一种175MPa超高压高抗硫套管头

By combining multiple fixing components and guide columns, the problem of cumbersome installation and disassembly of the sleeve head is solved, enabling rapid installation and disassembly of the sleeve head and improving installation efficiency and stability.

CN121875645BActive Publication Date: 2026-07-17JIANGSU XIONGYUE PETROLEUM MECHANICAL EQUIP MFG

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
JIANGSU XIONGYUE PETROLEUM MECHANICAL EQUIP MFG
Filing Date
2026-03-23
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

The existing sleeve head installation and disassembly process is cumbersome and cannot achieve convenient and quick installation and disassembly operations, which affects the installation efficiency of sleeve heads.

Method used

The system employs a multi-fixing component structure, including first, second, and third fixing components. Through the cooperation of guide columns and connecting channels, the system utilizes movable inserts and locking mechanisms to achieve rapid installation and removal of the sleeve head. The sealing half-sleeve and movable locking strips enhance the robustness and stability of the installation.

Benefits of technology

It enables convenient installation and disassembly of the casing head, improves installation efficiency and stability, simplifies the operation process, and ensures a firm connection between the casing head and the wellhead base.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121875645B_ABST
    Figure CN121875645B_ABST
Patent Text Reader

Abstract

本发明涉及套管头技术领域,具体为一种175MPa超高压高抗硫套管头,包括:套管头本体,所述套管头本体安装在井口基座上;第一固定组件,所述第一固定组件安装在套管头本体上,与井口基座相配合对套管头本体进行固定;第二固定组件,所述第二固定组件也安装在套管头本体上,与第一固定组件相连接,通过第一固定组件带动第二固定组件进行移动,与井口基座相配合对套管头本体进行固定;在进行套管头本体的安装时,通过连接通道与导向连柱的配合将套管头本体定位在井口基座上,然后推动第一条板即可实现对套管头本体的多重锁定,完成套管头本体的固定安装,同时能够实现第一条板的自动锁定,保证套管头本体安装的牢固性和稳定性,操作简单方便且快捷。