via saturated steam pipe 22 at the steam drum outlet. The outlet of primary superheater 6 is connected to the steam inlet of spray desuperheater 7 via superheated steam pipe 25 at the primary superheater outlet. The steam outlet of spray desuperheater 7 is connected to the secondary superheater via superheated steam pipe 23 at the secondary superheater inlet. The inlet of the spray desuperheater 7 is connected to the outlet of the boiler feed water pump 4 via the desuperheating water pipeline 26. The inlet of the ammonia addition device 9 is connected to the outlet of the deaerated feed water pump 2 via the demineralized water pipeline 18. The outlet of the ammonia addition device 9 is connected to the ammonia addition liquid pipeline mixer 13 via the ammonia addition pipeline 27. The outlet pipeline of the primary superheater sampler 11 is equipped with a primary superheater chlorine meter 15. The outlet pipeline of the secondary superheater sampler 10 is equipped with a secondary superheater chlorine meter 14. The outlet pipeline of the demineralized water sampler 12 is equipped with a demineralized water pH meter 16. The signals from the secondary superheater chlorine meter 14, the primary superheater chlorine meter 15, and the demineralized water pH meter 16, along with the control signal from the ammonia addition device 9, are sent to the PLC control cabinet 17.
[0025] The secondary superheater sampler 10 is installed on the outlet superheated steam pipeline of the secondary superheater 8; the primary superheater sampler 11 is installed on the saturated steam pipeline at the outlet of the steam drum 5 between the outlet of the steam drum 5 and the inlet of the primary superheater 6; and the demineralized water sampler 12 is installed on the demineralized water pipeline at the outlet of the deaerator feedwater pump 2 between the outlet of the deaerator feedwater pump 2 and the inlet of the deaerator 3.
[0026] Steam drum 5 is a pressure vessel for dry quenching coke boilers. The outlet is saturated steam. The working pressure parameters are 3.82~10.3MPa and the working temperature is saturated.
[0027] The heating surfaces and heating tubes of the primary superheater 6 and the secondary superheater 8 are mainly made of austenitic stainless steel and alloy steel. The outlet of the secondary superheater 8 is superheated steam. The working pressure parameters are 3.82~10.3MPa and the working temperature is 400~550℃.
[0028] Both the secondary superheater chlorine meter 14 and the primary superheater chlorine meter 15 can perform local indication, panel display, alarm, control, and output 4~20mA signals. They are used to measure the chlorine content of the outlet steam medium of the secondary superheater sampler 10 and the primary superheater sampler 11, in ppm. Their normal, alarm, and interlock values are as follows: 1) Normal value: <25ppm; 2) Alarm threshold: 25 ppm; 3) Interlock value: >25ppm; The demineralized water pH meter 16 can realize local indication, upper panel display, alarm, control, and output 4~20mA signal functions. It is used to measure the pH of the outlet pipe of the demineralized water sampler 12. Its normal, alarm and interlock values are as follows: 1) Low interlock value: <7.5; 2) Low alarm value: 7.5 ≤ pH < 8; 3) Normal value: 8 ≤ pH ≤ 10; 4) High alarm value: 10 < pH ≤ 10.5; 5) High interlock value: >10.5; PLC control cabinet 17 is a complete control system that collects 4~20mA signals from the secondary superheater chlorine meter 14, the primary superheater chlorine meter 15, the demineralized water pH meter 16, and the operating signals from the ammonia addition device 9. Based on the system settings, it outputs normal and alarm signals accordingly. When the interlock value is reached, it can output a control signal to automatically control the ammonia addition device 9.
[0029] The ammonia addition unit 9 transmits the operation signal to the PLC control cabinet 17, and realizes the start and stop of the ammonia addition system according to the interlock control signal of the PLC control cabinet 17, and transmits the start and stop feedback signals of the ammonia addition system to the PLC control cabinet 17.
[0030] A method for controlling the automatic interlocking PLC explosion-proof tube of the superheater in a dry quenching coke boiler includes the following steps: 1) The secondary superheater chlorine meter 14 and the primary superheater chlorine meter 15 output 4~20mA signals to the PLC control cabinet 17. The control logic between the two is OR logic, that is, when one of the signals triggers the alarm or interlock value, the action is taken. The control action of the PLC control cabinet 17 is as follows: Normal value: <25ppm, PLC control cabinet 17 has no action, and displays a normal signal; Alarm value: 25ppm, alarm signal displayed on PLC control cabinet 17; Interlock value: >25ppm, PLC control cabinet 17 interlock ammonia dosing device 9 starts; When the value returns to normal, the PLC control cabinet 17 interlocks the ammonia charging device 9 and stops. 2) The pH meter 16 outputs a 4~20mA signal to the PLC control cabinet 17. The PLC control cabinet 17 then performs the following actions: Low interlock value: <7.5, PLC control cabinet 17 interlock ammonia charging device 9 starts; Low alarm value: 7.5≤PH<8, alarm signal displayed on PLC control cabinet 17; Normal value: 8≤PH≤10, PLC control cabinet 17 has no action, and displays a normal signal; High alarm value: 10 < PH ≤ 10.5, alarm signal displayed on PLC control cabinet 17; High interlock value: >10.5, PLC control cabinet 17 interlock ammonia charging device 9 stops; When the value returns to normal, the PLC control cabinet 17 interlocks the ammonia charging device 9 and stops. 3) The control logic priority of PLC control cabinet 17 is set as follows: the interlocking action of secondary superheater chlorine meter 14 and primary superheater chlorine meter 15 has a higher priority than the interlocking action of demineralized water pH meter 16. That is, when the interlocking actions of secondary superheater chlorine meter 14, primary superheater chlorine meter 15 and demineralized water pH meter 16 conflict, priority is given to ensuring that the chlorine content at the outlet of secondary superheater 8 and primary superheater 6 is within the normal range.
[0031] This invention is applicable to the recovery and utilization of waste heat from dry quenching coke, as well as the recovery and utilization of waste heat from other similar working fluids. Its advantages are as follows: 1. It can achieve automated real-time monitoring and control of the chlorine content of steam in the superheater of dry quenching coke boiler.
[0032] 2. It can minimize the probability of tube rupture caused by chlorine corrosion in the primary and secondary superheaters of dry quenching coke boilers, thus ensuring the safe production and operation of dry quenching coke boilers.
[0033] Example 2
[0034] In this embodiment, the control system and method for the explosion-proof tube of the superheater of a dry quenching coke boiler are the same as those in Embodiment 1, with the addition of a control unit structure.
[0035] See Figure 2 , Figure 3The PLC control cabinet contains Control Unit 1, Control Unit 2, and Control Unit 3. Control Unit 1 is the master station, Control Unit 2 is the superheater substation of the dry quenching coke boiler, and Control Unit 3 is the chlorination unit substation. Control Unit 1 includes Communication Module 1, Control Unit 2 includes Communication Module 2, and Control Unit 3 includes Communication Module 3. Communication Modules 1, 2, and 3 are connected via port communication cables. This connection method enables high-speed data exchange and command synchronization between the master station and substations, improving system response speed and overall coordination, while also facilitating system expansion and modular maintenance. Control Units 1, 2, and 3 are all PLCs. Control Unit 1 also includes CPU Module 1 and an HMI (Human-Machine Interface) screen. CPU Module 1 and Communication Module 1 are connected via port... The CPU module 1 is connected to the HMI (Human-Machine Interface) screen via a port. Both the CPU module 1 and the HMI screen are existing equipment in the workshop. The control unit 2 also includes an analog input module, which is connected to the communication module 2 via a port. The analog input module is also connected to the secondary superheater chlorine meter 14, the primary superheater chlorine meter 15, and the demineralized water pH meter 16 via a port. The control unit 3 also includes an ammonia charging device 9, which includes the CPU module 2. The communication module 3 is connected to the CPU module 2 via a port. The ammonia charging device 9 is existing equipment in the workshop. Before the modification, the ammonia charging device 9 was not connected to the main station. After the modification, the data information of the ammonia charging device 9 is transmitted to the CPU module of the main station, which facilitates unified monitoring and management and improves the overall control efficiency and integration level of the system.
[0036] This invention constructs a multi-point, multi-parameter real-time corrosion monitoring system by installing chlorine meters at the outlets of the secondary and primary superheaters, combined with demineralized water pH monitoring. This system enables early identification and source control of chlorine corrosion risks, effectively preventing tube rupture hazards. A PLC control cabinet centrally processes chlorine and pH meter signals and automatically controls the start and stop of the ammonia dosing device according to preset logic, forming a closed-loop control of "monitoring-judgment-execution-feedback." This significantly improves the timeliness and accuracy of water quality adjustment and reduces the lag and operational errors of manual intervention. By setting alarm and interlock values, a multi-level response from early warning to automatic intervention is achieved. Chlorine content control is specifically prioritized over pH control to ensure that core safety indicators are protected in case of parameter conflicts, improving the system's reliability and responsiveness under complex operating conditions. The system can effectively reduce the probability of superheater tube rupture caused by chlorine corrosion. This system reduces unplanned downtime and maintenance costs, extends equipment lifespan, and ensures continuous and stable operation of the dry quenching boiler, while improving waste heat recovery efficiency and overall energy utilization. Separate samplers for the secondary superheater, primary superheater, and demineralized water enable independent and accurate sampling of key media, avoiding cross-contamination and parameter interference, and enhancing the representativeness and reliability of monitoring data. A centralized analog input module collects chlorine and pH meter signals, which are then displayed in real-time on an HMI (human-machine interface) screen, resulting in a clear structure and simple wiring, greatly facilitating daily monitoring, fault diagnosis, and system maintenance. The distributed structure, connecting the main station and substations via communication modules, achieves independent control and fault isolation for each subsystem while ensuring centralized data management and unified command scheduling, enhancing the system's modularity, communication reliability, and overall scalability.
Claims
1. A control system for explosion-proof tubes of superheaters in dry quenching coke boilers, characterized in that, include: The demineralized water tank (1), deoxygenated feed water pump (2), deaerator (3), boiler feed water pump (4), steam drum (5), primary superheater (6), spray desuperheater (7), secondary superheater (8), ammonia addition device (9), sampler, demineralized water tank (1), ammonia addition liquid pipeline mixer (13), deoxygenated feed water pump (2), deaerator (3), boiler feed water pump (4), and steam drum (5) are connected in sequence by pipeline; The steam drum (5), primary superheater (6), water spray desuperheater (7), and secondary superheater (8) are connected in sequence by pipelines; The outlet of the ammonia addition device (9) is connected to the inlet of the ammonia liquid pipeline mixer (13) via a pipeline; The inlet of the ammonia addition unit (9) is connected to the inlet of the deaerator (3) via a pipeline; The desuperheating water inlet of the spray desuperheater (7) is connected to the outlet of the boiler feed water pump (4) through a pipeline; The sampler is installed on the corresponding pipeline and connected to the corresponding detection instrument; The detection instruments and ammonia dosing device (9) are connected to the PLC control cabinet; The samplers include a secondary superheater sampler (10), a primary superheater sampler (11), and a demineralized water sampler (12); the detection instruments include a secondary superheater chlorine meter (14), a primary superheater chlorine meter (15), and a demineralized water pH meter (16). The secondary superheater sampler (10) is installed on the outlet superheated steam pipeline of the secondary superheater (8), and the secondary superheater sampler (10) is connected to the secondary superheater chlorine meter (14). The primary superheater sampler (11) is set on the saturated steam pipeline at the outlet of the steam drum (5) and the inlet of the primary superheater (6). The primary superheater sampler (11) is connected to the primary superheater chlorine meter (15). The demineralized water sampler (12) is installed on the demineralized water pipeline at the outlet of the deoxygenated water pump (2) and the inlet of the deaerator (3). The demineralized water sampler (12) is connected to the demineralized water pH meter (16). The secondary superheater chlorine meter (14), the primary superheater chlorine meter (15), and the demineralized water pH meter (16) are connected to the PLC control cabinet.
2. The explosion-proof tube control system for a dry quenching coke boiler superheater according to claim 1, characterized in that, The PLC control cabinet is equipped with a control unit 1, which is connected to the secondary superheater chlorine meter (14), the primary superheater chlorine meter (15), the demineralized water pH meter (16), and the ammonia addition device (9) via ports.
3. The explosion-proof tube control system for a dry quenching coke boiler superheater according to claim 2, characterized in that, The control unit includes an analog input module, which is connected to the secondary superheater chlorine meter (14), the primary superheater chlorine meter (15), and the demineralized water pH meter (16) via ports.
4. The explosion-proof tube control system for a dry quenching coke boiler superheater according to claim 2, characterized in that, The control unit 1 also includes a communication module 2. The ammonia adding device (9) includes a control unit 2. The control unit 2 includes a communication module 3. The communication module 3 is connected to the communication module 2 through a port. The communication module 3 and the communication module 2 are respectively connected to the main station through a port. Both control unit one and control unit two are PLCs.
5. The explosion-proof tube control system for a dry quenching coke boiler superheater according to claim 4, characterized in that, The main station includes a communication module one and a CPU module. Communication module one is connected to communication modules two and three via ports, and communication module one and the CPU module are connected via ports.
6. A method for controlling the explosion-proof tube of a superheater in a dry quenching coke boiler using the control system described in any one of claims 1-5, characterized in that, include: S1. Chlorine content control: The control logic is "OR" logic. If either the secondary superheater chlorine meter (14) or the primary superheater chlorine meter (15) triggers the interlock, the corresponding action will be executed: If the superheated steam level collected by any chlorine meter is less than 25 ppm, the PLC interlock will stop the ammonia dosing device. If any chlorine meter detects 25 ppm of superheated steam, the PLC will issue an alarm signal. If any chlorine meter detects superheated steam >25 ppm, the PLC will interlock and start the ammonia dosing device. S2, pH control: If the pH value collected by the demineralized water pH meter is <7.5, the PLC will interlock and start the ammonia dosing device. If the pH value collected by the demineralized water pH meter is within the range of 7.5 ≤ pH < 8, the PLC will issue a low alarm signal. If the pH value collected by the demineralized water pH meter is within the range of 8 ≤ pH ≤ 10, the PLC will not operate. If the pH value collected by the demineralized water pH meter is within the range of 10 < pH ≤ 10.5, the PLC will issue a high alarm signal. If the pH value collected by the demineralized water pH meter is > 10.5, the PLC interlock will stop the ammonia dosing device. S3, Control Priority Settings: Chlorine content control takes precedence over pH value control.
Citation Information
Patent Citations
Water supply system of coke dry quenching boiler
CN212298940U
Explosion-proof pipe low-temperature superheater
CN223319068U