一种风洞全模试验段整体框架结构

The modular and mechatronics-integrated design of the wind tunnel full-model test section frame structure solves the problems of wind tunnel frame material aging and difficult modification, realizes dynamic reconfigurability and intelligent support, and improves the efficiency and accuracy of wind tunnel testing.

CN121933224BActive Publication Date: 2026-07-17INST OF HIGH SPEED AERODYNAMICS OF CHINA AERODYNAMICS RES & DEV CENT

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
INST OF HIGH SPEED AERODYNAMICS OF CHINA AERODYNAMICS RES & DEV CENT
Filing Date
2026-03-31
Publication Date
2026-07-17

Smart Images

  • Figure CN121933224B_ABST
    Figure CN121933224B_ABST
Patent Text Reader

Abstract

本申请公开了一种风洞全模试验段整体框架结构,包括上框架、下框架和立柱,上框架与下框架之间连接有立柱,上框架、下框架与立柱共同形成前后贯通的箱式框架,上框架、下框架和立柱均前端连接入口法兰,上框架、下框架和立柱均后端连接出口法兰。本申请的有益效果:本框架通过将传统“被动支撑”升级为“主动可控”平台,以模块化、机电一体化设计攻克了静态框架的几何僵化、改造困难、干扰控制难等痛点,实现了风洞试验效率、精度与灵活性的协同跃升,并为未来功能扩展预留了物理及控制接口。
Need to check novelty before this filing date? Find Prior Art