一种建筑预制件生产智能调度方法及系统

By acquiring information on the status of prefabricated building component production resources, assessing the capabilities of molds and maintenance sites, constructing emergency plans and quantifying their impact, and dynamically adjusting resource allocation, the problem of resource conflicts and inefficiency in traditional scheduling methods when faced with customized orders and heavy production tasks is solved, thus achieving intelligent and efficient production scheduling.

CN122066181BActive Publication Date: 2026-07-17NINGBO YONGSHENG CONSTR TECH CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
NINGBO YONGSHENG CONSTR TECH CO LTD
Filing Date
2026-04-17
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Traditional prefabricated building component production scheduling methods cannot effectively manage resource conflicts and production process interruptions caused by customized orders, variable delivery deadlines, and heavy production tasks, resulting in decreased production efficiency and low resource utilization.

Method used

By receiving heavy production tasks, obtaining status information of key production resources, assessing the substitution and adjustment capabilities of molds and maintenance stations, constructing a list of contingency plans, quantifying the impact of each plan on the existing production plan, determining and implementing the best response plan, and dynamically adjusting resource allocation and production processes.

Benefits of technology

It enables intelligent response and scheduling of heavy production tasks, improving production flexibility and resource utilization, and avoiding the decline in production efficiency and low resource utilization caused by emergency order insertion.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122066181B_ABST
    Figure CN122066181B_ABST
Patent Text Reader

Abstract

本发明涉及建筑预制件生产调度的技术领域,提供了一种建筑预制件生产智能调度方法及系统,其方法包括:基于状态信息,评估对应的模具资源的替代与释放能力,得到模具资源评估结果;基于状态信息,评估养护站点的环境参数调整与占用调整能力,得到养护站点评估结果;根据模具资源评估结果和养护站点评估结果,得到应急预案列表;量化应急预案列表中的各个方案对现有生产计划的影响,得到影响量化结果;基于预设的优化目标,根据影响量化结果,确定出各个方案中的最佳应对方案;执行最佳应对方案,以调整建筑预制件生产的资源分配和生产流程。本发明具有提高建筑预制件生产调度的效率和准确性的效果。