一种混凝土搅拌配料温度控制方法、装置及系统

By pre-cooling in batches and calculating the equivalent pre-cooling time, combined with the proportion of coarse aggregate and the degree of residual heat, the amount of flake ice compensation was calculated, which solved the inaccuracy of concrete mixing batching temperature control, achieved active suppression of thermal rebound, and improved the accuracy of concrete mixing temperature.

CN122008412BActive Publication Date: 2026-07-17YIWU SHENGTONG NEW BUILDING MATERIALS CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
YIWU SHENGTONG NEW BUILDING MATERIALS CO LTD
Filing Date
2026-04-14
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Existing technologies cannot precisely control the temperature of concrete mixing and batching. In particular, the thermal rebound phenomenon caused by the lag in the thermal conduction of aggregates is difficult to predict and suppress, affecting the quality of large-volume concrete projects.

Method used

By monitoring the weight and temperature of aggregates in real time, pre-cooling is performed in batches and the equivalent pre-cooling time is calculated. Combined with the proportion of coarse aggregates and the residual heat, the amount of flake ice compensation is calculated to achieve precise temperature control.

Benefits of technology

It effectively eliminates the difference in dwell time caused by construction fluctuations, accurately obtains the cooling history of aggregates, quantifies the internal thermal state, actively suppresses thermal rebound, and improves the accuracy of concrete mixing and batching temperature control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122008412B_ABST
    Figure CN122008412B_ABST
Patent Text Reader

Abstract

本申请涉及温度控制技术领域,具体涉及一种混凝土搅拌配料温度控制方法、装置及系统,该方法包括:实时监测骨料输送重量并按预设步长分批记录进仓时间与温度;配料时根据目标重量调取对应批次骨料,计算其等效预冷时长;结合粗骨料比例预估传导难易程度,评估骨料的热量残留度;根据初始温差及热量残留度计算片冰补偿量,通过控制加冰操作调节配料温度。本申请通过量化骨料内部滞后的热量并实施前馈片冰补偿,解决了混凝土出机温度不可预测的热回弹问题,提升了对混凝土搅拌配料温度控制的精确度。