Construction method of fair-faced ultra-high-performance precast concrete wall

By combining staged pouring and flipping construction methods, problems such as residual air bubbles in UHPC walls, rebar positioning, and high formwork pressure were solved, achieving high internal density and surface smoothness of high-performance fair-faced concrete walls, and ensuring precise positioning of rebar cages and construction safety.

CN121946653APending Publication Date: 2026-05-01CHINA RAILWAY 11TH BUREAU GRP CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610186322.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-02-10
Publication Date
2026-05-01

AI Technical Summary

Technical Problem

In existing technologies, UHPC wall construction suffers from problems such as difficulty in removing air bubbles, difficulty in controlling the reinforcement protective layer, high formwork pressure, and poor consistency in finish quality, making it difficult to achieve a fair-faced finish and reinforcement positioning.

Method used

The construction method combines staged pouring and flipping, utilizing an attached vibrator and precisely controlled pouring thickness, along with nano-level release agent and UHPC concrete with excellent fluidity, to ensure precise positioning of the reinforcing cage and concrete density. High-quality fair-faced concrete effect is achieved through flipping and joint filling treatment.

Benefits of technology

It effectively removes residual air bubbles, ensuring the internal density and surface smoothness of the wall, ensuring the precise positioning of the rebar cage and the uniformity of the protective layer thickness, reducing formwork pressure and construction risks, and improving construction safety and aesthetics.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121946653A_ABST
    Figure CN121946653A_ABST
Patent Text Reader

Abstract

The invention provides a construction method of a fair-faced ultra-high-performance precast concrete wall. The construction method specifically comprises the following steps that a square concrete pouring mold with an upward opening is formed by one face mold plate and four side mold plates of a pouring mold of the prefabricated concrete wall, and a reinforcement cage is placed to pour UHPC concrete till the thickness of the UHPC concrete reaches 20%-80% of the design thickness of the prefabricated concrete wall; after pouring is completed, curing forming is conducted, the four side formworks are disassembled, the other side formwork and the four side formworks are reassembled to form a new upper opening type mold, UHPC concrete of the same formula is poured till the thickness of the UHPC concrete is 80%-20% of the design thickness of the prefabricated concrete wall, the formed first half concrete wall and the bottom mold are turned by 180 degrees, and the bottom mold is turned by 180 degrees; and the exposed reinforcement cage is vertically and downwards inserted into the new concrete pouring mold and is integrally formed and maintained with the newly poured concrete, and finally supplementary pouring is conducted on the center joint. By means of the innovative technology combining multi-time pouring and overturning, the problems of internal bubbles, surface defects and steel bar positioning of the UHPC wall are effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

A construction method for high-performance precast concrete walls made of clear water Technical Field

[0001] This invention relates to the field of building engineering technology, and specifically to a construction method for fair-faced ultra-high performance concrete walls. Background Technology

[0002] Ultra-High Performance Concrete (UHPC) is a cement-based composite material with ultra-high strength, high toughness, high durability, and excellent workability. Using UHPC to fabricate building exterior wall panels allows for thin-walled, large-span, and aesthetically pleasing exposed concrete finishes, meeting the modern architectural pursuit of both structural performance and aesthetic appeal.

[0003] However, the traditional UHPC wall construction method usually adopts a one-time casting. This method has the following defects: (1) It is difficult to remove air bubbles. Due to the high viscosity and relatively poor fluidity of UHPC material, when casting a thick wall at one time, it is difficult to completely remove air bubbles inside and on the surface of the template through vibration. This easily forms defects such as honeycomb and pitted surface on the wall surface, and cannot achieve the ideal fair-faced concrete finish.

[0004] (2) Difficulty in controlling the concrete cover: For walls with built-in steel cages, it is difficult to ensure that the steel cages are accurately positioned in the mold so that there is sufficient concrete cover around them. This is a common problem and uneven concrete cover thickness is likely to occur.

[0005] (3) High pressure on formwork: When pouring tall walls at one time, the freshly mixed concrete exerts huge lateral pressure on the formwork, which places extremely high demands on the strength and rigidity of the formwork system, increasing the cost of formwork and construction risks.

[0006] (4) Poor consistency of finish quality: The molding conditions of the two surfaces of the wall are different (one is in close contact with the bottom mold, and the other is a free surface), which leads to differences in the density and surface texture of the two walls, affecting the overall aesthetics.

[0007] Therefore, there is an urgent need for a construction method that can effectively ensure the internal density of UHPC walls, the surface finish, and the precise control of the rebar position. Summary of the Invention

[0008] The purpose of this invention is to overcome the shortcomings of the prior art and provide a construction method for fair-faced ultra-high performance concrete walls. This method effectively solves the problems of internal air bubbles, surface defects and rebar positioning in UHPC walls through an innovative process of multi-stage pouring and flipping, and can efficiently produce fair-faced concrete walls with excellent structural performance and outstanding decorative effect.

[0009] To achieve the above objectives, this invention provides a construction method for a high-performance precast concrete wall, specifically including the following steps: S1. Mold assembly: One face mold and four side molds of the precast concrete wall casting mold are combined to form a square concrete casting mold with the opening facing upwards; S2. Reinforcing cage placement: The reinforcing cage of the precast concrete wall is installed in the cavity of the square concrete casting mold formed in step S1. The reinforcing cage is supported by spacers, and the specific height is determined by the required concrete cover thickness; S3. First layer pouring: UHPC concrete is poured into the square mold cavity to 20%~80% of the designed thickness of the precast concrete wall, and the concrete is compacted using an attached vibrator during the pouring process; S4. Initial curing and demolding: After pouring, the first half of the precast concrete wall, with a design thickness of 20%~80%, is formed after curing for 1-2 days; the four side molds are removed, and the face mold is retained as the supporting bottom mold for the solidified first half of the concrete wall; S5. Tilting pouring S6. Reassemble the other side template with the four side templates to form a square concrete casting mold with the opening facing upwards; pour UHPC concrete with the same formula as in step S3 into the newly assembled square concrete casting mold, with a pouring thickness of 80% to 20% of the design thickness of the precast concrete wall, and the sum of the two pouring thicknesses should match the design thickness of the precast concrete wall; rotate the first half of the concrete wall formed in step S4 along with the supporting bottom mold 180° so that the exposed reinforcing cage is inserted vertically downwards into the newly assembled square concrete casting mold, and the newly poured UHPC concrete completely covers the exposed reinforcing cage and forms a precast concrete wall panel with the first half of the concrete wall formed. During the insertion process, use an attached vibrator to compact it; S6. Final curing and joint filling: After curing for 1-2 days, remove all the molds, use the pre-embedded holes to erect the cast precast concrete wall panel, and pour UHPC concrete into the joint according to the density of the joint to form a complete precast concrete wall.

[0010] The preferred technical solution of the present invention is as follows: in step S3, the power of the attached vibrator is ≥1kW and the vibration frequency is 150Hz~200Hz; in step S5, the power of the attached vibrator is ≥1kW and the vibration frequency is 300Hz~550Hz, so as to ensure the full liquefaction and compaction of high viscosity UHPC concrete.

[0011] The preferred technical solution of this invention is as follows: the curing temperature in steps S4 and S6 is maintained at 20℃~90℃, and the humidity is ≥95%. This promotes the early strength development of UHPC and ensures that the half-wall has sufficient strength when it is flipped.

[0012] The preferred technical solution of the present invention is as follows: When pouring concrete in steps S3 and S5, bolt holes are pre-embedded in the precast concrete wall. In step S5, the pre-embedded bolt holes are used in conjunction with hoisting equipment to achieve the flipping and precise positioning of the first half of the concrete wall. The immersion angle deviation of the reinforcing cage is ≤0.5°, ensuring that the reinforcing cage is accurately immersed in the newly poured concrete and avoiding positional deviation. In step S6, the pre-embedded bolt holes are used in conjunction with hoisting equipment to achieve the erection process of the precast concrete wall panel.

[0013] The preferred technical solution of the present invention is as follows: the UHPC concrete poured in step S6 has the same formula as the UHPC concrete in step S3, and the slump expansion is 650±50mm. Its excellent fluidity and self-filling properties ensure perfect fusion at the joints.

[0014] The preferred technical solution of the present invention is that the pouring thickness in steps S3 and S5 is monitored and controlled in real time by a laser rangefinder to ensure that the thickness of the two pouring steps accurately meets the design requirements.

[0015] The preferred technical solution of the present invention is as follows: the inner surface of the mold is coated with a nano-level water-based release agent with a release agent thickness ≤0.1mm, so as to obtain a smooth and flawless fair-faced concrete finish.

[0016] The preferred technical solution of the present invention is that the UHPC concrete dosage is 950 kg / m³ to 1050 kg / m³ to ensure its ultra-high performance.

[0017] The beneficial effects of the present invention are: (1) The present invention is formed in two stages, and the thickness of the concrete poured each time is reduced, which greatly reduces the risk of residual air bubbles; at the same time, both surfaces (the original outer surface and the new outer surface after flipping) are formed in high-quality templates, which ensures that both sides of the wall have a uniform, dense and smooth clear water effect, which greatly increases the clear water finish effect of the wall.

[0018] (2) The present invention uses a high-power, high-frequency attached vibrator and combines it with staged pouring, so that the vibration energy can be fully applied to the relatively thin concrete layer, ensuring that the concrete is fully compacted and greatly improving the internal density of the concrete wall.

[0019] (3) The present invention divides the steel cage into two parts and "inserts" it between the two concrete layers, which fundamentally ensures the centered positioning of the steel cage in the wall thickness direction, and the protective layer thickness is uniform and accurate, making the steel positioning and protective layer control more precise.

[0020] (4) The present invention adopts a staged pouring method, which significantly reduces the lateral pressure on the formwork of a single pouring, allows the use of a lighter and more economical formwork system, improves construction safety, and reduces formwork costs and construction risks.

[0021] (5) By controlling the curing conditions, the accuracy of the turning and the treatment of the joints, the present invention has a clear process flow and clear key node parameters, which effectively ensures the stability and reliability of the final wall quality. Attached Figure Description

[0022] Figure 1 is a schematic diagram of placing the reinforcing cage in a square open mold in an embodiment of the present invention; Figure 2 is a schematic diagram of the first layer of poured concrete after curing in an embodiment of the present invention; Figure 3 is a schematic diagram of pouring concrete in a new square open mold and waiting for it to be soaked in an embodiment of the present invention; Figure 4 is a schematic diagram of inserting the formed half-wall, together with the supporting bottom mold, into the newly poured concrete after being flipped in an embodiment of the present invention; Figure 5 is a schematic diagram of pouring UHPC concrete into the center seam by raising the wall panel in an embodiment of the present invention; Figure 6 is a schematic diagram of the water-cooled ultra-high performance precast concrete wall formed during construction in an embodiment of the present invention. Detailed Implementation

[0023] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments.

[0024] The embodiment provides a construction method for a fair-faced ultra-high performance precast concrete wall, specifically constructing a fair-faced UHPC decorative wall with a design thickness of 200mm, a wall design strength greater than 120MPa, a low water-cement ratio, a large air bubble rising distance during vertical pouring and vibration, and numerous surface pores. The specific construction steps are as follows: S1. Mold assembly: One face template of the precast concrete wall pouring mold is combined with four side templates to form a square concrete pouring mold with the opening facing upward; a nano-level release agent (approximately 0.08mm thick) is sprayed onto the inner surface of the mold.

[0025] S2. Reinforcing cage placement: The prefabricated reinforcing cage is hoisted into the square concrete casting mold cavity formed in step S1. The reinforcing cage is supported by spacers, and the specific height is determined by the required concrete cover thickness as shown in Figure 1.

[0026] S3. First layer pouring: Pour UHPC concrete into the square mold cavity to 60% of the designed thickness of the precast concrete wall, and use an attached vibrator to compact it during the pouring process; the amount of cementitious material used is 1000 kg / m³, and the pouring thickness is controlled to 120 mm (60% of the designed thickness) using a laser rangefinder; then start the attached vibrator with a power of 1.5 kW and a frequency of 180 Hz to vibrate until the concrete surface is covered with slurry and no large air bubbles emerge.

[0027] S4. Initial curing and demolding: After pouring, the entire mold is moved to the curing kiln and cured for 24 hours at 40℃ and 98% humidity to form the first half of the precast concrete wall with a design thickness of 60%; the four side formworks are removed. At this time, the hardened half of the side wall and the original face formwork form a whole. The face formwork is retained as the supporting bottom formwork of the solidified first half of the concrete wall.

[0028] S5. Flipping and Pouring: Reassemble the other side template with the four side templates to form a square concrete pouring mold with the opening facing upwards; pour UHPC concrete with the same formula as in step S3 into the newly assembled square concrete pouring mold, with a pouring thickness of 40% of the design thickness of the precast concrete wall, i.e., 80mm, and the sum of the two pouring thicknesses matches the design thickness of the precast concrete wall; install lifting devices in the pre-set lifting holes on the first half of the concrete wall, and smoothly flip the first half of the concrete wall together with its supporting bottom mold (i.e., the original mold 1) 180° using lifting equipment (such as a gantry crane), and then accurately lift it into the newly assembled mold, ensuring that the exposed steel cage is inserted vertically downwards into the newly formed square concrete pouring mold. The newly poured UHPC concrete completely covers the exposed steel cage and forms a precast concrete wall panel with the formed first half of the concrete wall. During the insertion process, use an attached vibrator to compact the concrete.

[0029] S6. Final Curing and Joint Repair: After curing for 48 hours under standard conditions (20℃, humidity >95%), remove all molds and inspect the horizontal joint 8 formed by the two pours in the middle of the wall. If minor defects are found, use the pre-embedded holes to erect the cast precast concrete wall panels. Depending on the density of the joint, pour UHPC concrete into the joint to form a complete precast concrete wall. After it hardens, grind it smooth to form a complete and beautiful fair-faced UHPC wall, as shown in Figure 6.

[0030] Upon inspection, the wall in the embodiment was found to be smooth as a mirror on both sides, with no visible bubbles or cracks. Internal ultrasonic testing showed that it was dense and uniform, and the thickness of the steel reinforcement protective layer fully met the design requirements.

Claims

1. A construction method for a high-performance precast concrete wall, characterized in that, Specifically, the following steps are included: S1. Mold Assembly: Assemble one face mold of the precast concrete wall casting mold with the four side molds to form an upward-facing square concrete casting mold; S2. Reinforcing Cage Placement: Install the reinforcing cage of the precast concrete wall into the square concrete casting mold cavity assembled in step S1. The reinforcing cage is supported by spacers, the specific height of which is determined by the required concrete cover thickness; S3. First Layer Pouring: Pour UHPC concrete into the square mold cavity to 20%~80% of the designed thickness of the precast concrete wall, and compact it using an attached vibrator during the pouring process; S4. Initial Curing and Demolding: After pouring, cure for 1-2 days to form the first half of the precast concrete wall with a thickness of 20%~80% of the designed thickness; remove the four side molds, retaining the face mold as the supporting bottom mold for the solidified first half of the concrete wall; S5. Turnover Pouring: Reassemble the other side mold with the four side molds to form an opening. The square concrete casting mold faces upwards; UHPC concrete with the same formula as in step S3 is poured into the newly assembled square concrete casting mold, with a pouring thickness of 80% to 20% of the design thickness of the precast concrete wall, and the sum of the two pouring thicknesses matches the design thickness of the precast concrete wall; the first half of the concrete wall formed in step S4, along with the supporting bottom mold, is rotated 180° so that the exposed reinforcing cage is inserted vertically downwards into the newly assembled square concrete casting mold. The newly poured UHPC concrete completely encloses the exposed reinforcing cage and forms a precast concrete wall panel with the first half of the concrete wall formed. During the insertion process, an attached vibrator is used to compact the concrete; S6. Final curing and joint filling: After curing for 1-2 days, all molds are removed. The precast concrete wall panels are erected using the pre-embedded holes. Depending on the density of the joints, UHPC concrete is poured into the joints to form a complete precast concrete wall.

2. The construction method of a high-performance precast concrete wall according to claim 1, characterized in that: In step S3, the power of the attached vibrator is ≥1kW and the vibration frequency is 150 Hz~200Hz; in step S5, the power of the attached vibrator is ≥1kW and the vibration frequency is 300 Hz~550Hz.

3. The construction method of a high-performance precast concrete wall according to claim 1, characterized in that: In steps S4 and S6, the curing temperature is maintained at 20℃~90℃, and the humidity is ≥95%.

4. The construction method of a high-performance precast concrete wall according to claim 1, characterized in that: When pouring concrete in steps S3 and S5, bolt holes are pre-embedded in the precast concrete wall. In step S5, the pre-embedded bolt holes are used in conjunction with hoisting equipment to achieve the flipping and precise positioning of the first half of the concrete wall, with the immersion angle deviation of the reinforcing cage ≤0.5°. In step S6, the pre-embedded bolt holes are used in conjunction with hoisting equipment to achieve the erection process of the precast concrete wall panels.

5. The construction method of a high-performance precast concrete wall according to claim 1, characterized in that: The UHPC concrete poured in step S6 has the same formula as the UHPC concrete in step S3, with a slump spread of 650±50mm.

6. The construction method of a high-performance precast concrete wall according to claim 1, characterized in that: The pouring thickness in steps S3 and S5 is monitored and controlled in real time using a laser rangefinder.

7. The construction method of a high-performance precast concrete wall according to claim 1, characterized in that: The inner surface of the mold is coated with a nano-scale water-based release agent with a thickness of ≤0.1mm.

8. The construction method of a high-performance precast concrete wall according to claim 1, characterized in that: The UHPC concrete dosage is 950 kg / m³ to 1050 kg / m³.