Auxiliary inspection system and method for informatization project file acceptance
By constructing an information-based project archive acceptance auxiliary inspection system and adopting automated and quantitative evaluation methods, the problem of low efficiency in traditional manual acceptance has been solved, realizing an efficient and objective archive acceptance process and improving acceptance efficiency and management quality.
Patent Information
- Application Number
- CN202411413223.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-11
- Publication Date
- 2026-04-14
AI Technical Summary
In the IT projects of large group enterprises, the document acceptance process relies on traditional and inefficient manual review, resulting in long acceptance cycles, frequent inconsistencies, time-consuming and labor-intensive processes, difficulty in quantitative evaluation, and the complexity of system integration projects increases the difficulty of acceptance.
Design an information-based project archive acceptance auxiliary inspection system, including an archive acceptance indicator system management module, a project deliverables management module, an archive pre-acceptance module, and a problem feedback and management module. Employ automated and quantitative evaluation methods to construct a scientific acceptance indicator system, and improve acceptance efficiency and objectivity through systematic management.
It automates the acceptance of archives and makes the results quantifiable, shortens the acceptance cycle, improves acceptance efficiency, reduces human interference, enhances the objectivity of acceptance, provides detailed feedback to guide rectification, and improves the quality of archive management.
Smart Images

Figure CN121860555A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the fields of project management and information technology, specifically to an auxiliary inspection system and method for the acceptance of information-based project archives. Background Technology
[0002] In IT projects, especially system integration projects, of large enterprise groups, the complexity and challenges of records management are becoming increasingly prominent. The wide cross-domain nature and intricate technical aspects of these projects place higher demands on records management. Such projects not only require meticulous records management but also urgently need to build a highly systematic and standardized management system. However, many large enterprise groups still widely use traditional and inefficient manual methods in the pre-archiving acceptance process, which has become a bottleneck restricting the efficient progress of projects.
[0003] Specifically, although the records management department has formulated detailed records acceptance standards, very few actually utilize information technology to assist in their implementation. Traditionally, acceptance standards are distributed to the IT department in Excel spreadsheet format. The IT department then needs to conduct tedious self-checks and pre-acceptance work based on these standards and project characteristics. This process is lengthy and time-consuming, often taking weeks or even months, severely hindering the overall project schedule. More importantly, there is often a disconnect between the initial records and the final acceptance results, with frequent inconsistencies forcing frequent rework during the acceptance preparation phase. This is not only time-consuming and labor-intensive but also adds unnecessary manpower and cost burdens. Furthermore, the unique nature of system integration projects—the diverse range of hardware and software products and the broad scope of the project—makes the collection of data that complies with records management standards particularly complex and variable, further increasing the difficulty of acceptance.
[0004] Given the aforementioned challenges, the traditional manual review-based document acceptance method is clearly lagging behind the high-efficiency requirements of modern project management. Its drawbacks, such as low efficiency, strong subjectivity, and difficulty in quantification, are becoming increasingly apparent. Therefore, the need for an intelligent document acceptance support system to automate the project document acceptance process and quantify the results is an urgent priority for improving project management efficiency and ensuring the smooth progress of projects. Summary of the Invention
[0005] The purpose of this invention is to provide a system and method for assisting in the acceptance of information technology project archives, thereby improving the efficiency of archive acceptance. To achieve the above objective, this invention provides an auxiliary inspection system and method for the acceptance of information technology project archives.
[0006] To achieve the objectives of this invention, the technical solution adopted is an information-based project archive acceptance auxiliary inspection system, including an archive acceptance indicator system management module, a project deliverables management module, an archive pre-acceptance module, and a problem feedback and management module.
[0007] The document acceptance indicator system management module presets the project's unit's requirements for project document acceptance and sets the document acceptance indicator system.
[0008] The project deliverables management module collects project deliverables from the implementation process documents of specific projects, including but not limited to contract documents, design documents, construction records, test reports, training records, and acceptance reports, to form a project deliverables database;
[0009] The pre-acceptance module evaluates the collected archives in accordance with the specific project archive requirements, calculates the scores of each indicator, and calculates the weighted sum to obtain the pre-acceptance self-score.
[0010] The problem feedback and management module performs in-depth analysis of the quantitative assessment results, identifies existing problems and deficiencies, and generates detailed pre-acceptance reports and feedback opinions.
[0011] Optionally, the information technology project archive acceptance auxiliary inspection system also includes a permission division and user management module;
[0012] The permission division and user management module can divide different roles and set different operation permissions according to different work tasks.
[0013] Optionally, the information-based project archive acceptance auxiliary inspection system also includes a statistical analysis module;
[0014] The statistical analysis module performs multi-dimensional statistics on the archive acceptance status within a certain period based on historical data, and displays the results visually.
[0015] Preferably, the archive acceptance indicator system management module includes a project type management unit, an archive indicator type management unit, an archive indicator management unit, and a scoring rule management unit;
[0016] The project type management unit presets information technology project types, including but not limited to software projects, system integration projects, and equipment procurement projects. Different types of projects correspond to different file requirements.
[0017] According to the requirements of archive management, the archive indicator type management unit divides the indicator types into archive integrity indicators, archive accuracy indicators, archive standardization indicators, archive compliance indicators, and archive security indicators. Each type of indicator corresponds to specific indicators, and the indicator types can be further classified into secondary indicators.
[0018] The archival indicator management unit is divided into multiple different archival indicators according to the different indicator types, and each archival indicator corresponds to one or more deliverables;
[0019] The scoring rules management unit manages the rules for assigning values to preset indicators, sets the weight for each indicator type, and allocates indicator scores according to the weight.
[0020] Preferably, the project deliverables management module includes a project basic information unit, a deliverables management unit, an archives management unit, and a project rules management unit;
[0021] The basic information unit for the project collects basic information including but not limited to project name, bidding method, winning bid time, winning bidder and winning bid amount, equipment delivery time, system testing time, system launch time, project acceptance time, project deliverables list and project deliverables;
[0022] The deliverables management unit verifies the completeness and compliance of the project deliverables;
[0023] The archive management unit has built-in volume catalog and transfer list templates, which can be used to automatically generate the volume catalog and transfer list required for archiving.
[0024] The project rules management unit verifies the compliance of the output generation time and issues warnings for non-compliant content.
[0025] Preferably, the pre-acceptance module includes an acceptance plan management unit, a pre-acceptance management unit, and a pre-acceptance report management unit;
[0026] The acceptance plan management unit can set the project acceptance time, which facilitates the reverse scheduling of pre-acceptance time nodes;
[0027] The pre-acceptance management unit matches the acceptance documents with the corresponding project file acceptance scoring criteria to form a file pre-acceptance score.
[0028] The pre-acceptance report management unit automatically generates a pre-acceptance report, which includes, but is not limited to, the pre-acceptance score, any missing items, and recommendations.
[0029] Preferably, the problem feedback and management module includes a problem classification management unit, a knowledge base management unit, and a problem tracking management unit;
[0030] The problem classification management unit has preset problem classification options, which allows the system to assign problems to the appropriate personnel more quickly.
[0031] The knowledge base management unit has a pre-set common questions knowledge base for processing personnel to quickly find and refer to.
[0032] The problem tracking and management unit tracks and manages problems, recording key information during the processing.
[0033] Preferably, the permission allocation and user management module includes a user information management unit and a permission management unit;
[0034] The user information management unit allows administrators to view, edit, and delete users' basic information, and supports batch import and export of user information;
[0035] The permission management unit supports the creation, editing, deletion, and copying of roles, and allows for the adjustment of role permissions as needed.
[0036] Preferably, the statistical analysis module includes a data analysis unit and a report generation unit;
[0037] The data analysis unit analyzes the collected data, identifies potential problems and trends, and provides data support for improvement.
[0038] The report generation unit generates a problem feedback report based on the data analysis results;
[0039] On the other hand, this application embodiment also provides an auxiliary inspection method for the acceptance of information technology project archives, characterized in that the inspection method includes the following steps:
[0040] S1: Construct an archive acceptance indicator system, set the value and weight of each indicator, and mark the key indicators and general indicators.
[0041] S2: Import project deliverables or deliverable lists, and manage the basic information of the deliverables;
[0042] S3: Compare the corresponding indicators in the indicator system with the project deliverables to find the differences between the two, especially whether key indicator items in the indicator system are missing, and form the pre-acceptance score of the archives.
[0043] S4: Automatically generates pre-acceptance reports to help archives management departments and project construction departments identify and address any shortcomings.
[0044] The beneficial effects of this invention are as follows:
[0045] Improve acceptance efficiency: By using automated and intelligent methods to conduct document acceptance, the acceptance cycle is greatly shortened and the acceptance efficiency is improved.
[0046] Enhancing the objectivity of acceptance: A scientific acceptance indicator system was constructed, and a quantitative evaluation method was adopted, which reduced the interference of human factors and enhanced the objectivity of acceptance.
[0047] Facilitates problem rectification: Provides detailed acceptance reports and feedback to guide the project team in making targeted rectifications, thereby improving the quality and level of record management. Attached Figure Description
[0048] Figure 1A schematic diagram of the composition structure of an information-based project archive acceptance auxiliary inspection system according to an embodiment of the present invention is shown.
[0049] Figure 2 A flowchart of an embodiment of the present invention for an auxiliary inspection method for the acceptance of information project archives is shown.
[0050] Figure 3 This invention illustrates a functional architecture diagram of a three-level acceptance process for information technology project auxiliary file management, according to an embodiment of the present invention.
[0051] Specific implementation method
[0052] The invention will now be described in more detail with reference to the accompanying drawings. While preferred embodiments of the invention are shown in the drawings, it should be understood that the invention can be implemented in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that the invention will be thorough and complete, and will fully convey the scope of the invention to those skilled in the art.
[0053] Figure 1 This diagram illustrates the structural composition of the information technology project archive acceptance auxiliary inspection system. (For reference) Figure 1 The information-based project archive acceptance auxiliary inspection system includes an archive acceptance indicator system management module, a project deliverables management module, an archive pre-acceptance module, a problem feedback and management module, an access control and user management module, and a statistical analysis module.
[0054] The document acceptance indicator system management module presets the project's unit's requirements for project document acceptance and sets up a document acceptance indicator system, including project type management and document acceptance indicator management.
[0055] The project deliverables management module collects relevant deliverables from the implementation process documents of specific projects, including but not limited to contract documents, design documents, construction records, test reports, training records, and acceptance reports, and organizes them to form a project deliverables database.
[0056] The aforementioned pre-acceptance module for archives is designed to evaluate the collected archives in accordance with the specific project archive requirements when conducting acceptance of specific projects. This evaluation involves calculating the scores of each indicator and then weighting and summing them to obtain the pre-acceptance self-assessment score.
[0057] The problem feedback and management module analyzes the results of the quantitative assessment, identifies existing problems and deficiencies, and generates detailed acceptance reports and feedback opinions to guide the project team in rectification and optimization.
[0058] The permission division and user management module can divide different roles and set different operation permissions according to different work tasks.
[0059] The statistical analysis module can perform multi-dimensional statistics on the acceptance of archives within a certain period based on historical data and display the results visually.
[0060] Specifically, the archive acceptance indicator system management module includes a project type management unit, an archive indicator type management unit, an archive indicator management unit, and a scoring rule management unit.
[0061] The project type management unit presets information technology project types, including software projects, system integration projects, and equipment procurement projects. Different projects have different requirements for archives. The archive management department sets the project type in this module, which is linked to archive indicators.
[0062] According to the requirements of archive management, the archive indicator type management unit divides the indicator types into five categories: archive integrity indicators, archive accuracy indicators, archive standardization indicators, archive compliance indicators, and archive security indicators. Each type of indicator corresponds to a specific indicator, and each type of indicator can be further classified into secondary indicators.
[0063] The archival indicator management unit is a summary of archival management requirements for a specific requirement. Depending on the type of indicator, it is divided into multiple different archival indicators, and each archival indicator corresponds to one or more deliverables.
[0064] The scoring rules management unit manages the rules for assigning values to preset indicators, sets the weight for each indicator type, and allocates indicator scores according to the different weights.
[0065] Specifically, in this example, the project deliverables management module includes a project basic information unit, a project rules management unit, an archive management unit, and a deliverables management unit.
[0066] The basic information unit for projects collects basic information including but not limited to project name, bidding method, winning bid time, winning bidder and winning bid amount, equipment delivery time, system testing time, system launch time, project acceptance time, and list of project deliverables.
[0067] The project deliverables list is derived from the specific requirements for deliverables in the project bidding documents and technology contracts. Additional deliverables requirements may also be added. The specific details of the deliverables list shall be determined by the project construction unit and the information management department.
[0068] The project's basic information unit allows for the batch entry of electronic files of archives based on the company's specific requirements for archive management. It can also be linked to the company's archive management system, using an interface to batch import or export relevant documents from the archive management system, thereby achieving data sharing between systems.
[0069] The project rules management unit is used to verify the compliance of the delivery time and issue warnings for non-compliant content.
[0070] The archive management unit includes built-in volume catalog and transfer list templates, which can automatically generate the volume catalog and transfer list required for archiving.
[0071] Specifically, the deliverables management unit verifies the completeness and compliance of the acceptance documents. Verification of the completeness of acceptance documents, during the final acceptance phase of a project or archive, generally requires a rigorous, item-by-item check against the completed acceptance document catalog and the detailed deliverables list. Archive compliance verification utilizes regular expression-based rule-based verification technology to validate the submission time of project deliverables. This involves strictly comparing the actual submission time of the deliverables with the pre-defined key milestone time nodes in the project's basic information to accurately assess the timeliness and compliance of the deliverables, thereby ensuring the standardization of the project process and the quality of the final deliverables.
[0072] Specifically, the algorithms for comparing deliverables in project deliverable management include:
[0073] A·B represents the dot product of outcome A and indicator B, and ∥A∥ and ∥B∥ represent the modulus (length) of outcome A and indicator B, respectively. The range of cosine similarity is [-1, 1]. The closer the value is to 1, the more similar the outcome and indicator are, and the higher the similarity. The closer the value is to -1, the less similar the two vectors are.
[0074]
[0075] Using the above algorithm:
[0076] Convert the text to be detected into a series of words;
[0077] The words are converted into numerical vectors, where each word corresponds to a dimension in the vector, and its value represents the importance of the word in the text;
[0078] The text vector to be detected is compared with the existing text vectors in the database;
[0079] The cosine similarity algorithm is used to calculate the cosine of the angle between two vectors to assess their similarity.
[0080] Set a threshold (e.g., 0.8). When the similarity between two texts exceeds this threshold, it is considered that there is a possibility that they are identical or extremely similar, which means that the output meets the archival acceptance requirements.
[0081] In this example, the pre-acceptance module includes an acceptance plan management unit, a pre-acceptance management unit, and a pre-acceptance report management unit.
[0082] The acceptance plan management unit allows information technology departments that need to manage multiple projects to set acceptance times for each project, facilitating the scheduling of pre-acceptance time nodes.
[0083] The pre-acceptance management unit collects information such as the file name, generation time, and summary description of the acceptance documents. Through the pre-acceptance function, it matches these information with the corresponding project file acceptance scoring criteria to generate a pre-acceptance score for the files.
[0084] The pre-acceptance report management unit automatically generates pre-acceptance reports, which include, but are not limited to, pre-acceptance scores, missing items, and recommendations, providing suggestions for subsequent document acceptance work.
[0085] Specifically, the algorithms used for simulated scoring in the pre-acceptance of archives include:
[0086] Suppose there are n indicators, and each indicator has a weight of w. i (i = 1, 2, ..., n), the actual value is x i Then the total score S can be expressed as:
[0087]
[0088] w i Let x represent the weight of the i-th indicator. i This indicates the specific score for the indicator.
[0089] Output preprocessing: Preprocessing operations such as word segmentation, stop word removal, and part-of-speech tagging are performed on the text;
[0090] Keyword matching: Uses exact matching or fuzzy matching algorithms to find words in the text that match predefined keywords;
[0091] Weighting: Calculate the total score based on the weight values and actual values of each indicator;
[0092] Pre-acceptance result output: The calculated score will be output as the result for user reference or further processing.
[0093] Specifically, in this example, the problem feedback and management module includes a problem classification management unit, a knowledge base management unit, and a problem tracking management unit;
[0094] The problem classification management unit allows users to set problem classification options and guide them to select the classification that best matches the nature of their problem, so that the system can more quickly assign the problem to the appropriate personnel.
[0095] The knowledge base management unit includes a pre-set common questions knowledge base for staff to quickly find and refer to.
[0096] The issue tracking and management unit tracks and manages each issue, recording key information during the processing, such as the personnel involved, the processing time, and the processing results.
[0097] In this example, the permission allocation and user management module includes a user information management unit and a permission management unit;
[0098] The user information management unit allows administrators to view, edit, and delete basic user information, including username, password, email address, and phone number. It supports batch import and export of user information, facilitating large-scale user data management for administrators.
[0099] The access control unit includes role management, which defines and manages system roles. Each role has a specific set of permissions and supports functions such as role creation, editing, deletion, and copying to adjust role permissions as needed. Permission allocation assigns specific permissions to different roles or users to control their access to and operation of system resources.
[0100] The group's management department can use the system to conduct policy briefings on the group's overall archives management work, summarize the annual information technology project archives management work, and use statistical information visualization to intuitively show the detailed situation of the group's archives work from multiple dimensions of archives management and project management work.
[0101] In this example, the group records management layer includes:
[0102] Archives Management Requirements: The Group manages and shares policies, regulations, and standards related to archives work. All documents related to the archives work of information technology projects can be viewed in this module.
[0103] Overview of Archival Work: This section showcases the group's achievements in archival work and related data, and can summarize and display data for different periods (quarterly, annual, and yearly).
[0104] Interface Management: This system enables data sharing with related modules of document management and the group's office portal.
[0105] Access Control: The group's management department has the function of assigning permissions to lower-level users.
[0106] In this example, the statistical analysis module includes a data analysis unit and a report generation unit.
[0107] The data analysis unit analyzes the collected data to identify potential problems and trends, providing data support for product or service improvements.
[0108] The report generation unit generates issue feedback reports based on data analysis results, reporting the issue feedback and handling status to management or relevant teams.
[0109] On the other hand, this application also provides a method for auxiliary inspection of information technology project archives, such as... Figure 2 It includes the following steps:
[0110] S1: Construct an archive acceptance indicator system, set the value and weight of each indicator, and mark the key indicators and general indicators.
[0111] S2: Import project deliverables or deliverable lists, and manage the basic information of the deliverables;
[0112] S3: Compare the corresponding indicators in the indicator system with the project deliverables to find the differences between the two, especially whether key indicator items in the indicator system are missing, and form the pre-acceptance score of the archives.
[0113] S4: Automatically generates a pre-acceptance report, presenting the comparison results to users and helping the archives management department and project construction department to identify and address any shortcomings.
[0114] Those skilled in the art will understand that embodiments of the present invention can be provided as methods, systems, or computer program products. Therefore, the present invention can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present invention can take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code. The solutions in the embodiments of the present invention can be implemented using various computer languages, such as the object-oriented programming language Java and the interpreted scripting language JavaScript.
[0115] This invention is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart illustrations and / or block diagrams. Figure 1One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.
[0116] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.
[0117] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.
[0118] Although preferred embodiments of the invention have been described, those skilled in the art, upon learning the basic inventive concept, can make other changes and modifications to these embodiments. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments as well as all changes and modifications falling within the scope of the invention.
[0119] Obviously, those skilled in the art can make various modifications and variations to this invention without departing from its spirit and scope. Therefore, if these modifications and variations fall within the scope of the claims of this invention and their equivalents, this invention also intends to include these modifications and variations.
Claims
1. An information-based project archive acceptance auxiliary inspection system, characterized in that, It includes modules for managing the archive acceptance indicator system, managing project deliverables, pre-acceptance of archives, and problem feedback and management. The document acceptance indicator system management module presets the project's unit's requirements for project document acceptance and sets the document acceptance indicator system. The project deliverables management module collects project deliverables from the implementation process documents of specific projects, including but not limited to contract documents, design documents, construction records, test reports, training records, and acceptance reports, to form a project deliverables database; The pre-acceptance module evaluates the collected archives in accordance with the specific project archive requirements, calculates the scores of each indicator, and calculates the weighted sum to obtain the pre-acceptance self-score. The problem feedback and management module performs in-depth analysis of the quantitative assessment results, identifies existing problems and deficiencies, and generates detailed pre-acceptance reports and feedback opinions.
2. The auxiliary inspection system for the acceptance of information-based project archives according to claim 1, characterized in that, It also includes a permission allocation and user management module; The permission division and user management module can divide different roles and set different operation permissions according to different work tasks.
3. The auxiliary inspection system for the acceptance of information-based project archives according to claim 2, characterized in that, It also includes a statistical analysis module; The statistical analysis module performs multi-dimensional statistics on the archive acceptance status within a certain period based on historical data, and displays the results visually.
4. The auxiliary inspection system for the acceptance of information-based project archives according to claim 3, characterized in that, The document acceptance indicator system management module includes a project type management unit, a document indicator type management unit, a document indicator management unit, and a scoring rule management unit; The project type management unit presets information technology project types, including but not limited to software projects, system integration projects, and equipment procurement projects. Different types of projects correspond to different file requirements. According to the requirements of archive management, the archive indicator type management unit divides the indicator types into archive integrity indicators, archive accuracy indicators, archive standardization indicators, archive compliance indicators, and archive security indicators. Each type of indicator corresponds to specific indicators, and the indicator types can be further classified into secondary indicators. The archival indicator management unit is divided into multiple different archival indicators according to the different indicator types, and each archival indicator corresponds to one or more deliverables; The scoring rules management unit manages the rules for assigning values to preset indicators, sets the weight for each indicator type, and allocates indicator scores according to the weight.
5. The information-based project archive acceptance auxiliary inspection system according to claim 4, characterized in that, The project deliverables management module includes a project basic information unit, a deliverables management unit, an archives management unit, and a project rules management unit; The basic information unit for the project collects basic information including but not limited to project name, bidding method, winning bid time, winning bidder and winning bid amount, equipment delivery time, system testing time, system launch time, project acceptance time, project deliverables list and project deliverables; The deliverables management unit verifies the completeness and compliance of the project deliverables; The archive management unit has built-in volume catalog and transfer list templates, which can be used to automatically generate the volume catalog and transfer list required for archiving. The project rules management unit verifies the compliance of the output generation time and issues warnings for non-compliant content.
6. The information-based project archive acceptance auxiliary inspection system according to claim 5, characterized in that, The file pre-acceptance module includes an acceptance plan management unit, a pre-acceptance management unit, and a pre-acceptance report management unit. The acceptance plan management unit can set the project acceptance time, which facilitates the reverse scheduling of pre-acceptance time nodes; The pre-acceptance management unit matches the acceptance documents with the corresponding project file acceptance scoring criteria to form a file pre-acceptance score. The pre-acceptance report management unit automatically generates a pre-acceptance report, which includes, but is not limited to, the pre-acceptance score, any missing items, and recommendations.
7. The information-based project archive acceptance auxiliary inspection system according to claim 6, characterized in that, The problem feedback and management module includes a problem classification management unit, a knowledge base management unit, and a problem tracking management unit; The problem classification management unit has preset problem classification options, which allows the system to assign problems to the appropriate personnel more quickly. The knowledge base management unit has a pre-set common questions knowledge base for processing personnel to quickly find and refer to. The problem tracking and management unit tracks and manages problems, recording key information during the processing.
8. The information-based project archive acceptance auxiliary inspection system according to claim 7, characterized in that, The permission allocation and user management module includes a user information management unit and a permission management unit; The user information management unit allows administrators to view, edit, and delete users' basic information, and supports batch import and export of user information; The permission management unit supports the creation, editing, deletion, and copying of roles, and allows for the adjustment of role permissions as needed.
9. The information-based project archive acceptance auxiliary inspection system according to claim 8, characterized in that, The statistical analysis module includes a data analysis unit and a report generation unit; The data analysis unit analyzes the collected data, identifies potential problems and trends, and provides data support for improvement. The report generation unit generates a problem feedback report based on the data analysis results.
10. A method for auxiliary inspection of information technology project archives, characterized in that, The inspection method includes the following steps: S1: Construct an archive acceptance indicator system, set the value and weight of each indicator, and mark the key indicators and general indicators. S2: Import project deliverables or deliverable lists, and manage the basic information of the deliverables; S3: Compare the corresponding indicators in the indicator system with the project deliverables to find the differences between the two, especially whether key indicator items in the indicator system are missing, and form the pre-acceptance score of the archives. S4: Automatically generates pre-acceptance reports to help archives management departments and project construction departments identify and address any shortcomings.