Power utilization safety intelligent early warning method based on multi-parameter fusion
By synchronously collecting electrical parameters and charging behavior in time and space, a risk profile is constructed and adaptive risk assessment weights are generated. A risk situation heat map is generated using a graph convolutional network. This solves the problems of low efficiency and untimely risk point location in existing intelligent early warning methods for electricity safety, and achieves efficient risk situation perception and propagation path prediction.
Patent Information
- Application Number
- CN202512030266.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-30
- Publication Date
- 2026-04-07
AI Technical Summary
Existing intelligent early warning methods for electricity safety rely on monitoring electrical parameters or isolated behaviors, lacking spatiotemporal synchronous acquisition and multi-source data fusion. This makes it impossible to achieve global perception of risk situations and prediction of propagation paths, resulting in low efficiency and untimely location of risk points.
By collecting electrical parameters and charging behavior in a spatiotemporal synchronous manner, a risk profile is constructed. Combined with environmental adaptive adjustment, an adaptive risk assessment weight is generated. A risk situation heat map is generated using a graph convolutional network, and multi-level intelligent response is performed.
It significantly improves the accuracy of electricity safety early warning and the timeliness of response, can quickly locate risk points and predict risk propagation paths, reduce the probability of electrical fires, and improve the initiative and efficiency of safety handling.
Smart Images

Figure CN121808317A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of intelligent early warning technology for electricity safety, specifically referring to an intelligent early warning method for electricity safety based on multi-parameter fusion. Background Technology
[0002] With the acceleration of urbanization and the widespread application of electrical equipment, electricity safety issues are becoming increasingly prominent, especially in densely populated areas, industrial and mining enterprises, and various public facilities. Traditional electricity safety management mainly relies on manual inspections and simple threshold alarm mechanisms, which are not only inefficient but also difficult to adapt to complex and ever-changing real-world application scenarios.
[0003] However, existing intelligent early warning methods for electricity safety still have certain shortcomings. Existing technologies rely on the monitoring of electrical parameters or isolated behaviors, lacking the spatiotemporal synchronous acquisition of electrical parameters and charging behaviors. They adopt static risk assessment models, failing to consider the impact of environmental factors on electrical risks. They use single-point monitoring and local analysis, which cannot achieve global perception of risk status and prediction of propagation paths. They rely on single-point electrical parameters to generate risk status, lacking multi-source data fusion and real-time heat map update functions, and cannot quickly locate sudden risk points. Therefore, an intelligent early warning method for electricity safety based on multi-parameter fusion is proposed. Summary of the Invention
[0004] The purpose of this invention is to provide an intelligent early warning method for electricity safety based on multi-parameter fusion, so as to solve the problems mentioned in the background art.
[0005] To achieve the above objectives, the present invention provides the following technical solution: an intelligent early warning method for electricity safety based on multi-parameter fusion, comprising the following steps:
[0006] S1. Construct a dual-modal data foundation by synchronously collecting electrical parameters and charging behavior in time and space;
[0007] S2. Based on the synchronously collected electrical parameters and behavioral data, perform correlation mining of behavioral and electrical features to construct a risk profile;
[0008] S3. Based on risk profiles and real-time environmental data, perform dynamic environmental adaptive adjustments to generate adaptive risk assessment weights;
[0009] S4. Construct a risk situation heat map by integrating multi-source data and risk assessment weights;
[0010] S5. Generate risk propagation paths based on the risk situation heat map;
[0011] S6. Based on the preset risk index threshold and propagation path results, perform multi-level intelligent response;
[0012] S7. By integrating response feedback data, perform model optimization risk assessment and response strategy parameters.
[0013] Preferably, in step S1, high-precision sensors are installed at key nodes such as meter boxes and charging sockets. The spatial correspondence between the camera's field of view and the installation location of the electrical sensors is determined through camera calibration technology. The monitoring points of the electrical sensors are spatially associated with the charging behavior area captured by the camera. Multi-threaded tasks are started to acquire real-time data streams from the electrical sensors and the camera, respectively. The data is temporarily cached through shared memory. The electrical parameter data and video frames of the corresponding time period are packaged at fixed time intervals to form spatiotemporally synchronized dual-modal data. The collected data is preprocessed, and the processed electrical parameters and charging behavior data are stored in a unified format.
[0014] Preferably, in step S2, electrical parameter features and charging behavior features are extracted from the structured storage of S1, and the correlation strength between the behavior features and electrical features is analyzed using an association rule mining algorithm, thereby achieving the following:
[0015] ,
[0016] In the formula, Indicates the strength of behavioral and electrical association, where B represents charging behavior characteristics and E represents electrical anomaly characteristics. This indicates the number of transactions that simultaneously contain behavior B and electrical anomaly E. This represents the total number of transactions containing behavior B; by pre-setting the confidence, support, and lift of association rules, high-association rules are selected to form a set of behavior and electrical association rules.
[0017] Preferably, in step S2, based on the association rule set, a standardized dimension of the risk profile is preset, including risk type, risk intensity, and risk duration. The risk profile intensity is implemented as follows:
[0018] ,
[0019] In the formula, This indicates the intensity of the risk profile, representing the quantified risk value of behavioral and electrical associations in the current environment. Indicates the environmental sensitivity coefficient. Indicates the current ambient temperature. It represents the baseline ambient temperature, verifies the accuracy of the risk profile using historical risk event data, and outputs a verified standardized risk profile.
[0020] Preferably, in step S3, environmental data is acquired in real time, the environmental data is standardized to eliminate differences in units, structured environmental features are formed, a preset weight coefficient is assigned to each environmental parameter, the weight is optimized based on historical risk data, and the environmental adaptation weight is calculated, which is implemented as follows:
[0021] ,
[0022] In the formula, Indicates the environmental adaptation weight. The coefficient representing the environmental parameter k. Represents a mapping function. This represents standardized environmental parameter values.
[0023] Preferably, in step S4, the adaptive risk assessment weights are generated based on the risk profile intensity and environmental adaptation weights, as follows:
[0024] .
[0025] Preferably, in step S4, risk assessment weights are obtained, and electrical parameters, behavioral characteristics, environmental data, and building topology are integrated to construct a unified node feature vector for each electricity consumption point, including risk assessment weights, mean electrical parameters, behavioral risk labels, and environmental adaptability parameters. Based on the building floor plan data, a heterogeneous graph structure is constructed, including nodes: electricity consumption point locations; edges: based on circuit connections.
[0026] Feature fusion is performed using a graph convolutional network, and a fusion risk score is calculated for each node, as follows:
[0027] ,
[0028] In the formula, This represents the fusion risk score of node i. This represents the degree of node i. The feature vector of node j is represented; it will be mapped to the building floor plan to generate a risk situation heat map.
[0029] Preferably, in step S5, a risk situation heat map is obtained, and a real-time risk score is extracted for each electricity consumption point. Spatially map the constructed building topology map to form a spatial coordinate association table for node risk scoring, based on... and distance between nodes The probability of risk propagating from node i to node j is calculated as follows:
[0030] .
[0031] Preferably, in step S6, the risk value of the propagation path is obtained, compared with a preset threshold, and divided into low risk, medium risk, and high risk. A response level label is generated, a corresponding preset strategy is executed based on the risk level, the details of the response action are recorded in real time, and a structured feedback data packet is generated.
[0032] Preferably, in step S7, a structured response feedback data packet is acquired, the risk situation before the response is compared with the security status after the response, and the response is marked as effective or invalid. The false alarm rate and the false alarm rate are analyzed, and the risk assessment and response strategy parameters are dynamically updated based on the false alarm rate and the false alarm rate.
[0033] Compared with the prior art, the beneficial effects of the present invention are:
[0034] 1. This invention uses multi-parameter fusion and intelligent analysis to collect electrical parameters and charging behavior data in a spatiotemporal synchronous manner. It constructs a risk profile through association rule mining, and combines environmental adaptive adjustment and graph neural network modeling to generate a risk situation heat map and predict the propagation path. Finally, through multi-level intelligent response and model closed-loop optimization, it significantly improves the accuracy of early warning, the timeliness of response, and the self-evolution capability of the system, thereby comprehensively reducing the probability of electrical fires.
[0035] 2. This invention extracts high-confidence behavioral electrical association rules from a large amount of bimodal data through an association rule algorithm, and constructs a standardized risk profile dimension. The risk profile strength introduces an environmental sensitivity coefficient, which enables the risk assessment to dynamically adapt to environmental changes such as seasons and temperature, thereby significantly improving the early warning capability.
[0036] 3. This invention integrates risk assessment weights with building topology maps to construct a heterogeneous graph structure. It uses graph convolutional networks to aggregate node and edge features to generate a fused risk score for each electricity consumption point. The heatmap visually displays the risk distribution with color gradients, and its real-time update function quickly locates new risk points and triggers responses.
[0037] 4. This invention calculates the probability of risk spreading from high-risk points to neighboring areas by using node risk scores and physical distances in a risk situation heatmap. By improving Dijkstra's algorithm to generate a priority propagation path list, it can identify potential impact areas in advance, guide resource allocation and emergency measures, and significantly improve the initiative and efficiency of safety response. Attached Figure Description
[0038] Figure 1 The following is the operation flow of the intelligent early warning method for power safety based on multi-parameter fusion of the present invention. Figure 1 ;
[0039] Figure 2 The following is the operation flow of the intelligent early warning method for power safety based on multi-parameter fusion of the present invention. Figure 2 ;
[0040] Figure 3 The following is the operation flow of the intelligent early warning method for power safety based on multi-parameter fusion of the present invention. Figure 3 ;
[0041] Figure 4 The following is the operation flow of the intelligent early warning method for power safety based on multi-parameter fusion of the present invention. Figure 4 . Detailed Implementation
[0042] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0043] Example
[0044] Please see Figures 1-4 As shown, the present invention provides a technical solution comprising the following steps:
[0045] S1. Construct a dual-modal data foundation by synchronously collecting electrical parameters and charging behavior in time and space;
[0046] S2. Based on the synchronously collected electrical parameters and behavioral data, perform correlation mining of behavioral and electrical features to construct a risk profile;
[0047] S3. Based on risk profiles and real-time environmental data, perform dynamic environmental adaptive adjustments to generate adaptive risk assessment weights;
[0048] S4. Construct a risk situation heat map by integrating multi-source data and risk assessment weights;
[0049] S5. Generate risk propagation paths based on the risk situation heat map;
[0050] S6. Based on the preset risk index threshold and propagation path results, perform multi-level intelligent response;
[0051] S7. By integrating response feedback data, perform model optimization risk assessment and response strategy parameters.
[0052] In this embodiment, step S1 involves installing high-precision sensors at key nodes such as meter boxes and charging sockets to monitor parameters such as current, voltage, power, and temperature in real time. AI cameras or infrared cameras are deployed in the monitoring area to cover the visible range of the electric vehicle charging behavior, capturing video streams or images. Hardware clock synchronization modules are configured for the electrical sensors and cameras to ensure that the sampling timestamps of the two devices are aligned within microsecond precision. A unified timestamp is added to the electrical parameter data and video frames to form a strict correspondence in the time dimension.
[0053] The spatial correspondence between the camera's field of view and the electrical sensor's installation location is determined by camera calibration technology. A physical space coordinate mapping model is established, and the monitoring points of the electrical sensor are spatially associated with the charging behavior area captured by the camera. Multi-threaded tasks are started to obtain real-time data streams from the electrical sensor and the camera respectively. The data is temporarily cached through shared memory or message queues, and the electrical parameter data is packaged with video frames of the corresponding time period at fixed time intervals to form spatiotemporally synchronized dual-modal data.
[0054] The collected data is preprocessed, and the processed electrical parameters and charging behavior data are stored in a unified format, including fields such as timestamp, spatial coordinates, electrical parameter values, and behavior tags.
[0055] In this embodiment, step S2 extracts electrical parameter features and charging behavior features from the structured storage of S1, and analyzes the correlation strength between the behavior features and electrical features using an association rule mining algorithm, which is implemented as follows:
[0056] ,
[0057] In the formula, This represents the strength of the behavioral and electrical association, and indicates the conditional probability that an electrical anomaly E will occur when behavior B occurs. Here, B represents the charging behavior characteristic, and E represents the electrical anomaly characteristic. This indicates the number of transactions that simultaneously contain behavior B and electrical anomaly E. This represents the total number of transactions containing action B.
[0058] Specifically, by pre-setting the confidence, support, and lift of association rules, rules with high correlation are selected to form a set of behavioral and electrical association rules.
[0059] In this embodiment, S2, based on the association rule set, presets standardized dimensions of the risk profile, including risk type, risk intensity, and risk duration. The risk type is determined by the associated behavior, the association intensity is quantified by the confidence level of the association rules, and the risk duration is mapped from the behavior duration to the electrical anomaly duration. The risk profile intensity is implemented as follows:
[0060] ,
[0061] In the formula, This indicates the intensity of the risk profile, representing the quantified risk value of behavioral and electrical associations in the current environment. Indicates the environmental sensitivity coefficient. Indicates the current ambient temperature. It represents the baseline ambient temperature, verifies the accuracy of the risk profile using historical risk event data, and outputs a verified standardized risk profile.
[0062] In this embodiment, in step S3, environmental data, including temperature, humidity, season, weather conditions, building power load, and current time period, is obtained in real time from meteorological services, building power management systems, etc. The environmental data is standardized to eliminate differences in dimensions, form structured environmental features, and a preset weight coefficient is assigned to each environmental parameter.
[0063] Specifically, based on historical risk data, the environmental adaptation weights are optimized and calculated, as follows:
[0064] ,
[0065] In the formula, Indicates the environmental adaptation weight. The coefficient representing the environmental parameter k. Represents a mapping function. This represents standardized environmental parameter values.
[0066] In this embodiment, step S4, which generates adaptive risk assessment weights based on risk profile intensity and environmental adaptation weights, is implemented as follows:
[0067] ;
[0068] The generated The electricity consumption points are stored in the database and linked to the risk profiles.
[0069] In this embodiment, step S4 involves obtaining risk assessment weights and integrating electrical parameters, behavioral characteristics, environmental data, and building topology to construct a unified node feature vector for each electricity consumption point. This vector includes risk assessment weights, average electrical parameters, behavioral risk labels, and environmental adaptability parameters. Based on building floor plan data, a heterogeneous graph structure is constructed, including nodes (electricity consumption point locations) and edges (established based on circuit connections or physical adjacency relationships), with edge weights reflecting the probability of risk propagation.
[0070] Feature fusion is performed using a graph convolutional network, and a fusion risk score is calculated for each node, as follows:
[0071] ,
[0072] In the formula, This represents the fusion risk score of node i. This represents the degree of node i. The feature vector of node j is represented; it will be mapped to the building floor plan to generate a risk situation heat map.
[0073] In this embodiment, step S5 involves acquiring a risk situation heat map, extracting a real-time risk score for each electricity consumption point, and then... Spatial mapping is performed with the constructed building topology map to ensure that the risk score strictly corresponds to the physical location, forming a spatial coordinate association table of node risk scores.
[0074] Specifically, based on and distance between nodes The probability of risk propagating from node i to node j is calculated as follows:
[0075] ;
[0076] Specifically, with Using edge weights, the propagation path from high-risk nodes to other nodes is calculated using Dijkstra's algorithm. The path risk value is the weighted sum of the risk scores of all nodes on the path. The paths are sorted from high to low risk values to generate a priority propagation path list.
[0077] In this embodiment, step S6 involves obtaining the propagation path risk value, comparing it with a preset threshold, classifying it into low risk, medium risk, and high risk, generating a response level label, executing the corresponding preset strategy based on the risk level, recording response action details in real time, and generating a structured feedback data packet.
[0078] In this embodiment, step S7 involves acquiring a structured response feedback data packet, comparing the risk situation before the response with the security status after the response, marking it as a valid response or an invalid response, analyzing the false alarm rate and the false alarm rate, and dynamically updating the risk assessment and response strategy parameters based on the false alarm rate and the false alarm rate.
[0079] Working principle: High-precision sensors are deployed at key nodes such as meter boxes and charging sockets to collect electrical parameters such as current, voltage, power, and temperature in real time. At the same time, AI cameras are installed in the monitoring area to capture the charging behavior of electric vehicles. To ensure data consistency, the sensors and cameras are equipped with hardware clock synchronization modules to align the electrical parameters with the timestamps of the video frames within microseconds. A physical space coordinate mapping model is established through camera calibration technology to spatially associate the monitoring points of the electrical sensors with the charging behavior area captured by the cameras. The system collects data streams in parallel through multi-threaded tasks, and packages the electrical parameters and corresponding video frames into spatiotemporally synchronized dual-modal data at fixed time intervals. After preprocessing, the data is stored in a unified format, including timestamps, spatial coordinates, electrical parameter values, and behavior tags.
[0080] By leveraging bimodal data, electrical parameter features and charging behavior features are extracted. Association rule mining is used to analyze the correlation strength between behavior and electrical anomalies, selecting high-confidence rules. Based on the rule set, standardized dimensions for risk profiling are constructed: risk type is defined by associated behavior, risk intensity is quantified by rule confidence, and risk duration is mapped from the duration of behavior to electrical anomalies. The risk profile intensity is dynamically adjusted by considering the difference between current ambient temperature and baseline temperature, outputting a standardized risk profile validated by historical events. Real-time environmental data is obtained from meteorological services and building power management systems, and dimensional differences are eliminated through standardization processing to form a structured environmental profile. The system employs several methods: First, it optimizes environmental parameter weights based on historical risk data, calculates environmental adaptation weights to reflect the current environment's impact on risk. Second, it combines risk profile strength to generate adaptive risk assessment weights, quantifying the risk level of specific electrical associations under environmental changes. Third, it stores the generated weights in a database according to the electricity point identifier and links them to the risk profile index. Fourth, it integrates S3's risk assessment weights, electrical parameters, behavioral characteristics, environmental data, and building topology to construct a unified node feature vector for each electricity point. Fifth, it constructs a heterogeneous graph structure based on building floor plan data, where nodes represent electricity point locations, edges represent circuit connections or physical adjacencies, and edge weights reflect the relative positions of the nodes. This method reflects the risk propagation probability; it fuses node and edge features through a graph convolutional network to calculate the fused risk score for each node, comprehensively considering its own risk and the influence of neighboring nodes; the score is mapped to the building floor plan to generate a risk situation heatmap, visually displaying the risk distribution; real-time risk scores for each node are extracted from the risk situation heatmap and mapped to the building topology graph to form a node risk score association table; the risk propagation probability is calculated based on the score and the distance between nodes, and using the propagation probability as the edge weight, an improved Dijkstra algorithm is used to calculate the propagation path from high-risk nodes to other nodes, with the path risk value being the sum of the scores of all nodes on the path. The system prioritizes and sorts risk levels by path risk value; it classifies response levels based on the risk value of the propagation path and preset thresholds; low-risk actions trigger local audio-visual alerts, medium-risk actions push notifications to administrators and record video of the behavior, and high-risk actions automatically cut off power and trigger the fire department; response actions are recorded in real time to generate structured feedback data packets, including path ID, response level, execution results, etc.; high-risk paths are handled first through a priority-driven mechanism; response feedback data is integrated to compare the risk situation before and after the response, and the effectiveness of the response is marked; false alarm rate and false negative rate are analyzed to dynamically adjust the risk assessment model parameters and response strategies.
[0081] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their likenesses.
[0082] The present invention and its embodiments have been described above. This description is not restrictive, and the accompanying drawings are only one embodiment of the present invention; the actual structure is not limited thereto. In conclusion, if those skilled in the art are inspired by this description and design similar structures and embodiments without departing from the spirit of the invention, such designs should fall within the protection scope of the present invention.
Claims
1. A method for intelligent early warning of electricity safety based on multi-parameter fusion, characterized in that, Includes the following steps: S1. Construct a dual-modal data foundation by synchronously collecting electrical parameters and charging behavior in time and space; S2. Based on the synchronously collected electrical parameters and behavioral data, perform correlation mining of behavioral and electrical features to construct a risk profile; S3. Based on risk profiles and real-time environmental data, perform dynamic environmental adaptive adjustments to generate adaptive risk assessment weights; S4. Construct a risk situation heat map by integrating multi-source data and risk assessment weights; S5. Generate risk propagation paths based on the risk situation heat map; S6. Based on the preset risk index threshold and propagation path results, perform multi-level intelligent response; S7. By integrating response feedback data, perform model optimization risk assessment and response strategy parameters.
2. The intelligent early warning method for electricity safety based on multi-parameter fusion according to claim 1, characterized in that: S1 involves installing high-precision sensors at key nodes such as meter boxes and charging sockets. The spatial correspondence between the camera's field of view and the electrical sensor's installation location is determined by camera calibration technology. The monitoring points of the electrical sensor are spatially associated with the charging behavior area captured by the camera. Multi-threaded tasks are started to acquire real-time data streams from the electrical sensor and the camera respectively. The data is temporarily cached through shared memory. The electrical parameter data and video frames of the corresponding time period are packaged at fixed time intervals to form spatiotemporally synchronized dual-modal data. The collected data is preprocessed, and the processed electrical parameters and charging behavior data are stored in a unified format.
3. The intelligent early warning method for electricity safety based on multi-parameter fusion according to claim 2, characterized in that: S2 extracts electrical parameter features and charging behavior features from the structured storage of S1, and analyzes the correlation strength between the behavior features and electrical features using an association rule mining algorithm, as follows: , In the formula, Indicates the strength of behavioral and electrical association, where B represents charging behavior characteristics and E represents electrical anomaly characteristics. This indicates the number of transactions that simultaneously contain behavior B and electrical anomaly E. This represents the total number of transactions containing action B; By pre-setting the confidence, support, and lift of association rules, high-association rules are selected to form a set of behavioral and electrical association rules.
4. The intelligent early warning method for electricity safety based on multi-parameter fusion according to claim 3, characterized in that: S2, based on the association rule set, presets standardized dimensions for the risk profile, including risk type, risk intensity, and risk duration. The risk profile intensity is implemented as follows: , In the formula, This indicates the intensity of the risk profile, representing the quantified risk value of behavioral and electrical associations in the current environment. Indicates the environmental sensitivity coefficient. Indicates the current ambient temperature. It represents the baseline ambient temperature, verifies the accuracy of the risk profile using historical risk event data, and outputs a verified standardized risk profile.
5. The intelligent early warning method for electricity safety based on multi-parameter fusion according to claim 4, characterized in that: In step S3, environmental data is acquired in real time, standardized to eliminate dimensional differences, and structured environmental features are formed. A preset weight coefficient is assigned to each environmental parameter, optimized based on historical risk data, and the environmental adaptation weight is calculated. This process is implemented as follows: , In the formula, Indicates the environmental adaptation weight. The coefficient representing the environmental parameter k. Represents a mapping function. This represents standardized environmental parameter values.
6. The intelligent early warning method for electricity safety based on multi-parameter fusion according to claim 5, characterized in that: In step S4, an adaptive risk assessment weight is generated based on the risk profile intensity and environmental adaptation weight, as follows: 。 7. The intelligent early warning method for electricity safety based on multi-parameter fusion according to claim 6, characterized in that: In step S4, risk assessment weights are obtained, and electrical parameters, behavioral characteristics, environmental data, and building topology are integrated to construct a unified node feature vector for each electricity consumption point, including risk assessment weights, mean electrical parameters, behavioral risk labels, and environmental adaptability parameters. Based on the building floor plan data, a heterogeneous graph structure is constructed, including nodes: the location of the electricity consumption point. Edge: Based on circuit connection; Feature fusion is performed using a graph convolutional network, and a fusion risk score is calculated for each node, as follows: , In the formula, This represents the fusion risk score of node i. This represents the degree of node i. Represent the feature vector of node j; Mapping the data onto the building floor plan generates a risk situation heatmap.
8. The intelligent early warning method for electricity safety based on multi-parameter fusion according to claim 7, characterized in that: In step S5, a risk situation heat map is obtained, and a real-time risk score is extracted for each electricity consumption point. Spatially map the constructed building topology map to form a spatial coordinate association table for node risk scoring, based on... and distance between nodes The probability of risk propagating from node i to node j is calculated as follows: 。 9. The intelligent early warning method for electricity safety based on multi-parameter fusion according to claim 8, characterized in that: In step S6, the risk value of the propagation path is obtained, compared with a preset threshold, and divided into low risk, medium risk and high risk. A response level label is generated, and a corresponding preset strategy is executed based on the risk level. The details of the response action are recorded in real time, and a structured feedback data packet is generated.
10. The intelligent early warning method for electricity safety based on multi-parameter fusion according to claim 9, characterized in that: In step S7, the structured response feedback data packet is acquired, the risk situation before the response is compared with the security status after the response, and it is marked as a valid response or an invalid response. The false alarm rate and the false alarm rate are analyzed, and the risk assessment and response strategy parameters are dynamically updated based on the false alarm rate and the false alarm rate.