Coupling flow and river network topology to assess river connectivity and barrier recovery
CN121684266BActive Publication Date: 2026-08-28HUBEI UNIV +1
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202511746611.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-26
- Publication Date
- 2026-08-28
- Estimated Expiration
- 2045-11-26
AI Technical Summary
Technical Problem
[0005]本发明提供一种耦合流量与河网拓扑的水系连通性及阻隔恢复评估方法,用以解决现有技术中河流连通性评估方法生态代表性弱、修复优先级偏差大的缺陷,通过引入“归化长度”概念,量化不同规模河段的生态贡献差异,消除传统方法对小流量支流的过度加权,实现对不同规模河段生态贡献的差异化加权,提升评估结果的生态合理性
Benefits of technology
(1)在传统树状水系连通性指数的基础上,考虑到不同河段间流量差异对连通性的影响,以流量加权方式修正原始河段长度,构建了以归化长度计算的改进指数;
✦ Generated by Eureka AI based on patent content.
Smart Images

Figure CN121684266B_ABST
Abstract
The application provides a method for coupling flow with river network topology, river system connectivity and barrier recovery evaluation, comprising: obtaining river section information of a target river system; performing Strahler river network classification on each tributary that flows into the main stream of the target river system based on the river section information, and determining the Strahler river network classification result of each river section; performing flow weighting correction on the original river section length based on the normalized length of the river section according to the Strahler river network classification result, the length of each river section in each tributary, and the average flow information of each tributary at the estuary where the tributary flows into the main stream; searching and obtaining the connection path information between different river sections in the target river system; calculating the tree-shaped river system connectivity index of the target river system by using the normalized length of the river section, the connection path information between different river sections, and the barrier situation; and determining the recommended recovery order of each barrier in the target river system by iterative evaluation based on the repair priority index.
Need to check novelty before this filing date? Find Prior Art