5G network slice resource scheduling method for power distribution network
By collecting the geographical coordinates and priorities of service requests in 5G network slicing resource scheduling, dynamically dividing service areas and identifying cluster centers, and combining priorities and geographical locations for collaborative scheduling, the problem of inaccurate resource matching in existing technologies is solved, achieving more efficient and reliable resource allocation and service carrying.
Patent Information
- Application Number
- CN202610079124.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-01-21
- Publication Date
- 2026-04-28
AI Technical Summary
Existing 5G network slicing resource scheduling methods cannot accurately match the spatial distribution characteristics of power distribution network services, resulting in inaccurate resource matching and low scheduling efficiency, and in particular, it is difficult to guarantee the low latency and high reliability requirements of critical services.
By collecting the geographic coordinates and priority labels of business requests, business areas are dynamically divided, business cluster centers are identified, and coordinated scheduling is performed by combining priority and geographic location to generate a global priority scheduling sequence. The network resource nodes with the shortest path and spatial proximity are selected for resource allocation.
It improves the accuracy and locality of resource matching, reduces service transmission latency, optimizes the spatial distribution of network traffic, and enhances the overall utilization efficiency and system stability of 5G network slicing resources when carrying distribution network services.
Smart Images

Figure CN121940820A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of information and communication technology, and in particular to a 5G network slicing resource scheduling method for power distribution networks. Background Technology
[0002] In modern power systems, the distribution network is the last mile connecting the backbone transmission network and end users. Its operational efficiency and reliability directly affect the quality of electricity used for social production and residential purposes. With the advancement of "dual-carbon" goals, a large number of new services, such as distributed power sources, electric vehicle charging stations, and smart electricity terminals, are being densely integrated into the distribution network, placing unprecedented demands on the real-time performance, reliability, and flexibility of communication. 5G networks, with their high bandwidth, low latency, high reliability, and network slicing capabilities, are considered an ideal communication platform for carrying the diverse services of the distribution network. However, how to accurately match the resource advantages of 5G networks with the dispersed, heterogeneous, and dynamically changing service needs of the distribution network to achieve efficient and intelligent resource scheduling has become a core technical challenge in promoting the intelligent transformation of the power grid.
[0003] Currently, the main challenge for resource scheduling in power distribution networks using 5G networks lies in the uneven distribution of service requests in time and space, and the significant differences in latency, bandwidth, and reliability requirements among different services (such as protection and control, data acquisition, and video surveillance). Most existing scheduling methods employ simple first-come, first-served or fixed-priority queuing strategies, lacking in-depth consideration of the correlation between the geographical location of the service request and the spatial location of the requested network resource node. This leads to a disconnect between scheduling decisions and the spatial distribution characteristics of services. For example, an emergency fault isolation request located in region A might be scheduled to a physically distant resource node with a light load but complex transmission path, resulting in additional network latency and failing to meet millisecond-level response requirements. Alternatively, the system might schedule multiple geographically adjacent service requests to different remote nodes, causing network path detours and resource fragmentation, failing to fully utilize the advantages of centralized processing of local resources. Summary of the Invention
[0004] Therefore, the purpose of this invention is to overcome the problem in the prior art that the scheduling of 5G network slice resources is disconnected from the geographical spatial distribution characteristics of distribution network services, resulting in inaccurate resource matching and low scheduling efficiency. This invention provides a 5G network slice resource scheduling method for distribution networks. By dynamically dividing service areas, identifying service cluster centers, and combining priority and geographical location for coordinated scheduling, this method effectively improves the accuracy and locality of resource matching, reduces service transmission latency, and optimizes the spatial distribution of network traffic, ultimately achieving more efficient and reliable distribution network service carrying.
[0005] To address the aforementioned technical problems, this invention provides a 5G network slicing resource scheduling method for power distribution networks, comprising: Collect service requests initiated in the power distribution network, and extract the geographical coordinates of the initiation location and the service priority label from each service request; Based on the geographic coordinates of all business requests, all business requests are divided into regions to generate multiple business regions, and the business cluster center of each business region is determined. Based on the service priority tag of each service request and the service region to which the service request belongs, all service requests are sorted hierarchically to generate a global priority scheduling sequence. For each service request in the priority scheduling sequence, the path distance from the service request to multiple network resource nodes is calculated based on its geographical coordinates and the service cluster center, and the network resource node with the shortest path is selected as its target resource node. According to the priority scheduling sequence, resource quotas are allocated from the network resource pool associated with the target resource node for each service request.
[0006] Preferably, based on the geographic coordinates, all service requests are divided into regions to generate multiple service regions, including: obtaining the geographic coordinates of all service requests within the current time period to form a set of location points; calculating the straight-line distance between each pair of location points in the set; merging location points whose straight-line distance is less than an initial distance threshold to form several initial service groups; for each initial service group, calculating the average coordinates of all location points it contains, and defining a circular coverage area as a first-level service region with the average coordinates as the center and a radius threshold as the radius; for location points not classified into any initial service group, defining a circular coverage area as an independent service region with its own coordinates as the center and a basic radius as the radius; for all first-level service regions and independent service regions, detecting whether any two regions have overlapping coverage areas, merging the two overlapping regions, and marking the merged region as a second-level service region; readjusting the boundaries of all second-level service regions until the minimum distance between any two second-level service regions is greater than the isolation distance threshold, thus generating the multiple service regions.
[0007] Preferably, the boundaries of all second-level service areas are readjusted until the minimum distance between any two second-level service areas is greater than the isolation distance threshold, including: S3.1, determining the point on the boundary of each second-level service area that is closest to the adjacent area as an adjustment reference point based on the current coverage boundary range of each second-level service area; S3.2, moving the adjustment reference point inward along a direction perpendicular to the current boundary, wherein the adjustment distance is equal to the difference between the isolation distance threshold and the current minimum distance; S3.3, based on the moved adjustment reference point, locally reconstructing the boundary of the current second-level service area to generate a new coverage boundary range; S3.4, repeating steps S3.1 to S3.3 to process each second-level service area that needs adjustment until the minimum distance between all second-level service areas is greater than the isolation distance threshold.
[0008] Preferably, at least one of the initial distance threshold, the radius threshold, and the isolation distance threshold is dynamically adjusted. The adjustment method includes: calculating a distribution dispersion index based on the spatial distribution dispersion of service request location points within the same historical time period; calculating a network load pressure index based on the average load rate of current network resource nodes; and dynamically adjusting the distribution dispersion index and the network load pressure index based on a weighted sum. The distribution dispersion index is positively correlated with the threshold value, and the network load pressure index is negatively correlated with the threshold value.
[0009] Preferably, determining the business cluster center for each business region includes: for each business region, obtaining the geographic coordinates of all business request location points within it; based on the geographic coordinates, calculating the spatial distribution density of the business request location points within the business region, and identifying at least one high-density core area with a distribution density higher than a density threshold; assigning a weight value to each business request location point within the business region, wherein location points located within the high-density core area receive a first weight value, location points located outside the high-density core area receive a second weight value, and the first weight is greater than the second weight; and obtaining the coordinates of the business cluster center for the business region by weighted averaging based on the geographic coordinates of all business request location points and their corresponding weight values.
[0010] Preferably, based on the service priority tag of each service request and the service region to which the service request belongs, all service requests are hierarchically sorted to generate a global priority scheduling sequence, including: identifying and extracting the highest priority service request in each service region, aggregating the highest priority service requests in all regions to generate a first request set; calculating a region scheduling weight for each service region based on the total number of service requests, historical scheduling load, and region importance evaluation parameters; sorting the service requests in the first request set according to the region scheduling weight to generate a first sorting subsequence; removing service requests already selected in the first sorting subsequence from the original service requests in each service region to obtain the remaining service request set for each service region; sorting the remaining service requests in each service region according to their priority tags in descending order of priority to generate an internal sorting list for each service region; cross-selecting and sorting the service requests in the internal sorting lists of all service regions according to the region scheduling weight to generate a second sorting subsequence; and sequentially concatenating the first sorting subsequence and the second sorting subsequence to generate the global priority scheduling sequence.
[0011] Preferably, for each service request in the priority scheduling sequence, the path distance from the service request to multiple network resource nodes is calculated based on its geographical coordinates and the service cluster center, including: obtaining the geographical coordinates of the service request to be processed and the coordinates of the service cluster center of its service area; based on the coordinates of the service cluster center, selecting candidate network resource nodes located in the geographical location of the service cluster center from a preset set of multiple network resource nodes to form a first candidate set; for each node in the first candidate set, calculating the straight-line distance from the service request to the coverage boundary of the node based on the geographical coordinates of the service request to be processed and the coverage information of the node; for each node, calculating the topological path distance from the starting point to the network access location of the node based on the network topology connection relationship, using its coverage boundary as the starting point; and adding the straight-line distance to the corresponding topological path distance to obtain the path distance from the service request to the network resource node.
[0012] Preferably, based on the network topology connection relationship, calculating the topological path distance from the starting point to the network access location of the node includes: obtaining the network access location of the network resource node and the corresponding network topology map; determining the network access point corresponding to the service request location in the network topology map as the path starting point; determining the network access location of the network resource node as the path ending point; starting from the path starting point, performing multi-path parallel probing along each connection link in the network topology map, and recording the cumulative link length of each probing path; selecting the path with the shortest cumulative link length, and using its cumulative link length as the topological path distance.
[0013] Preferably, the method further includes: when a detection path first reaches the end of the path, recording the cumulative link length of the path as a reference path distance; during subsequent detection processes, if the cumulative link length of a certain detection branch reaches or exceeds the reference path distance, then the detection of that detection branch is terminated.
[0014] Preferably, it further includes: if the resource allocation is successful, sending a resource allocation confirmation response to the initiator of the business request.
[0015] Compared with the prior art, the above-described technical solution of the present invention has the following advantages: The 5G network slicing resource scheduling method for power distribution networks described in this invention solves the problem of the disconnect between 5G network slicing resource scheduling decisions and service spatial distribution through the synergistic effect of the following technical solutions: First, by collecting the geographical coordinates of the service request initiator, each service is anchored to a specific location in the digital space, and its service priority is identified; Next, the solution does not process each request in isolation, but dynamically divides multiple service areas according to the geographical aggregation of all services, and calculates the service cluster center of each area. This is an intelligent identification of the hotspots and centers of gravity of power distribution network service activities in space, transforming scattered service points into spatial management units.
[0016] After gaining an understanding of the spatial structure, the solution further combines business priorities with information about the region to generate a global priority scheduling sequence. This ensures that the scheduling order considers both the urgency of the business and its spatial affiliation. Then, for each business request in the sequence, the solution executes its core optimization steps: not only calculating the path distance from the request to each network resource node, but also making a comprehensive judgment based on the business cluster center of its region. This makes the selection process of resource nodes spatially oriented, and the system tends to select nodes that have the shortest path and are spatially close to the center of activity of the business region.
[0017] Through the synergistic effect of the aforementioned technical features, the technical solution of this invention has the following beneficial effects: First, by introducing business geographic coordinates and regional division, the scheduling system acquires spatial awareness, transforming scheduling decisions from blind scheduling to location-aware scheduling. Second, by combining resource node selection with the business cluster center, the accuracy and locality of resource matching are significantly improved; high-priority or geographically concentrated services have a greater chance of being scheduled to nodes that are superior in both physical and network topology, thereby directly reducing service transmission latency and improving response speed. Third, the entire method forms a collaborative scheduling mechanism based on regional organization, priority ranking, and spatial distance matching. This not only optimizes the performance of individual services but also guides network traffic towards a reasonable spatial distribution from a global perspective, avoiding link congestion and improving the overall utilization efficiency and system stability of 5G network slice resources when carrying distribution network services. Attached Figure Description
[0018] To make the content of this invention easier to understand, the invention will be further described in detail below with reference to specific embodiments and accompanying drawings, wherein: Figure 1 This is a flowchart illustrating the 5G network slicing resource scheduling method for power distribution networks in a preferred embodiment of the present invention. Figure 2 This is a flowchart illustrating the process of obtaining multiple business areas in a preferred embodiment of the present invention; Figure 3 This is a flowchart illustrating the generation of a global priority scheduling sequence in a preferred embodiment of the present invention; Figure 4 This is a flowchart for calculating path distance in a preferred embodiment of the present invention. Detailed Implementation
[0019] The present invention will be further described below with reference to the accompanying drawings and specific embodiments, so that those skilled in the art can better understand and implement the present invention. However, the embodiments described are not intended to limit the present invention.
[0020] The purpose of this invention is to solve the technical problem that existing 5G network slicing resource scheduling methods are disconnected from the actual physical distribution of power distribution network services, resulting in inaccurate resource matching, low scheduling efficiency, and especially difficulty in guaranteeing the low latency and high reliability requirements of critical services.
[0021] Reference Figure 1 As shown in the figure, this invention discloses a 5G network slicing resource scheduling method for power distribution networks, including the following steps: The system collects service requests initiated in the power distribution network, extracts the geographical coordinates of the initiating location and the service priority label from each service request; divides all service requests into regions based on the geographical coordinates of all service requests, generates multiple service regions, and determines the service cluster center of each service region; based on the service priority label of each service request and the service region to which the service request belongs, it performs hierarchical sorting of all service requests to generate a global priority scheduling sequence; for each service request in the priority scheduling sequence, it calculates the path distance from the service request to multiple network resource nodes based on its geographical coordinates and the service cluster center, and selects the network resource node with the shortest path as its target resource node; according to the order of the priority scheduling sequence, it allocates resource quotas from the network resource pool associated with its corresponding target resource node for each service request; if the resource allocation is successful, it sends a resource allocation confirmation response to the initiating end of the service request.
[0022] The specific implementation process of the 5G network slicing resource scheduling method in this embodiment is as follows: Step 1: Business Request Information Collection: The system listens for or receives communication business requests initiated by various business terminals in the distribution network (such as distribution automation terminals, distributed energy controllers, charging piles, inspection robots, etc.). From the metadata of each business request, two key features are extracted: first, the geographical coordinates of the initiating terminal or application instance; these coordinates are digital identifiers that can accurately locate the physical location of the business source. The source can be the latitude and longitude reported by the terminal's built-in positioning module (such as GPS / BeiDou), or the asset coordinates recorded in the power grid geographic information system, mapped from the terminal device ID (such as pole number, ring main unit number) through the distribution network resource management system. Geographic coordinates are the absolute foundation and data source for all subsequent spatial processing, anchoring the originally abstract network communication requirements to a specific physical space.
[0023] Second is the service priority label, which is a classification identifier representing the differentiated network service quality requirements (such as latency and reliability) of services. Its implementation is typically based on predefined rules: for example, control commands originating from relay protection devices and requiring millisecond-level response are marked as "highest priority"; services used for data acquisition and status monitoring are marked as "medium priority"; and non-real-time services such as file transfer and log reporting are marked as "low priority". This label can be directly carried by specific fields in the service message or automatically generated by the system based on a rule base matching the service type. The service priority label is the fundamental basis for implementing service classification and differentiated treatment.
[0024] Step 2, Dynamic Division of Business Areas and Determination of Cluster Center: The purpose of this step is to aggregate scattered and independent business requests into logically meaningful units based on their spatial distribution, and to determine a service reference center for each unit.
[0025] In practice, the system first aggregates the geographic coordinates of all business requests collected within the current scheduling cycle, forming a set of location points to be processed. Next, spatial clustering is employed. For example, the system can calculate the straight-line distance between any two points in the location point set; then, based on a preset proximity threshold, points with distances less than this threshold are grouped together to form an initial cluster. Isolated points that cannot be aggregated into any cluster can be considered as a separate micro-cluster. Subsequently, the system defines the spatial extent of these initially formed clusters. For example, it calculates the average coordinates of all points within each cluster as the center and expands outwards with a preset radius to form a circular geographic coverage area, which is initially defined as the business area. To form a more reasonable and non-overlapping (or minimally overlapping) final area, the system can further detect whether there is geographic overlap between these initial areas and merge overlapping areas, ultimately generating a clear set of multiple business areas.
[0026] After the business regions are divided, the operation of determining the business cluster center for each generated business region is performed. Here, the business cluster center is intended to represent the spatial center of gravity of business activities within the region, rather than a simple geometric center. A straightforward implementation is as follows: analyze the distribution of all business request locations within the region to identify the core sub-region with the densest point distribution; then, assign a weight value to each location point within the region, giving higher weights to points located within the core sub-region and lower weights to points outside it; finally, based on the geographical coordinates of all points within the region and their corresponding weights, a weighted calculation is performed to obtain a coordinate point, which is the business cluster center of the business region; this center point can more accurately reflect the concentrated location of business pressure within the region.
[0027] Step 3, Global Priority Scheduling Sequence Generation: Based on the service priority tag of each service request and the service region to which the service request belongs, all service requests are sorted hierarchically.
[0028] In practice, the logic follows a sequence of first balancing across regions, then prioritizing within each region. First, the highest-priority requests within each business region are identified, and these requests from all regions are collected to form a cross-regional top-level request set. Next, a regional scheduling weight coefficient is calculated for each region based on factors such as importance and business density. Then, requests in the cross-regional top-level request set are sorted according to this weight coefficient, generating a top-level scheduling subsequence. The purpose of this is to ensure that the most urgent services in each region receive priority scheduling and to achieve appropriate balance between regions.
[0029] Next, from the original business request list of each region, requests that have been selected into the aforementioned top-level subsequences are removed, resulting in the remaining request set for each region. Within each region, these remaining requests are sorted from highest to lowest solely based on their business priority tags, forming an internal ordered list for each region.
[0030] Finally, based on the regional scheduling weight coefficients of each region, a cross-regional selection strategy (e.g., round-robin by weight ratio) is adopted to sequentially select requests from the internal ordered lists of all regions and sort them to generate a secondary scheduling subsequence.
[0031] Finally, by sequentially concatenating the top-level scheduling subsequence and the secondary scheduling subsequence, a unified global priority scheduling sequence is formed that takes into account both the absolute priority of the business and the fairness of the spatial region. This sequence clarifies the execution order of all pending business requests.
[0032] Step 4, allocate resource quotas in sequence: process each service request in the order of the global priority scheduling sequence; for the current request, dynamically allocate bandwidth, time slots and other resource quotas that meet the service requirements from the network resource pool associated with the matched target resource node (the resource pool corresponds to a specific 5G network slice instance, such as a uRLLC slice), and complete resource reservation and binding.
[0033] The 5G network slicing resource scheduling method for power distribution networks described in this invention effectively improves the accuracy and locality of resource matching, reduces service transmission latency, and optimizes the spatial distribution of network traffic by dynamically dividing service areas, identifying service cluster centers, and coordinating scheduling based on priority and geographical location. Ultimately, this achieves more efficient and reliable power distribution network service carrying.
[0034] In implementing step two of the above scheme, a method is needed that can automatically handle service request points with arbitrary spatial distribution and generate a set of structurally reasonable, clearly defined, and mutually isolated service areas. Existing simple grid partitioning or fixed-radius coverage methods cannot adapt to the dynamic characteristics of uneven spatial density of distribution network service points, which can easily lead to imbalances in area partitioning size, blurred boundaries, or excessive overlap between areas, affecting the accuracy of subsequent cluster center calculations and resource scheduling.
[0035] To solve this problem, refer to Figure 2 As shown, this embodiment of the invention provides a method for region partitioning through dynamic clustering and iterative merging. The specific steps of this method are as follows: 1) Obtain the geographic coordinates of all business requests within the current time period to form a set of location points; 2) Calculate the straight-line distance between each pair of location points in the set; 3) Merge location points whose straight-line distance is less than an initial distance threshold to form several initial business groups; 4) For each initial business group, calculate the average coordinates of all location points it contains, and delineate a circular coverage area as a first-level business area using the average coordinates as the center and a radius threshold as the radius; 5) For location points not classified into any initial business group, delineate a circular coverage area as an independent business area using its own coordinates as the center and a basic radius as the radius; 6) For all first-level business areas and independent business areas, detect whether any two areas have overlapping coverage areas, merge the two overlapping areas, and mark the merged area as a second-level business area; 7) Readjust the boundaries of all second-level business areas until the minimum distance between any two second-level business areas is greater than the isolation distance threshold, thereby generating the multiple business areas.
[0036] In a specific implementation scenario, all pending business requests within the current scheduling cycle are obtained, and their geographical coordinates are extracted to form a set of location points. Subsequently, for each pair of location points in the set, their Euclidean straight-line distance is calculated; this step is the basis for all subsequent clustering judgments, and the calculated distance matrix describes the spatial relative relationships of all business points.
[0037] The system presets an initial distance threshold, which serves as a metric for determining whether two service points are adjacent. During implementation, this threshold can be initialized based on the historical average density of service points. Then, the system traverses the set of location points, merging those with a straight-line distance less than the initial distance threshold. This merging operation follows the connectivity clustering principle: if the distance between point A and point B is less than the threshold, and the distance between point B and point C is also less than the threshold, then points A, B, and C will be merged into the same initial service group, even if the distance between A and C might be greater than the threshold. This principle effectively captures service points distributed along power distribution lines in chain-like or clustered patterns. Ultimately, several initial service groups are formed, with points within each group interconnected and the distance between points in different groups greater than the threshold. This step initially organizes the discrete set of location points into several internally compact clusters.
[0038] For each initial business group formed in the previous step, calculate the average coordinates of all its contained location points to obtain the average coordinates of the group. This average coordinate represents the average location of the business in that group. Then, using this average coordinate as the center and a preset radius threshold as the radius, delineate a circular area in geographic space. This circular area is defined as the first-level business area. The radius threshold determines the initial size of the area and can be set based on the maximum distance or standard deviation of points within the group from the average coordinate, or an empirical value can be used. This step transforms the abstract group of points into a regional entity with a defined geometric shape and spatial extent.
[0039] For isolated locations that failed to be merged into any initial business group in the previous step, a management scope also needs to be defined for them. In implementation, a circular coverage area is defined with its own coordinates as the center and a base radius as the radius, serving as an independent business area. The base radius is typically less than or equal to a radius threshold to reflect the singularity of its business scale. This step ensures that every business request, regardless of whether it is clustered with other points, can be included in the area management.
[0040] After the aforementioned steps, the system contains two types of areas: first-level business areas and independent business areas. Due to the possibility that the radius used when defining these areas might be too large, or that the original point groups are adjacent, the circular coverage areas of these areas may overlap. Overlapping areas are redundant and unclear in spatial management. Therefore, it is necessary to detect whether any two areas have overlapping coverage areas. The detection method can be to determine whether the distance between the centers of the two circular areas is less than the sum of their radii. For all detected pairs of overlapping areas, the system merges the two overlapping areas; the newly generated area after merging should completely encompass the original two areas. A simple implementation is to calculate the smallest circumcircle that can enclose all boundary points of the original two areas, and use this as the circular range of the new area. The merged area is marked as a second-level business area. This step eliminates the overlap between areas, making the spatial division clearer.
[0041] Even after merging, the resulting second-level business regions may still have boundaries that are too close together. To ensure the independence of subsequent region-based scheduling decisions, a certain distance needs to be maintained between regions. A preset isolation distance threshold is set, representing the minimum interval that should be maintained between adjacent regions. Then, the boundaries of all second-level business regions are readjusted. The goal of the adjustment is to ensure that the minimum distance between any two second-level business regions is greater than the isolation distance threshold; here, the minimum distance refers to the shortest Euclidean distance between the boundaries of the two regions (the circumference of a circular region).
[0042] This invention transforms disordered business request coordinates into a set of structured business regions with clearly defined spatial relationships. Overcoming the rigidity of fixed partitioning methods, it adapts to the actual distribution density of business points (through connectivity clustering) and ultimately ensures the quality of the generated regions (clear boundaries and isolation), laying a reliable foundation for subsequent accurate calculation of business cluster centers and spatially aware scheduling.
[0043] In the aforementioned embodiment, the boundaries of all second-level business areas are readjusted until the minimum distance between any two second-level business areas exceeds the isolation distance threshold. Before adjustment, it is only known that two areas are too close, but it is unknown which specific point on the boundary caused the conflict, or the severity of the conflict. Without precise location, the entire area can only be uniformly shrunk, which would cause the boundaries of non-conflict areas to be unnecessarily shifted inward, resulting in excessive loss of area and shape distortion. For example, if a circular area is only close to a neighboring area at a certain point, uniform shrinkage would make the entire circle smaller, while its originally open directions would also be compressed, which is obviously unreasonable. Furthermore, even if the conflict point is found and moved inward, directly moving an isolated point would cause the boundary line to have a concave or sharp corner at that point, disrupting the continuity and smoothness of the boundary.
[0044] To address this issue, this invention discloses an adjustment scheme based on local perturbation and smooth reconstruction using a reference point. This scheme precisely locates conflict points, implements minimal local adjustments, and reconstructs smooth boundaries. Specifically, it includes the following steps: S3.1: Based on the current coverage boundary range of each second-level service area, determine the point on its boundary closest to an adjacent area as the adjustment reference point; S3.2: Move the adjustment reference point inward along a direction perpendicular to the current boundary, where the adjustment distance is equal to the difference between the isolation distance threshold and the current minimum distance; S3.3: Based on the moved adjustment reference point, perform local reconstruction on the boundary of the current second-level service area to generate a new coverage boundary range; S3.4: Repeat steps S3.1 to S3.3 for each second-level service area requiring adjustment until the minimum distance between all second-level service areas is greater than the isolation distance threshold.
[0045] In a specific implementation example, for the currently processed region (referred to as Region A), all other second-level business regions (Regions B, C, D...) are traversed. For each pair of regions (e.g., A and B), the shortest spatial distance d_AB between their boundaries is calculated, and simultaneously, the point P_AB on the boundary of Region A that causes this shortest distance is recorded; this point P_AB is the potential conflict point of Region A relative to Region B. Among all the calculated distances {d_AB, d_AC, ...}, the minimum value is found and denoted as d_min; this d_min is the current minimum distance of Region A, and this value is less than the preset isolation distance threshold T. The potential conflict point corresponding to d_min, such as P_AB, is determined as the adjustment benchmark point of Region A in this iteration. At the same time, Region B is recorded as the current conflicting neighbor of Region A.
[0046] Calculate the adjustment distance Δ = T - d_min; Δ is a specific numerical value representing the space that needs to be vacated at the reference point. At the adjustment reference point P, determine the inner normal direction of the boundary of region A at that point (i.e., the direction perpendicular to the boundary and pointing inwards into the region). For a circular boundary, this direction is from point P towards the center of the circle. Move the adjustment reference point P precisely along this inner normal direction by a distance Δ to obtain a new point P'. That is, P' = P + Δ. Only at the conflict point, move the point by the minimum distance required, along the direction that most directly increases the distance to the neighboring points, minimizing interference with other parts of the region.
[0047] The original boundary of region A was a circle (center O, radius R). After moving the reference point P to P', P' is no longer on the original circumference. The goal of local reconstruction is to find a new circle (center O', radius R') that satisfies the following: a) The new circle is as close as possible to all original boundary control points (including unmoved points); b) It must pass precisely through the new point P'; c) The new circle must contain all original service request location points within region A. One implementation method is to use the original circle center O of region A, several points uniformly sampled on the original circle (including other unmoved conflict points), and the new point P' as a set of data points. Using a constrained least squares circle fitting algorithm, under the constraint that the fitted circle must pass through P', the new circle center O' and radius R' are solved. This new circle is the new coverage boundary range generated after local reconstruction. Through mathematical fitting, the local point displacement is converted into a smooth, small change in the shape of the entire boundary. The new boundary is still a regular circle (or polygon), maintaining good geometric properties and eliminating possible distortions.
[0048] After adjusting region A, update the boundary data of region A to the new circle (O', R'); based on the updated boundaries of all regions, recalculate the minimum distance between each pair of regions; check if there is still any pair of regions whose minimum distance is not greater than the isolation distance threshold. If so, select the region with the smallest current minimum distance from the regions that have never met the condition as the next adjustment target, and repeat the above steps until the minimum distance of all region pairs is greater than the isolation distance threshold T.
[0049] The embodiment of the present invention minimizes displacement by locating conflict reference points and achieves smooth boundary reconstruction through constraint fitting. Ultimately, while ensuring that isolation requirements are met, the morphological features and spatial coverage of the original region division are preserved to the greatest extent, providing a high-quality and geometrically regular spatial partitioning basis for subsequent scheduling processes.
[0050] In the aforementioned scheme, pre-setting initial distance thresholds, radius thresholds, and isolation distance thresholds, and using fixed thresholds, presents practical implementation difficulties, manifested in: poor adaptability due to time-varying service distribution and a mismatch between scheduling pressure caused by network load fluctuations. Specifically, during peak electricity consumption periods or in specific areas (such as industrial parks), service requests may be highly concentrated. In such cases, an excessively small initial distance threshold may lead to the formation of too many or too small initial service groups, increasing computational complexity; while an excessively large radius threshold may lead to over-merging of regions, rendering the division meaningless. Conversely, during periods or in areas with sparse service, fixed thresholds may fail to effectively aggregate relevant service points. On the other hand, when the overall load on network resource nodes is high, overly fine-grained region division (small thresholds leading to multiple regions) may trigger more frequent cross-region scheduling and resource contention, exacerbating network pressure; while when the load is low, fine-grained division facilitates more accurate scheduling. Fixed thresholds cannot be flexibly adapted to network conditions.
[0051] To address this issue, this invention discloses a dynamic threshold adjustment method based on dual-factor feedback of service distribution and network status. The aim is to enable key parameters for region division to adapt to the spatiotemporal characteristics of services and network load status. The adjustment method includes: calculating a distribution dispersion index based on the spatial distribution dispersion of service request locations within a historical time period; calculating a network load pressure index based on the average load rate of current network resource nodes; and dynamically adjusting the distribution dispersion index and the network load pressure index based on a weighted sum. The distribution dispersion index is positively correlated with the threshold value, and the network load pressure index is negatively correlated with the threshold value.
[0052] In specific implementation scenarios, business request location data for the same historical time period (e.g., the same hour yesterday, or the same time period on the same day last week) is obtained. Based on the coordinates of these historical location points, the spatial dispersion is calculated. One specific calculation method is as follows: first, the average center of all points is calculated; then, the distance from each point to the center is calculated; finally, the standard deviation or mean absolute deviation of these distances is calculated. The larger the value, the more spatially dispersed the business points are; the smaller the value, the more clustered the business points are. The calculated raw dispersion values are then normalized to obtain the distribution dispersion index.
[0053] Collect real-time resource utilization data for all network resource nodes, such as CPU utilization, memory utilization, and network bandwidth utilization. Calculate the average (or weighted average, with node importance as the weight) of these utilization rates as the overall network load level. Similarly, normalize this load level to obtain a network load pressure index; the closer this value is to 1, the greater the network load pressure.
[0054] Assign weight coefficients α and β to the distribution dispersion index L1 and the network load pressure index L2, respectively, where α + β = 1. The weight coefficients can be set based on experience or optimization algorithms to reflect the importance of different factors to the threshold adjustment. For example, if it is believed that the business distribution characteristics have a greater impact on the segmentation quality, α > β can be set. Calculate the comprehensive adjustment factor K: K = α × L1 + β × L2.
[0055] The present invention, by introducing the above-mentioned dynamic threshold adjustment method, firstly improves the quality and stability of the region division results, enabling the generation of reasonable region structures under different service densities; secondly, enhances the robustness of the overall system scheduling performance by appropriately simplifying the region topology when the network is under high load, reducing the computational and decision-making overhead of the scheduler itself, which helps to maintain the stable operation of the system under pressure.
[0056] The aforementioned scheme obtains multiple business areas. After obtaining these areas, determining the business cluster center within each area has a significant drawback if the arithmetic mean of all business point coordinates is directly used as the center. When the distribution of business points within an area is extremely uneven (e.g., most business points are densely distributed around a power distribution room, while a few are scattered far away), the arithmetic mean center will be pulled away from the main business cluster area by these sparse outliers. This calculated center cannot accurately reflect the true active area of the business, and using it as a reference point for subsequent resource matching will lead to inaccurate scheduling decisions. This invention aims to provide a method for determining the specific center of a business area that can resist interference from sparse points and bias the calculation results towards densely populated business areas. The specific steps are as follows: For each business area, obtain the geographical coordinates of all business request location points within it; Based on the geographical coordinates, calculate the spatial distribution density of business request location points within the business area and identify at least one high-density core area with a distribution density higher than a density threshold; Assign a weight value to each business request location point within the business area, wherein location points located within the high-density core area receive a first weight value, location points located outside the high-density core area receive a second weight value, and the first weight is greater than the second weight; Based on the geographical coordinates of all business request location points and their corresponding weight values, calculate the coordinates of the business cluster center of the business area through weighted average calculation.
[0057] In a specific implementation scenario, for the current business area to be processed, the system extracts the geographical coordinates of the originating locations from all business requests contained within it, forming a set of location points specific to that area {Pi | i=1, 2, ..., N}, Pi = (xi, yi). The local density ρi around each business point Pi is calculated; a common method is kernel density estimation. Specifically, for point Pi, its density ρi is defined as the sum of the contributions of all other points within a radius of a certain bandwidth h centered on that point. A simplified calculation can be: ρi=Σ{j≠i}K( dist(Pi, Pj) / h ), where dist is the distance between two points, and K is a kernel function (such as a Gaussian kernel function). In this way, the density value of points located in the center of the point group will be very high, while the density value of isolated points located at the edges will be very low.
[0058] Identifying high-density core areas: First, calculate the average density {ρi} of all points within the entire area, μρ and standard deviation σρ. Set a density threshold ρ*, which can be set as μρ + k × σρ, where k is an adjustable parameter (e.g., k = 0.5). Points with a density higher than the average are considered high-density points. All service points Pi that satisfy ρi > ρ* are considered to constitute one or more high-density core areas. These core areas typically correspond to service hotspots within the area, such as substations, switching stations, or areas surrounding important user clusters.
[0059] Assign a weight value wi to each business request location point Pi within the business area; the assignment rule is: if point Pi is located within any high-density core area, then assign it the first weight value w. H If point Pi is not located within any high-density core region, then it is assigned a second weight value w. L Clearly stipulate w H >w L For example, you can set w H = 2.0, w L = 1.0, which means that the points located within the business hotspot have twice the influence on the final center coordinates as the points located on the periphery sparse points.
[0060] The system already has the coordinates (xi, yi) and corresponding weights wi for each point Pi. The weighted average center coordinates (Cx, Cy) are calculated as follows: The longitude coordinates of each point are multiplied by their weights, summed, and then divided by the sum of all weights to obtain the longitude coordinates Cx of the business cluster center. Similarly, the latitude coordinates of each point are multiplied by their weights, summed, and then divided by the sum of all weights to obtain the latitude coordinates Cy of the business cluster center. This coordinate point (Cx, Cy) is the calculated coordinates of the business cluster center. Since w H>w L In a high-density core area, a large number of points collectively generate a strong pull, causing the final computing center to gravitate towards that core area. Conversely, while the sparse peripheral points are fewer in number and have lower weights, their influence on pulling the center is significantly weakened. Therefore, the final cluster center will more stably reside in the area where business is truly concentrated.
[0061] In this embodiment of the invention, the calculated service cluster center is a density-sensitive centroid, which more accurately identifies the main sources and spatial focus of service pressure within the area. Using this center as a spatial reference benchmark for subsequent resource matching allows for more natural scheduling of services to network resource nodes closer to their active areas. This, in principle, provides a better geometric reference point for reducing average service transmission latency and improving the accuracy of resource matching, thus enhancing the spatial rationality and effectiveness of the entire scheduling method.
[0062] When implementing the hierarchical sorting to generate a global scheduling sequence, a dilemma arises: If only a single global sort is performed based on business priority, while ensuring absolute priority for high-priority services, it may lead to low-priority requests in densely populated or critical areas remaining unscheduled for extended periods, while requests in sparsely populated areas are frequently served, creating an unfair situation of both regional starvation and regional oversaturation, affecting the overall service balance of the system. Conversely, if only round-robin is performed by region, timely responses to high-priority requests across regions cannot be guaranteed.
[0063] To solve this problem, refer to Figure 3 As shown, based on the service priority tag of each service request and the service region to which the service request belongs, all service requests are hierarchically sorted to generate a global priority scheduling sequence. This includes: identifying and extracting the highest priority service request within each service region, aggregating the highest priority service requests from all regions to generate a first request set; calculating a region scheduling weight for each service region based on the total number of service requests, historical scheduling load, and region importance evaluation parameters; sorting the service requests in the first request set according to the region scheduling weight to generate a first sorting subsequence; removing service requests already selected for the first sorting subsequence from the original service requests in each service region to obtain the remaining service request set for each service region; sorting the remaining service requests in each service region according to their priority tags from highest to lowest priority to generate an internal sorting list for each service region; cross-selecting and sorting the service requests in the internal sorting lists of all service regions according to the region scheduling weight to generate a second sorting subsequence; and sequentially concatenating the first sorting subsequence and the second sorting subsequence to generate the global priority scheduling sequence.
[0064] In a practical implementation scenario, within each business region, the business priority tags of all business requests it contains are checked to identify the highest priority request. If multiple requests have the same highest priority, one can be selected based on timestamps or other rules, or all can be included. These highest priority requests from all regions are collected together to form the first request set, the size of which is equal to the number of business regions.
[0065] For each business region, collect the following three parameters: Total number of service requests: The total number of requests currently pending scheduling in this region.
[0066] Historical scheduling load: The number of requests or the total amount of resources consumed by this region in the most recent historical scheduling cycles, reflecting its recent activity level.
[0067] Regional importance assessment parameter: A preset static or semi-static parameter used to identify the importance level of a region (for example, core urban areas, key industrial areas, and ordinary residential areas can be assigned different levels of importance).
[0068] Based on the above parameters, a regional scheduling weight is calculated for each region. An example calculation formula is as follows: w r =A1×(Requests in this region / Total requests) + A2×(Historical load in this region / Total historical load) + A3×(Importance parameter of this region), where A1, A2, and A3 are normalization coefficients and A1+A2+A3=1, used to adjust the weight of different factors; w r It is a value greater than 0. The larger the value, the more share that region should receive in the global scheduling.
[0069] Based on the calculated regional scheduling weight w for each region r The business requests in the first request set are sorted according to the regional scheduling weight w of their respective regions. r Sort the data from largest to smallest; regions with higher weights represent requests that appear earlier in the sequence. The resulting sorted subsequence is the first sorted subsequence.
[0070] From the original set of all pending business requests in each business region, remove the requests that have been selected into the first sorting subsequence mentioned above to obtain the set of remaining business requests in each region after removing the highest priority requests; for the set of remaining business requests in each region, sort them according to the business priority label of each request in the set, in descending order of priority; after sorting each region, an ordered internal sorting list is obtained, which reflects the order of urgency of requests within that region.
[0071] Finally, the regional scheduling weight w is used again. rA weighted round-robin scheduling algorithm is used to merge and sort the internal sorted lists of all regions. The algorithm process is as follows: A pointer is maintained for the internal sorted list of each region, initially pointing to the head of the list. The pointer is then adjusted according to the weight w of each region. r The system allocates scheduling tickets. In each round of scheduling, the system takes one request from the head of each region's list according to its weight, adds it to the global sequence, and moves the region's pointer one position to the right. If a region's list is empty, it is skipped. This process is repeated until all regions' internal sorted lists are empty. This cross-selection method generates a second sorted subsequence, which allows high-weight regions to be selected more frequently, while still maintaining their internal priority order.
[0072] In the embodiments of the present invention, the first sorting subsequence ensures that critical services in any region can obtain the highest priority global scheduling opportunity; the second sorting subsequence, through weight-driven cross-sorting, enables differentiated services based on the actual business scale, historical activity, and importance of the region when scheduling non-highest priority services, avoiding monopolistic or starvation phenomena in a single region, and achieving cross-regional load balancing and fairness.
[0073] Based on the above embodiments, referring to Figure 4 As shown, for each service request in the priority scheduling sequence, the path distance from the service request to multiple network resource nodes is calculated based on its geographical coordinates and the service cluster center. This includes: obtaining the geographical coordinates of the service request to be processed and the coordinates of the service cluster center of its service area; based on the coordinates of the service cluster center, selecting candidate network resource nodes located in the geographical location of the service cluster center from a preset set of multiple network resource nodes to form a first candidate set; for each node in the first candidate set, calculating the straight-line distance from the service request to the coverage boundary of the node based on the geographical coordinates of the service request to be processed and the coverage information of the node; for each node, calculating the topological path distance from the starting point to the network access location of the node based on the network topology connection relationship, using its coverage boundary as the starting point; and adding the straight-line distance to the corresponding topological path distance to obtain the path distance from the service request to the network resource node.
[0074] In a specific implementation scenario, for a pending service request R from the priority scheduling sequence, the geographical coordinates (Xr, Yr) of its originating location are extracted. Simultaneously, based on the service region identifier to which the request belongs, the coordinates (Xc, Yc) of the service cluster center of that region are obtained from the pre-calculated region information. The system pre-defines multiple network resource nodes (such as MEC servers and UPFs), each with its fixed geographical coordinates (Xn, Yn). Using the service cluster center (Xc, Yc) of the region to which the service request belongs as a reference point, the azimuth angle (or vector direction) from this center point to each network resource node is calculated. Simultaneously, the azimuth angle from the center point to the service request point (Xr, Yr) is calculated. An azimuth tolerance angle (e.g., ±4 degrees) is set, and network resource nodes whose azimuth angle differs from the azimuth angle of the request point relative to the center point within this tolerance range are selected. These nodes are considered to be on the same side or in a similar direction to the service request from the center point. All nodes that pass the selection constitute the first candidate set. This step utilizes region information for rapid initial screening, significantly reducing the number of objects requiring subsequent precise calculations.
[0075] For each node Ni in the first candidate set, obtain its coverage information. This information can be a circular area with radius Rni centered at the node coordinates (Xni, Yni) or a polygonal area. Calculate the shortest straight-line distance Dairi from the service request coordinates (Xr, Yr) to the boundary of the coverage area of node Ni.
[0076] For a circular coverage area: Dairi = max(0, dist((Xr, Yr), (Xni, Yni)) - Rni); if the requested point is inside the circle, the distance is 0; if it is outside the circle, the distance from the point to the center of the circle is minus the radius.
[0077] For polygon coverage: calculate the shortest distance from the point to each side of the polygon; Dairi represents the spatial gap that the service requesting terminal and the node wireless access point need to cross, which can be associated with the air interface propagation delay.
[0078] For node Ni, its network access location refers to its logical access point in the backhaul / bearer network (e.g., the corresponding aggregation switch port or router interface), which has a corresponding node identifier Vni in the network topology graph G. Determine the starting point: Map the service request to an access point Vstart in the network topology. This could be the corresponding node in the topology graph of the base station or aggregation point closest to (Xr, Yr). Based on the network topology connections, calculate the path distance Dneti from the starting point Vstart to the target node's network access location Vni. Calculation method: Assign a weight to each link in the topology graph G, and use the shortest path algorithm to calculate the sum of the shortest path weights from Vstart to Vni, which is Dneti. Dneti represents the cost of data routing and forwarding within the network and can be correlated with network transmission latency.
[0079] The solution of this invention first uses the service cluster center to perform rapid directional screening to reduce the amount of computation. Then, the path distance is decomposed into two parts: the air interface straight-line distance and the network internal topology path distance, and calculated separately. This makes the final distance value able to reflect both wireless access quality and core network routing efficiency, and more representative of the true end-to-end transmission performance than the geographical straight-line distance.
[0080] Based on the above embodiment, the topological path distance from the starting point to the network access location of the node is calculated based on the network topology connection relationship. This includes: obtaining the network access location of the network resource node and the corresponding network topology map; determining the network access point corresponding to the service request location in the network topology map as the path starting point; determining the network access location of the network resource node as the path ending point; starting from the path starting point, performing multi-path parallel probing along each connection link in the network topology map, and recording the cumulative link length of each probing path; selecting the path with the shortest cumulative link length and using its cumulative link length as the topological path distance.
[0081] In a specific implementation scenario, the system maintains or acquires a network topology graph G(V, E, W(e)) representing the bearer network (such as SPN, IPRAN). Here, V is the set of vertices (network device interfaces or logical locations), E is the set of edges (links), and W(e) is the weight of edge E. Determining the path endpoint: Based on the currently calculated network resource node Ni, its predefined network access location is obtained. This location has a unique corresponding vertex in the topology graph G. Determining the path start point: Based on the geographical coordinates (Xr, Yr) of the service request, it is mapped to an access point in the network topology. The mapping rule can be: find the physical access device (such as a 5G base station or OLT) closest to (Xr, Yr). The logical representative vertex of this device in the topology graph G is the path start point; the path start point represents the entry point for the service data flow into this bearer network.
[0082] Starting from the path's origin, the system initiates path probing in the topology graph G. To efficiently explore multiple possible paths, a parallelized breadth-first search or a weighted heuristic parallel exploration strategy can be employed. The probing process is as follows: Initial state: Maintain a set of active probe fronts, initially containing only path origins, and record the cumulative link length from the path origin to each active point (initially 0).
[0083] Iterative expansion: In each iteration, all vertices in the active probe front are processed in parallel. For each vertex Vcurrent, all its adjacent vertices Vnext that have not been visited in this probe are traversed.
[0084] Length accumulation: For each edge e from Vcurrent to Vnext, calculate the new cumulative length = cumulative length of Vcurrent + weight W(e) of edge e.
[0085] Recording and updating: If Vnext is being visited for the first time by the current probe branch, record the cumulative length of the path from the branch to Vnext and add Vnext to the new active probe frontier; if Vnext has been visited by other branches, but the cumulative length of the new branch is shorter, update the record of the shortest cumulative length of Vnext and set the branch containing the shorter path to an active state to continue exploration.
[0086] The probing process continues until the path endpoint is visited by at least one probing branch; at this point, the cumulative link length Lk from that branch to the path endpoint is recorded; for more paths leading to the path endpoint, the cumulative link length {L1, L2, ..., Lm} of each different path is recorded.
[0087] Furthermore, it also includes: when a probe path first reaches the endpoint of the path, the cumulative link length of that path is recorded as the reference path distance; during subsequent probes, if the cumulative link length of a probe branch reaches or exceeds the reference path distance, then probes on that probe branch are terminated. This scheme improves the computational efficiency of path probing through dynamic pruning without affecting the finding of the global shortest path.
[0088] Obviously, the above embodiments are merely illustrative examples for clear explanation and are not intended to limit the implementation. Those skilled in the art will recognize that other variations or modifications can be made based on the above description. It is neither necessary nor possible to exhaustively list all possible implementations here. However, obvious variations or modifications derived therefrom are still within the scope of protection of this invention.
Claims
1. A 5G network slicing resource scheduling method for power distribution networks, characterized in that, include: Collect service requests initiated in the power distribution network, and extract the geographical coordinates of the initiation location and the service priority label from each service request; Based on the geographic coordinates of all business requests, all business requests are divided into regions to generate multiple business regions, and the business cluster center of each business region is determined. Based on the service priority tag of each service request and the service region to which the service request belongs, all service requests are sorted hierarchically to generate a global priority scheduling sequence. For each service request in the priority scheduling sequence, the path distance from the service request to multiple network resource nodes is calculated based on its geographical coordinates and the service cluster center, and the network resource node with the shortest path is selected as its target resource node. According to the priority scheduling sequence, resource quotas are allocated from the network resource pool associated with the target resource node for each service request.
2. The 5G network slicing resource scheduling method for power distribution networks according to claim 1, characterized in that, Based on the geographical coordinates, all business requests are divided into regions, generating multiple business regions, including: Obtain the geographic coordinates of all business requests within the current time period to form a set of location points; and calculate the straight-line distance between each pair of location points in the set of location points. The locations whose straight-line distance is less than the initial distance threshold are merged to form several initial service groups; For each initial service group, calculate the average coordinates of all location points it contains, and use the average coordinates as the center and a radius threshold as the radius to define a circular coverage area as the first-level service area. For location points not classified into any of the initial business groups, a circular coverage area is defined as an independent business area, centered on its own coordinates and with the base radius as the radius. For all first-level business areas and independent business areas, detect whether any two areas have overlapping coverage areas, merge the two overlapping areas, and mark the merged area as a second-level business area; All second-level business areas are re-adjusted until the minimum distance between any two second-level business areas is greater than the isolation distance threshold, thus generating the multiple business areas.
3. The 5G network slicing resource scheduling method for power distribution networks according to claim 2, characterized in that, All Level 2 business areas will undergo boundary readjustment until the minimum distance between any two Level 2 business areas exceeds the isolation distance threshold, including: S3.
1. Based on the current coverage boundary of each second-level service area, determine the point on its boundary that is closest to the adjacent area as the adjustment reference point; S3.2 Move the adjustment reference point inward into the region by an adjustment distance along a direction perpendicular to the current boundary, wherein the adjustment distance is equal to the difference between the isolation distance threshold and the current minimum distance; S3.
3. Based on the adjusted reference point after the movement, the boundary of the current second-level business area is partially reconstructed to generate a new coverage boundary range; S3.4 Repeat steps S3.1 to S3.3 to process each second-level business area that needs adjustment until the minimum distance between all second-level business areas is greater than the isolation distance threshold.
4. The 5G network slicing resource scheduling method for power distribution networks according to claim 3, characterized in that, At least one of the initial distance threshold, the radius threshold, and the isolation distance threshold is dynamically adjusted, and the adjustment method includes: Calculate the distribution dispersion index based on the spatial distribution dispersion of business request locations within the same historical time period. Calculate the network load pressure index based on the average load rate of the current network resource nodes; The distribution dispersion index and the network load pressure index are weighted and dynamically adjusted; wherein the distribution dispersion index is positively correlated with the threshold value, and the network load pressure index is negatively correlated with the threshold value.
5. The 5G network slicing resource scheduling method for power distribution networks according to claim 2 or 3, characterized in that, Determine the business cluster center for each business region, including: For each business region, obtain the geographic coordinates of all business request locations within it; Based on the geographic coordinates, calculate the spatial distribution density of business request location points within the business area, and identify at least one high-density core area with a distribution density higher than the density threshold. A weight value is assigned to each service request location point within the service area, wherein location points located within the high-density core area receive a first weight value, location points located outside the high-density core area receive a second weight value, and the first weight is greater than the second weight. Based on the geographical coordinates of all business request locations and their corresponding weight values, the coordinates of the business cluster center in the business area are obtained by weighted average calculation.
6. The 5G network slicing resource scheduling method for power distribution networks according to claim 1, characterized in that, Based on the service priority tag of each service request and the service region to which the service request belongs, all service requests are hierarchically sorted to generate a global priority scheduling sequence, including: Identify and extract the highest priority business requests in each business area, aggregate the highest priority business requests from all areas, and generate the first request set. Based on the total number of business requests, historical scheduling load, and regional importance assessment parameters for each business region, a regional scheduling weight is calculated for each business region. Based on the regional scheduling weight, the service requests in the first request set are sorted to generate a first sorted subsequence; Remove the business requests that have been selected into the first sorting subsequence from the original business requests of each business region to obtain the set of remaining business requests for each business region; Within each business area, the remaining business requests are sorted in descending order of priority based on their priority tags, generating an internal sorting list for each business area. Based on the regional scheduling weight, the service requests in the internal sorting list of all service regions are cross-selected and sorted to generate a second sorting subsequence; The first sorted subsequence and the second sorted subsequence are concatenated in sequence to generate the global priority scheduling sequence.
7. The 5G network slicing resource scheduling method for power distribution networks according to claim 1, characterized in that, For each service request in the priority scheduling sequence, the path distance from the service request to multiple network resource nodes is calculated based on its geographical coordinates and the service cluster center, including: Obtain the geographic coordinates of the pending business request and the coordinates of the business cluster center of its respective business region; Based on the coordinates of the business cluster center, candidate network resource nodes located in the geographical location of the business cluster center are selected from a set of preset network resource nodes to form a first candidate set. For each node in the first candidate set, based on the geographical coordinates of the service request to be processed and the coverage information of the node, calculate the straight-line distance from the service request to the boundary of the coverage area of the node. For each node, taking its coverage boundary as the starting point, the topological path distance from the starting point to the network access location of the node is calculated based on the network topology connection relationship. The straight-line distance is added to the corresponding topological path distance to obtain the path distance from the service request to the network resource node.
8. The 5G network slicing resource scheduling method for power distribution networks according to claim 7, characterized in that, Based on the network topology connections, the topological path distance from the starting point to the network access location of the node is calculated, including: Obtain the network access location of the network resource node and the corresponding network topology map. In the network topology map, determine the network access point corresponding to the service request location as the path start point and determine the network access location of the network resource node as the path end point. Starting from the path origin, perform multi-path parallel probing along each connecting link in the network topology graph, and record the cumulative link length of each probing path; Select the path with the shortest cumulative link length and use its cumulative link length as the distance of the topological path.
9. The 5G network slicing resource scheduling method for power distribution networks according to claim 8, characterized in that, Also includes: When a probe path reaches the endpoint of the path for the first time, the cumulative link length of the path is recorded as the reference path distance; During subsequent detection, if the cumulative link length of a certain detection branch reaches or exceeds the reference path distance, the detection of that detection branch will be terminated.
10. The 5G network slicing resource scheduling method for power distribution networks according to claim 1, characterized in that, Also includes: If resource allocation is successful, a resource allocation confirmation response is sent to the initiator of the business request.
Citation Information
Patent Citations
Method and device of radio resource scheduling and terminal equipment
CN109548161A
Optical fiber wireless convergence network resource allocation mechanism and income calculation method
CN110519798A
Business deployment method and system based on frequency spectrum and computing power joint transaction mechanism
CN117857955A
Real-time hierarchical distribution method for power cloud resources of digital power grid
CN119603304A
Dynamic bandwidth allocation and resource scheduling method based on 5G network
CN119854880A
Cited By
A virtual boundary node driven decoupling method for boundary interaction
CN122136880A
A virtual boundary node driven decoupling method for boundary interaction
CN122136880B