紧坡地区路线生成方法、系统、设备、介质及程序产品

By using a multi-branch tree route search algorithm and clearance constraint detection, the problems of computational complexity and time consumption in railway design in steep slope areas are solved, and route schemes that meet design standards are generated efficiently.

CN121980836BActive Publication Date: 2026-07-17CHINA RAILWAY ERYUAN ENGINEERING GROUP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
CHINA RAILWAY ERYUAN ENGINEERING GROUP CO LTD
Filing Date
2026-04-09
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In railway design on steep slopes, existing technologies are complex and time-consuming to calculate, and do not take into account railway clearance constraints, resulting in low design efficiency.

Method used

A multi-branch tree route search algorithm is adopted, combined with intelligent search parameters and DEM grid elevation files, to generate a global feasible path tree from the starting point to the ending point, and to perform clearance constraint detection to generate a horizontal and vertical route scheme.

Benefits of technology

This reduced the amount of data processing, improved the efficiency of route generation, and ensured that the generated route plans met design standards and clearance requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121980836B_ABST
    Figure CN121980836B_ABST
Patent Text Reader

Abstract

本发明涉及铁道施工技术领域,具体涉及一种紧坡地区路线生成方法、系统、设备、介质及程序产品。紧坡地区路线生成方法包括以下步骤:获取道路选线设计标准和研究区域的DEM格网高程文件;根据道路选线设计标准确定智能搜索参数;生成起点至终点的全域可行路径树;从终点依次回溯路径节点至起点,梳理出可行三维路径集;利用单条路径的三维节点坐标,生成对应的平纵面路线方案。本发明通过多叉树线路搜索算法,构建起点至终点的全域可行路径树,无需遍历研究区域,降低了数据处理量,提高了方案生成效率,并且可以通过对道路选线设计标准进行约束,确保生成可行方案。
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Wind power plant road line selection method, system and device and storage medium

    CN115455623A

  • Improved SAC railway line planning method based on course learning

    CN121303512A